SlideShare uma empresa Scribd logo
1 de 40
Baixar para ler offline
INTERIOR
PROGRAMMING AND
SPACE PLANNING
WEEK 11 – FACILITIES MANAGEMENT
INTERIOR
PROGRAMMING
 Is the art and science of programming and
enhancing interiors, sometimes including
the exterior of a space building, to achieve
a healthier and more aesthetically pleasing
environment for the end user
SPACE PLANNING
 The main function is for the design
professional blocks out spatial areas, define
circulation patterns, and develops plans and
layouts for furniture and equipment
placement.
SPACE PLANNING
 Services consider numerous design patterns including
client’s project goals and priorities, the client’s
organizational structure and relationships, space allocation
criteria, building codes and access for the disabled,
furniture standards, circulation and workflow, design
considerations, the constraints of fixed building elements
and building system interfaces, security and privacy issues,
and flexibility of future space needs.
DESIGN REQUIREMENTS FOR CORPORATE
FUNCTIONS
FUNCTION BUILDING SPACE REQUIRED
 Administrative  Executive offices, general office, and
supporting office
 Manufacturing  Fabrication, assembly processing,
financing, and refining
 Utilities  Electrical generation and transmission,
telecommunications, and switching
 Extraction  Mines and wells
 Agriculture  Farmlands and timberlands
 Distribution  Warehouses, pipelines, and ports
 Selling  Wholesale marts, and retail office services
SPACE AND FURNISHING STANDARDS ARE
GENERALLY BASED ON:
Functional
requirements
Tasks
performed
Surface area
requirements
Technology or
equipment
requirements
Storage
requirements
Configuration
requirements
Lighting
SPACE AND FURNISHING STANDARDS ARE
GENERALLY BASED ON:
Wire
management
Accessories
Conference or
meeting
requirements
Organizationa
culture
Organizationa
status – job
classification
Industry or
professional
standards
TWO APPROACHES IN INTERIOR
DESIGNING
Closed-Plan Approach
Open-Plan Approach
CLOSED-PLAN
APPROACH
 An office space design that uses panels and
cubicles to create separate individual work
spaces for each employee.
ADVANTAGES
DISADVANTAGES
OPEN-PLAN
APPROACH
 An office space design that uses large, open
spaces and minimizes the use of small,
enclosed rooms such as private offices.
ADVANTAGES
DISADVANTAGES
ERGONOMICS
 Is the science of designing something
created specifically to fit human dimensions
and respond to functional requirements.
HANDICAP
REQUIREMENTS
 The need for more accessible parking, building
entrances, stairs, elevators, rest rooms, and
workstations could reduce the usable site and
building size.
LIFE SAFETY
 Fire evacuation plans, fire extinguishers, sprinkler
systems, panic hardware, unlocked exits, emergency
lighting, lighted and unlighted exit signage,
emergency speaker systems, emergency power,
smoke detectors, fire alarms, adequate passage
width and unobstructed exit ways are some of the
basic life safety concerns and issues that must be
addressed.
ADDITIONAL PLANNING ON
DESIGN REQUIREMENTS –
CURRENT TRENDS
 Computer-aided management tools such as decision,
knowledge-based, expert systems, computer-aided design
(CAD), computer-aided facility management (CAFM), and
facility management information systems (FMIS), both
server based and internet based, will continue to develop
and assist all levels of management and staff in
forecasting, processing, and accessing more pertinent
information faster.
TWO PRIMARY REASONS FOR COMPUTERIZING
THE FMIS
I
• To save time and thus the cost of
information.
II
• To deal efficiently with complex and
diverse data.
THE ROLE OF A FACILITY MANAGEMENT
INFORMATION SYSTEM
DISASTER PREVENTION AND RECOVERY
Identify the disaster.
Develop prevention and
preparation strategies.
Implement
recovery
procedures if
disasters occur.
FIVE CATEGORIES OF FMIS INFRASTRUCTURE
Personnel Data Equipment Software Vendors
FACILITY MANAGEMENT AND INFORMATION
SYSTEM
DISASTER PREVENTION AND
PREPARATION
RECOVERY
Personnel
 Absences  Training more than one
operator.
 Good working environment.
 Documentation of system.
 Responsibility and authority.
 Scheduling of vacations.
 Reschedule backup time.
 Implement training for new.
 Productivity  Training new users.
 Time allocation.
 Allow time to develop
productivity.
 Implement training as soon
possible.
 Schedule “uninterrupted”
time.
 Bring vendor in.
FACILITY MANAGEMENT AND INFORMATION
SYSTEM
DISASTER PREVENTION AND
PREPARATION
RECOVERY
 Errors  Training program.
 System “lock out”.
 Data auditing.
 Work records.
 Locate errors or locate
latest valid data.
 Correct errors.
 Malicious Actions  Backup data and store
separately.
 Password security and
change.
 Physically isolate data.
 Data auditing and system
log.
 Restore data.
 Change password.
 Locate valid data.
 Identify cause of problem.
FACILITY MANAGEMENT AND INFORMATION
SYSTEM
DISASTER PREVENTION AND PREPARATION RECOVERY
Data
 Data Loss  Power backup and conditioners.
 Daily backup stored off-site.
 Weekly backup stored out of
 Check backups and restore
monthly.
 Determine extent of loss.
 Restore only lost data.
 Test data to verify.
 Check for computer virus and
remove virus from system.
 Data Corruption  Data auditing process.
 Backup incrementally.
 Work-order log of changes.
 Identify corrupt data.
 Check for computer virus and
remove virus from the system.
 Restore noncorrupt data.
 Destroy any corrupt backup.
 Noncurrent Data  Data maintenance process.
 Record of facility changes.
 Update and maintenance
program.
 Identify extent of update
 Determine in-house or service.
 Update data.
FACILITY MANAGEMENT AND INFORMATION
SYSTEM
DISASTER PREVENTION AND PREPARATION RECOVERY
Equipment
 Lost of Stolen  Physical security.
 Insurance coverage.
 Store data separately.
 Encrypt data.
 Backup systems.
 Replacement policy.
 Loaner equipment.
 Breakdown  Regular maintenance.
 Power perfection.
 Maintenance contracts.
 Backup systems.
 Response time.
 Loaner equipment.
 Lead time for replacement.
 Obsolescence  Open architecture hardware.
 Standard parts.
 Upgradable.
 Determine upgrade required.
 Upgrade of replace?
 Other uses for system.
FACILITY MANAGEMENT AND INFORMATION
SYSTEM
DISASTER PREVENTION AND PREPARATION RECOVERY
Software
 Faulty Software  Research.
 Test .
 Standard data format.
 Ease of use.
 Purchase compatible software.
 Develop an in-house program.
 Lost or Stolen or Damaged  Store original disks separately.
 Register software.
 Insure any “lock”.
 Make backup disks.
 Request new disks from the
manufacturer.
 Re-install from backup.
 File police report.
 File insurance claim.
 Obsolescence  Buy from reputable maker.
 Data in standard format.
 Excess capacity.
 Purchase new software with same data
format.
 Convert formulas and programs.
 Input data from old system.
 Incompatibility  “Standard data”.
 “Industry standard”.
 Hardware requirements.
 Change software.
 Upgrade hardware.
 Translation programs.
FACILITY MANAGEMENT AND INFORMATION
SYSTEM
DISASTER PREVENTION AND
PREPARATION
RECOVERY
Vendors
 Poor Performance  Selection of dependable
and reliable vendors.
 Multiple vendors.
 Select new vendor.
 Change software.
 Develop support in-
 High Cost  Ensure competition.
 Negotiate.
 Alternate vendor.
 In-house support.
 Out of Business  Multiple sources.
 Manufacturer support.
 Alternate vendor.
 In-house support.
WORK ENVIRONMENT TRENDS
TRADITIONAL
WORKPLACE
 Today’s office environments consists of private or semi-private
space separated by enclosed walls and supported by systems
furniture.
 Larger offices, larger staff, and an office with a window are
examples of traditional perks. Studies shows that these
traditional methods of space utilization, which require
increasingly expensive lease space and human resources,
represent ineffective space management for today’s business
environment.
 As a result, several concepts have been designed to achieve
better results.
HOTELING
 A space-sharing concept in which work space is made
available on advance notice from employee.
 It operates like a hotel, where a room is provided on
request.
 This arrangement can be useful for companies with a
group of employees who spend a great deal of their
time outside their traditional offices.
NON-TERRITORIAL
 Have been designed for projects involving short-or-moderate-term
teamwork. In a non-territorial environment, no one person has an
assigned workstation but shares space, resources, files, and quiet
areas with other members of their team. The sharing of resources
encourages interaction.
 They are not appropriate for all companies and all types of work.
Such practices are far from risk free and should be considered in
the context of each specific organization. Although an exciting new
possibility, organizations should carefully consider whether this type
of work environment is right for them before adopting this latest
trend.
NON-TERRITORIAL
BENEFITS DRAWBACKS
 Employees have the opportunity to choose a
location that is most conducive to their work
task.
o Loss of personal identity. Research shows that
people like to have their own space and to
personalize their environment. It is often
considered a basic human need.
 Ability to mix with a variety of people and meet
people in other teams.
o Inability to adopt your space to your specific
needs e.g. in terms of hearing and sight needs,
the height of your chair and adjustments to
your PC.
 Better for the organization in terms of
alignment between the type of work and type
space.
o Issues of noise due to high occupancy rates.
 Equal access to office spaces. o Overall feelings of powerless and job
dissatisfaction.
CAVES AND COMMONS
 Each office worker has a private office, often small, which
opens into a generous open area surrounded by many other
private offices.
 The open area has a kitchen, some couches, sometimes tables
for sitting around informally, and sometimes a working library,
or at least a rack of current periodicals. You can shut the door
of your cave and concentrate, or you can leave your door
open and keep an eye and ear on who’s coming and going in
the commons, and whether the meeting or presentation going
on there might be worth leaning on.
FREE ADDRESS
 A less-structured method for managing unassigned space. Without using a
reservation system, people who come to the office on any given day choose
from the empty or available desk to work from that day. It takes less setup,
planning, and cost since it does not require a reservation system, but only works
in environments where space is plentiful and cost reduction is not a goal.
 Free address in space-constrained environments lead to conflict since there is
no arbitrator and it perpetuates the high cost of vacant space.
 It is often debated hotly between real estate management side and office users
side within the company, because it means not having one’s own desk.
 For those who are to work in a department within a company that has free
address office, it is like going to class in a university where one does not have
any seat arrangement.
TELECOMMUTING
 Is working from a remote location outside of a
traditional office. The remote location can be from
home, a coffee shop, or a hotel room. Internet,
faxes, phones, webcams, and instant messaging are
some of the technological advances that enable this
type of work arrangement. Most telecommuters
work in the financial, high-tech, and
communications industries.
TELECOMMUTING
Advantage
•Opportunities are great for single-parent homes and those for physical disabilities. Today, some parents choose to stay at home
with their kids instead of putting them in day care.
•If you have a physical disability, you don’t have to worry about whether or not a job is handicapped-accessible.
•Another benefit is that you will not have a traffic commute and you can save on gas as well if you don’t have to commute.
Disadvantage
•There are many distractions that you may have to deal with. For example, if you’re working from home, you could find yourself
dealing with a crying child, a barking dog, or friends and family visiting or calling you when you should be working. These
distractions can make it look like you were unproductive all day.

Mais conteúdo relacionado

Mais procurados

GREEN SUSTAINABLE INTERIOR
GREEN SUSTAINABLE INTERIORGREEN SUSTAINABLE INTERIOR
GREEN SUSTAINABLE INTERIORKarishma Kakoti
 
Presentation on furniture design
Presentation on furniture designPresentation on furniture design
Presentation on furniture designrenu rajbahak
 
Lighting & colour in interior
Lighting & colour in interiorLighting & colour in interior
Lighting & colour in interiorHimanshu Saxena
 
Interior designing
Interior designingInterior designing
Interior designingRohit Mohan
 
Introduction to interior design
Introduction to interior designIntroduction to interior design
Introduction to interior designMuhammad Tariq
 
Interior Design ppt.
Interior Design ppt.Interior Design ppt.
Interior Design ppt.guest9aea7694
 
Introduction to interior design
Introduction to interior designIntroduction to interior design
Introduction to interior designVirtu Institute
 
Furniture, Furnishing and Floor covering
Furniture, Furnishing and Floor coveringFurniture, Furnishing and Floor covering
Furniture, Furnishing and Floor coveringPreethi Sivagnanam
 
Light as an architectural elemant1
Light as an architectural  elemant1Light as an architectural  elemant1
Light as an architectural elemant1Architecture
 
Interior designer profession presentation
Interior designer profession presentation Interior designer profession presentation
Interior designer profession presentation Hanis A.Badri
 
WALL FINISHES - MATERIALS AND APPLICATIONS
WALL FINISHES - MATERIALS AND APPLICATIONSWALL FINISHES - MATERIALS AND APPLICATIONS
WALL FINISHES - MATERIALS AND APPLICATIONSSoumya Sharma
 

Mais procurados (20)

FALSE CEILING
FALSE CEILINGFALSE CEILING
FALSE CEILING
 
Acoustic materials
Acoustic materialsAcoustic materials
Acoustic materials
 
GREEN SUSTAINABLE INTERIOR
GREEN SUSTAINABLE INTERIORGREEN SUSTAINABLE INTERIOR
GREEN SUSTAINABLE INTERIOR
 
Presentation on furniture design
Presentation on furniture designPresentation on furniture design
Presentation on furniture design
 
Office Interiors
Office InteriorsOffice Interiors
Office Interiors
 
Lighting & colour in interior
Lighting & colour in interiorLighting & colour in interior
Lighting & colour in interior
 
False ceiling
False ceilingFalse ceiling
False ceiling
 
Partition walls
Partition wallsPartition walls
Partition walls
 
Wood panelling & staircase
Wood panelling & staircaseWood panelling & staircase
Wood panelling & staircase
 
Interior designing
Interior designingInterior designing
Interior designing
 
Introduction to interior design
Introduction to interior designIntroduction to interior design
Introduction to interior design
 
Interior Design ppt.
Interior Design ppt.Interior Design ppt.
Interior Design ppt.
 
Introduction to interior design
Introduction to interior designIntroduction to interior design
Introduction to interior design
 
Furniture, Furnishing and Floor covering
Furniture, Furnishing and Floor coveringFurniture, Furnishing and Floor covering
Furniture, Furnishing and Floor covering
 
Module 1 1.2 space planning
Module 1  1.2 space planningModule 1  1.2 space planning
Module 1 1.2 space planning
 
office design
office design office design
office design
 
Light as an architectural elemant1
Light as an architectural  elemant1Light as an architectural  elemant1
Light as an architectural elemant1
 
Interior and lighting design
Interior and lighting designInterior and lighting design
Interior and lighting design
 
Interior designer profession presentation
Interior designer profession presentation Interior designer profession presentation
Interior designer profession presentation
 
WALL FINISHES - MATERIALS AND APPLICATIONS
WALL FINISHES - MATERIALS AND APPLICATIONSWALL FINISHES - MATERIALS AND APPLICATIONS
WALL FINISHES - MATERIALS AND APPLICATIONS
 

Semelhante a Interior Programming and Space Planning

Estuate EDM Checklist
Estuate EDM ChecklistEstuate EDM Checklist
Estuate EDM ChecklistEstuate, Inc.
 
Data Mesh in Azure using Cloud Scale Analytics (WAF)
Data Mesh in Azure using Cloud Scale Analytics (WAF)Data Mesh in Azure using Cloud Scale Analytics (WAF)
Data Mesh in Azure using Cloud Scale Analytics (WAF)Nathan Bijnens
 
Misd chap 8 technical environment
Misd chap 8 technical environmentMisd chap 8 technical environment
Misd chap 8 technical environmentEdiey Smile
 
AD Showers Resume-IT (2) (1)
AD Showers Resume-IT (2) (1)AD Showers Resume-IT (2) (1)
AD Showers Resume-IT (2) (1)Alfred Showers
 
Denodo’s Data Catalog: Bridging the Gap between Data and Business
Denodo’s Data Catalog: Bridging the Gap between Data and BusinessDenodo’s Data Catalog: Bridging the Gap between Data and Business
Denodo’s Data Catalog: Bridging the Gap between Data and BusinessDenodo
 
Rdba Presentation
Rdba PresentationRdba Presentation
Rdba Presentationgln_gln_48
 
Ashley Budd Resume 01-15-16
Ashley Budd Resume 01-15-16Ashley Budd Resume 01-15-16
Ashley Budd Resume 01-15-16Ashley Budd
 
Are your systems and Asset or a Liability
Are your systems and Asset or a LiabilityAre your systems and Asset or a Liability
Are your systems and Asset or a LiabilityStat Health
 
Accounting System Design and Development - System Planning and Development
Accounting System Design and Development - System Planning and Development Accounting System Design and Development - System Planning and Development
Accounting System Design and Development - System Planning and Development HelpWithAssignment.com
 
Francisco De La Cruz Resue
Francisco De La Cruz ResueFrancisco De La Cruz Resue
Francisco De La Cruz Resueciscod2007
 
Linked In Profile Resume
Linked In Profile ResumeLinked In Profile Resume
Linked In Profile ResumeMelissa Gilmore
 
Adaptive Case Management Workshop 2014 - Keynote
Adaptive Case Management Workshop 2014 - KeynoteAdaptive Case Management Workshop 2014 - Keynote
Adaptive Case Management Workshop 2014 - KeynoteKeith Swenson
 

Semelhante a Interior Programming and Space Planning (20)

Estuate EDM Checklist
Estuate EDM ChecklistEstuate EDM Checklist
Estuate EDM Checklist
 
AnnetteCarperResume
AnnetteCarperResumeAnnetteCarperResume
AnnetteCarperResume
 
Brian E Smith
Brian E SmithBrian E Smith
Brian E Smith
 
Data Mesh in Azure using Cloud Scale Analytics (WAF)
Data Mesh in Azure using Cloud Scale Analytics (WAF)Data Mesh in Azure using Cloud Scale Analytics (WAF)
Data Mesh in Azure using Cloud Scale Analytics (WAF)
 
Misd chap 8 technical environment
Misd chap 8 technical environmentMisd chap 8 technical environment
Misd chap 8 technical environment
 
AD Showers Resume-IT (2) (1)
AD Showers Resume-IT (2) (1)AD Showers Resume-IT (2) (1)
AD Showers Resume-IT (2) (1)
 
Meadows Business Systems Company Overview
Meadows Business Systems Company OverviewMeadows Business Systems Company Overview
Meadows Business Systems Company Overview
 
tp chakravty
tp chakravtytp chakravty
tp chakravty
 
Denodo’s Data Catalog: Bridging the Gap between Data and Business
Denodo’s Data Catalog: Bridging the Gap between Data and BusinessDenodo’s Data Catalog: Bridging the Gap between Data and Business
Denodo’s Data Catalog: Bridging the Gap between Data and Business
 
Rdba Presentation
Rdba PresentationRdba Presentation
Rdba Presentation
 
Sunil Vuppu
Sunil VuppuSunil Vuppu
Sunil Vuppu
 
Ashley Budd Resume 01-15-16
Ashley Budd Resume 01-15-16Ashley Budd Resume 01-15-16
Ashley Budd Resume 01-15-16
 
Are your systems and Asset or a Liability
Are your systems and Asset or a LiabilityAre your systems and Asset or a Liability
Are your systems and Asset or a Liability
 
Accounting System Design and Development - System Planning and Development
Accounting System Design and Development - System Planning and Development Accounting System Design and Development - System Planning and Development
Accounting System Design and Development - System Planning and Development
 
Database 1 Introduction
Database 1   IntroductionDatabase 1   Introduction
Database 1 Introduction
 
Francisco De La Cruz Resue
Francisco De La Cruz ResueFrancisco De La Cruz Resue
Francisco De La Cruz Resue
 
Linked In Profile Resume
Linked In Profile ResumeLinked In Profile Resume
Linked In Profile Resume
 
Adaptive Case Management Workshop 2014 - Keynote
Adaptive Case Management Workshop 2014 - KeynoteAdaptive Case Management Workshop 2014 - Keynote
Adaptive Case Management Workshop 2014 - Keynote
 
Data Architecture Success Stories
Data Architecture Success StoriesData Architecture Success Stories
Data Architecture Success Stories
 
Peter J. Simpson Resume
Peter J. Simpson ResumePeter J. Simpson Resume
Peter J. Simpson Resume
 

Último

Goyal Ganga One Boat Club Pune Brochure.pdf
Goyal Ganga One Boat Club Pune Brochure.pdfGoyal Ganga One Boat Club Pune Brochure.pdf
Goyal Ganga One Boat Club Pune Brochure.pdfabbu831446
 
Ganga Fusion 85 Gurugram - PDF Download.pdf
Ganga Fusion 85 Gurugram - PDF Download.pdfGanga Fusion 85 Gurugram - PDF Download.pdf
Ganga Fusion 85 Gurugram - PDF Download.pdfanjalisaini334541
 
Mana Dale Kodathi, Sarjapur Road, Bangalore E-Brochure.pdf
Mana Dale Kodathi, Sarjapur Road, Bangalore E-Brochure.pdfMana Dale Kodathi, Sarjapur Road, Bangalore E-Brochure.pdf
Mana Dale Kodathi, Sarjapur Road, Bangalore E-Brochure.pdffaheemali990101
 
Prestige Sanctuary Nandi Hills Bangalore.pdf
Prestige Sanctuary Nandi Hills Bangalore.pdfPrestige Sanctuary Nandi Hills Bangalore.pdf
Prestige Sanctuary Nandi Hills Bangalore.pdfashiyadav24
 
Goyal Orchid Life East Bangalore.pdf.pdf
Goyal Orchid Life East Bangalore.pdf.pdfGoyal Orchid Life East Bangalore.pdf.pdf
Goyal Orchid Life East Bangalore.pdf.pdfkratirudram
 
_Purva Blubelle Magadi Road E-Brochure.pdf
_Purva Blubelle Magadi Road E-Brochure.pdf_Purva Blubelle Magadi Road E-Brochure.pdf
_Purva Blubelle Magadi Road E-Brochure.pdffaheemali990101
 
Volition Meetup 2024 03 Mortgages & Interest Rates – Is The Worst Behind Us_ ...
Volition Meetup 2024 03 Mortgages & Interest Rates – Is The Worst Behind Us_ ...Volition Meetup 2024 03 Mortgages & Interest Rates – Is The Worst Behind Us_ ...
Volition Meetup 2024 03 Mortgages & Interest Rates – Is The Worst Behind Us_ ...Volition Properties
 
SVN Live 4.15.24 Weekly Property Broadcast
SVN Live 4.15.24 Weekly Property BroadcastSVN Live 4.15.24 Weekly Property Broadcast
SVN Live 4.15.24 Weekly Property BroadcastSVN International Corp.
 
LCAR Unit 20 - Appraising Real Estate - 14th Edition Revised
LCAR Unit 20 - Appraising Real Estate - 14th Edition RevisedLCAR Unit 20 - Appraising Real Estate - 14th Edition Revised
LCAR Unit 20 - Appraising Real Estate - 14th Edition RevisedTom Blefko
 
Prestige Orchards Plots in Shamshabad, Mamidipalli, Hyderabad pdf.pdf
Prestige Orchards Plots in Shamshabad, Mamidipalli, Hyderabad pdf.pdfPrestige Orchards Plots in Shamshabad, Mamidipalli, Hyderabad pdf.pdf
Prestige Orchards Plots in Shamshabad, Mamidipalli, Hyderabad pdf.pdfAhanundefined
 
Honer Richmont Hyderabad E brochure - A Life With A View
Honer Richmont Hyderabad E brochure - A Life With A ViewHoner Richmont Hyderabad E brochure - A Life With A View
Honer Richmont Hyderabad E brochure - A Life With A ViewAhanundefined
 
Sobha Oakshire Devanhalli Bangalore.pdf.pdf
Sobha Oakshire Devanhalli Bangalore.pdf.pdfSobha Oakshire Devanhalli Bangalore.pdf.pdf
Sobha Oakshire Devanhalli Bangalore.pdf.pdfkratirudram
 
Experion Elements Phase 1 Noida E-Brochure
Experion Elements Phase 1 Noida E-BrochureExperion Elements Phase 1 Noida E-Brochure
Experion Elements Phase 1 Noida E-BrochureRealEstate Info
 
Dubai Real Estate vs Other Global Markets-a-Comparative-Analysis
Dubai Real Estate vs Other Global Markets-a-Comparative-AnalysisDubai Real Estate vs Other Global Markets-a-Comparative-Analysis
Dubai Real Estate vs Other Global Markets-a-Comparative-AnalysisHomeStation1
 
It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...
It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...
It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...Tom Blefko
 
Sankla East World Hadapsar Pune Brochure.pdf
Sankla East World Hadapsar Pune Brochure.pdfSankla East World Hadapsar Pune Brochure.pdf
Sankla East World Hadapsar Pune Brochure.pdfabbu831446
 
Lancaster Market Expenses and Company Worksheet
Lancaster Market Expenses and Company WorksheetLancaster Market Expenses and Company Worksheet
Lancaster Market Expenses and Company WorksheetTom Blefko
 
LCAR RE Practice - The Power of Your Database
LCAR RE Practice - The Power of Your DatabaseLCAR RE Practice - The Power of Your Database
LCAR RE Practice - The Power of Your DatabaseTom Blefko
 
Experion Elements Sector 45 Noida E-Brochure
Experion Elements Sector 45 Noida E-BrochureExperion Elements Sector 45 Noida E-Brochure
Experion Elements Sector 45 Noida E-BrochureRealEstate Info
 
Purva BlueBelle Magadi Road Bangalore.pdf.pdf
Purva BlueBelle Magadi Road Bangalore.pdf.pdfPurva BlueBelle Magadi Road Bangalore.pdf.pdf
Purva BlueBelle Magadi Road Bangalore.pdf.pdfkratirudram
 

Último (20)

Goyal Ganga One Boat Club Pune Brochure.pdf
Goyal Ganga One Boat Club Pune Brochure.pdfGoyal Ganga One Boat Club Pune Brochure.pdf
Goyal Ganga One Boat Club Pune Brochure.pdf
 
Ganga Fusion 85 Gurugram - PDF Download.pdf
Ganga Fusion 85 Gurugram - PDF Download.pdfGanga Fusion 85 Gurugram - PDF Download.pdf
Ganga Fusion 85 Gurugram - PDF Download.pdf
 
Mana Dale Kodathi, Sarjapur Road, Bangalore E-Brochure.pdf
Mana Dale Kodathi, Sarjapur Road, Bangalore E-Brochure.pdfMana Dale Kodathi, Sarjapur Road, Bangalore E-Brochure.pdf
Mana Dale Kodathi, Sarjapur Road, Bangalore E-Brochure.pdf
 
Prestige Sanctuary Nandi Hills Bangalore.pdf
Prestige Sanctuary Nandi Hills Bangalore.pdfPrestige Sanctuary Nandi Hills Bangalore.pdf
Prestige Sanctuary Nandi Hills Bangalore.pdf
 
Goyal Orchid Life East Bangalore.pdf.pdf
Goyal Orchid Life East Bangalore.pdf.pdfGoyal Orchid Life East Bangalore.pdf.pdf
Goyal Orchid Life East Bangalore.pdf.pdf
 
_Purva Blubelle Magadi Road E-Brochure.pdf
_Purva Blubelle Magadi Road E-Brochure.pdf_Purva Blubelle Magadi Road E-Brochure.pdf
_Purva Blubelle Magadi Road E-Brochure.pdf
 
Volition Meetup 2024 03 Mortgages & Interest Rates – Is The Worst Behind Us_ ...
Volition Meetup 2024 03 Mortgages & Interest Rates – Is The Worst Behind Us_ ...Volition Meetup 2024 03 Mortgages & Interest Rates – Is The Worst Behind Us_ ...
Volition Meetup 2024 03 Mortgages & Interest Rates – Is The Worst Behind Us_ ...
 
SVN Live 4.15.24 Weekly Property Broadcast
SVN Live 4.15.24 Weekly Property BroadcastSVN Live 4.15.24 Weekly Property Broadcast
SVN Live 4.15.24 Weekly Property Broadcast
 
LCAR Unit 20 - Appraising Real Estate - 14th Edition Revised
LCAR Unit 20 - Appraising Real Estate - 14th Edition RevisedLCAR Unit 20 - Appraising Real Estate - 14th Edition Revised
LCAR Unit 20 - Appraising Real Estate - 14th Edition Revised
 
Prestige Orchards Plots in Shamshabad, Mamidipalli, Hyderabad pdf.pdf
Prestige Orchards Plots in Shamshabad, Mamidipalli, Hyderabad pdf.pdfPrestige Orchards Plots in Shamshabad, Mamidipalli, Hyderabad pdf.pdf
Prestige Orchards Plots in Shamshabad, Mamidipalli, Hyderabad pdf.pdf
 
Honer Richmont Hyderabad E brochure - A Life With A View
Honer Richmont Hyderabad E brochure - A Life With A ViewHoner Richmont Hyderabad E brochure - A Life With A View
Honer Richmont Hyderabad E brochure - A Life With A View
 
Sobha Oakshire Devanhalli Bangalore.pdf.pdf
Sobha Oakshire Devanhalli Bangalore.pdf.pdfSobha Oakshire Devanhalli Bangalore.pdf.pdf
Sobha Oakshire Devanhalli Bangalore.pdf.pdf
 
Experion Elements Phase 1 Noida E-Brochure
Experion Elements Phase 1 Noida E-BrochureExperion Elements Phase 1 Noida E-Brochure
Experion Elements Phase 1 Noida E-Brochure
 
Dubai Real Estate vs Other Global Markets-a-Comparative-Analysis
Dubai Real Estate vs Other Global Markets-a-Comparative-AnalysisDubai Real Estate vs Other Global Markets-a-Comparative-Analysis
Dubai Real Estate vs Other Global Markets-a-Comparative-Analysis
 
It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...
It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...
It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...
 
Sankla East World Hadapsar Pune Brochure.pdf
Sankla East World Hadapsar Pune Brochure.pdfSankla East World Hadapsar Pune Brochure.pdf
Sankla East World Hadapsar Pune Brochure.pdf
 
Lancaster Market Expenses and Company Worksheet
Lancaster Market Expenses and Company WorksheetLancaster Market Expenses and Company Worksheet
Lancaster Market Expenses and Company Worksheet
 
LCAR RE Practice - The Power of Your Database
LCAR RE Practice - The Power of Your DatabaseLCAR RE Practice - The Power of Your Database
LCAR RE Practice - The Power of Your Database
 
Experion Elements Sector 45 Noida E-Brochure
Experion Elements Sector 45 Noida E-BrochureExperion Elements Sector 45 Noida E-Brochure
Experion Elements Sector 45 Noida E-Brochure
 
Purva BlueBelle Magadi Road Bangalore.pdf.pdf
Purva BlueBelle Magadi Road Bangalore.pdf.pdfPurva BlueBelle Magadi Road Bangalore.pdf.pdf
Purva BlueBelle Magadi Road Bangalore.pdf.pdf
 

Interior Programming and Space Planning

  • 1. INTERIOR PROGRAMMING AND SPACE PLANNING WEEK 11 – FACILITIES MANAGEMENT
  • 2. INTERIOR PROGRAMMING  Is the art and science of programming and enhancing interiors, sometimes including the exterior of a space building, to achieve a healthier and more aesthetically pleasing environment for the end user
  • 3. SPACE PLANNING  The main function is for the design professional blocks out spatial areas, define circulation patterns, and develops plans and layouts for furniture and equipment placement.
  • 4. SPACE PLANNING  Services consider numerous design patterns including client’s project goals and priorities, the client’s organizational structure and relationships, space allocation criteria, building codes and access for the disabled, furniture standards, circulation and workflow, design considerations, the constraints of fixed building elements and building system interfaces, security and privacy issues, and flexibility of future space needs.
  • 5. DESIGN REQUIREMENTS FOR CORPORATE FUNCTIONS FUNCTION BUILDING SPACE REQUIRED  Administrative  Executive offices, general office, and supporting office  Manufacturing  Fabrication, assembly processing, financing, and refining  Utilities  Electrical generation and transmission, telecommunications, and switching  Extraction  Mines and wells  Agriculture  Farmlands and timberlands  Distribution  Warehouses, pipelines, and ports  Selling  Wholesale marts, and retail office services
  • 6. SPACE AND FURNISHING STANDARDS ARE GENERALLY BASED ON: Functional requirements Tasks performed Surface area requirements Technology or equipment requirements Storage requirements Configuration requirements Lighting
  • 7. SPACE AND FURNISHING STANDARDS ARE GENERALLY BASED ON: Wire management Accessories Conference or meeting requirements Organizationa culture Organizationa status – job classification Industry or professional standards
  • 8. TWO APPROACHES IN INTERIOR DESIGNING Closed-Plan Approach Open-Plan Approach
  • 9. CLOSED-PLAN APPROACH  An office space design that uses panels and cubicles to create separate individual work spaces for each employee.
  • 10.
  • 13. OPEN-PLAN APPROACH  An office space design that uses large, open spaces and minimizes the use of small, enclosed rooms such as private offices.
  • 14.
  • 17. ERGONOMICS  Is the science of designing something created specifically to fit human dimensions and respond to functional requirements.
  • 18. HANDICAP REQUIREMENTS  The need for more accessible parking, building entrances, stairs, elevators, rest rooms, and workstations could reduce the usable site and building size.
  • 19. LIFE SAFETY  Fire evacuation plans, fire extinguishers, sprinkler systems, panic hardware, unlocked exits, emergency lighting, lighted and unlighted exit signage, emergency speaker systems, emergency power, smoke detectors, fire alarms, adequate passage width and unobstructed exit ways are some of the basic life safety concerns and issues that must be addressed.
  • 20. ADDITIONAL PLANNING ON DESIGN REQUIREMENTS – CURRENT TRENDS  Computer-aided management tools such as decision, knowledge-based, expert systems, computer-aided design (CAD), computer-aided facility management (CAFM), and facility management information systems (FMIS), both server based and internet based, will continue to develop and assist all levels of management and staff in forecasting, processing, and accessing more pertinent information faster.
  • 21. TWO PRIMARY REASONS FOR COMPUTERIZING THE FMIS I • To save time and thus the cost of information. II • To deal efficiently with complex and diverse data.
  • 22. THE ROLE OF A FACILITY MANAGEMENT INFORMATION SYSTEM
  • 23. DISASTER PREVENTION AND RECOVERY Identify the disaster. Develop prevention and preparation strategies. Implement recovery procedures if disasters occur.
  • 24. FIVE CATEGORIES OF FMIS INFRASTRUCTURE Personnel Data Equipment Software Vendors
  • 25. FACILITY MANAGEMENT AND INFORMATION SYSTEM DISASTER PREVENTION AND PREPARATION RECOVERY Personnel  Absences  Training more than one operator.  Good working environment.  Documentation of system.  Responsibility and authority.  Scheduling of vacations.  Reschedule backup time.  Implement training for new.  Productivity  Training new users.  Time allocation.  Allow time to develop productivity.  Implement training as soon possible.  Schedule “uninterrupted” time.  Bring vendor in.
  • 26. FACILITY MANAGEMENT AND INFORMATION SYSTEM DISASTER PREVENTION AND PREPARATION RECOVERY  Errors  Training program.  System “lock out”.  Data auditing.  Work records.  Locate errors or locate latest valid data.  Correct errors.  Malicious Actions  Backup data and store separately.  Password security and change.  Physically isolate data.  Data auditing and system log.  Restore data.  Change password.  Locate valid data.  Identify cause of problem.
  • 27. FACILITY MANAGEMENT AND INFORMATION SYSTEM DISASTER PREVENTION AND PREPARATION RECOVERY Data  Data Loss  Power backup and conditioners.  Daily backup stored off-site.  Weekly backup stored out of  Check backups and restore monthly.  Determine extent of loss.  Restore only lost data.  Test data to verify.  Check for computer virus and remove virus from system.  Data Corruption  Data auditing process.  Backup incrementally.  Work-order log of changes.  Identify corrupt data.  Check for computer virus and remove virus from the system.  Restore noncorrupt data.  Destroy any corrupt backup.  Noncurrent Data  Data maintenance process.  Record of facility changes.  Update and maintenance program.  Identify extent of update  Determine in-house or service.  Update data.
  • 28. FACILITY MANAGEMENT AND INFORMATION SYSTEM DISASTER PREVENTION AND PREPARATION RECOVERY Equipment  Lost of Stolen  Physical security.  Insurance coverage.  Store data separately.  Encrypt data.  Backup systems.  Replacement policy.  Loaner equipment.  Breakdown  Regular maintenance.  Power perfection.  Maintenance contracts.  Backup systems.  Response time.  Loaner equipment.  Lead time for replacement.  Obsolescence  Open architecture hardware.  Standard parts.  Upgradable.  Determine upgrade required.  Upgrade of replace?  Other uses for system.
  • 29. FACILITY MANAGEMENT AND INFORMATION SYSTEM DISASTER PREVENTION AND PREPARATION RECOVERY Software  Faulty Software  Research.  Test .  Standard data format.  Ease of use.  Purchase compatible software.  Develop an in-house program.  Lost or Stolen or Damaged  Store original disks separately.  Register software.  Insure any “lock”.  Make backup disks.  Request new disks from the manufacturer.  Re-install from backup.  File police report.  File insurance claim.  Obsolescence  Buy from reputable maker.  Data in standard format.  Excess capacity.  Purchase new software with same data format.  Convert formulas and programs.  Input data from old system.  Incompatibility  “Standard data”.  “Industry standard”.  Hardware requirements.  Change software.  Upgrade hardware.  Translation programs.
  • 30. FACILITY MANAGEMENT AND INFORMATION SYSTEM DISASTER PREVENTION AND PREPARATION RECOVERY Vendors  Poor Performance  Selection of dependable and reliable vendors.  Multiple vendors.  Select new vendor.  Change software.  Develop support in-  High Cost  Ensure competition.  Negotiate.  Alternate vendor.  In-house support.  Out of Business  Multiple sources.  Manufacturer support.  Alternate vendor.  In-house support.
  • 32. TRADITIONAL WORKPLACE  Today’s office environments consists of private or semi-private space separated by enclosed walls and supported by systems furniture.  Larger offices, larger staff, and an office with a window are examples of traditional perks. Studies shows that these traditional methods of space utilization, which require increasingly expensive lease space and human resources, represent ineffective space management for today’s business environment.  As a result, several concepts have been designed to achieve better results.
  • 33. HOTELING  A space-sharing concept in which work space is made available on advance notice from employee.  It operates like a hotel, where a room is provided on request.  This arrangement can be useful for companies with a group of employees who spend a great deal of their time outside their traditional offices.
  • 34. NON-TERRITORIAL  Have been designed for projects involving short-or-moderate-term teamwork. In a non-territorial environment, no one person has an assigned workstation but shares space, resources, files, and quiet areas with other members of their team. The sharing of resources encourages interaction.  They are not appropriate for all companies and all types of work. Such practices are far from risk free and should be considered in the context of each specific organization. Although an exciting new possibility, organizations should carefully consider whether this type of work environment is right for them before adopting this latest trend.
  • 35. NON-TERRITORIAL BENEFITS DRAWBACKS  Employees have the opportunity to choose a location that is most conducive to their work task. o Loss of personal identity. Research shows that people like to have their own space and to personalize their environment. It is often considered a basic human need.  Ability to mix with a variety of people and meet people in other teams. o Inability to adopt your space to your specific needs e.g. in terms of hearing and sight needs, the height of your chair and adjustments to your PC.  Better for the organization in terms of alignment between the type of work and type space. o Issues of noise due to high occupancy rates.  Equal access to office spaces. o Overall feelings of powerless and job dissatisfaction.
  • 36. CAVES AND COMMONS  Each office worker has a private office, often small, which opens into a generous open area surrounded by many other private offices.  The open area has a kitchen, some couches, sometimes tables for sitting around informally, and sometimes a working library, or at least a rack of current periodicals. You can shut the door of your cave and concentrate, or you can leave your door open and keep an eye and ear on who’s coming and going in the commons, and whether the meeting or presentation going on there might be worth leaning on.
  • 37.
  • 38. FREE ADDRESS  A less-structured method for managing unassigned space. Without using a reservation system, people who come to the office on any given day choose from the empty or available desk to work from that day. It takes less setup, planning, and cost since it does not require a reservation system, but only works in environments where space is plentiful and cost reduction is not a goal.  Free address in space-constrained environments lead to conflict since there is no arbitrator and it perpetuates the high cost of vacant space.  It is often debated hotly between real estate management side and office users side within the company, because it means not having one’s own desk.  For those who are to work in a department within a company that has free address office, it is like going to class in a university where one does not have any seat arrangement.
  • 39. TELECOMMUTING  Is working from a remote location outside of a traditional office. The remote location can be from home, a coffee shop, or a hotel room. Internet, faxes, phones, webcams, and instant messaging are some of the technological advances that enable this type of work arrangement. Most telecommuters work in the financial, high-tech, and communications industries.
  • 40. TELECOMMUTING Advantage •Opportunities are great for single-parent homes and those for physical disabilities. Today, some parents choose to stay at home with their kids instead of putting them in day care. •If you have a physical disability, you don’t have to worry about whether or not a job is handicapped-accessible. •Another benefit is that you will not have a traffic commute and you can save on gas as well if you don’t have to commute. Disadvantage •There are many distractions that you may have to deal with. For example, if you’re working from home, you could find yourself dealing with a crying child, a barking dog, or friends and family visiting or calling you when you should be working. These distractions can make it look like you were unproductive all day.