On Power Plant Operation cource In Urdu by Khalid ayaz Soomro.pdf

PLANT OPERATION IN URDU
CENTRAL POWER GENERATION CO. LTD
GENCO-II
TRAINING CENTER TPS GUDDU
BASICS OF POWER
BY
KHALID AYAZ SOOMRO
INSTRUCTOR OPERATION/ (INTERN ENGINEERS)
TRAINING CENTER TPS, GUDDU
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
SAFETY & HEALTH
GOALS
The following goals have been
established for XYZ Company:
(1) Provide workers with a safe work
environment.
(2) Conduct routine/regular
workplace inspections.
(3) Provide Personal Protective
Equipment.
(4) Develop and implement safe
work procedures and rules.
(5) Provide on-going safety training
(6) Enforce safety rules and
appropriate discipline.
(7) Provide on-going property
conservation practices.
SAFETY RULES
All safety rules must be obeyed. Failure to do so will
result in strict disciplinary action.
All injuries must be reported as soon as
possible.
No horseplay, alcohol, or drugs allowed on
premises.
No alcohol usage allowed during lunch
break.
PPE must be worn as prescribed by
management.
All tools/equipment must be maintained in
All tools/equipment must be maintained in
good condition.
Only appropriate tools shall be used for
specific jobs.
All guards must be kept in place.
No spliced electrical cords/wiring allowed.
Only authorized personnel can operate forklift
vehicles.
Smoking allowed only in lunchroom.
Seat belt use required of all
drivers/passengers.
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
Power Plant
Power Plant
Conventional
Power Plant
Conventional
Power Plant
Hydel Power Plant
Non-Conventional
Power Plant
Non-Conventional
Power Plant
Thermal Power Plant
Thermal Power Plant
Steam Power Plant
Combined Cycle Power Plant
Gas Turbine Power Plant
Diesel Power Plant
Steam Power Plant
Combined Cycle Power Plant
Gas Turbine Power Plant
Diesel Power Plant
Hydel Power Plant
Hydel Power Plant
Low Head Power Plant
Medium Head Power Plant
High Head Power Plant
Run of River Power Plant
Low Head Power Plant
Medium Head Power Plant
High Head Power Plant
Run of River Power Plant
Nuclear Power Plant
Solar Power Plant
Tidal Power Plant
Nuclear Power Plant
Solar Power Plant
Tidal Power Plant
Geo Thermal Power Plant
Wind Power Plant
Bio-mass Power Plant
Geo Thermal Power Plant
Wind Power Plant
Bio-mass Power Plant
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
• GAS TURBINE PREPERATION / CHECKS BEFORE STARTING
• 1- Auxilary power supply 6.6kv ON (internal/external)source for all equepment which are in
servece before strating .
• 2- DC power supplt for control and protection system ON (thrugh Rectifire) and batteries on
stand by position
• 3- No any PTW are in Panding
• 4- Clearence from all maintanence sections
• 5- Check all Mechanical,Instrumentations,and Electrical Equepments are ready for
operation
• 6- Cooling Water circuit are in operation
• 7- Lube oil circuit are in operation and lube oil Temp >35c and turning Gear On
• 7- Lube oil circuit are in operation and lube oil Temp >35c and turning Gear On
• 8-Checke no any Leakage,Vibration,rubbing Noise and over Heating occures
• 9- Filtter house ready for operation
• 10-Anounciator pannel clear no any indication persists
• 11- Fuel (Gas/ Oil) raedy for operation
• 12-H2/Air cooling and sealing system ON
• 13- Gas Turbine Ready For operatoin indication ON.
GAS TURBINE STRARTING PROCEDURE
OF GE WITH RELAYS AND SIEMENS WITH SPEED (STARTING PROCEDURE ALMOST
SAME )
A- GT Ready for operation indication ON
B-Operation mode selector put on Generator and indication must on Generator
C-Master Control selector ON AUTO
D-Synchronizing Selector put on AUTO/Manual
E-Load selector put on BASE LOAD/PEAK LOAD
F- Fuel slector put on GAS/OIL
G-Give strart pulse to master control and starting sequence start
1- starting sequence progress On and ready to start Light OFF
2-14HR relay Light ON and Starting Divice Energize ( it meanse no Zero speed )
3-14HM relay Light On (it meanse speed at 16%)
- speadtronice signal
-for( GCE) for gas and (LCE )for oil , values on for ignition
-IGNITION SEQUENCE ON and Flame detector light ON
-IGNITION SEQUENCE ON and Flame detector light ON
GCE/LCE values decreased up to warm up value for warm up time before
acceleration
4- GCE/LCE values increased for Acceleration speed
5-Accceleration control/speed control light ON
6- 14HA relay light ON (when speed at 50%
-Feild braeker ON for feild flashing
7-14HC relay light ON (when speed at 70%) and Starting Divice Disengage s
8-14HS lrelay light ON -Auxilary Lube oil pump OFF and Axilary Hydrulic pump
OFF
9-Starting Sequence Complet light ON
10-m/c Synchronized through AUTO/Manual
-Spnning Reserve Load On (That is 5 to 8MW)
11- GT Laoding start according to gradient select (normal gradient
11MW/minute and fast gradie
NOTE:- During Inital operation Master Control Switch put on Crank,Fire ,and Auto
to check the Leakages, Rubbing Noise,Overheating.from Lubrication,Automizing
air,fuel gas manifold ,fuel oil, flow devider,cumustion chamber
/combustors,crossfire tube,Liner
check all these things during start up sequence from diffrent comportments.
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
Steam Turbine
Steam turbine is a prime mover that drives its energy of rotation due to
conversion of heat energy of steam into kinetic energy as it expands through a
series of nozzles mounted on the casing or produced by the fixed blades.
That machine converts heat energy into mechanical energy called steam
turbine.
Definition of a steam turbine?
A steam turbine is a prime mover that derives its energy of rotation
due to conversion of the heat energy of steam into kinetic energy as it
due to conversion of the heat energy of steam into kinetic energy as it
expands through a series of nozzles mounted on the casing or
produced by the fixed blades.
1-Neilson defines it: The turbine is a machine in which a rotary motion
is obtained by the gradual change of the momentum of the fluid.
2-Graham's definition: The turbine is a prime mover in which a rotary
motion is obtained by the centrifugal force brought into action by changing
the direction of a jet of a fluid (steam) escaping from the nozzle at high
velocity.
Ts diagram of a typical Rankine cycle operating between pressures of
0.06bar and 50bar
There are four processes in the Rankine cycle. These states are identified by
numbers (in brown) in the above Ts diagram.
 Process 1-2: The working fluid is pumped from low to high pressure. As the fluid
is a liquid at this stage the pump requires little input energy.
 Process 2-3: The high pressure liquid enters a boiler where it is heated at
constant pressure by an external heat source to become a dry saturated
vapor. The input energy required can be easily calculated using mollier
vapor. The input energy required can be easily calculated using mollier
diagram or h-s chart or enthalpy-entropy chart also known as steam tables.
 Process 3-4: The dry saturated vapor expands through a turbine, generating
power. This decreases the temperature and pressure of the vapor, and some
condensation may occur. The output in this process can be easily calculated
using the Enthalpy-entropy chart or the steam tables.
 Process 4-1: The wet vapor then enters a condenser where it is condensed at
a constant temperature to become a saturated liquid.
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
• Synchronization
• When do different electrical systems are coupled together it is called synchronization or to connect the generator with system.
•
• There are three main aspects during synchronization
•
• Generator and system voltage should be same.
• Generator and system frequency should be same.
• Generator and system phase angle should be equal.
•
• Thus, if above three conditions are equal then generator should be synchronized with system
•
• Advantages of A.C Generator
• Field winding on rotor
• Less insulation
• Weight of rotor less
• Easy to retain centrifugal force
• Size of rotor is smaller
• High voltage on rotor
• High voltage on rotor
• Transmission of voltage is easy
• Easy cooling system
•
• Generator protections
• Generator differential protection
• Generator over current protection
• Stator earth fault protection
• Rotor earth fault protection
• Under excitation protection
• Reverse power protection generator motoring
• Negative phase sequence protection… system unbalance
• Over / under frequency protection
• Breaker pole failure protection
• Synchronous check protection “When you system supply is dead and you are the 1st one in the system.. no need of
synchronization”
• Over excitation
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
On Power Plant Operation  cource In Urdu by Khalid ayaz Soomro.pdf
D.C Supply
As we all know that AC supply can’t be stored. Thus the back systems in power houses are used built on
DC supply system. It is a stand by source of electricity available at every movement in shape of storage
batteries in order to protect our main system to damage.
•Importance of DC supply
All the control and protection system is based on DC supply. Usually the AC supply is converted to DC
through rectifier. Further battery bank is also used which is charge through rectifier. This DC produced by
battery bank is used in emergency when AC is not available. Moreover, during charging the chemical
energy converts into electrical energy.
•Different parts of DC supply
•Rectifier
•Battery charger
•Battery cell 24VDC or 220VDC
•Kinds of batteries
There are so many kinds of batteries; however below mentioned are the one
who have been chosen on their type of material and electrode.
•Lead acid batteries
•Nickel cadmium alkaline batteries
•Nickel cadmium alkaline batteries
Nickel iron alkaline batteries
•Use of battery if power station
•Control of electrical equipment
•Open / close of breakers
•Position indicators
•Emergency lights
•Field flashing
•Control and protection system
•Emergency pumps
Note: The charge battery has 11% water and 89% sulphuric acid and when it
discharged it become 15% sulphric acid and 15% water.
•Thank You for
Your Time and
Attention !!!!
If you Gets Some Points
Please Remember Me
in your Prayers
KHALID AYAZ SOOMRO
INSTRUCTOR OPERATION/ (INTERN ENGINEERS)
TRAINING CENTER TPS, GUDDU
REGARDS:
1 de 106

Recomendados

J D J por
J D JJ D J
J D Jjjinesh
166 visualizações25 slides
railway workshop jodhpur por
railway workshop jodhpur railway workshop jodhpur
railway workshop jodhpur kalumutha
2.1K visualizações25 slides
railway workshop jodhpur por
railway workshop jodhpurrailway workshop jodhpur
railway workshop jodhpurkalumutha
574 visualizações25 slides
Gas Turbine Power Plant.pdf por
Gas Turbine Power Plant.pdfGas Turbine Power Plant.pdf
Gas Turbine Power Plant.pdfKIET Group of Institutions
129 visualizações40 slides
LETTER OF AUTHORIZATION por
LETTER OF AUTHORIZATIONLETTER OF AUTHORIZATION
LETTER OF AUTHORIZATIONMoiz Akhter
6.2K visualizações48 slides
Bhel training ppt_v[1] at bawana por
Bhel training ppt_v[1] at bawanaBhel training ppt_v[1] at bawana
Bhel training ppt_v[1] at bawanaVisheshKumar55
74 visualizações20 slides

Mais conteúdo relacionado

Similar a On Power Plant Operation cource In Urdu by Khalid ayaz Soomro.pdf

PresentationGGSSTP_Atul por
PresentationGGSSTP_AtulPresentationGGSSTP_Atul
PresentationGGSSTP_AtulAtul Kataria
86 visualizações22 slides
NTPC DADRI THERMAL PLANT PPT por
NTPC DADRI THERMAL PLANT PPTNTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTShivam Sharma
2.9K visualizações24 slides
ONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptx por
ONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptxONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptx
ONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptxTimilehinonalaja
900 visualizações42 slides
V.T ppt por
V.T pptV.T ppt
V.T pptAditi Tiwari
592 visualizações27 slides
Vocational training at mejia thermal power plant por
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plantNipak Banerjee
3.5K visualizações29 slides
Introduction to operation and Control of Thermal Power Plant por
Introduction to operation and Control of Thermal Power PlantIntroduction to operation and Control of Thermal Power Plant
Introduction to operation and Control of Thermal Power PlantSWAPNILTRIVEDI6
169 visualizações35 slides

Similar a On Power Plant Operation cource In Urdu by Khalid ayaz Soomro.pdf(20)

PresentationGGSSTP_Atul por Atul Kataria
PresentationGGSSTP_AtulPresentationGGSSTP_Atul
PresentationGGSSTP_Atul
Atul Kataria86 visualizações
NTPC DADRI THERMAL PLANT PPT por Shivam Sharma
NTPC DADRI THERMAL PLANT PPTNTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPT
Shivam Sharma2.9K visualizações
ONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptx por Timilehinonalaja
ONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptxONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptx
ONALAJA OLORUNTIMILEHIN EGBIN PRESENTATION SLIDE.pptx
Timilehinonalaja900 visualizações
V.T ppt por Aditi Tiwari
V.T pptV.T ppt
V.T ppt
Aditi Tiwari592 visualizações
Vocational training at mejia thermal power plant por Nipak Banerjee
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plant
Nipak Banerjee3.5K visualizações
Introduction to operation and Control of Thermal Power Plant por SWAPNILTRIVEDI6
Introduction to operation and Control of Thermal Power PlantIntroduction to operation and Control of Thermal Power Plant
Introduction to operation and Control of Thermal Power Plant
SWAPNILTRIVEDI6169 visualizações
Ignition System & Engine Electronics por Umar Fayyaz
Ignition System & Engine ElectronicsIgnition System & Engine Electronics
Ignition System & Engine Electronics
Umar Fayyaz3.1K visualizações
Bangladesh Power Stations & Power Plants Overview por Ridwanul Hoque
Bangladesh Power Stations & Power Plants OverviewBangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants Overview
Ridwanul Hoque193 visualizações
Motor protection principles por Atiq Sayal
Motor protection principlesMotor protection principles
Motor protection principles
Atiq Sayal2.7K visualizações
ntpc khalgaon por Vimal Tripathi
ntpc khalgaonntpc khalgaon
ntpc khalgaon
Vimal Tripathi1.2K visualizações
Power Cycles and power plants por Sarthak Kohli
Power Cycles and power plantsPower Cycles and power plants
Power Cycles and power plants
Sarthak Kohli950 visualizações
Hydro Power Plant Auxaleries por Mahajan Saurabh
Hydro Power Plant AuxaleriesHydro Power Plant Auxaleries
Hydro Power Plant Auxaleries
Mahajan Saurabh6.2K visualizações
Control Valves for the Power Generation Industry" A Product and Applications ... por Belilove Company-Engineers
Control Valves for the Power Generation Industry" A Product and Applications ...Control Valves for the Power Generation Industry" A Product and Applications ...
Control Valves for the Power Generation Industry" A Product and Applications ...
Belilove Company-Engineers1.7K visualizações
Operation and maintanance por AnasMirza10
Operation and maintananceOperation and maintanance
Operation and maintanance
AnasMirza10129 visualizações
battery-thermal-management-in-evs-and-hevs-issues-and.pdf por CHANDAMAMATV
battery-thermal-management-in-evs-and-hevs-issues-and.pdfbattery-thermal-management-in-evs-and-hevs-issues-and.pdf
battery-thermal-management-in-evs-and-hevs-issues-and.pdf
CHANDAMAMATV86 visualizações
Ntpc report por vipinchaudhary45
Ntpc  report Ntpc  report
Ntpc report
vipinchaudhary45596 visualizações
Appraisal ppt ankur por Ankur Mishra
Appraisal ppt ankurAppraisal ppt ankur
Appraisal ppt ankur
Ankur Mishra126 visualizações
Condensate Return Solutions.ppt por ssuser8006c7
Condensate Return Solutions.pptCondensate Return Solutions.ppt
Condensate Return Solutions.ppt
ssuser8006c719 visualizações
Wiring diagram krisbow 26 13 por -
Wiring diagram krisbow 26 13Wiring diagram krisbow 26 13
Wiring diagram krisbow 26 13
-7.7K visualizações

Mais de KhalidAyaz3

Presentation of Advance Operator Course new course 2Urdu by Khalid ayaz Soomr... por
Presentation of Advance Operator Course new course 2Urdu by Khalid ayaz Soomr...Presentation of Advance Operator Course new course 2Urdu by Khalid ayaz Soomr...
Presentation of Advance Operator Course new course 2Urdu by Khalid ayaz Soomr...KhalidAyaz3
43 visualizações108 slides
FInal Internship Report nust.pdf por
FInal Internship Report nust.pdfFInal Internship Report nust.pdf
FInal Internship Report nust.pdfKhalidAyaz3
11 visualizações42 slides
internship Report Print - Copy.pdf por
internship Report Print - Copy.pdfinternship Report Print - Copy.pdf
internship Report Print - Copy.pdfKhalidAyaz3
13 visualizações30 slides
Cogeneration Power desalination plant - Copy.pdf por
Cogeneration Power desalination plant - Copy.pdfCogeneration Power desalination plant - Copy.pdf
Cogeneration Power desalination plant - Copy.pdfKhalidAyaz3
4 visualizações121 slides
My book on power plant by khalid ayaz soomro.pdf por
My book on power plant by khalid ayaz soomro.pdfMy book on power plant by khalid ayaz soomro.pdf
My book on power plant by khalid ayaz soomro.pdfKhalidAyaz3
8 visualizações105 slides
GAS TURBINE OPERATION - Copy.pdf por
GAS TURBINE OPERATION - Copy.pdfGAS TURBINE OPERATION - Copy.pdf
GAS TURBINE OPERATION - Copy.pdfKhalidAyaz3
14 visualizações8 slides

Mais de KhalidAyaz3(13)

Presentation of Advance Operator Course new course 2Urdu by Khalid ayaz Soomr... por KhalidAyaz3
Presentation of Advance Operator Course new course 2Urdu by Khalid ayaz Soomr...Presentation of Advance Operator Course new course 2Urdu by Khalid ayaz Soomr...
Presentation of Advance Operator Course new course 2Urdu by Khalid ayaz Soomr...
KhalidAyaz343 visualizações
FInal Internship Report nust.pdf por KhalidAyaz3
FInal Internship Report nust.pdfFInal Internship Report nust.pdf
FInal Internship Report nust.pdf
KhalidAyaz311 visualizações
internship Report Print - Copy.pdf por KhalidAyaz3
internship Report Print - Copy.pdfinternship Report Print - Copy.pdf
internship Report Print - Copy.pdf
KhalidAyaz313 visualizações
Cogeneration Power desalination plant - Copy.pdf por KhalidAyaz3
Cogeneration Power desalination plant - Copy.pdfCogeneration Power desalination plant - Copy.pdf
Cogeneration Power desalination plant - Copy.pdf
KhalidAyaz34 visualizações
My book on power plant by khalid ayaz soomro.pdf por KhalidAyaz3
My book on power plant by khalid ayaz soomro.pdfMy book on power plant by khalid ayaz soomro.pdf
My book on power plant by khalid ayaz soomro.pdf
KhalidAyaz38 visualizações
GAS TURBINE OPERATION - Copy.pdf por KhalidAyaz3
GAS TURBINE OPERATION - Copy.pdfGAS TURBINE OPERATION - Copy.pdf
GAS TURBINE OPERATION - Copy.pdf
KhalidAyaz314 visualizações
01. Khalid Ayaz 41 Years pdf.pdf por KhalidAyaz3
01. Khalid Ayaz 41 Years pdf.pdf01. Khalid Ayaz 41 Years pdf.pdf
01. Khalid Ayaz 41 Years pdf.pdf
KhalidAyaz37 visualizações
Internship report on 747 mw ccpp Guddu.pdf por KhalidAyaz3
Internship report on 747 mw ccpp Guddu.pdfInternship report on 747 mw ccpp Guddu.pdf
Internship report on 747 mw ccpp Guddu.pdf
KhalidAyaz34 visualizações
Engr Ahmad raza Internship report on 600mw ccpp giddupdf por KhalidAyaz3
Engr Ahmad raza Internship report on 600mw ccpp giddupdfEngr Ahmad raza Internship report on 600mw ccpp giddupdf
Engr Ahmad raza Internship report on 600mw ccpp giddupdf
KhalidAyaz316 visualizações
A BOOK ON BASIC CONCEPT OF MODERN POWER PLANTS by khalid ayaz soomro.pdf por KhalidAyaz3
A BOOK ON BASIC CONCEPT OF MODERN POWER PLANTS by khalid ayaz soomro.pdfA BOOK ON BASIC CONCEPT OF MODERN POWER PLANTS by khalid ayaz soomro.pdf
A BOOK ON BASIC CONCEPT OF MODERN POWER PLANTS by khalid ayaz soomro.pdf
KhalidAyaz331 visualizações
A BOOK ON BASIC CONCEPT OF MODERN combined cycle POWER PLANTS.pdf por KhalidAyaz3
A BOOK ON BASIC CONCEPT OF MODERN combined cycle POWER PLANTS.pdfA BOOK ON BASIC CONCEPT OF MODERN combined cycle POWER PLANTS.pdf
A BOOK ON BASIC CONCEPT OF MODERN combined cycle POWER PLANTS.pdf
KhalidAyaz333 visualizações
GOLDEN BOOK ON STEAM TURBINE TTC GUDDU.pdf por KhalidAyaz3
GOLDEN BOOK ON STEAM TURBINE TTC GUDDU.pdfGOLDEN BOOK ON STEAM TURBINE TTC GUDDU.pdf
GOLDEN BOOK ON STEAM TURBINE TTC GUDDU.pdf
KhalidAyaz330 visualizações
GOLDEN BOOK ON BOILER TTC GUDDU.pdf por KhalidAyaz3
GOLDEN BOOK ON BOILER TTC GUDDU.pdfGOLDEN BOOK ON BOILER TTC GUDDU.pdf
GOLDEN BOOK ON BOILER TTC GUDDU.pdf
KhalidAyaz324 visualizações

Último

Web Dev Session 1.pptx por
Web Dev Session 1.pptxWeb Dev Session 1.pptx
Web Dev Session 1.pptxVedVekhande
23 visualizações22 slides
Integrating Sustainable Development Goals (SDGs) in School Education por
Integrating Sustainable Development Goals (SDGs) in School EducationIntegrating Sustainable Development Goals (SDGs) in School Education
Integrating Sustainable Development Goals (SDGs) in School EducationSheetalTank1
13 visualizações29 slides
Pitchbook Repowerlab.pdf por
Pitchbook Repowerlab.pdfPitchbook Repowerlab.pdf
Pitchbook Repowerlab.pdfVictoriaGaleano
9 visualizações12 slides
GPS Survery Presentation/ Slides por
GPS Survery Presentation/ SlidesGPS Survery Presentation/ Slides
GPS Survery Presentation/ SlidesOmarFarukEmon1
7 visualizações13 slides
Plant Design Report-Oil Refinery.pdf por
Plant Design Report-Oil Refinery.pdfPlant Design Report-Oil Refinery.pdf
Plant Design Report-Oil Refinery.pdfSafeen Yaseen Ja'far
9 visualizações10 slides
Créativité dans le design mécanique à l’aide de l’optimisation topologique por
Créativité dans le design mécanique à l’aide de l’optimisation topologiqueCréativité dans le design mécanique à l’aide de l’optimisation topologique
Créativité dans le design mécanique à l’aide de l’optimisation topologiqueLIEGE CREATIVE
9 visualizações84 slides

Último(20)

Web Dev Session 1.pptx por VedVekhande
Web Dev Session 1.pptxWeb Dev Session 1.pptx
Web Dev Session 1.pptx
VedVekhande23 visualizações
Integrating Sustainable Development Goals (SDGs) in School Education por SheetalTank1
Integrating Sustainable Development Goals (SDGs) in School EducationIntegrating Sustainable Development Goals (SDGs) in School Education
Integrating Sustainable Development Goals (SDGs) in School Education
SheetalTank113 visualizações
Pitchbook Repowerlab.pdf por VictoriaGaleano
Pitchbook Repowerlab.pdfPitchbook Repowerlab.pdf
Pitchbook Repowerlab.pdf
VictoriaGaleano9 visualizações
GPS Survery Presentation/ Slides por OmarFarukEmon1
GPS Survery Presentation/ SlidesGPS Survery Presentation/ Slides
GPS Survery Presentation/ Slides
OmarFarukEmon17 visualizações
Plant Design Report-Oil Refinery.pdf por Safeen Yaseen Ja'far
Plant Design Report-Oil Refinery.pdfPlant Design Report-Oil Refinery.pdf
Plant Design Report-Oil Refinery.pdf
Safeen Yaseen Ja'far9 visualizações
Créativité dans le design mécanique à l’aide de l’optimisation topologique por LIEGE CREATIVE
Créativité dans le design mécanique à l’aide de l’optimisation topologiqueCréativité dans le design mécanique à l’aide de l’optimisation topologique
Créativité dans le design mécanique à l’aide de l’optimisation topologique
LIEGE CREATIVE9 visualizações
unit 1.pptx por rrbornarecm
unit 1.pptxunit 1.pptx
unit 1.pptx
rrbornarecm5 visualizações
CCNA_questions_2021.pdf por VUPHUONGTHAO9
CCNA_questions_2021.pdfCCNA_questions_2021.pdf
CCNA_questions_2021.pdf
VUPHUONGTHAO97 visualizações
IRJET-Productivity Enhancement Using Method Study.pdf por SahilBavdhankar
IRJET-Productivity Enhancement Using Method Study.pdfIRJET-Productivity Enhancement Using Method Study.pdf
IRJET-Productivity Enhancement Using Method Study.pdf
SahilBavdhankar10 visualizações
Trust Metric-Based Anomaly Detection via Deep Deterministic Policy Gradient R... por IJCNCJournal
Trust Metric-Based Anomaly Detection via Deep Deterministic Policy Gradient R...Trust Metric-Based Anomaly Detection via Deep Deterministic Policy Gradient R...
Trust Metric-Based Anomaly Detection via Deep Deterministic Policy Gradient R...
IJCNCJournal5 visualizações
MongoDB.pdf por ArthyR3
MongoDB.pdfMongoDB.pdf
MongoDB.pdf
ArthyR351 visualizações
Field Programmable Gate Arrays : Architecture por Usha Mehta
Field Programmable Gate Arrays : ArchitectureField Programmable Gate Arrays : Architecture
Field Programmable Gate Arrays : Architecture
Usha Mehta23 visualizações
dummy.pptx por JamesLamp
dummy.pptxdummy.pptx
dummy.pptx
JamesLamp7 visualizações
CPM Schedule Float.pptx por Mathew Joseph
CPM Schedule Float.pptxCPM Schedule Float.pptx
CPM Schedule Float.pptx
Mathew Joseph8 visualizações
Unlocking Research Visibility.pdf por KhatirNaima
Unlocking Research Visibility.pdfUnlocking Research Visibility.pdf
Unlocking Research Visibility.pdf
KhatirNaima11 visualizações
Design_Discover_Develop_Campaign.pptx por ShivanshSeth6
Design_Discover_Develop_Campaign.pptxDesign_Discover_Develop_Campaign.pptx
Design_Discover_Develop_Campaign.pptx
ShivanshSeth656 visualizações
Basic Design Flow for Field Programmable Gate Arrays por Usha Mehta
Basic Design Flow for Field Programmable Gate ArraysBasic Design Flow for Field Programmable Gate Arrays
Basic Design Flow for Field Programmable Gate Arrays
Usha Mehta10 visualizações
taylor-2005-classical-mechanics.pdf por ArturoArreola10
taylor-2005-classical-mechanics.pdftaylor-2005-classical-mechanics.pdf
taylor-2005-classical-mechanics.pdf
ArturoArreola1037 visualizações
Automated Remote sensing GPS satellite system for managing resources and moni... por Khalid Abdel Naser Abdel Rahim
Automated Remote sensing GPS satellite system for managing resources and moni...Automated Remote sensing GPS satellite system for managing resources and moni...
Automated Remote sensing GPS satellite system for managing resources and moni...
Khalid Abdel Naser Abdel Rahim5 visualizações
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdf por AlhamduKure
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdfASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdf
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdf
AlhamduKure10 visualizações

On Power Plant Operation cource In Urdu by Khalid ayaz Soomro.pdf

  • 1. PLANT OPERATION IN URDU CENTRAL POWER GENERATION CO. LTD GENCO-II TRAINING CENTER TPS GUDDU BASICS OF POWER BY KHALID AYAZ SOOMRO INSTRUCTOR OPERATION/ (INTERN ENGINEERS) TRAINING CENTER TPS, GUDDU
  • 7. SAFETY & HEALTH GOALS The following goals have been established for XYZ Company: (1) Provide workers with a safe work environment. (2) Conduct routine/regular workplace inspections. (3) Provide Personal Protective Equipment. (4) Develop and implement safe work procedures and rules. (5) Provide on-going safety training (6) Enforce safety rules and appropriate discipline. (7) Provide on-going property conservation practices.
  • 8. SAFETY RULES All safety rules must be obeyed. Failure to do so will result in strict disciplinary action. All injuries must be reported as soon as possible. No horseplay, alcohol, or drugs allowed on premises. No alcohol usage allowed during lunch break. PPE must be worn as prescribed by management. All tools/equipment must be maintained in All tools/equipment must be maintained in good condition. Only appropriate tools shall be used for specific jobs. All guards must be kept in place. No spliced electrical cords/wiring allowed. Only authorized personnel can operate forklift vehicles. Smoking allowed only in lunchroom. Seat belt use required of all drivers/passengers.
  • 25. Power Plant Power Plant Conventional Power Plant Conventional Power Plant Hydel Power Plant Non-Conventional Power Plant Non-Conventional Power Plant Thermal Power Plant Thermal Power Plant Steam Power Plant Combined Cycle Power Plant Gas Turbine Power Plant Diesel Power Plant Steam Power Plant Combined Cycle Power Plant Gas Turbine Power Plant Diesel Power Plant Hydel Power Plant Hydel Power Plant Low Head Power Plant Medium Head Power Plant High Head Power Plant Run of River Power Plant Low Head Power Plant Medium Head Power Plant High Head Power Plant Run of River Power Plant Nuclear Power Plant Solar Power Plant Tidal Power Plant Nuclear Power Plant Solar Power Plant Tidal Power Plant Geo Thermal Power Plant Wind Power Plant Bio-mass Power Plant Geo Thermal Power Plant Wind Power Plant Bio-mass Power Plant
  • 51. • GAS TURBINE PREPERATION / CHECKS BEFORE STARTING • 1- Auxilary power supply 6.6kv ON (internal/external)source for all equepment which are in servece before strating . • 2- DC power supplt for control and protection system ON (thrugh Rectifire) and batteries on stand by position • 3- No any PTW are in Panding • 4- Clearence from all maintanence sections • 5- Check all Mechanical,Instrumentations,and Electrical Equepments are ready for operation • 6- Cooling Water circuit are in operation • 7- Lube oil circuit are in operation and lube oil Temp >35c and turning Gear On • 7- Lube oil circuit are in operation and lube oil Temp >35c and turning Gear On • 8-Checke no any Leakage,Vibration,rubbing Noise and over Heating occures • 9- Filtter house ready for operation • 10-Anounciator pannel clear no any indication persists • 11- Fuel (Gas/ Oil) raedy for operation • 12-H2/Air cooling and sealing system ON • 13- Gas Turbine Ready For operatoin indication ON.
  • 52. GAS TURBINE STRARTING PROCEDURE OF GE WITH RELAYS AND SIEMENS WITH SPEED (STARTING PROCEDURE ALMOST SAME ) A- GT Ready for operation indication ON B-Operation mode selector put on Generator and indication must on Generator C-Master Control selector ON AUTO D-Synchronizing Selector put on AUTO/Manual E-Load selector put on BASE LOAD/PEAK LOAD F- Fuel slector put on GAS/OIL G-Give strart pulse to master control and starting sequence start 1- starting sequence progress On and ready to start Light OFF 2-14HR relay Light ON and Starting Divice Energize ( it meanse no Zero speed ) 3-14HM relay Light On (it meanse speed at 16%) - speadtronice signal -for( GCE) for gas and (LCE )for oil , values on for ignition -IGNITION SEQUENCE ON and Flame detector light ON -IGNITION SEQUENCE ON and Flame detector light ON GCE/LCE values decreased up to warm up value for warm up time before acceleration 4- GCE/LCE values increased for Acceleration speed 5-Accceleration control/speed control light ON 6- 14HA relay light ON (when speed at 50% -Feild braeker ON for feild flashing 7-14HC relay light ON (when speed at 70%) and Starting Divice Disengage s 8-14HS lrelay light ON -Auxilary Lube oil pump OFF and Axilary Hydrulic pump OFF 9-Starting Sequence Complet light ON 10-m/c Synchronized through AUTO/Manual -Spnning Reserve Load On (That is 5 to 8MW) 11- GT Laoding start according to gradient select (normal gradient 11MW/minute and fast gradie
  • 53. NOTE:- During Inital operation Master Control Switch put on Crank,Fire ,and Auto to check the Leakages, Rubbing Noise,Overheating.from Lubrication,Automizing air,fuel gas manifold ,fuel oil, flow devider,cumustion chamber /combustors,crossfire tube,Liner check all these things during start up sequence from diffrent comportments.
  • 58. Steam Turbine Steam turbine is a prime mover that drives its energy of rotation due to conversion of heat energy of steam into kinetic energy as it expands through a series of nozzles mounted on the casing or produced by the fixed blades. That machine converts heat energy into mechanical energy called steam turbine. Definition of a steam turbine? A steam turbine is a prime mover that derives its energy of rotation due to conversion of the heat energy of steam into kinetic energy as it due to conversion of the heat energy of steam into kinetic energy as it expands through a series of nozzles mounted on the casing or produced by the fixed blades. 1-Neilson defines it: The turbine is a machine in which a rotary motion is obtained by the gradual change of the momentum of the fluid. 2-Graham's definition: The turbine is a prime mover in which a rotary motion is obtained by the centrifugal force brought into action by changing the direction of a jet of a fluid (steam) escaping from the nozzle at high velocity.
  • 59. Ts diagram of a typical Rankine cycle operating between pressures of 0.06bar and 50bar There are four processes in the Rankine cycle. These states are identified by numbers (in brown) in the above Ts diagram.  Process 1-2: The working fluid is pumped from low to high pressure. As the fluid is a liquid at this stage the pump requires little input energy.  Process 2-3: The high pressure liquid enters a boiler where it is heated at constant pressure by an external heat source to become a dry saturated vapor. The input energy required can be easily calculated using mollier vapor. The input energy required can be easily calculated using mollier diagram or h-s chart or enthalpy-entropy chart also known as steam tables.  Process 3-4: The dry saturated vapor expands through a turbine, generating power. This decreases the temperature and pressure of the vapor, and some condensation may occur. The output in this process can be easily calculated using the Enthalpy-entropy chart or the steam tables.  Process 4-1: The wet vapor then enters a condenser where it is condensed at a constant temperature to become a saturated liquid.
  • 94. • Synchronization • When do different electrical systems are coupled together it is called synchronization or to connect the generator with system. • • There are three main aspects during synchronization • • Generator and system voltage should be same. • Generator and system frequency should be same. • Generator and system phase angle should be equal. • • Thus, if above three conditions are equal then generator should be synchronized with system • • Advantages of A.C Generator • Field winding on rotor • Less insulation • Weight of rotor less • Easy to retain centrifugal force • Size of rotor is smaller • High voltage on rotor • High voltage on rotor • Transmission of voltage is easy • Easy cooling system • • Generator protections • Generator differential protection • Generator over current protection • Stator earth fault protection • Rotor earth fault protection • Under excitation protection • Reverse power protection generator motoring • Negative phase sequence protection… system unbalance • Over / under frequency protection • Breaker pole failure protection • Synchronous check protection “When you system supply is dead and you are the 1st one in the system.. no need of synchronization” • Over excitation
  • 104. D.C Supply As we all know that AC supply can’t be stored. Thus the back systems in power houses are used built on DC supply system. It is a stand by source of electricity available at every movement in shape of storage batteries in order to protect our main system to damage. •Importance of DC supply All the control and protection system is based on DC supply. Usually the AC supply is converted to DC through rectifier. Further battery bank is also used which is charge through rectifier. This DC produced by battery bank is used in emergency when AC is not available. Moreover, during charging the chemical energy converts into electrical energy. •Different parts of DC supply •Rectifier •Battery charger •Battery cell 24VDC or 220VDC •Kinds of batteries There are so many kinds of batteries; however below mentioned are the one who have been chosen on their type of material and electrode. •Lead acid batteries •Nickel cadmium alkaline batteries •Nickel cadmium alkaline batteries Nickel iron alkaline batteries •Use of battery if power station •Control of electrical equipment •Open / close of breakers •Position indicators •Emergency lights •Field flashing •Control and protection system •Emergency pumps Note: The charge battery has 11% water and 89% sulphuric acid and when it discharged it become 15% sulphric acid and 15% water.
  • 105. •Thank You for Your Time and Attention !!!! If you Gets Some Points Please Remember Me in your Prayers
  • 106. KHALID AYAZ SOOMRO INSTRUCTOR OPERATION/ (INTERN ENGINEERS) TRAINING CENTER TPS, GUDDU REGARDS: