SHE Manpower Relocation
S.
No.
Position Requirement as per Condition of Contract on Safety,
Health & Environment
As per present site work
front requirement
Actual Deployed Shortage at
Present
1. Chief SHE Manager 01 01 01 00
2. Sr. SHE Manager 12 10 06 04
3. Jr. SHE Manager 28 20 12 08
4. Safety Steward 28 22 18 04
Total 69 53 37 16
*Note: TBA = To Be Appointed
SHE Manpower as per as per Appendix – III of Employer’s Requirement on SHE RRTS Package 7.
SHE Manpower requirement as per Work fronts.
Site/Station
Sr. SHE Manager Jr. SHE Manager Safety Steward
Day Shift Night Shift
Available
Shortage
Day Shift
Night
Shift
Available
Shortage
Day Shift Night Shift
Available
Shortage
Casting Yard TBA TBA 0 2 TBA TBA 0 2
Santosh
Meena
Vijay Kumar 2 0
Daurli Batching Plant - - 0 0 TBA TBA 0 2 Vikram Singh
Nirdesh
Kumar
2 0
Reach-1 & Brahmapuri
K C Rao
Dipen
Chatterji
2 0
Parvendra TBA 1 1 Rajiv Ranjan S. Tiwari 2 0
LG-1
Rahman
Khan
Sujit
Kumar
2 0
Pramod
Pandey
Rajneesh 2 0
LG-2 TBA 0 1
Sandeep
Kumar
Sahil 2 0
Anisur
Rehaman
Rahim 2 0
LG-3 TBA 0 1 TBA TBA 0 2 TBA TBA 0 2
Daurli Site (Station & Viaduct)
Khagesh
Kumar
Vineet
Kumar
2 0
Mithilesh
Jha
Amandee
p
2 0 MD Shakib Mukesh Pal 2 0
MES Site (Station & Viaduct) Ajay Joshi TBA 1 1
Mukesh
Kumar
Javed 2 0
Meerut North (Station & Viaduct)
Ralla
Sameer
Sanjay
Singh
2 0
Varun Sangeeth 2 0 Rahul Anand TBA 1 1
Modipuram Site (Station &
Viaduct) Anup
Kumar
Ahmad
Aziz
2 0
TBA Gokulram 1 1
Modipuram Depot Line Tarun
Nishant
Shukla
2 0
Total 03 03 06 04 07 05 12 08 10 10 18 04
15. Environment Good Practices
Pile heads removed from
Reach-1
Covering of sand and C&D
waste ensured at Reach 1
Covering of loose material
ensured at Meerut North
34. Observations @ Reach-1A
Proper access and cross
bracing not provided at
PP1394
Loose materials were kept
found at height P1398 LHS C&D waste and Pile heads was
observed in multiple locations
PP 1392
PP 1391 LHS
35. NCR's / Observation from external parties
NCN Received Compliance
Submitted
Open Target Remarks
19 18 01 15.04.2023
36. Internal NCR’s
Note: Detailed NCR’s
NCR
STATUS
TOTAL
Total NCRs 346
Closed NCRs 316
Open NCRs 30
NCR Status Site-wise from 30th March'2022 to 23rd February'2023
CASTING YARD DAURLI BATCHING PLANT DAURLI STATION MES STATION MEERUT NORTH MODIPURAM
STATION
REACH-1 & 1A
39 18 7 30 134 103 15
39 18 6 28 128 82 15
0 0 1 2 6 21 0
37. S.
No
Description of Discussion Action By Target Remarks
1 Downloading of Shield EHS App & IB4U App for all Site Eng./DPM as per HQ instructions.
DPM’s/Department Heads to download Apps. Ongoing Open
2 HIT – Hazard Identification Tool to be used by all Site Eng./DPM. 2 HIT cards to be issued by each
Eng./DPM with corrective action compliance. Continuous Ongoing
3 C&D waste disposal in progress.
Continuous In progress
4 Disposal of gunny bags.
Continuous In progress
5
NCR’s observation from the Third party
All GC Observation Reports is submitted till November’2022. December reports not
received till now. 1 report is pending for the month October’22.
1 is pending 15.04.2023
6
Status of Implementation of Project EHS plan
Being Implemented.
GST Sir Continuous
7
Evaluation of compliance to Legal requirements:
Being evaluated and complied.