SlideShare uma empresa Scribd logo
1 de 14
Root Cause Relationships Deliverable 11G
Improve Module Roadmap Define 1D – Define VOC, VOB, and CTQ’s 2D – Define Project Boundaries 3D – Quantify Project Value 4D – Develop Project Mgmt. Plan Measure 5M – Document Process 6M – Prioritize List of X’s 7M – Create Data Collection Plan 8M – Validate Measurement System 9M – Establish Baseline Process Cap. Analyze  10A – Determine Critical X’s Improve 12I – Prioritized List of Solutions 13I – Pilot Best Solution Control 14C – Create Control System 15C – Finalize Project Documentation Green 11G – Identify Root Cause Relationships
Deliverable – Green # Deliverable Deliverable Concept & Tasks Primary Tool(s) Secondary Tool(s) 11G Relationship Analysis  Before developing alternative solutions to explore, it is necessary to examine the context of the identified root causes. When you explore alternative countermeasures, understanding the relationship to the various environmental concerns of the organization is mandatory in today’s highlighted climate change, conservation, renewable energy, green living, protecting our water resources, recycling and the personal environment for all customers and employees. This module assures that these issues are raised and explored BEFORE people become ego-invested in countermeasures that can produce less than optimal outcomes. ,[object Object],[object Object]
11G – Identifying Root Cause Context Relationships # Deliverable Deliverable Concept & Tasks Primary Tool(s) Secondary Tool(s) 12IG Relationship Analysis Before developing alternative solutions to explore, it is necessary to examine the context of the identified root causes. When you explore alternative countermeasures, understanding the relationship to the various environmental concerns of the organization is mandatory in today’s highlighted climate change, conservation, renewable energy, green living, protecting our water resources, recycling and the personal environment for all customers and employees. This module assures that these issues are raised and explored BEFORE people become ego-invested in countermeasures that can produce less than optimal outcomes. ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Objectives ,[object Object],[object Object],[object Object]
Deliverable 10: Analyze  Root Cause Investigation Matrix Problem State-ment “Y" Probable / Possible Root Cause(s) "Xs" BB Con-currs Y/N Explain "WHY" - (Logic Flow for Verification Method) Statistical Test or Description of non-Stat Treatment Statistical or Logical Analysis  Root Cause Investigation Matrix During the time period from July 2005 to September 2006, 79,771,600 CCF of water were produced, and 68,052,475 CCF of water were billed to customers. This results in 14.69% of Unaccounted-For Water (UFW), versus an AWWA standard of 10%. These losses represent a potential COPQ of $1.59MM per year in lost revenues per percent UFW. Statistical Statistical Logical Logical Y Y Y Y Regression Regression 5-Why Tree 5-Why Tree Logical Y 5-Why Tree Theft of water through the use of a non-metered connection Fire hydrant use not measured or recorded Use of water before customer record exists Construction flush quantities are not known/recorded Routine flush quantities are not known/recorded Use Affidavits DB We will not have meter data from the use of hydrants by the city Use building permit data We have not metered flushing in the past We have not metered flushing in the past
Deliverable 10: Analyze Root Cause Investigation Matrix
Deliverable 10: Analyze  Root Cause Investigation Matrix ,[object Object],[object Object],[object Object],[object Object],[object Object]
Deliverable 10: Analyze  Root Cause Investigation Matrix Problem State-ment “Y" Probable / Possible Root Cause(s) "Xs" BB Con-currs Y/N Explain "WHY" - (Logic Flow for Verification Method) Statistical Test or Description of non-Stat Treatment Statistical or Logical Analysis  Root Cause Investigation Matrix Increasing the SO 2  removal rate has historically caused SDA nozzle pluggage and SDA downtime.  Mix tank pump problems Density Exit gas Temp Logical Statistical Statistical Equipment issues Non-normal Data; >2 Samples Non-normal Data; >2 Samples Y Y Y Moods Median Slurry Flow/Exit gas Temp Statistical Non-normal Data; >2 Samples Y Moods Median Tree Diagram Moods Median
Deliverable 10: Analyze  Root Cause Investigation Matrix The 3 X’s will be analyzed for impact on Steam Temps These 3 X’s worked as capital projects
Deliverable 10: Analyze  Root Cause Investigation Matrix Root Cause Investigation Matrix Problem Statement “Y" Probable / Possible Root  Cause "Xs" Statistical or Logical Analysis  Explain "WHY" -  (Logic Flow for Verification Method) MBB  Concurs Y/N? Stat. Test or Description of non-Stat Treatment Homes in Jacksonville are using a high relative percentage of their income on energy costs Use of Resistance Heating Statistical & Logical Will validate “X” based on field data and database information Y Statistical Analysis, Graphical Analysis, Cause Effect, Basic Stat Tests Old Heating Equipment (Inefficient) Statistical & Logical Will validate “X” based on field data and database information Y Statistical Analysis, Graphical Analysis, Cause Effect, Basic Stat Tests Malfunctioning Heating Equipment Statistical & Logical Will validate “X” based on field data and database information Y Statistical Analysis, Graphical Analysis, Cause Effect, Basic Stat Tests Leaks in Air Ducts  (Central Systems) Statistical & Logical Will validate “X” based on field data and database information Y Statistical Analysis, Graphical Analysis, Cause Effect, Basic Stat Tests
Factor Description #1 Insulation (& Air Leaks) #2 “ Off Grade” Home Elevations #3 Thermostat Settings (Behavior) #4 Heating Systems #5 Customer Knowledge Our in-home surveys and analysis of consumption data led us to five statistically significant factors that are driving poor winter energy efficiency. Important Findings
Deliverable 10: Analyze  Root Cause Investigation Matrix
Learning Check ,[object Object],[object Object],[object Object]

Mais conteúdo relacionado

Mais procurados

PMP 1600 Questions by TechFAQ360
PMP 1600 Questions by TechFAQ360PMP 1600 Questions by TechFAQ360
PMP 1600 Questions by TechFAQ360Artonline Home
 
An introduction
An introductionAn introduction
An introductiontumetr
 
Balancing burdens of proof in dispute avoidance and resolution by "Ari Isaacs...
Balancing burdens of proof in dispute avoidance and resolution by "Ari Isaacs...Balancing burdens of proof in dispute avoidance and resolution by "Ari Isaacs...
Balancing burdens of proof in dispute avoidance and resolution by "Ari Isaacs...Project Controls Expo
 
Pmi sp questions with answers
Pmi sp questions with answersPmi sp questions with answers
Pmi sp questions with answersMohamed Saeed
 
10 me667 chap6 performance measures
10 me667 chap6 performance measures10 me667 chap6 performance measures
10 me667 chap6 performance measuresPavan Kumar
 
Schedule quality – detailed analysis of the main metrics webinar, 27 June 2017
Schedule quality – detailed analysis of the main metrics webinar, 27 June 2017Schedule quality – detailed analysis of the main metrics webinar, 27 June 2017
Schedule quality – detailed analysis of the main metrics webinar, 27 June 2017Association for Project Management
 
Problem Solving Tools & Methods - Part 3
Problem Solving Tools & Methods - Part 3Problem Solving Tools & Methods - Part 3
Problem Solving Tools & Methods - Part 3Tony Alvarez
 
Dealing With Troubled Projects in 8 Simple Steps
Dealing With Troubled Projects in 8 Simple StepsDealing With Troubled Projects in 8 Simple Steps
Dealing With Troubled Projects in 8 Simple StepsDoug Ziemke
 
Earned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project ControlEarned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project ControlM Maged Hegazy, LLM, MBA, CCP, P3O
 

Mais procurados (19)

D11 Define Review
D11 Define ReviewD11 Define Review
D11 Define Review
 
I07 Simulation
I07 SimulationI07 Simulation
I07 Simulation
 
PMP 1600 Questions by TechFAQ360
PMP 1600 Questions by TechFAQ360PMP 1600 Questions by TechFAQ360
PMP 1600 Questions by TechFAQ360
 
An introduction
An introductionAn introduction
An introduction
 
Module 12 Monitoring and Control I
Module 12 Monitoring and Control IModule 12 Monitoring and Control I
Module 12 Monitoring and Control I
 
Balancing burdens of proof in dispute avoidance and resolution by "Ari Isaacs...
Balancing burdens of proof in dispute avoidance and resolution by "Ari Isaacs...Balancing burdens of proof in dispute avoidance and resolution by "Ari Isaacs...
Balancing burdens of proof in dispute avoidance and resolution by "Ari Isaacs...
 
Pmp4
Pmp4Pmp4
Pmp4
 
Pmi sp questions with answers
Pmi sp questions with answersPmi sp questions with answers
Pmi sp questions with answers
 
10 me667 chap6 performance measures
10 me667 chap6 performance measures10 me667 chap6 performance measures
10 me667 chap6 performance measures
 
Schedule quality – detailed analysis of the main metrics webinar, 27 June 2017
Schedule quality – detailed analysis of the main metrics webinar, 27 June 2017Schedule quality – detailed analysis of the main metrics webinar, 27 June 2017
Schedule quality – detailed analysis of the main metrics webinar, 27 June 2017
 
Pmp full mock test – 200 questions
Pmp full mock test – 200 questionsPmp full mock test – 200 questions
Pmp full mock test – 200 questions
 
Problem Solving Tools & Methods - Part 3
Problem Solving Tools & Methods - Part 3Problem Solving Tools & Methods - Part 3
Problem Solving Tools & Methods - Part 3
 
Session 6 gdas pmp study group presentation
Session 6   gdas pmp study group presentationSession 6   gdas pmp study group presentation
Session 6 gdas pmp study group presentation
 
Pmp5
Pmp5Pmp5
Pmp5
 
06 pmp time management exam
06 pmp time  management exam06 pmp time  management exam
06 pmp time management exam
 
Dealing With Troubled Projects in 8 Simple Steps
Dealing With Troubled Projects in 8 Simple StepsDealing With Troubled Projects in 8 Simple Steps
Dealing With Troubled Projects in 8 Simple Steps
 
SPM PPT
SPM PPTSPM PPT
SPM PPT
 
Earned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project ControlEarned Value Management - Leading & Misleading in Project Control
Earned Value Management - Leading & Misleading in Project Control
 
Pmstudy exam 2
Pmstudy exam 2Pmstudy exam 2
Pmstudy exam 2
 

Destaque

D05 Define VOC, VOB and CTQ
D05 Define VOC, VOB and CTQD05 Define VOC, VOB and CTQ
D05 Define VOC, VOB and CTQLeanleaders.org
 
Variation and mistake proofing
Variation and mistake proofingVariation and mistake proofing
Variation and mistake proofingLeanleaders.org
 
Kano analysis and your job
Kano analysis and your jobKano analysis and your job
Kano analysis and your jobJack Su
 
RMS Six Sigma Training 2010 Final
RMS Six Sigma Training 2010 FinalRMS Six Sigma Training 2010 Final
RMS Six Sigma Training 2010 FinalMichael Camp
 
Basics Six Sigma Fresher Guide
Basics Six Sigma Fresher GuideBasics Six Sigma Fresher Guide
Basics Six Sigma Fresher GuideNeetu Maltiar
 
Blank Logo LEAN template
Blank Logo LEAN templateBlank Logo LEAN template
Blank Logo LEAN templateLeanleaders.org
 
ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)Leanleaders.org
 
Lss pharma presentation2-2006
Lss pharma presentation2-2006Lss pharma presentation2-2006
Lss pharma presentation2-2006Omnex Inc.
 
NG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionNG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionLeanleaders.org
 
How to design a universal incentive system for a manufacturing company
How to design a universal incentive system for a manufacturing companyHow to design a universal incentive system for a manufacturing company
How to design a universal incentive system for a manufacturing companyIbrahim Khan Md.
 
A05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat TestsA05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat TestsLeanleaders.org
 
D02 Certification requirements
D02 Certification requirementsD02 Certification requirements
D02 Certification requirementsLeanleaders.org
 

Destaque (20)

NG BB 17 Takt Time
NG BB 17 Takt TimeNG BB 17 Takt Time
NG BB 17 Takt Time
 
D05 Define VOC, VOB and CTQ
D05 Define VOC, VOB and CTQD05 Define VOC, VOB and CTQ
D05 Define VOC, VOB and CTQ
 
Variation and mistake proofing
Variation and mistake proofingVariation and mistake proofing
Variation and mistake proofing
 
Kano analysis and your job
Kano analysis and your jobKano analysis and your job
Kano analysis and your job
 
SIX SIGMA BLACKBELT
SIX SIGMA BLACKBELTSIX SIGMA BLACKBELT
SIX SIGMA BLACKBELT
 
Coats web portal
Coats web portalCoats web portal
Coats web portal
 
D06 Project Selection
D06 Project SelectionD06 Project Selection
D06 Project Selection
 
RMS Six Sigma Training 2010 Final
RMS Six Sigma Training 2010 FinalRMS Six Sigma Training 2010 Final
RMS Six Sigma Training 2010 Final
 
Basics Six Sigma Fresher Guide
Basics Six Sigma Fresher GuideBasics Six Sigma Fresher Guide
Basics Six Sigma Fresher Guide
 
Blank Logo LEAN template
Blank Logo LEAN templateBlank Logo LEAN template
Blank Logo LEAN template
 
ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)
 
Lss pharma presentation2-2006
Lss pharma presentation2-2006Lss pharma presentation2-2006
Lss pharma presentation2-2006
 
NG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionNG BB 36 Simple Linear Regression
NG BB 36 Simple Linear Regression
 
How to design a universal incentive system for a manufacturing company
How to design a universal incentive system for a manufacturing companyHow to design a universal incentive system for a manufacturing company
How to design a universal incentive system for a manufacturing company
 
D11 Define Review
D11 Define ReviewD11 Define Review
D11 Define Review
 
D04 Why6Sigma
D04 Why6SigmaD04 Why6Sigma
D04 Why6Sigma
 
Introduction to Six Sigma
Introduction to Six SigmaIntroduction to Six Sigma
Introduction to Six Sigma
 
D10 Project Management
D10 Project ManagementD10 Project Management
D10 Project Management
 
A05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat TestsA05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat Tests
 
D02 Certification requirements
D02 Certification requirementsD02 Certification requirements
D02 Certification requirements
 

Semelhante a G04 Root Cause Relationships

DMAIC-Review-Template-14-steps-1.1.pptx
DMAIC-Review-Template-14-steps-1.1.pptxDMAIC-Review-Template-14-steps-1.1.pptx
DMAIC-Review-Template-14-steps-1.1.pptxKristofMC
 
080324 Miller Opportunity Matrix Asq Presentation
080324 Miller Opportunity Matrix Asq Presentation080324 Miller Opportunity Matrix Asq Presentation
080324 Miller Opportunity Matrix Asq Presentationrwmill9716
 
Lean Vs Six Sigma.ppt
Lean Vs Six Sigma.pptLean Vs Six Sigma.ppt
Lean Vs Six Sigma.pptssuser09851b1
 
Monetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionMonetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionBlack & Veatch
 
Management Of Business Operation Components PowerPoint Presentation Slides
Management Of Business Operation Components PowerPoint Presentation SlidesManagement Of Business Operation Components PowerPoint Presentation Slides
Management Of Business Operation Components PowerPoint Presentation SlidesSlideTeam
 
prefeasibility_study_guidelines_final.pdf
prefeasibility_study_guidelines_final.pdfprefeasibility_study_guidelines_final.pdf
prefeasibility_study_guidelines_final.pdfJanPan7
 
Operation Mangement Suppl.-SPC training-ppt
Operation Mangement Suppl.-SPC training-pptOperation Mangement Suppl.-SPC training-ppt
Operation Mangement Suppl.-SPC training-pptRanjeet338208
 
W Tanenbaum Making The Supply Chain Sustainable 0210
W Tanenbaum Making The Supply Chain Sustainable 0210W Tanenbaum Making The Supply Chain Sustainable 0210
W Tanenbaum Making The Supply Chain Sustainable 0210William Tanenbaum
 
Foods Case StudyWhat to coverExecuti.docx
            Foods Case StudyWhat to coverExecuti.docx            Foods Case StudyWhat to coverExecuti.docx
Foods Case StudyWhat to coverExecuti.docxhallettfaustina
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Cause and Effect An...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Cause and Effect An...Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Cause and Effect An...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Cause and Effect An...J. García - Verdugo
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Effective Cost Measurement through DMAIC.
Effective Cost Measurement through DMAIC.Effective Cost Measurement through DMAIC.
Effective Cost Measurement through DMAIC.Kaustav Lahiri
 
Presentacion de Prueba
Presentacion de PruebaPresentacion de Prueba
Presentacion de Pruebasaypepe
 

Semelhante a G04 Root Cause Relationships (20)

C & E Matrix.ppt
C & E Matrix.pptC & E Matrix.ppt
C & E Matrix.ppt
 
DFSS short
DFSS shortDFSS short
DFSS short
 
G06 Green Review
G06 Green ReviewG06 Green Review
G06 Green Review
 
DMAIC-Review-Template-14-steps-1.1.pptx
DMAIC-Review-Template-14-steps-1.1.pptxDMAIC-Review-Template-14-steps-1.1.pptx
DMAIC-Review-Template-14-steps-1.1.pptx
 
080324 Miller Opportunity Matrix Asq Presentation
080324 Miller Opportunity Matrix Asq Presentation080324 Miller Opportunity Matrix Asq Presentation
080324 Miller Opportunity Matrix Asq Presentation
 
Lean Vs Six Sigma.ppt
Lean Vs Six Sigma.pptLean Vs Six Sigma.ppt
Lean Vs Six Sigma.ppt
 
Monetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionMonetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization Solution
 
Management Of Business Operation Components PowerPoint Presentation Slides
Management Of Business Operation Components PowerPoint Presentation SlidesManagement Of Business Operation Components PowerPoint Presentation Slides
Management Of Business Operation Components PowerPoint Presentation Slides
 
prefeasibility_study_guidelines_final.pdf
prefeasibility_study_guidelines_final.pdfprefeasibility_study_guidelines_final.pdf
prefeasibility_study_guidelines_final.pdf
 
7 QC Tools Training
7 QC Tools Training7 QC Tools Training
7 QC Tools Training
 
Operation Mangement Suppl.-SPC training-ppt
Operation Mangement Suppl.-SPC training-pptOperation Mangement Suppl.-SPC training-ppt
Operation Mangement Suppl.-SPC training-ppt
 
Spc training
Spc trainingSpc training
Spc training
 
W Tanenbaum Making The Supply Chain Sustainable 0210
W Tanenbaum Making The Supply Chain Sustainable 0210W Tanenbaum Making The Supply Chain Sustainable 0210
W Tanenbaum Making The Supply Chain Sustainable 0210
 
Foods Case StudyWhat to coverExecuti.docx
            Foods Case StudyWhat to coverExecuti.docx            Foods Case StudyWhat to coverExecuti.docx
Foods Case StudyWhat to coverExecuti.docx
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Cause and Effect An...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Cause and Effect An...Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Cause and Effect An...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Cause and Effect An...
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Effective Cost Measurement through DMAIC.
Effective Cost Measurement through DMAIC.Effective Cost Measurement through DMAIC.
Effective Cost Measurement through DMAIC.
 
Presentacion de Prueba
Presentacion de PruebaPresentacion de Prueba
Presentacion de Prueba
 
7qc Tools 173
7qc Tools 1737qc Tools 173
7qc Tools 173
 

Mais de Leanleaders.org

Chi-sq GOF Calculator.xls
Chi-sq GOF Calculator.xlsChi-sq GOF Calculator.xls
Chi-sq GOF Calculator.xlsLeanleaders.org
 
Cause and Effect Tree.vst
Cause and Effect Tree.vstCause and Effect Tree.vst
Cause and Effect Tree.vstLeanleaders.org
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapLeanleaders.org
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change OverLeanleaders.org
 
Attribute Process Capability Calculator.xls
Attribute Process Capability Calculator.xlsAttribute Process Capability Calculator.xls
Attribute Process Capability Calculator.xlsLeanleaders.org
 
A05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat TestsA05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat TestsLeanleaders.org
 
G04 Root Cause Relationships
G04 Root Cause RelationshipsG04 Root Cause Relationships
G04 Root Cause RelationshipsLeanleaders.org
 
NG BB 37 Multiple Regression
NG BB 37 Multiple RegressionNG BB 37 Multiple Regression
NG BB 37 Multiple RegressionLeanleaders.org
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project ValueLeanleaders.org
 
D12 Airplane DMAGIC Project
D12 Airplane DMAGIC ProjectD12 Airplane DMAGIC Project
D12 Airplane DMAGIC ProjectLeanleaders.org
 
Obstacles Countermeasure - Action Plan Blank.xls
Obstacles Countermeasure - Action Plan Blank.xlsObstacles Countermeasure - Action Plan Blank.xls
Obstacles Countermeasure - Action Plan Blank.xlsLeanleaders.org
 

Mais de Leanleaders.org (20)

Blankgage.MTW
Blankgage.MTWBlankgage.MTW
Blankgage.MTW
 
Chi-sq GOF Calculator.xls
Chi-sq GOF Calculator.xlsChi-sq GOF Calculator.xls
Chi-sq GOF Calculator.xls
 
Attrib R&R.xls
Attrib R&R.xlsAttrib R&R.xls
Attrib R&R.xls
 
D07 Project Charter
D07 Project CharterD07 Project Charter
D07 Project Charter
 
Cause and Effect Tree.vst
Cause and Effect Tree.vstCause and Effect Tree.vst
Cause and Effect Tree.vst
 
LEAN template
LEAN templateLEAN template
LEAN template
 
I07 Simulation
I07 SimulationI07 Simulation
I07 Simulation
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE Roadmap
 
D01 Define Spacer
D01 Define SpacerD01 Define Spacer
D01 Define Spacer
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change Over
 
Attribute Process Capability Calculator.xls
Attribute Process Capability Calculator.xlsAttribute Process Capability Calculator.xls
Attribute Process Capability Calculator.xls
 
A05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat TestsA05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat Tests
 
XY Matrix.xls
XY Matrix.xlsXY Matrix.xls
XY Matrix.xls
 
NG BB 11 Power Steering
NG BB 11 Power SteeringNG BB 11 Power Steering
NG BB 11 Power Steering
 
G04 Root Cause Relationships
G04 Root Cause RelationshipsG04 Root Cause Relationships
G04 Root Cause Relationships
 
15 Deliv template
15 Deliv template15 Deliv template
15 Deliv template
 
NG BB 37 Multiple Regression
NG BB 37 Multiple RegressionNG BB 37 Multiple Regression
NG BB 37 Multiple Regression
 
D08 Quantify Project Value
D08 Quantify Project ValueD08 Quantify Project Value
D08 Quantify Project Value
 
D12 Airplane DMAGIC Project
D12 Airplane DMAGIC ProjectD12 Airplane DMAGIC Project
D12 Airplane DMAGIC Project
 
Obstacles Countermeasure - Action Plan Blank.xls
Obstacles Countermeasure - Action Plan Blank.xlsObstacles Countermeasure - Action Plan Blank.xls
Obstacles Countermeasure - Action Plan Blank.xls
 

Último

Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxkarenfajardo43
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxSayali Powar
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataBabyAnnMotar
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWQuiz Club NITW
 
week 1 cookery 8 fourth - quarter .pptx
week 1 cookery 8  fourth  -  quarter .pptxweek 1 cookery 8  fourth  -  quarter .pptx
week 1 cookery 8 fourth - quarter .pptxJonalynLegaspi2
 
Mental Health Awareness - a toolkit for supporting young minds
Mental Health Awareness - a toolkit for supporting young mindsMental Health Awareness - a toolkit for supporting young minds
Mental Health Awareness - a toolkit for supporting young mindsPooky Knightsmith
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSMae Pangan
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQuiz Club NITW
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1GloryAnnCastre1
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptxDhatriParmar
 
Multi Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleMulti Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleCeline George
 

Último (20)

Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
 
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of EngineeringFaculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
prashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Professionprashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Profession
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped data
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITW
 
week 1 cookery 8 fourth - quarter .pptx
week 1 cookery 8  fourth  -  quarter .pptxweek 1 cookery 8  fourth  -  quarter .pptx
week 1 cookery 8 fourth - quarter .pptx
 
Mental Health Awareness - a toolkit for supporting young minds
Mental Health Awareness - a toolkit for supporting young mindsMental Health Awareness - a toolkit for supporting young minds
Mental Health Awareness - a toolkit for supporting young minds
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
 
Multi Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleMulti Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP Module
 

G04 Root Cause Relationships

  • 1. Root Cause Relationships Deliverable 11G
  • 2. Improve Module Roadmap Define 1D – Define VOC, VOB, and CTQ’s 2D – Define Project Boundaries 3D – Quantify Project Value 4D – Develop Project Mgmt. Plan Measure 5M – Document Process 6M – Prioritize List of X’s 7M – Create Data Collection Plan 8M – Validate Measurement System 9M – Establish Baseline Process Cap. Analyze 10A – Determine Critical X’s Improve 12I – Prioritized List of Solutions 13I – Pilot Best Solution Control 14C – Create Control System 15C – Finalize Project Documentation Green 11G – Identify Root Cause Relationships
  • 3.
  • 4.
  • 5.
  • 6. Deliverable 10: Analyze Root Cause Investigation Matrix Problem State-ment “Y" Probable / Possible Root Cause(s) "Xs" BB Con-currs Y/N Explain "WHY" - (Logic Flow for Verification Method) Statistical Test or Description of non-Stat Treatment Statistical or Logical Analysis Root Cause Investigation Matrix During the time period from July 2005 to September 2006, 79,771,600 CCF of water were produced, and 68,052,475 CCF of water were billed to customers. This results in 14.69% of Unaccounted-For Water (UFW), versus an AWWA standard of 10%. These losses represent a potential COPQ of $1.59MM per year in lost revenues per percent UFW. Statistical Statistical Logical Logical Y Y Y Y Regression Regression 5-Why Tree 5-Why Tree Logical Y 5-Why Tree Theft of water through the use of a non-metered connection Fire hydrant use not measured or recorded Use of water before customer record exists Construction flush quantities are not known/recorded Routine flush quantities are not known/recorded Use Affidavits DB We will not have meter data from the use of hydrants by the city Use building permit data We have not metered flushing in the past We have not metered flushing in the past
  • 7. Deliverable 10: Analyze Root Cause Investigation Matrix
  • 8.
  • 9. Deliverable 10: Analyze Root Cause Investigation Matrix Problem State-ment “Y" Probable / Possible Root Cause(s) "Xs" BB Con-currs Y/N Explain "WHY" - (Logic Flow for Verification Method) Statistical Test or Description of non-Stat Treatment Statistical or Logical Analysis Root Cause Investigation Matrix Increasing the SO 2 removal rate has historically caused SDA nozzle pluggage and SDA downtime. Mix tank pump problems Density Exit gas Temp Logical Statistical Statistical Equipment issues Non-normal Data; >2 Samples Non-normal Data; >2 Samples Y Y Y Moods Median Slurry Flow/Exit gas Temp Statistical Non-normal Data; >2 Samples Y Moods Median Tree Diagram Moods Median
  • 10. Deliverable 10: Analyze Root Cause Investigation Matrix The 3 X’s will be analyzed for impact on Steam Temps These 3 X’s worked as capital projects
  • 11. Deliverable 10: Analyze Root Cause Investigation Matrix Root Cause Investigation Matrix Problem Statement “Y" Probable / Possible Root Cause "Xs" Statistical or Logical Analysis Explain "WHY" - (Logic Flow for Verification Method) MBB Concurs Y/N? Stat. Test or Description of non-Stat Treatment Homes in Jacksonville are using a high relative percentage of their income on energy costs Use of Resistance Heating Statistical & Logical Will validate “X” based on field data and database information Y Statistical Analysis, Graphical Analysis, Cause Effect, Basic Stat Tests Old Heating Equipment (Inefficient) Statistical & Logical Will validate “X” based on field data and database information Y Statistical Analysis, Graphical Analysis, Cause Effect, Basic Stat Tests Malfunctioning Heating Equipment Statistical & Logical Will validate “X” based on field data and database information Y Statistical Analysis, Graphical Analysis, Cause Effect, Basic Stat Tests Leaks in Air Ducts (Central Systems) Statistical & Logical Will validate “X” based on field data and database information Y Statistical Analysis, Graphical Analysis, Cause Effect, Basic Stat Tests
  • 12. Factor Description #1 Insulation (& Air Leaks) #2 “ Off Grade” Home Elevations #3 Thermostat Settings (Behavior) #4 Heating Systems #5 Customer Knowledge Our in-home surveys and analysis of consumption data led us to five statistically significant factors that are driving poor winter energy efficiency. Important Findings
  • 13. Deliverable 10: Analyze Root Cause Investigation Matrix
  • 14.

Notas do Editor

  1. First three X’s will be analyzed for impact on Y, 2nd three will be presented as additional projects/tasks
  2. The Root Cause Investigation Matrix is visited again to see if we are still focused on the same x’s or if the focus changed during the project. There is nothing wrong with the x’s being the same. There is nothing wrong for the x’s having changed. However, if they have changed, an explanation of why is needed in the speaker notes. Distinguish logical from Statistical