SlideShare a Scribd company logo
1 of 2
Download to read offline
KRISTINE OBENDORF, P.E.
CIVIL ENGINEER
C A R E E R S U M M A R Y
A thorough and diligent civil engineer with 16 years of
experience as project manager, project engineer, planner and
construction manager/inspector, who is vastly experienced in
all aspects of a project from grant proposals to final
construction advertisement. With specific expertise in
project management, transportation and trail design and
construction engineering management.
H I G H L I G H T S
EIGHT – Years Managing Projects and Consultants
$29 Million – Transportation Projects Managed
$4.1 Million – Design Fees Managed
12 –Agencies worked with, or for, in Northern Colorado
FOUR – Railroad crossings
NINE – Pedestrian Bridges THREE – Roadway Bridges
Over $10 Million – Transportation Projects Designed
$3.6 and $1.4 Million– Largest Bridge and Trail Projects
A C A D E M I C S
BACHELOR OF CIVIL ENGINEERING - Construction Engineering
Management
1998|University of Wisconsin – Madison
MASTER OF CIVIL ENGINEERING - Transportation
1999 | University of Washington - Seattle
PROFESSIONAL ENGINEER
Colorado No. 37733
P R O F E S S I O N A L D E V E L O P M E N T
BOULDER COUNTY SUPERVISORY SKILLS CERTIFICATE
2013 | Boulder County, CO
PRINCIPLES OF ACCOUNTING
2012 | Arapahoe Community College
BOULDER COUNTY LEADERSHIP ACADEMY
2010 | Boulder County, CO
ACEC/CO FUTURE LEADERS SUPERVISORY SKILLS
2005 | Denver, CO
Key Expertise
SKILLS
Project Management
Scope Development
Proposal Writing
Public Meetings
Presentations
Team Building
Leadership
Engineering Design
Construction Mgmt
Construction Insp.
Organization
Planning
Communication
CIVIL ENGINEERING SKILLS
• Manages consultants on rural and urban
roadway projects both design and construction
projects.
• Implements CDOT Local Agency requirements.
• Specializes in specifications, cost estimating
SWMP and Erosion Control
• Provides construction coordination and
oversight.
• Reviews and prepares plan sets, engineer’s
estimates and specifications.
• Represents projects at meetings with Board of
County Commissioners, advisory boards, public
open houses and opening celebrations
PERSONAL SKILLS
• Collaborates and communicates well with
consultants, contractors, elected officials, local
agencies, utilities, and the public.
• Continually improves project management
processes.
• Develops effective relationships.
• Willingly shares expertise and experience with
others.
• Produces high quality work.
REFERENCES: Available on request
CONTACT
2446 Omni Court
Berthoud, CO 80513
T: 303.903.2642
E: nelsonk25@hotmail.com
KRISTINE OBENDORF, P.E.
P R O F F E S S I O N A L G R O W T H A N D E X P E R I E N C E
ENGINEER II Boulder, CO
Boulder County Transportation Department Sept. 2013 to Present
• Review preliminary and final construction documents for roadway projects including plan sets, engineer’s estimates and
specifications.
• Provide construction coordination between consultant, contractor, and County inspectors for FEMA and FHWA funded flood
projects.
• Develop project management tools for myself and fellow engineers to assist in project tracking and efficiency.
• Coordinate project design with utility companies, local agencies, County Parks & Open Space, County Road Maintenance, Weld
County and Larimer County.
• Manage consultants associated with county projects and supervise their planning, design, plan preparations, budgets and
project timelines.
• Continue duties, project oversight and coordination for Boulder County’s Regional Trail Program.
REGIONAL TRAILS PLANNER Boulder, CO
Boulder County Transportation Department Jun. 2008 to August 2013
• Assisted the CIP coordinator to track budgets for department project expenditures and budget analysis.
• Implemented and managed the Regional Trails Program of Boulder County in collaboration with Boulder County’s
Transportation and Parks & Open Space departments, the County’s communities and CDOT – Region 4.
• Developed trail routes that balance recreation with the natural environment, residential spaces and agricultural landscapes.
• Managed and selected consultants associated with county trail projects and supervising their planning, design, plan
preparations, budgets and project timelines.
• Reviewed preliminary and final construction documents for trail projects including plan sets, engineer’s estimates and
specifications.
• Provided construction coordination, oversight, and closeout for county and federally funded trail projects.
• Coordinated agreements and design with the BNSF Railway, the Regional Transportation District (RTD), private property owners,
ditch companies and other local agencies.
• Represented the Regional Trail Program at Board of County Commissioners, various open space advisory boards, public open
houses, and opening celebrations.
• Prepared grants to solicit funds from Great Outdoors Colorado and Colorado Parks & Wildlife.
TRAIL ENGINEER Lafayette, CO
Loris and Associates, Inc. Jul. 2006 to May 2008
• Provided oversight and guidance to the project team to develop design plans.
• Coordinated project team including clients, sub-consultants, utilities and internal staff.
• Designed, implemented and managed trail and bicycle lane projects in Colorado and Arizona.
• Developed feasibility reports for trail projects.
• Developed preliminary and final construction documents for trail and bikeway projects including plan sets, engineer's estimates
and specifications.
TRAVEL ABROAD
Argentina, Chile, Brazil, and Peru Feb. 2006 to July 2006
PROJECT MANAGER & ENGINEER Centennial, CO
Felsburg Holt & Ullevig Oct. 2003 to Feb. 2006
• Coordinated and provided oversight of project teams including clients, utilities, sub-consultants and internal staff.
• Designed, implemented and managed bicycle lane, roadway, and interchange projects including those with CDOT-Region 4
oversight, Fort Collins, Weld County, E470 Public Highway Authority (E470), and Loveland.
• Managed project budgets, billings, and tasks.
• Developed feasibility reports for roadway projects.
• Developed preliminary and final construction documents: plan sets, engineer’s estimate and specifications for federally funded
projects through CDOT and city projects.
• Solicited public’s input at open houses and developed display boards and handouts for public’s use.

More Related Content

What's hot

BLAKEHARDINRESUME(1)
BLAKEHARDINRESUME(1)BLAKEHARDINRESUME(1)
BLAKEHARDINRESUME(1)Blake Hardin
 
South County Police Station and Animal Shelter Community Meeting Presentation...
South County Police Station and Animal Shelter Community Meeting Presentation...South County Police Station and Animal Shelter Community Meeting Presentation...
South County Police Station and Animal Shelter Community Meeting Presentation...Fairfax County
 
State of the Trails 2015
State of the Trails 2015State of the Trails 2015
State of the Trails 2015Paul Schumann
 
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Fairfax County
 
Backlick Road Walkway Citizens Information Meeting: Nov. 9, 2017
Backlick Road Walkway Citizens Information Meeting: Nov. 9, 2017Backlick Road Walkway Citizens Information Meeting: Nov. 9, 2017
Backlick Road Walkway Citizens Information Meeting: Nov. 9, 2017Fairfax County
 
LCCO General Meeting 120116
LCCO General Meeting 120116LCCO General Meeting 120116
LCCO General Meeting 120116Paul Schumann
 
Kirby Road Sidewalk Improvements
Kirby Road Sidewalk ImprovementsKirby Road Sidewalk Improvements
Kirby Road Sidewalk ImprovementsFairfax County
 
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...Fairfax County
 
NJ Future Forum 2012 Complete Streets Kremer
NJ Future Forum 2012 Complete Streets KremerNJ Future Forum 2012 Complete Streets Kremer
NJ Future Forum 2012 Complete Streets KremerNew Jersey Future
 
LCCO General Meeting 110316
LCCO General Meeting 110316LCCO General Meeting 110316
LCCO General Meeting 110316Paul Schumann
 
Georgetown Pike Walkway Phase IV
Georgetown Pike Walkway Phase IVGeorgetown Pike Walkway Phase IV
Georgetown Pike Walkway Phase IVFairfax County
 
Kosinski, Andy - CV
Kosinski, Andy - CVKosinski, Andy - CV
Kosinski, Andy - CVakosinski
 

What's hot (17)

BLAKEHARDINRESUME(1)
BLAKEHARDINRESUME(1)BLAKEHARDINRESUME(1)
BLAKEHARDINRESUME(1)
 
South County Police Station and Animal Shelter Community Meeting Presentation...
South County Police Station and Animal Shelter Community Meeting Presentation...South County Police Station and Animal Shelter Community Meeting Presentation...
South County Police Station and Animal Shelter Community Meeting Presentation...
 
State of the Trails 2015
State of the Trails 2015State of the Trails 2015
State of the Trails 2015
 
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
Reston Arts Center Feasibility Focus Groups Visual, March 14, 2022
 
Backlick Road Walkway Citizens Information Meeting: Nov. 9, 2017
Backlick Road Walkway Citizens Information Meeting: Nov. 9, 2017Backlick Road Walkway Citizens Information Meeting: Nov. 9, 2017
Backlick Road Walkway Citizens Information Meeting: Nov. 9, 2017
 
LCCO General Meeting 120116
LCCO General Meeting 120116LCCO General Meeting 120116
LCCO General Meeting 120116
 
successful applications of project visualization
successful applications of project visualizationsuccessful applications of project visualization
successful applications of project visualization
 
Kirby Road Sidewalk Improvements
Kirby Road Sidewalk ImprovementsKirby Road Sidewalk Improvements
Kirby Road Sidewalk Improvements
 
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
 
TO Blvd Outreach City Info Mtg PPT Final
TO Blvd Outreach City Info Mtg PPT FinalTO Blvd Outreach City Info Mtg PPT Final
TO Blvd Outreach City Info Mtg PPT Final
 
Resume pe civil
Resume pe civilResume pe civil
Resume pe civil
 
NJ Future Forum 2012 Complete Streets Kremer
NJ Future Forum 2012 Complete Streets KremerNJ Future Forum 2012 Complete Streets Kremer
NJ Future Forum 2012 Complete Streets Kremer
 
LCCO General Meeting 110316
LCCO General Meeting 110316LCCO General Meeting 110316
LCCO General Meeting 110316
 
Georgetown Pike Walkway Phase IV
Georgetown Pike Walkway Phase IVGeorgetown Pike Walkway Phase IV
Georgetown Pike Walkway Phase IV
 
Fdot d1
Fdot d1Fdot d1
Fdot d1
 
My Résumé
My RésuméMy Résumé
My Résumé
 
Kosinski, Andy - CV
Kosinski, Andy - CVKosinski, Andy - CV
Kosinski, Andy - CV
 

Similar to kobendorfresume2016

Emily Lange resume 2020 website
Emily Lange resume 2020 websiteEmily Lange resume 2020 website
Emily Lange resume 2020 websiteEmily Lange
 
MSG Resume_Kalabat, Iden_2015
MSG Resume_Kalabat, Iden_2015MSG Resume_Kalabat, Iden_2015
MSG Resume_Kalabat, Iden_2015Iden Kalabat
 
Dumbarton Crossbay
Dumbarton Crossbay Dumbarton Crossbay
Dumbarton Crossbay Adina Levin
 
2015 Resume - Private Sector
2015 Resume - Private Sector2015 Resume - Private Sector
2015 Resume - Private SectorBruce L. Wacker
 
AllanMelius.Resume
AllanMelius.ResumeAllanMelius.Resume
AllanMelius.ResumeAllan Melius
 
Gardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 PanelsGardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 PanelsGardinerEast
 
Upp scoping session presentation 4 4-2019
Upp scoping session presentation 4 4-2019Upp scoping session presentation 4 4-2019
Upp scoping session presentation 4 4-2019E'ville Eye
 
Portland's Complete Streets Policy - GSMSummit 2014, Bruce Hyman
Portland's Complete Streets Policy - GSMSummit 2014, Bruce HymanPortland's Complete Streets Policy - GSMSummit 2014, Bruce Hyman
Portland's Complete Streets Policy - GSMSummit 2014, Bruce HymanGrowSmart Maine
 
James Daisa PE (transportation planning traffic engineering).rev 5.14
James Daisa PE (transportation planning traffic engineering).rev 5.14James Daisa PE (transportation planning traffic engineering).rev 5.14
James Daisa PE (transportation planning traffic engineering).rev 5.14jdaisa
 
ITD_P1_PLANNER DRAWING
ITD_P1_PLANNER DRAWINGITD_P1_PLANNER DRAWING
ITD_P1_PLANNER DRAWINGMao Hua
 
ICI Project 1- Urban Planner
ICI Project 1- Urban PlannerICI Project 1- Urban Planner
ICI Project 1- Urban PlannerEricaGloriaChin
 
ICI/ITD P1
ICI/ITD P1ICI/ITD P1
ICI/ITD P1Mao Hua
 
ICI_P1_PLANNER
ICI_P1_PLANNERICI_P1_PLANNER
ICI_P1_PLANNERMao Hua
 
ITD/ICI Project 1
ITD/ICI Project 1ITD/ICI Project 1
ITD/ICI Project 1TeoViVien
 
CKS_Portfolio_Min_CH2MHILL
CKS_Portfolio_Min_CH2MHILLCKS_Portfolio_Min_CH2MHILL
CKS_Portfolio_Min_CH2MHILLCarmen Squires
 

Similar to kobendorfresume2016 (20)

Emily Lange resume 2020 website
Emily Lange resume 2020 websiteEmily Lange resume 2020 website
Emily Lange resume 2020 website
 
Julian_Carroll resume 2015 link
Julian_Carroll resume 2015 linkJulian_Carroll resume 2015 link
Julian_Carroll resume 2015 link
 
MSG Resume_Kalabat, Iden_2015
MSG Resume_Kalabat, Iden_2015MSG Resume_Kalabat, Iden_2015
MSG Resume_Kalabat, Iden_2015
 
Dumbarton Crossbay
Dumbarton Crossbay Dumbarton Crossbay
Dumbarton Crossbay
 
2015 Resume - Private Sector
2015 Resume - Private Sector2015 Resume - Private Sector
2015 Resume - Private Sector
 
AllanMelius.Resume
AllanMelius.ResumeAllanMelius.Resume
AllanMelius.Resume
 
LORENZO CABRAS CV
LORENZO CABRAS CVLORENZO CABRAS CV
LORENZO CABRAS CV
 
Gardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 PanelsGardiner East EA - Public Forum 5 Panels
Gardiner East EA - Public Forum 5 Panels
 
Upp scoping session presentation 4 4-2019
Upp scoping session presentation 4 4-2019Upp scoping session presentation 4 4-2019
Upp scoping session presentation 4 4-2019
 
Portland's Complete Streets Policy - GSMSummit 2014, Bruce Hyman
Portland's Complete Streets Policy - GSMSummit 2014, Bruce HymanPortland's Complete Streets Policy - GSMSummit 2014, Bruce Hyman
Portland's Complete Streets Policy - GSMSummit 2014, Bruce Hyman
 
14 04-09 complete streets overview
14 04-09 complete streets overview14 04-09 complete streets overview
14 04-09 complete streets overview
 
Cuyahoga Greenways: Community Meeting #2
Cuyahoga Greenways: Community Meeting #2Cuyahoga Greenways: Community Meeting #2
Cuyahoga Greenways: Community Meeting #2
 
James Daisa PE (transportation planning traffic engineering).rev 5.14
James Daisa PE (transportation planning traffic engineering).rev 5.14James Daisa PE (transportation planning traffic engineering).rev 5.14
James Daisa PE (transportation planning traffic engineering).rev 5.14
 
ITD_P1_PLANNER DRAWING
ITD_P1_PLANNER DRAWINGITD_P1_PLANNER DRAWING
ITD_P1_PLANNER DRAWING
 
ICI Project 1- Urban Planner
ICI Project 1- Urban PlannerICI Project 1- Urban Planner
ICI Project 1- Urban Planner
 
ICI/ITD P1
ICI/ITD P1ICI/ITD P1
ICI/ITD P1
 
ICI_P1_PLANNER
ICI_P1_PLANNERICI_P1_PLANNER
ICI_P1_PLANNER
 
ITD/ICI Project 1
ITD/ICI Project 1ITD/ICI Project 1
ITD/ICI Project 1
 
CKS_Portfolio_Min_CH2MHILL
CKS_Portfolio_Min_CH2MHILLCKS_Portfolio_Min_CH2MHILL
CKS_Portfolio_Min_CH2MHILL
 
M walker resume_current
M walker resume_currentM walker resume_current
M walker resume_current
 

kobendorfresume2016

  • 1. KRISTINE OBENDORF, P.E. CIVIL ENGINEER C A R E E R S U M M A R Y A thorough and diligent civil engineer with 16 years of experience as project manager, project engineer, planner and construction manager/inspector, who is vastly experienced in all aspects of a project from grant proposals to final construction advertisement. With specific expertise in project management, transportation and trail design and construction engineering management. H I G H L I G H T S EIGHT – Years Managing Projects and Consultants $29 Million – Transportation Projects Managed $4.1 Million – Design Fees Managed 12 –Agencies worked with, or for, in Northern Colorado FOUR – Railroad crossings NINE – Pedestrian Bridges THREE – Roadway Bridges Over $10 Million – Transportation Projects Designed $3.6 and $1.4 Million– Largest Bridge and Trail Projects A C A D E M I C S BACHELOR OF CIVIL ENGINEERING - Construction Engineering Management 1998|University of Wisconsin – Madison MASTER OF CIVIL ENGINEERING - Transportation 1999 | University of Washington - Seattle PROFESSIONAL ENGINEER Colorado No. 37733 P R O F E S S I O N A L D E V E L O P M E N T BOULDER COUNTY SUPERVISORY SKILLS CERTIFICATE 2013 | Boulder County, CO PRINCIPLES OF ACCOUNTING 2012 | Arapahoe Community College BOULDER COUNTY LEADERSHIP ACADEMY 2010 | Boulder County, CO ACEC/CO FUTURE LEADERS SUPERVISORY SKILLS 2005 | Denver, CO Key Expertise SKILLS Project Management Scope Development Proposal Writing Public Meetings Presentations Team Building Leadership Engineering Design Construction Mgmt Construction Insp. Organization Planning Communication CIVIL ENGINEERING SKILLS • Manages consultants on rural and urban roadway projects both design and construction projects. • Implements CDOT Local Agency requirements. • Specializes in specifications, cost estimating SWMP and Erosion Control • Provides construction coordination and oversight. • Reviews and prepares plan sets, engineer’s estimates and specifications. • Represents projects at meetings with Board of County Commissioners, advisory boards, public open houses and opening celebrations PERSONAL SKILLS • Collaborates and communicates well with consultants, contractors, elected officials, local agencies, utilities, and the public. • Continually improves project management processes. • Develops effective relationships. • Willingly shares expertise and experience with others. • Produces high quality work. REFERENCES: Available on request CONTACT 2446 Omni Court Berthoud, CO 80513 T: 303.903.2642 E: nelsonk25@hotmail.com
  • 2. KRISTINE OBENDORF, P.E. P R O F F E S S I O N A L G R O W T H A N D E X P E R I E N C E ENGINEER II Boulder, CO Boulder County Transportation Department Sept. 2013 to Present • Review preliminary and final construction documents for roadway projects including plan sets, engineer’s estimates and specifications. • Provide construction coordination between consultant, contractor, and County inspectors for FEMA and FHWA funded flood projects. • Develop project management tools for myself and fellow engineers to assist in project tracking and efficiency. • Coordinate project design with utility companies, local agencies, County Parks & Open Space, County Road Maintenance, Weld County and Larimer County. • Manage consultants associated with county projects and supervise their planning, design, plan preparations, budgets and project timelines. • Continue duties, project oversight and coordination for Boulder County’s Regional Trail Program. REGIONAL TRAILS PLANNER Boulder, CO Boulder County Transportation Department Jun. 2008 to August 2013 • Assisted the CIP coordinator to track budgets for department project expenditures and budget analysis. • Implemented and managed the Regional Trails Program of Boulder County in collaboration with Boulder County’s Transportation and Parks & Open Space departments, the County’s communities and CDOT – Region 4. • Developed trail routes that balance recreation with the natural environment, residential spaces and agricultural landscapes. • Managed and selected consultants associated with county trail projects and supervising their planning, design, plan preparations, budgets and project timelines. • Reviewed preliminary and final construction documents for trail projects including plan sets, engineer’s estimates and specifications. • Provided construction coordination, oversight, and closeout for county and federally funded trail projects. • Coordinated agreements and design with the BNSF Railway, the Regional Transportation District (RTD), private property owners, ditch companies and other local agencies. • Represented the Regional Trail Program at Board of County Commissioners, various open space advisory boards, public open houses, and opening celebrations. • Prepared grants to solicit funds from Great Outdoors Colorado and Colorado Parks & Wildlife. TRAIL ENGINEER Lafayette, CO Loris and Associates, Inc. Jul. 2006 to May 2008 • Provided oversight and guidance to the project team to develop design plans. • Coordinated project team including clients, sub-consultants, utilities and internal staff. • Designed, implemented and managed trail and bicycle lane projects in Colorado and Arizona. • Developed feasibility reports for trail projects. • Developed preliminary and final construction documents for trail and bikeway projects including plan sets, engineer's estimates and specifications. TRAVEL ABROAD Argentina, Chile, Brazil, and Peru Feb. 2006 to July 2006 PROJECT MANAGER & ENGINEER Centennial, CO Felsburg Holt & Ullevig Oct. 2003 to Feb. 2006 • Coordinated and provided oversight of project teams including clients, utilities, sub-consultants and internal staff. • Designed, implemented and managed bicycle lane, roadway, and interchange projects including those with CDOT-Region 4 oversight, Fort Collins, Weld County, E470 Public Highway Authority (E470), and Loveland. • Managed project budgets, billings, and tasks. • Developed feasibility reports for roadway projects. • Developed preliminary and final construction documents: plan sets, engineer’s estimate and specifications for federally funded projects through CDOT and city projects. • Solicited public’s input at open houses and developed display boards and handouts for public’s use.