Modular Construction Overview

22.485 visualizações

Publicada em

Why would you choose modular construction from KMPS over conventional field construction? Here are 5 of the most common reasons our customers give:
1. Shorter Schedules – Building a process unit in a shop, with a well controlled fabrication sequence, can save months when compared to building outside in a plant environment where work is subject to weather related delays, work permits, work stoppages, waiting for cranes, etc. A typical schedule for delivery of a complete modular process unit, fabricated in stainless or carbon steel, is 7-8 months from receipt of a Purchase Order, including all engineering and design activities.
2. Lower Cost/Lump Sum Bid – KMPS has made a science out of studying fabrication efficiencies and construction sequences in our module shops. Typically a 25-30% reduction in cost can be realized with modular construction when compared to field construction. Prices quoted for modular constructed systems are also firm/lump sum prices, not T&M.
3. Construction Proceeds While Waiting for Permits – Offsite construction of entire process units in our module shop can proceed while permits are in-process. This can be a significant time saver because permits often take months to obtain and field construction can’t begin until the permits are in hand.
4. Minimal Plant Site Interruption – In the case where a new process unit is built alongside of an existing operating chemical manufacturing unit, there are many hazards and safety risks associated with the field construction activities. Ask yourself this QUESTION – “Do I want dozens of contract construction workers walking around in my chemical plant?” If the answer to this question is no, then modular construction (off-site) makes a lot of sense. It minimizes the potential hazards and production interruptions that can occur.
5. Single Source Responsibility – Is your project management/project organization stretched to the limit? Building your process unit in our module shop will unload your project team because you will place only ONE purchase order for the entire system, our project team will do the rest.
DID YOU KNOW? Modular units are also quite versatile. Although most of our modules are installed outdoors many are also installed inside of a building. Modules can easily be sided to protect operating equipment and personnel against the harshest of weather conditions or to shield the process components from the view of neighbors and potential competitors.

Publicada em: Engenharia
  • I went from getting $3 surveys to $500 surveys every day!! learn more...  https://tinyurl.com/realmoneystreams2019
       Responder 
    Tem certeza que deseja  Sim  Não
    Insira sua mensagem aqui
  • Like to know how to take easy surveys and get huge checks - then you need to visit us now! Having so many paid surveys available to you all the time let you live the kind of life you want. learn more...▲▲▲ https://tinyurl.com/make2793amonth
       Responder 
    Tem certeza que deseja  Sim  Não
    Insira sua mensagem aqui

Modular Construction Overview

  1. 1. Telephone: (201) 267-8670 www.modularprocess.com KMPS CONSTRUCTION OVERVIEW Steps to Install a Module 45 Eisenhower Drive, Suite 350, Paramus, NJ 07652 | Tel: (201) 267 -8670 | Fax: (201) 368-8989 | www.modularprocess.com
  2. 2. M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G Telephone: (201) 267-8670 www.modularprocess.com 2 Module Arrives at Plant Site
  3. 3. M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G Telephone: (201) 267-8670 www.modularprocess.com 3 Shipping and Lifting Plan Detailed by KMPS
  4. 4. M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G Telephone: (201) 267-8670 www.modularprocess.com 4 Module Moving into Loadout Position
  5. 5. M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G Telephone: (201) 267-8670 www.modularprocess.com 5 Securing Module to Lifts
  6. 6. M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G Telephone: (201) 267-8670 www.modularprocess.com 6 Preparing for Lift
  7. 7. M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G Telephone: (201) 267-8670 www.modularprocess.com 7 Module Lifted to Vertical Position
  8. 8. M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G Telephone: (201) 267-8670 www.modularprocess.com 8 Module Lifted to Vertical Position
  9. 9. M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G Telephone: (201) 267-8670 www.modularprocess.com 9 Transferring Module to Foundation
  10. 10. M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G Telephone: (201) 267-8670 www.modularprocess.com 10 Aligning Module on Anchor Bolts
  11. 11. M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G Telephone: (201) 267-8670 www.modularprocess.com 11 Module Installed

×