DESIGN PROCEDURE FOR IRRIGATION CHANNELS
1. Cross-section of an Irrigation Canal
A typical and most desired section of a canal, i.e. partly in cutting and
partly in filling, is shown in the following figure.
NSL = Natural Surface Level
CBL = Canal Bed Level
FSL = Full Supply Level
When NSL is above the top of the bank, the canal section will have to be
cut, and it shall be called “canal in cutting”.
When NSL is lower than the CBL, the canal section will have to be built
in filling, and it is called “canal in filling”.
Side Slopes
Side slopes (H:V) are fixed according to stability requirements,
depending upon the type of the soil (angle of repose of soil).
A comparatively steeper slope can be provided in cutting because soil is
naturally consolidated, and hence, more stable.
Generally adopted slopes:
In cutting: 1:1 to 1½: 1
In filling: 1½:1 to 2:1
For channels with silt laden water, the actual capacity of the channel is
worked out with ½ :1 side slopes.
Berms
Berm is the horizontal distance left at ground level between the toe of
the bank and the top edge of cutting.
If s1:1 is the slope in cutting and s2:1 in filling, then initial berm width
= (s2-s1) d1
Since NSL fluctuates considerably, while canal bed level (CBL) varies
very slightly, d1 shall vary; and, therefore, the berm width shall vary.
After the water flows in the channel for some time, the silt gets
deposited on the sides giving them a slope of ½:1.
The position of the berm, therefore, changes from ground level to FSL.
as shown in Fig. and its width becomes equal to (s2- ½ ).y. If s2 = 1 ½
then the final berm width =y, i.e. equal to the depth of the canal.
The berms when fully formed, serve the following purposes :
(i) The silt deposited on the sides is very fine and impervious. It,
therefore, serves as a good lining for reducing losses, leakage and
consequent breaches, etc.
(ii) They help the channel to attain regime conditions, as they help in
providing a wider waterway, if required. Even fluctuations of
discharge do not produce much fluctuations in depths because of
wider waterway.
(iii) They give additional strength to the banks and provide protection
against erosion and breaches.
(iv) The possibility of breaches gets reduced because the saturation
line comes more in the body of the embankment.
(v) They protect the banks from erosion due to wave action.
(vi) They provide a scope for future widening of the canal.
(vii) Berms can be used as borrow pits for excavating soil to be used
for filling.
Freeboard
The margin between FSL and bank level is known as freeboard.
The amount of freeboard depends upon the size of the channel. The
generally provided values of freeboard are given in following table.
Values of Freeboard in Canals
Discharge (cumec) Extent of Free board (m)
1 to 5 0.5
5 to 10 0.6
10 to 30 0.75
30 to 150 0.90
Banks
The primary purpose of banks is to retain water. They can be used as
means of communication and as inspection paths.
They should be wide enough, so that a minimum cover of 0.5 m is
available above the saturation line, as shown in below Fig.
High banks will have to be designed as earth dams.
Service Roads
Service roads are provided on canals for inspection purposes, and may
simultaneously serve as the means of communication in remote areas.
They are provided 0.4 m to 1.0 m above FSL, depending upon the size of
the channel.
Dowlas
As a measure of safety in driving, dowlas 0.3 m high and 0.3 to 0.6 m
wide at top, with side slopes of 1:1 to 2:1, are provided along the banks,
as shown in below figure.
They also help in preventing slope erosion due to rains, etc.
Back Berm or Counter Berms.
Even after providing sufficient section for bank embankment, the
saturation gradient line may cut the downstream end of the bank.
In such a case, the saturation line can be kept covered at least by 0.5 m
with the help of counter berms, as shown in following figure.
The straight saturation gradient line may be drawn with the following
slopes.
Assumed Values of Saturation Gradients in Different
Soils
Type of soil Slope (H:V)
Clay 1 in 4
Clayey loam 1 in 6
Loam 1 in 8
Loamy sand 1 in 10
sand 1 in 15
Spoil Banks.
When the earthwork in excavation exceeds earthwork in filling, even
after providing maximum width of bank embankments, the extra earth
has to be disposed off economically.
To dispose off this earth by mechanical transport, etc. may become very
costly, and an economical mode of its disposal may be found in the form
of collecting this soil on the edge of the bank embankment itself.
The soil is, therefore, deposited in such a case, in the form of heaps on
both banks or only on one bank, as shown in following figure.
These heaps of soil are discontinued at suitable intervals and longitudinal
drains running by their sides are excavated for the disposal of rain water.
Cross drains through the spoil banks may also be excavated, if needed.
Borrow Pits
When earthwork in filling exceeds the earthwork in excavation, the earth
has to be brought from somewhere.
The pits, which are dug for bringing earth, are known as borrow pits.
If such pits are excavated outside the channel, they are known as
external borrow pits, and if they are excavated somewhere within the
channel, they are known as internal borrow pits.
It is a very costly affair to bring soil from distances. Even in the nearby
areas, these pits may cause mosquito nuisance due to collection of rain
water in these pits, and hence, external borrow pits are not preferred.
When needed, internal
borrow pits are excavated
on the bed of the canal, as
shown in figure.
The borrow pits should start from a point at a distance more than 5 m
from the toe for small channels, and 10 m for large channels.
The width of these pits (b) should be less than half the width of the canal
(B), and should be dug in the centre.
The depth of these pits should be equal to or less than 1 m.
Longitudinally, these pits should not run continuous but a minimum
space of 0.5 L should be left between two consecutive pits. (where L is
the length of one pit) as shown in following figure.
Balancing Depth for Excavating Canals
Maximum economy can be achieved in canal construction. if the
earthwork in excavation equals the earthwork in filling. Such a thing is
possible when a canal is constructed partly in filling and partly in
cutting, which mostly happens in practical life.
If this balance between cutting and filling can occur. then the need for
spoil banks or borrow pits is entirely eliminated. and moreover.
earthwork has to be paid only once in a single item.
For a given cross-section of a channel. there can be only one depth. for
which such a balance between cutting and filling will occur. This depth
is known as the Balancing depth.
This depth can be worked out easily by equating the areas of cutting and
filling.
Example
Calculate the balancing depth for a channel section having a bed width equal to 18 m
and side slopes of 1:1 in cutting and 2:1 in filling. The bank embankments are kept 3.0
m higher than the ground level (berm level) and crest width of banks is kept as 2.0 m.
Solution
The channel section is shown in Fig. Let d1 be the balancing depth, i.e. the depth for
which excavation and filling becomes equal.
Area of cutting = (18+d1).d1 m2
Equating cutting and filling, we get (18+d1).d1 = 48
Solving for d1, we get
Balancing depth = 2.35 m
2
m483
2
142
2fillingofArea =





×
+
=
Example
Design and Prepare the longitudinal section, schedule of area statistics
and channel dimensions of an irrigation channel from the following data:
Longitudinal leveling of channel alignment gives the following results:
Assume a datum level of 150.00 m, Full Supply Level of parent channel
as 157.70 m, and Bed Level of parent channel as 156.00 m.
km Ground level km Ground level
0.0 155.20 2.6 155.35
0.2 157.26 2.8 155.17
0.4 157.29 3.0 155.12
0.6 156.21 3.2 154.95
0.8 156.56 3.4 154.70
1.0 156.52 3.6 154.39
1.2 156.51 3.8 154.28
1.4 156.28 4.0 154.19
1.6 156.11 4.2 154.10
1.8 156.14 4.4 153.74
2.0 155.83 4.6 153.58
2.2 155.68 4.8 153.38
2.4 155.58 5.0 153.18
Commanded areas are given as follows:
Total loss is between km 0.5 to 5.0. Losses are to be calculated at the rate of 2 cumecs
per million square metres of the wetted perimeter.
Take side slope of the channel section as 1V:0.5H, m = 1, and Kutter’s N = 0.0225.
Below km GCA (ha) CCA (ha)
0 24000 16000
1 22000 14000
2 18000 12000
3 16000 11000
4 14000 10000
5 12000 8000
Intensity of irrigation Rabi (wheat) 30% Kharif (Rice) 12.5%
Kor-period (B) 4 weeks 2.5 weeks
Kor-depth (∆) 13.4 cm 19 cm
Solution:
Design Procedure:
1.The longitudinal section (L-section) of the ground is plotted first.
2.The slope of the channel is calculated with Lacey’s formula or taken from Lacey’s
diagrams and is tabulated in Schedule of Area Statistics.
3.A trial slope line for full supply level is marked. The position and depth of falls are
also tentatively marked.
4.The actual channel design is thereafter carried out by filling in the table of Schedule
of Area Statistics.
5.The outlet discharge factor for controlling crops is determined as follows:
(a)
where, B = kor period = 4 x 7 days; and ∆ = kor depth = 0.134 m
(b)
where, B = kor period = 2.5 x 7 days; and ∆ = kor depth = 0.19 m
∆
=
B64.8
RabiforfactordischargeOutlet
cumecha /1800
0.134
748.64
factordischargeoutletHence =
××
=
∆
=
B64.8
KharifforfactordischargeOutlet
cumecha /076
0.19
72.58.64
factordischargeoutletHence =
××
=
The outlet discharge factor for the controlling crops is the one which gives maximum
discharge.
Let us assume the CCA as 16000 ha.
Hence outlet discharge factor to be adopted = 1800 ha/cumecs.
ha48000.301600030%asI.I.withcropRabiunderArea =×=
cumec
D
A
67.2
1800
4800
cropRabiforneededDischarge ===∴
ha20000.1251600012.5%asI.I.withcropKharifunderArea =×=
cumec
D
A
63.2
760
2000
cropRabiforneededDischarge ===∴
Design of Channel at various sections:
The design is started from the tail where the losses are known.
At km 5.0:
Culturable Commanded Area (CCA) = 8000 ha
Intensity of Rabi irrigation = 30%
Area to be irrigated for Rabi crops = 8000 x 0.3 = 2400 ha
Outlet discharge factor = 1800 ha/cumec
Total losses after 5.0 km = 0.5 cumec (Given)
Total discharge at km 5.0 = 1.34 + 0.5 = 1.84 cumec
Adopt design discharge Q, 10% more than the total discharge.
Therefore,
design discharge = 1.84 x 1.1 = 2.02 cumec,
V/Vo = m = 1.0 (Given), and
N = 0.0225
Assume slope S = 0.25 m per km = 1/4000
cumec
D
A
34.1
1800
2400
cropRabiforneededDischarge ===∴
Garret's diagram:
It gives the graphical method of designing the channel dimensions based on Kennedy's Theory.
The diagram has discharge plotted on the abscissa.
The ordinates on the left indicate the slope and on the right water depth in the channel &
critical velocity Vo.
The discharge lines are curved and the bed width lines are shown dashed.
Procedure to use Garret's diagram in channel design:
1. Find out the discharge for which the channel is to be designed through Schedule of
Area Statistics.
2.Find out the slope of the channel through longitudinal section.
3.Follow the discharge line and find out its intersection with the horizontal line from the slope.
Interpolation may be done if needed.
Mark the intersection point P.
4.Draw the vertical line through the intersection point. This will cut several bed width curves.
Each point of intersection gives a depth & Vo on right hand side of ordinates.
5.Choose a pair of bed width, depth and Vo corresponding to point of intersection obtained
above.
6.Calculate the area of channel section A corresponding to channel bed width and depth.
7.Calculate the velocity corresponding to the area A.
8.Calculate the ratio V/Vo. This should be equal to unity or as given for the channel design.
9.Repeat the procedure for other values of bed width and depth till the value of V/Vo is the same
value as given for channel design.
From Garret's diagram: At km 5.0
Discharge
Q (Cumecs)
Slope S Bed width B
(m)
Water
Depth D
(m)
Area
A
Velocity V
= Q/A
(m/s)
Critical
Velocity Vo
(m/s)
Critical
Velocity
Ratio
5.50 0.73 4.28 0.472 0.450 1.05
2.02 1 in 4000 4.90 0.79 4.18 0.483 0.473 1.02
4.55 0.84 4.17 0.484 0.492 0.98
At km 4.0:
Culturable Commanded Area (CCA) = 10,000 ha
Intensity of Rabi irrigation = 30%
Area to be irrigated for Rabi crops = 10,000 x 0.3 = 3000 ha
Outlet discharge factor = 1800 ha/cumec
Losses below km 5.0 = 0.5 cumec (Given)
Losses in channel between km 5.0 and km 4.0
Note: For calculation of losses adopt section at km 5.0 as section at km 4.0 is not yet
calculated.
Total losses at km 4.0 =
losses below km 5.0 + losses between km 5.0 and km 4.0 = 0.5 + 0.013 = 0.513
cumec.
Therefore total discharge required at km 4.0 = 1.67 + 0.513 = 2.183 cumec
Adopt design discharge Q 10% more than the total discharge.
Therefore design discharge = 2.183 x 1.1 = 2.40 cumec, Similar approach is used in
calculating discharge at km 3.0, 2.0, 1.0 and 0.0.
cumec
D
A
67.1
1800
3000
cropRabiforneededDischarge ===∴
m445.684.0555.45DB=5.0kmatsectionchannelofperimeterWetted =×+=+
cumec013.02
000,000,1
10006.445
4.0kmto5.0kmfromreachinlossThus, =×
×
=
Below
km
GCA CCA
Area to be irrigated
Outlet
discharge
factor
Outlet
discharge
Loss
in
reach
Total
losses
Total
discharge
Channel dimensions
Velocity V/Vo
Rabi
30%
Sugar
Cane
Rice
12.5%
Bed
slope
Bed
width
Water
depth
Design
Discharge
Height
of bank
Width of
bank
ha ha ha ha ha ha ha/Cms Cms Cms Cms Cms
cm/
km
m m Cms m m m/sec
0 24000 16000 4800 Nil 2000 1800 2.667 0.015 0.569 3.236 22.5 5.500 1.040 3.56 2.0 0.570 1.015
1 22000 14000 4200 Nil 1750 1800 2.333 0.014 0.554 2.888 22.5 5.200 1.007 3.17 2.0 0.555 1.000
2 18000 12000 3600 Nil 1500 1800 2.000 0.014 0.540 2.540 22.5 4.850 0.975 2.80 2.0 0.538 1.000
3 16000 11000 3300 Nil 1375 1800 1.833 0.014 0.527 2.360 24.0 4.700 0.945 2.60 2.0 0.532 1.000
4 14000 10000 3000 Nil 1250 1800 1.667 0.013 0.513 2.180 24.0 4.550 0.915 2.40 2.0 0.521 1.000
5 12000 8000 2400 Nil 1000 1800 1.333 0.500 1.833 25.0 4.550 0.840 2.02 2.0 0.484 0.992
Schedule of Area Statistics
Schedule of area statistics and Channel Dimensions
The design of channel cross section from km to km is done in tabular form & is called
schedule of area statistics & channel dimensions. The column wise calculation is done
as follows:
Col 1: The actual design of the channel is done from km to km. If any channel is off
taking in between the kms the channel dimensions are also found downstream
of the cross regulator.
Col 2: It indicates the Gross Commanded Area (GCA) below that particular km.
Col 3: It indicates the Culturable Commanded Area (CCA) below that particular km.
Col 4 – 6: They indicate the % of area under the Rabi, Perennial, & Kharif crops.
Col 7: It indicates the outlet discharge factor for the controlling crop.
Col 8: It indicates the outlet discharge required which is found by multiplying the
area to be irrigated with the outlet discharge factor.
Col 9: It indicates the losses in the reach from km to km. Generally these
transmission losses are assumed as 2.5 cumecs per million square metres of
wetted perimeter for unlined channels and 0.6 cumecs per million square
metres of wetted perimeter for lined channels.
Schedule of area statistics and Channel Dimensions (continued)
Col 10: It indicates the total losses in the channel below any particular km.
Col 11: It indicates the total discharge for which the channel has to be designed which
includes outlet discharges and losses.
Col 12 – 17: These columns pertain to channel dimensions and are to be filled up after
designing the channel in each reach.
Col 18: It indicates the velocity in the channel
Col 19: It indicates the critical velocity ratio

Mais conteúdo relacionado

Mais procurados (20)

Canal alignment
Canal alignmentCanal alignment
Canal alignment
 
Canal Irrigation
Canal IrrigationCanal Irrigation
Canal Irrigation
 
types of canals
types of canals types of canals
types of canals
 
Chapter 4 seepage theories
Chapter 4 seepage theoriesChapter 4 seepage theories
Chapter 4 seepage theories
 
Irrigation canals
Irrigation canalsIrrigation canals
Irrigation canals
 
Canal
CanalCanal
Canal
 
Unlined Canal design
Unlined Canal designUnlined Canal design
Unlined Canal design
 
Irrigation Engineering
Irrigation EngineeringIrrigation Engineering
Irrigation Engineering
 
Diversion headwork
Diversion headwork Diversion headwork
Diversion headwork
 
Canal regulation works. m4pptx
Canal regulation works. m4pptxCanal regulation works. m4pptx
Canal regulation works. m4pptx
 
Canal Fall
Canal FallCanal Fall
Canal Fall
 
Canal Regulation & Cross Drainage Works
Canal Regulation & Cross Drainage WorksCanal Regulation & Cross Drainage Works
Canal Regulation & Cross Drainage Works
 
Kennedy's and laccy's theory
Kennedy's and laccy's theoryKennedy's and laccy's theory
Kennedy's and laccy's theory
 
Diversion headworks
Diversion headworksDiversion headworks
Diversion headworks
 
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion HeadworkDesign of Canal (Kennedy & Lacey Theory) & Diversion Headwork
Design of Canal (Kennedy & Lacey Theory) & Diversion Headwork
 
Dams and spillways
Dams and spillwaysDams and spillways
Dams and spillways
 
river training work
river training workriver training work
river training work
 
Failure of weir and barrage
Failure of weir and barrageFailure of weir and barrage
Failure of weir and barrage
 
Hydraulic jump
Hydraulic jumpHydraulic jump
Hydraulic jump
 
Canal irrigation
Canal irrigationCanal irrigation
Canal irrigation
 

Destaque

Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1Mulugeta Abera
 
Lacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLatif Hyder Wadho
 
Design Of Hydraulic Structure - Kennedy's Theory
Design Of Hydraulic Structure - Kennedy's TheoryDesign Of Hydraulic Structure - Kennedy's Theory
Design Of Hydraulic Structure - Kennedy's TheoryLatif Hyder Wadho
 
Rajastan canal or indira Ghandi canal project ppt
Rajastan canal or indira Ghandi canal project pptRajastan canal or indira Ghandi canal project ppt
Rajastan canal or indira Ghandi canal project pptdathan cs
 
Irrigation Engineering Terms In Civil Engineering
Irrigation Engineering Terms In Civil EngineeringIrrigation Engineering Terms In Civil Engineering
Irrigation Engineering Terms In Civil EngineeringLatif Hyder Wadho
 
Introduction to Pavement Design Concepts
Introduction to Pavement Design ConceptsIntroduction to Pavement Design Concepts
Introduction to Pavement Design ConceptsLatif Hyder Wadho
 
Design mannual for small scale irrigation scheme book
Design mannual for small scale irrigation scheme bookDesign mannual for small scale irrigation scheme book
Design mannual for small scale irrigation scheme bookSurendra Maharjan
 
Canals ppt
Canals pptCanals ppt
Canals pptbyju pk
 

Destaque (20)

Canal irrigation
Canal irrigationCanal irrigation
Canal irrigation
 
Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1
 
Lacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation EngineeringLacey Regime Theory - Irrigation Engineering
Lacey Regime Theory - Irrigation Engineering
 
Design Of Hydraulic Structure - Kennedy's Theory
Design Of Hydraulic Structure - Kennedy's TheoryDesign Of Hydraulic Structure - Kennedy's Theory
Design Of Hydraulic Structure - Kennedy's Theory
 
Rajastan canal or indira Ghandi canal project ppt
Rajastan canal or indira Ghandi canal project pptRajastan canal or indira Ghandi canal project ppt
Rajastan canal or indira Ghandi canal project ppt
 
AGEN 159 lec 3
AGEN 159 lec 3AGEN 159 lec 3
AGEN 159 lec 3
 
Irrigation Engineering Terms In Civil Engineering
Irrigation Engineering Terms In Civil EngineeringIrrigation Engineering Terms In Civil Engineering
Irrigation Engineering Terms In Civil Engineering
 
Transformer
TransformerTransformer
Transformer
 
Geology Terms
Geology TermsGeology Terms
Geology Terms
 
Timber
TimberTimber
Timber
 
Cleaning & shaping of root canal sytem
Cleaning & shaping of root canal sytemCleaning & shaping of root canal sytem
Cleaning & shaping of root canal sytem
 
Design traffic For Highways
Design traffic For HighwaysDesign traffic For Highways
Design traffic For Highways
 
3. earthen roads 30 aug
3. earthen roads 30 aug3. earthen roads 30 aug
3. earthen roads 30 aug
 
Introduction to Pavement Design Concepts
Introduction to Pavement Design ConceptsIntroduction to Pavement Design Concepts
Introduction to Pavement Design Concepts
 
Soil dynamics
Soil dynamicsSoil dynamics
Soil dynamics
 
Design mannual for small scale irrigation scheme book
Design mannual for small scale irrigation scheme bookDesign mannual for small scale irrigation scheme book
Design mannual for small scale irrigation scheme book
 
Civil Engineering Materials
Civil Engineering MaterialsCivil Engineering Materials
Civil Engineering Materials
 
Canals ppt
Canals pptCanals ppt
Canals ppt
 
Working of dragline
Working of draglineWorking of dragline
Working of dragline
 
The plumbing code
The plumbing codeThe plumbing code
The plumbing code
 

Semelhante a Design of a channel Reach

08. Classification of Canals.pdf
08. Classification of Canals.pdf08. Classification of Canals.pdf
08. Classification of Canals.pdfMuhammadAjmal326519
 
Unit 4-canal
Unit 4-canalUnit 4-canal
Unit 4-canalsaibabu48
 
WREII Canals Head Works and Distribution system
WREII Canals Head Works and Distribution systemWREII Canals Head Works and Distribution system
WREII Canals Head Works and Distribution systemMitaliShelke
 
CHAPTER 5- Water Conveynance and Control-1.pptx
CHAPTER  5- Water Conveynance and Control-1.pptxCHAPTER  5- Water Conveynance and Control-1.pptx
CHAPTER 5- Water Conveynance and Control-1.pptxMamushLeta
 
Chapter 3 channel design
Chapter 3  channel designChapter 3  channel design
Chapter 3 channel designMohsin Siddique
 
10. Kenedy's and Lacey's Theory (Supply).pdf
10. Kenedy's and Lacey's Theory (Supply).pdf10. Kenedy's and Lacey's Theory (Supply).pdf
10. Kenedy's and Lacey's Theory (Supply).pdfMuhammadAjmal326519
 
10-CE 408 Lining &Design of channel.pptx
10-CE 408 Lining &Design of  channel.pptx10-CE 408 Lining &Design of  channel.pptx
10-CE 408 Lining &Design of channel.pptxHuzaifaZafar15
 
Drainage Engineering (Drainage and design of drainage systems)
Drainage Engineering (Drainage and design of drainage systems)Drainage Engineering (Drainage and design of drainage systems)
Drainage Engineering (Drainage and design of drainage systems)Latif Hyder Wadho
 
drainage-engineering-ppt.pdf
drainage-engineering-ppt.pdfdrainage-engineering-ppt.pdf
drainage-engineering-ppt.pdfPkSong
 
Module 03 Distribution Works.pptx
Module 03 Distribution Works.pptxModule 03 Distribution Works.pptx
Module 03 Distribution Works.pptxSilasChaudhari
 
Storm drainage design
Storm drainage designStorm drainage design
Storm drainage designdobariya axit
 
Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1Mulugeta Abera
 
fdocuments.in_chapter-four-drainage-design-of-drainage-design-of-surface-drai...
fdocuments.in_chapter-four-drainage-design-of-drainage-design-of-surface-drai...fdocuments.in_chapter-four-drainage-design-of-drainage-design-of-surface-drai...
fdocuments.in_chapter-four-drainage-design-of-drainage-design-of-surface-drai...SubhadipMajumder2
 
Terraces:Soil Water Conservation structure
Terraces:Soil Water Conservation structureTerraces:Soil Water Conservation structure
Terraces:Soil Water Conservation structureMoudud Hasan
 
1_Drainage_Design.ppt
1_Drainage_Design.ppt1_Drainage_Design.ppt
1_Drainage_Design.pptRounokBiswas1
 
Hydrologic Design of a Percolation Tank
Hydrologic Design of a Percolation TankHydrologic Design of a Percolation Tank
Hydrologic Design of a Percolation TankC. P. Kumar
 

Semelhante a Design of a channel Reach (20)

Canal Irrigation
Canal IrrigationCanal Irrigation
Canal Irrigation
 
08. Classification of Canals.pdf
08. Classification of Canals.pdf08. Classification of Canals.pdf
08. Classification of Canals.pdf
 
Unit 4-canal
Unit 4-canalUnit 4-canal
Unit 4-canal
 
WREII Canals Head Works and Distribution system
WREII Canals Head Works and Distribution systemWREII Canals Head Works and Distribution system
WREII Canals Head Works and Distribution system
 
CHAPTER 5- Water Conveynance and Control-1.pptx
CHAPTER  5- Water Conveynance and Control-1.pptxCHAPTER  5- Water Conveynance and Control-1.pptx
CHAPTER 5- Water Conveynance and Control-1.pptx
 
Chapter 3 channel design
Chapter 3  channel designChapter 3  channel design
Chapter 3 channel design
 
10. Kenedy's and Lacey's Theory (Supply).pdf
10. Kenedy's and Lacey's Theory (Supply).pdf10. Kenedy's and Lacey's Theory (Supply).pdf
10. Kenedy's and Lacey's Theory (Supply).pdf
 
10-CE 408 Lining &Design of channel.pptx
10-CE 408 Lining &Design of  channel.pptx10-CE 408 Lining &Design of  channel.pptx
10-CE 408 Lining &Design of channel.pptx
 
Drainage Engineering (Drainage and design of drainage systems)
Drainage Engineering (Drainage and design of drainage systems)Drainage Engineering (Drainage and design of drainage systems)
Drainage Engineering (Drainage and design of drainage systems)
 
drainage-engineering-ppt.pdf
drainage-engineering-ppt.pdfdrainage-engineering-ppt.pdf
drainage-engineering-ppt.pdf
 
Open channel design
Open channel designOpen channel design
Open channel design
 
Module 03 Distribution Works.pptx
Module 03 Distribution Works.pptxModule 03 Distribution Works.pptx
Module 03 Distribution Works.pptx
 
Storm drainage design
Storm drainage designStorm drainage design
Storm drainage design
 
Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1Chapter 6 design of irrigation channel1
Chapter 6 design of irrigation channel1
 
fdocuments.in_chapter-four-drainage-design-of-drainage-design-of-surface-drai...
fdocuments.in_chapter-four-drainage-design-of-drainage-design-of-surface-drai...fdocuments.in_chapter-four-drainage-design-of-drainage-design-of-surface-drai...
fdocuments.in_chapter-four-drainage-design-of-drainage-design-of-surface-drai...
 
Terraces:Soil Water Conservation structure
Terraces:Soil Water Conservation structureTerraces:Soil Water Conservation structure
Terraces:Soil Water Conservation structure
 
1_Drainage_Design.ppt
1_Drainage_Design.ppt1_Drainage_Design.ppt
1_Drainage_Design.ppt
 
Canals
CanalsCanals
Canals
 
Hydrologic Design of a Percolation Tank
Hydrologic Design of a Percolation TankHydrologic Design of a Percolation Tank
Hydrologic Design of a Percolation Tank
 
Canal design
Canal designCanal design
Canal design
 

Mais de Latif Hyder Wadho

Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control  Internal Checking Internal Auditing - Auditing By LATiFHRWInternal Control  Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRWLatif Hyder Wadho
 
Supply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRWSupply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRWLatif Hyder Wadho
 
SPSC CCE 2013 Pcs past papers
SPSC  CCE 2013 Pcs past papersSPSC  CCE 2013 Pcs past papers
SPSC CCE 2013 Pcs past papersLatif Hyder Wadho
 
SPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening testSPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening testLatif Hyder Wadho
 
Why is english as a global language
Why is english as a global languageWhy is english as a global language
Why is english as a global languageLatif Hyder Wadho
 
Introduction to Geo technical Engineering 2
 Introduction to Geo technical Engineering 2 Introduction to Geo technical Engineering 2
Introduction to Geo technical Engineering 2Latif Hyder Wadho
 
Introdction to Geo technical Engineering
Introdction to Geo technical EngineeringIntrodction to Geo technical Engineering
Introdction to Geo technical EngineeringLatif Hyder Wadho
 
Sub surface exploration part 2
Sub surface exploration part 2Sub surface exploration part 2
Sub surface exploration part 2Latif Hyder Wadho
 
Problems on piles and deep footing
Problems on piles and deep footingProblems on piles and deep footing
Problems on piles and deep footingLatif Hyder Wadho
 
Load carrying capacity of piles
Load carrying capacity of pilesLoad carrying capacity of piles
Load carrying capacity of pilesLatif Hyder Wadho
 
Subsurface exploration (part-3)
Subsurface exploration (part-3)Subsurface exploration (part-3)
Subsurface exploration (part-3)Latif Hyder Wadho
 
Sub surface exploration (part-1)
Sub surface exploration (part-1)Sub surface exploration (part-1)
Sub surface exploration (part-1)Latif Hyder Wadho
 
Introduction to Foundation Engineering
Introduction to Foundation EngineeringIntroduction to Foundation Engineering
Introduction to Foundation EngineeringLatif Hyder Wadho
 

Mais de Latif Hyder Wadho (20)

Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control  Internal Checking Internal Auditing - Auditing By LATiFHRWInternal Control  Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
 
Supply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRWSupply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRW
 
Surveying and Leveling
Surveying and LevelingSurveying and Leveling
Surveying and Leveling
 
Energy crisis in Pakistan
Energy crisis in PakistanEnergy crisis in Pakistan
Energy crisis in Pakistan
 
SPSC PCS Syllabus cce 2018
SPSC PCS Syllabus cce 2018SPSC PCS Syllabus cce 2018
SPSC PCS Syllabus cce 2018
 
SPSC CCE 2013 Pcs past papers
SPSC  CCE 2013 Pcs past papersSPSC  CCE 2013 Pcs past papers
SPSC CCE 2013 Pcs past papers
 
SPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening testSPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening test
 
Engineering drawing
Engineering drawingEngineering drawing
Engineering drawing
 
Why is english as a global language
Why is english as a global languageWhy is english as a global language
Why is english as a global language
 
Bricks
BricksBricks
Bricks
 
Introduction to Geo technical Engineering 2
 Introduction to Geo technical Engineering 2 Introduction to Geo technical Engineering 2
Introduction to Geo technical Engineering 2
 
Introdction to Geo technical Engineering
Introdction to Geo technical EngineeringIntrodction to Geo technical Engineering
Introdction to Geo technical Engineering
 
Sub surface exploration part 2
Sub surface exploration part 2Sub surface exploration part 2
Sub surface exploration part 2
 
Problems on piles and deep footing
Problems on piles and deep footingProblems on piles and deep footing
Problems on piles and deep footing
 
Load carrying capacity of piles
Load carrying capacity of pilesLoad carrying capacity of piles
Load carrying capacity of piles
 
Settlement of piles
Settlement of pilesSettlement of piles
Settlement of piles
 
Plate load test
Plate load testPlate load test
Plate load test
 
Subsurface exploration (part-3)
Subsurface exploration (part-3)Subsurface exploration (part-3)
Subsurface exploration (part-3)
 
Sub surface exploration (part-1)
Sub surface exploration (part-1)Sub surface exploration (part-1)
Sub surface exploration (part-1)
 
Introduction to Foundation Engineering
Introduction to Foundation EngineeringIntroduction to Foundation Engineering
Introduction to Foundation Engineering
 

Último

Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
Industrial Applications of Centrifugal Compressors
Industrial Applications of Centrifugal CompressorsIndustrial Applications of Centrifugal Compressors
Industrial Applications of Centrifugal CompressorsAlirezaBagherian3
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
signals in triangulation .. ...Surveying
signals in triangulation .. ...Surveyingsignals in triangulation .. ...Surveying
signals in triangulation .. ...Surveyingsapna80328
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHSneha Padhiar
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solidnamansinghjarodiya
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsResearcher Researcher
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 

Último (20)

Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
Industrial Applications of Centrifugal Compressors
Industrial Applications of Centrifugal CompressorsIndustrial Applications of Centrifugal Compressors
Industrial Applications of Centrifugal Compressors
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
signals in triangulation .. ...Surveying
signals in triangulation .. ...Surveyingsignals in triangulation .. ...Surveying
signals in triangulation .. ...Surveying
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solid
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending Actuators
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 

Design of a channel Reach

  • 1. DESIGN PROCEDURE FOR IRRIGATION CHANNELS 1. Cross-section of an Irrigation Canal A typical and most desired section of a canal, i.e. partly in cutting and partly in filling, is shown in the following figure. NSL = Natural Surface Level CBL = Canal Bed Level FSL = Full Supply Level When NSL is above the top of the bank, the canal section will have to be cut, and it shall be called “canal in cutting”. When NSL is lower than the CBL, the canal section will have to be built in filling, and it is called “canal in filling”.
  • 2. Side Slopes Side slopes (H:V) are fixed according to stability requirements, depending upon the type of the soil (angle of repose of soil). A comparatively steeper slope can be provided in cutting because soil is naturally consolidated, and hence, more stable. Generally adopted slopes: In cutting: 1:1 to 1½: 1 In filling: 1½:1 to 2:1 For channels with silt laden water, the actual capacity of the channel is worked out with ½ :1 side slopes.
  • 3. Berms Berm is the horizontal distance left at ground level between the toe of the bank and the top edge of cutting. If s1:1 is the slope in cutting and s2:1 in filling, then initial berm width = (s2-s1) d1 Since NSL fluctuates considerably, while canal bed level (CBL) varies very slightly, d1 shall vary; and, therefore, the berm width shall vary. After the water flows in the channel for some time, the silt gets deposited on the sides giving them a slope of ½:1. The position of the berm, therefore, changes from ground level to FSL. as shown in Fig. and its width becomes equal to (s2- ½ ).y. If s2 = 1 ½ then the final berm width =y, i.e. equal to the depth of the canal.
  • 4. The berms when fully formed, serve the following purposes : (i) The silt deposited on the sides is very fine and impervious. It, therefore, serves as a good lining for reducing losses, leakage and consequent breaches, etc. (ii) They help the channel to attain regime conditions, as they help in providing a wider waterway, if required. Even fluctuations of discharge do not produce much fluctuations in depths because of wider waterway. (iii) They give additional strength to the banks and provide protection against erosion and breaches. (iv) The possibility of breaches gets reduced because the saturation line comes more in the body of the embankment. (v) They protect the banks from erosion due to wave action. (vi) They provide a scope for future widening of the canal. (vii) Berms can be used as borrow pits for excavating soil to be used for filling.
  • 5. Freeboard The margin between FSL and bank level is known as freeboard. The amount of freeboard depends upon the size of the channel. The generally provided values of freeboard are given in following table. Values of Freeboard in Canals Discharge (cumec) Extent of Free board (m) 1 to 5 0.5 5 to 10 0.6 10 to 30 0.75 30 to 150 0.90
  • 6. Banks The primary purpose of banks is to retain water. They can be used as means of communication and as inspection paths. They should be wide enough, so that a minimum cover of 0.5 m is available above the saturation line, as shown in below Fig. High banks will have to be designed as earth dams. Service Roads Service roads are provided on canals for inspection purposes, and may simultaneously serve as the means of communication in remote areas. They are provided 0.4 m to 1.0 m above FSL, depending upon the size of the channel.
  • 7. Dowlas As a measure of safety in driving, dowlas 0.3 m high and 0.3 to 0.6 m wide at top, with side slopes of 1:1 to 2:1, are provided along the banks, as shown in below figure. They also help in preventing slope erosion due to rains, etc.
  • 8. Back Berm or Counter Berms. Even after providing sufficient section for bank embankment, the saturation gradient line may cut the downstream end of the bank. In such a case, the saturation line can be kept covered at least by 0.5 m with the help of counter berms, as shown in following figure. The straight saturation gradient line may be drawn with the following slopes. Assumed Values of Saturation Gradients in Different Soils Type of soil Slope (H:V) Clay 1 in 4 Clayey loam 1 in 6 Loam 1 in 8 Loamy sand 1 in 10 sand 1 in 15
  • 9. Spoil Banks. When the earthwork in excavation exceeds earthwork in filling, even after providing maximum width of bank embankments, the extra earth has to be disposed off economically. To dispose off this earth by mechanical transport, etc. may become very costly, and an economical mode of its disposal may be found in the form of collecting this soil on the edge of the bank embankment itself. The soil is, therefore, deposited in such a case, in the form of heaps on both banks or only on one bank, as shown in following figure. These heaps of soil are discontinued at suitable intervals and longitudinal drains running by their sides are excavated for the disposal of rain water. Cross drains through the spoil banks may also be excavated, if needed.
  • 10. Borrow Pits When earthwork in filling exceeds the earthwork in excavation, the earth has to be brought from somewhere. The pits, which are dug for bringing earth, are known as borrow pits. If such pits are excavated outside the channel, they are known as external borrow pits, and if they are excavated somewhere within the channel, they are known as internal borrow pits. It is a very costly affair to bring soil from distances. Even in the nearby areas, these pits may cause mosquito nuisance due to collection of rain water in these pits, and hence, external borrow pits are not preferred. When needed, internal borrow pits are excavated on the bed of the canal, as shown in figure.
  • 11. The borrow pits should start from a point at a distance more than 5 m from the toe for small channels, and 10 m for large channels. The width of these pits (b) should be less than half the width of the canal (B), and should be dug in the centre. The depth of these pits should be equal to or less than 1 m. Longitudinally, these pits should not run continuous but a minimum space of 0.5 L should be left between two consecutive pits. (where L is the length of one pit) as shown in following figure.
  • 12. Balancing Depth for Excavating Canals Maximum economy can be achieved in canal construction. if the earthwork in excavation equals the earthwork in filling. Such a thing is possible when a canal is constructed partly in filling and partly in cutting, which mostly happens in practical life. If this balance between cutting and filling can occur. then the need for spoil banks or borrow pits is entirely eliminated. and moreover. earthwork has to be paid only once in a single item. For a given cross-section of a channel. there can be only one depth. for which such a balance between cutting and filling will occur. This depth is known as the Balancing depth. This depth can be worked out easily by equating the areas of cutting and filling.
  • 13. Example Calculate the balancing depth for a channel section having a bed width equal to 18 m and side slopes of 1:1 in cutting and 2:1 in filling. The bank embankments are kept 3.0 m higher than the ground level (berm level) and crest width of banks is kept as 2.0 m. Solution The channel section is shown in Fig. Let d1 be the balancing depth, i.e. the depth for which excavation and filling becomes equal. Area of cutting = (18+d1).d1 m2 Equating cutting and filling, we get (18+d1).d1 = 48 Solving for d1, we get Balancing depth = 2.35 m 2 m483 2 142 2fillingofArea =      × + =
  • 14. Example Design and Prepare the longitudinal section, schedule of area statistics and channel dimensions of an irrigation channel from the following data: Longitudinal leveling of channel alignment gives the following results: Assume a datum level of 150.00 m, Full Supply Level of parent channel as 157.70 m, and Bed Level of parent channel as 156.00 m. km Ground level km Ground level 0.0 155.20 2.6 155.35 0.2 157.26 2.8 155.17 0.4 157.29 3.0 155.12 0.6 156.21 3.2 154.95 0.8 156.56 3.4 154.70 1.0 156.52 3.6 154.39 1.2 156.51 3.8 154.28 1.4 156.28 4.0 154.19 1.6 156.11 4.2 154.10 1.8 156.14 4.4 153.74 2.0 155.83 4.6 153.58 2.2 155.68 4.8 153.38 2.4 155.58 5.0 153.18
  • 15. Commanded areas are given as follows: Total loss is between km 0.5 to 5.0. Losses are to be calculated at the rate of 2 cumecs per million square metres of the wetted perimeter. Take side slope of the channel section as 1V:0.5H, m = 1, and Kutter’s N = 0.0225. Below km GCA (ha) CCA (ha) 0 24000 16000 1 22000 14000 2 18000 12000 3 16000 11000 4 14000 10000 5 12000 8000 Intensity of irrigation Rabi (wheat) 30% Kharif (Rice) 12.5% Kor-period (B) 4 weeks 2.5 weeks Kor-depth (∆) 13.4 cm 19 cm
  • 16. Solution: Design Procedure: 1.The longitudinal section (L-section) of the ground is plotted first. 2.The slope of the channel is calculated with Lacey’s formula or taken from Lacey’s diagrams and is tabulated in Schedule of Area Statistics. 3.A trial slope line for full supply level is marked. The position and depth of falls are also tentatively marked. 4.The actual channel design is thereafter carried out by filling in the table of Schedule of Area Statistics. 5.The outlet discharge factor for controlling crops is determined as follows: (a) where, B = kor period = 4 x 7 days; and ∆ = kor depth = 0.134 m (b) where, B = kor period = 2.5 x 7 days; and ∆ = kor depth = 0.19 m ∆ = B64.8 RabiforfactordischargeOutlet cumecha /1800 0.134 748.64 factordischargeoutletHence = ×× = ∆ = B64.8 KharifforfactordischargeOutlet cumecha /076 0.19 72.58.64 factordischargeoutletHence = ×× =
  • 17. The outlet discharge factor for the controlling crops is the one which gives maximum discharge. Let us assume the CCA as 16000 ha. Hence outlet discharge factor to be adopted = 1800 ha/cumecs. ha48000.301600030%asI.I.withcropRabiunderArea =×= cumec D A 67.2 1800 4800 cropRabiforneededDischarge ===∴ ha20000.1251600012.5%asI.I.withcropKharifunderArea =×= cumec D A 63.2 760 2000 cropRabiforneededDischarge ===∴
  • 18. Design of Channel at various sections: The design is started from the tail where the losses are known. At km 5.0: Culturable Commanded Area (CCA) = 8000 ha Intensity of Rabi irrigation = 30% Area to be irrigated for Rabi crops = 8000 x 0.3 = 2400 ha Outlet discharge factor = 1800 ha/cumec Total losses after 5.0 km = 0.5 cumec (Given) Total discharge at km 5.0 = 1.34 + 0.5 = 1.84 cumec Adopt design discharge Q, 10% more than the total discharge. Therefore, design discharge = 1.84 x 1.1 = 2.02 cumec, V/Vo = m = 1.0 (Given), and N = 0.0225 Assume slope S = 0.25 m per km = 1/4000 cumec D A 34.1 1800 2400 cropRabiforneededDischarge ===∴
  • 19.
  • 20.
  • 21. Garret's diagram: It gives the graphical method of designing the channel dimensions based on Kennedy's Theory. The diagram has discharge plotted on the abscissa. The ordinates on the left indicate the slope and on the right water depth in the channel & critical velocity Vo. The discharge lines are curved and the bed width lines are shown dashed. Procedure to use Garret's diagram in channel design: 1. Find out the discharge for which the channel is to be designed through Schedule of Area Statistics. 2.Find out the slope of the channel through longitudinal section. 3.Follow the discharge line and find out its intersection with the horizontal line from the slope. Interpolation may be done if needed. Mark the intersection point P. 4.Draw the vertical line through the intersection point. This will cut several bed width curves. Each point of intersection gives a depth & Vo on right hand side of ordinates. 5.Choose a pair of bed width, depth and Vo corresponding to point of intersection obtained above. 6.Calculate the area of channel section A corresponding to channel bed width and depth. 7.Calculate the velocity corresponding to the area A. 8.Calculate the ratio V/Vo. This should be equal to unity or as given for the channel design. 9.Repeat the procedure for other values of bed width and depth till the value of V/Vo is the same value as given for channel design.
  • 22. From Garret's diagram: At km 5.0 Discharge Q (Cumecs) Slope S Bed width B (m) Water Depth D (m) Area A Velocity V = Q/A (m/s) Critical Velocity Vo (m/s) Critical Velocity Ratio 5.50 0.73 4.28 0.472 0.450 1.05 2.02 1 in 4000 4.90 0.79 4.18 0.483 0.473 1.02 4.55 0.84 4.17 0.484 0.492 0.98
  • 23. At km 4.0: Culturable Commanded Area (CCA) = 10,000 ha Intensity of Rabi irrigation = 30% Area to be irrigated for Rabi crops = 10,000 x 0.3 = 3000 ha Outlet discharge factor = 1800 ha/cumec Losses below km 5.0 = 0.5 cumec (Given) Losses in channel between km 5.0 and km 4.0 Note: For calculation of losses adopt section at km 5.0 as section at km 4.0 is not yet calculated. Total losses at km 4.0 = losses below km 5.0 + losses between km 5.0 and km 4.0 = 0.5 + 0.013 = 0.513 cumec. Therefore total discharge required at km 4.0 = 1.67 + 0.513 = 2.183 cumec Adopt design discharge Q 10% more than the total discharge. Therefore design discharge = 2.183 x 1.1 = 2.40 cumec, Similar approach is used in calculating discharge at km 3.0, 2.0, 1.0 and 0.0. cumec D A 67.1 1800 3000 cropRabiforneededDischarge ===∴ m445.684.0555.45DB=5.0kmatsectionchannelofperimeterWetted =×+=+ cumec013.02 000,000,1 10006.445 4.0kmto5.0kmfromreachinlossThus, =× × =
  • 24. Below km GCA CCA Area to be irrigated Outlet discharge factor Outlet discharge Loss in reach Total losses Total discharge Channel dimensions Velocity V/Vo Rabi 30% Sugar Cane Rice 12.5% Bed slope Bed width Water depth Design Discharge Height of bank Width of bank ha ha ha ha ha ha ha/Cms Cms Cms Cms Cms cm/ km m m Cms m m m/sec 0 24000 16000 4800 Nil 2000 1800 2.667 0.015 0.569 3.236 22.5 5.500 1.040 3.56 2.0 0.570 1.015 1 22000 14000 4200 Nil 1750 1800 2.333 0.014 0.554 2.888 22.5 5.200 1.007 3.17 2.0 0.555 1.000 2 18000 12000 3600 Nil 1500 1800 2.000 0.014 0.540 2.540 22.5 4.850 0.975 2.80 2.0 0.538 1.000 3 16000 11000 3300 Nil 1375 1800 1.833 0.014 0.527 2.360 24.0 4.700 0.945 2.60 2.0 0.532 1.000 4 14000 10000 3000 Nil 1250 1800 1.667 0.013 0.513 2.180 24.0 4.550 0.915 2.40 2.0 0.521 1.000 5 12000 8000 2400 Nil 1000 1800 1.333 0.500 1.833 25.0 4.550 0.840 2.02 2.0 0.484 0.992 Schedule of Area Statistics
  • 25. Schedule of area statistics and Channel Dimensions The design of channel cross section from km to km is done in tabular form & is called schedule of area statistics & channel dimensions. The column wise calculation is done as follows: Col 1: The actual design of the channel is done from km to km. If any channel is off taking in between the kms the channel dimensions are also found downstream of the cross regulator. Col 2: It indicates the Gross Commanded Area (GCA) below that particular km. Col 3: It indicates the Culturable Commanded Area (CCA) below that particular km. Col 4 – 6: They indicate the % of area under the Rabi, Perennial, & Kharif crops. Col 7: It indicates the outlet discharge factor for the controlling crop. Col 8: It indicates the outlet discharge required which is found by multiplying the area to be irrigated with the outlet discharge factor. Col 9: It indicates the losses in the reach from km to km. Generally these transmission losses are assumed as 2.5 cumecs per million square metres of wetted perimeter for unlined channels and 0.6 cumecs per million square metres of wetted perimeter for lined channels.
  • 26. Schedule of area statistics and Channel Dimensions (continued) Col 10: It indicates the total losses in the channel below any particular km. Col 11: It indicates the total discharge for which the channel has to be designed which includes outlet discharges and losses. Col 12 – 17: These columns pertain to channel dimensions and are to be filled up after designing the channel in each reach. Col 18: It indicates the velocity in the channel Col 19: It indicates the critical velocity ratio