ENGR. ODAYIBO LAWSON
18TH March, 1980
No 1 Ukori Close, Off Upper-Agbarho St, Ughelli, Delta State.
Male
Married
Christian
Ekeremor L. G. A.
Bayelsa State
Nigerian
07030248696
odaylaws@yahoo.com
PROFILE
Dedicated and self motivated Engineer with enormous sense of job satisfaction
with professionexpertise arising from my over 18years working experience with
Gas turbine Operations and Maintenance. Am ready to work in a competitive
environment with a good team spirit, accepting challenges and being target
oriented, self-motivated, able to work under pressure and adapt to new work
environment
EDUCATION
2007 Bachelor of Engineering in Mechanical Engineering (B.Eng (Mech) )
University of Benin, Benin City
2007 Advance Technician Diploma in Electrical Engineering
City and Guilds of London Institute
2007 Certificate in conflict Analysis, United State Institute of Peace (On-Line)
2004 Technician Diploma in Electrical Engineering, City and Guilds of London
Institute
1999 Diploma in Computer Operations, Delta State University, Abraka, Delta
State
1996 Senior Secondary SchoolCertificate, Government College, Ughelli, Delta
State
1990 First SchoolLeaving Certificate, Itive Primary School, Oteri, Ughelli, Delta
State
WORK HISTORY
1. TRANSCORPUGHELLI POWER LIMITED
POSITION: Mechanical Maintenance Staff
DURATION: 1ST
November2013 till date
DUTIES AND RESPONSIBILITIES
INSTALLATION, MAINTENANCE AND SERVINCING OF GAS
TURBINE POWER PLANT
GE FRAME 9E MACHINES
Carryout Combustion Inspection, Hot Gas path Inspection and Major
Inspection Overhauling
Installation/maintenance of accessorycompartment component to include,
cranking motor, torque converter and accessory gear box
Replacement of gear box main shaft
Calibration of inlet guide vain controlactuator
Compressor washing
Turbine accessorycompartment alignment
Installation and repair of Cooling Water Pumps
Installation of stages 1,2 and 3 turbine buckets and Nozzles
Removal of Generator Rotorfor rehabilitation
Servicing of accessoryshaft
Maintenance and servicing of CompressorBleed Valves
Regulation of lube oil pressure valve, cooling water header regulatory
valve
Installation of Static Compressorblades
Installation of stages 1,2 and 3 turbine buckets and Nozzles
Rotorclearance on GE Gas turbine frames
TP set back, X1&X2/R1&X1. Bearing 1, 2 & 3 Clearances
Inspection and maintenance of Air Inlet system
Inspection and maintenance of Exhaust plenum and stalk.
Rigging
ON SITE TECHNICAL PATNERS
THOMASSEN HOLDING LIMITED, DUBAI
Rehabilitation and Major Inspection
E & B TURBINE SERVICES, HOLLAND
Rehabilitation and Major Inspection
HITACHI H25 MACHINES
Carrying Combustion Inspection, Hot Gas path Inspection, Major Inspection
Overhauling
Installation and maintenance of Detroit Diesel Engine
Installation of Torque Converters and Charge pumps
Installation and alignment of Torque converter, AccessoryGear Box,
Reduction Gear, Turbine Accessorycompartment and Generator Alignment
Installation of bothDiesel and Lube oil lines Footvalves
Re-calibration of inlet Guide Vane
Installation of stage 1,2 and 3 Turbine buckets and Turbine Nozzles
Carry out of BoroscopeInspection
Maintenance of Mist Separator
Servicing of Air Pulsation System compressors
Servicing of Accessoryand Load coupling shafts
Servicing of INGERSOLL RAND Compressors forAir Pulsation System
Servicing of GREENFIELD Compressorfor ABB Hydrogen Plant
Servicing of Holman mobile compressors
2. POWER HOLDING COMPANYOF NIGERIA
UGHELLI POWER PLC
POSITION: System ElectricalOperator
DURATION: 1stSeptember 1998 – 30th October2013
DUTIES AND RESPONSIBILITIES
CONTROL, MONITORING AND OPERATIONOF GAS TURBINE
GENERATOR
Control, Monitor and operation of GE FRAME 9E gas Turbine Generators
and HITACHI 25 gas turbine and SIEMENS generators
STARTING, RUNNING AND SYNCHRONISATION OF GAS PLANTS
Run-up of gas turbine generators, monitor startup/run-up conditions and
synchronize same to National grid using Human Machine Interface (HMI) or
Backup Operator Interface (BOI)
MONITORING, CONTROLSTABILIZATION OF SYSTEM
FREQUENCY
Monitoring, control and stabilization of system condition and frequency by
varying the Gas turbine output to match customer demand/consumption in
other to prevent system collapse, and restoration of same in the case of a
collapse
OPERATIONOF 132KV/33KV/3.3KV/415 SWITCHGEARS
Operation of 132KV/33KV/3.3KV/415KV high to low voltage switch gears,
for unit Power ControlCenter and Motor controlCenter. Powering cranking
motors and other unit auxiliary motors
PRODUCTIONOF HYDROGEN
Running and operation of ABB Hydrogen plant for the production of
hydrogen used for the cooling of GE Generator stators winding
ISSUANCE AND ACCEPTANCE OF WORKPERMIT
Creating safe work condition for workmen, issuing work permits to
workmen after isolation of equipment and accepting surrounding of permits
upon successfuljob completion
LOGGING AND REPORTING
Operation event/activities, hourly machine readings are logged timely and
are relay to National ControlCentre and Area Control Centre for system
analysis
INSPECTION
Carrying out of unit and station Inspection. Startup inspection and Routine
Inspection
INSPECTION/OPERATIONOF 330KV/132KV SWITCHYARD
Operation of 330KV/132KV switch yard equipment to cover, breakers,
Isolators, CTs and PTs, Grounding switches
ACHIEVEMENTS
REHABILITATION OF GAS TURBINE (GT19) GE FRAME
9E
Execution of Compressorbellmouth, Compressorforward and aft casing
upper half opening
Performance of laser casing alignment due casing change
Replacement of Damaged CompressorRotor
Replacement of Bearing Nos 1, 2 and 3 Labyrinth Seal
Replacement of Bearing Nos1, 2 and 3
Combustion Liners and Nozzles replacement done
Replacement of Stages 1, 2 and 3 turbine Nozzles and Stages 1, 2 and 3
Shrewd Blocks
Stages 1, 2 and 3 Turbine Buckets replacement done
Execution of Exhaust plenum repair
Execution of Compressorand Exhaust Bellows repair and replacement
Unit was restored to service generating 100mw full capacity
REPAIR OF GT16 GE FRAME 9E OIL SPILL FROM
ACCESSORYGEAR BOX SHAFT BEARING
Opened up AccessoryGear Box after separation of bothcoupling (forward
and after)
Replacement of AccessoryGear Box Main Shaft with a new one
Replacement of both Accessaryand Turbine side Bearings and Labyrinth
seals
Alignment of AccessoryGear Box to No1 Bearing, AccessoryGear Box to
Torque Converter and Torqueconverter to Cranking Motor.
Unit was restored back to service with the oil leakage/spill stopped
GAS TURBINE (GT6) HITACHI H25 REHABILITATION
Removal of Combustion components and opening up of Turbine casing
Installation of stage 1 turbine buckets
Installation of stages 1 and 2 turbine Nozzles
Installation of 10Nos transition pieces
Boxing up
Alignment of Generator to Reduction gear, Reduction gear to No 2 Bearing.
Alignment of turbine compartment to AccessoryCompartment
Application of packing on one side of bearing No2 housing resulting from
bad turbine clearance of the turbine rotor
Addition of 350g of weight on load coupling shaft to balance the rotor for
correction of high vibration of 25mm/s to 6mm/s
Unit fired generating 20mw
COURSES ATTENDED
PHCN Two years system operator’s course (Portharcourt)
PHCN In -Plant/On -the-job Training
System Operator’s Refresher Courses
Siemens Gas Power Plant on-the-site Training ( Ajaokuta, Nigeria)
Siemens V94.2 GTPP Simulation Training (Erlange, Germany)
PROFESSIONAL MEMBERSHIP
Member, Nigeria Institute of Mechanical Engineers (MNiMechE)
Member, The Nigerian Society of Engineers (MNSE)
Registered with the Council for the Regulation of Engineering in Nigeria
(COREN)
NYSC
Exempted (Exemption Certificate available)
REFEREES
PastorEngr . Onokurhefe Blessed
Head Mechanical
Transcorp Ughelli Power Ltd.
08037744021
Engr. P. O. Olagbegi
Head of Department
Mechanical Department
Faculty of Engineering
University of Benin, Benin City
07039547375