SlideShare uma empresa Scribd logo
1 de 3
Kenneth Todd Meyers
4824 Nightingale Lane
Chesapeake, VA 23321
(H) (757) 606-2738
(W) (757) 688-8364
(C) (757) 262-7004
OBJECTIVE:
To obtain a challenging position, which will utilize my management and engineering
skills and provide opportunities for advancement.
EXPERIENCE:
Supervisor Experience
January 1, 2006 to Present – Engineering Manager 2 (Refueling Technical - Head Area
Disassembly Group)
Newport News Shipbuilding – Reactor Services Project
January 1, 2005 to December 31, 2005 – Acting Supervisor/Senior Project Engineer
Northrop Grumman Newport News – Reactor Services Project (Fluids/HVAC Group)
I am currently the Engineering Manager 2 of the Reactor Servicing Operations Head
Area Disassembly group. This position has provides me the opportunity to manage the
day-to-day operations of this group. This role requires assigning and prioritizing work to
ensure our products are developed on-schedule. It also necessitates attending and
conducting staff meetings to facilitate good communication within the group, as well as
between the group and upper management. It requires counseling and mentoring Junior
Engineers, conducting Performance Reviews and reviewing technical documents for
accuracy. In addition to these duties I have been the interim Manger 2 for the
Radiological Support Group and the Fuel Disassembly and Shipout Group. My current
and previous Engineering Manager has also assigned me Acting Manager 3 duties during
scheduled absences. In addition to these duties I am the lead manager for CVN 73
Planning for E82. In this role I provide leadership and guidance to all Project Technical
engineers in E82 that are developing scopes for the CVN 73 Refueling.
Technical Experience
January 1, 2003 to December 31, 2004 – Project Engineer
Northrop Grumman Newport News – Reactor Services Project
I was assigned the task of managing the D&D program at DD#3 and DD#4 for Reactor
Servicing. This task includes prioritizing work and positioning of personnel to ensure the
work is performed on time and meets the needs of the customer. To accomplish this task,
I have worked with NRRO, X73, E85 and the Trades. The product issued is the
Technical Work Documents (TWDs) that will reduce the radiological risks associated
with these Facilities.
1988 to 2003 - Associate Engineer, Engineer and Senior Engineer.
Northrop Grumman Newport News – Reactor Services Project
During this time I provided technical services to E82.
• Maintained drawings, technical work documents, and monitored all maintenance
and cleaning and testing of the radioactive liquid waste (RLW) tanks at NGNN.
This included the development and implementation of a new high-pressure wash-
down system for RLW tanks that eliminated the need to enter the tanks for
cleaning purposes.
• Developed/Implemented new radioactive liquid waste tank inspection method.
• Designed Hydrovac/Pump down Systems for various ships.
• Developed the water based hydraulic system (CDRS) used on the SSSB.
• Member of NGNN Quality Team that selected Flowmaster Software.
• Designed HVAC Systems for control of contamination.
• Resolved discrepancies associated with the DI Water System
• Writing, certifying and reviewing procedures for technical quality and proper
radiological controls.
• Resolved numerous discrepancy reports on shipyard equipment and refueling
equipment.
• Written numerous OFI’s (NGNN Opportunity for Improvement Program) from
1993 to Present that has resulted in annual savings of approximately $200,000,
savings every three years of over $600,000 as well as improved numerous NNS
processes.
EDUCATION:
Bachelor of Science in Mechanical Engineering from Old Dominion University
CONTINUOUS EDUCATION:
• RTNE Qualified
• RADCON 106.5 Qualified
• ASME Professional Development Short Course on Pump and Valve Selection for
Optimum System Performance
• Flowmaster (Pressure Drop/Pipe Sizing Software)
• I-Deas Master Series – Parts Modeling (FEA Modeling Software)
• I-Deas Master Series – Simulation (FEA Modeling Software)
• CFDesign (Finite Element Code for Fluid Flow and Heat Transfer Solver)
• TechPro Class on Pumps and Seals
resume for Mngr position 4-13-16

Mais conteúdo relacionado

Mais procurados

Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerTarun Sharna
 
QC Field Engineer 2016
QC Field Engineer 2016QC Field Engineer 2016
QC Field Engineer 2016Michael Nugent
 
Episode 30 : Project Execution ( Part 1 )
Episode 30 :  Project Execution ( Part 1 ) Episode 30 :  Project Execution ( Part 1 )
Episode 30 : Project Execution ( Part 1 ) SAJJAD KHUDHUR ABBAS
 
Veerappa Panchal_Piping Stress Engineer
Veerappa Panchal_Piping Stress EngineerVeerappa Panchal_Piping Stress Engineer
Veerappa Panchal_Piping Stress Engineerveerappa panchal
 
Tom resume' updated june 2016 pm
Tom resume' updated june 2016 pmTom resume' updated june 2016 pm
Tom resume' updated june 2016 pmTom Hinton
 
20150121 Ausgrid PM work experience and skills
20150121 Ausgrid PM work experience and skills20150121 Ausgrid PM work experience and skills
20150121 Ausgrid PM work experience and skillsChamath Wijeratne
 
Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015sathiya prabhu
 
Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CVvaithiya nathan
 
Job Desciption Completions Engineer
Job Desciption Completions EngineerJob Desciption Completions Engineer
Job Desciption Completions EngineerDenis Utebaliev
 
Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams
 

Mais procurados (20)

Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineer
 
Resume Jun-2015
Resume Jun-2015Resume Jun-2015
Resume Jun-2015
 
Nevins Resume
Nevins ResumeNevins Resume
Nevins Resume
 
QC Field Engineer 2016
QC Field Engineer 2016QC Field Engineer 2016
QC Field Engineer 2016
 
Episode 30 : Project Execution ( Part 1 )
Episode 30 :  Project Execution ( Part 1 ) Episode 30 :  Project Execution ( Part 1 )
Episode 30 : Project Execution ( Part 1 )
 
Veerappa Panchal_Piping Stress Engineer
Veerappa Panchal_Piping Stress EngineerVeerappa Panchal_Piping Stress Engineer
Veerappa Panchal_Piping Stress Engineer
 
BK2014
BK2014BK2014
BK2014
 
Tom resume' updated june 2016 pm
Tom resume' updated june 2016 pmTom resume' updated june 2016 pm
Tom resume' updated june 2016 pm
 
20150121 Ausgrid PM work experience and skills
20150121 Ausgrid PM work experience and skills20150121 Ausgrid PM work experience and skills
20150121 Ausgrid PM work experience and skills
 
Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015
 
RAMESH PIPING STRESS ENGINEER
RAMESH PIPING STRESS ENGINEERRAMESH PIPING STRESS ENGINEER
RAMESH PIPING STRESS ENGINEER
 
Nadeem kumar cv
Nadeem kumar cvNadeem kumar cv
Nadeem kumar cv
 
Mechanical Maintenance Supervisor CV
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CV
 
Latest CV of Gangadhar
Latest CV of GangadharLatest CV of Gangadhar
Latest CV of Gangadhar
 
resume-6
resume-6resume-6
resume-6
 
Farrukh ali hassan civil engineer cv
Farrukh ali hassan   civil engineer cvFarrukh ali hassan   civil engineer cv
Farrukh ali hassan civil engineer cv
 
2016 Resume (3)
2016 Resume (3)2016 Resume (3)
2016 Resume (3)
 
Resident Engineer
Resident EngineerResident Engineer
Resident Engineer
 
Job Desciption Completions Engineer
Job Desciption Completions EngineerJob Desciption Completions Engineer
Job Desciption Completions Engineer
 
Ron Williams CV Feb 2017
Ron Williams CV Feb 2017Ron Williams CV Feb 2017
Ron Williams CV Feb 2017
 

Destaque

6 Strategies to Maximize Sales Results eBook
6 Strategies to Maximize Sales Results eBook6 Strategies to Maximize Sales Results eBook
6 Strategies to Maximize Sales Results eBookBrittany Shonka
 
Aparato respiratorio luis chango
Aparato respiratorio luis changoAparato respiratorio luis chango
Aparato respiratorio luis changoLuis Espinoza
 
Guiorelatriovisitadeestudo
GuiorelatriovisitadeestudoGuiorelatriovisitadeestudo
Guiorelatriovisitadeestudoanabela.dias
 
Cà phê sáng Phi lợi nhuận 03/2016: Trách nhiệm với đối tượng thụ hưởng
Cà phê sáng Phi lợi nhuận 03/2016: Trách nhiệm với đối tượng thụ hưởngCà phê sáng Phi lợi nhuận 03/2016: Trách nhiệm với đối tượng thụ hưởng
Cà phê sáng Phi lợi nhuận 03/2016: Trách nhiệm với đối tượng thụ hưởngLIN Center for Community Development
 
Prezentace 2016 17 - text
Prezentace 2016 17 - textPrezentace 2016 17 - text
Prezentace 2016 17 - textpetrzed
 
Contrarios
Contrarios Contrarios
Contrarios saos2829
 
GIMP como alternativa para processamento de imagens - Leandro Stachlewski
GIMP como alternativa para processamento de imagens - Leandro StachlewskiGIMP como alternativa para processamento de imagens - Leandro Stachlewski
GIMP como alternativa para processamento de imagens - Leandro StachlewskiTchelinux
 
Penanganan ikan-segar
Penanganan ikan-segarPenanganan ikan-segar
Penanganan ikan-segarPT. SASA
 

Destaque (15)

tie-up point reinforcement - Seamer
tie-up point reinforcement - Seamertie-up point reinforcement - Seamer
tie-up point reinforcement - Seamer
 
6 Strategies to Maximize Sales Results eBook
6 Strategies to Maximize Sales Results eBook6 Strategies to Maximize Sales Results eBook
6 Strategies to Maximize Sales Results eBook
 
Aparato respiratorio luis chango
Aparato respiratorio luis changoAparato respiratorio luis chango
Aparato respiratorio luis chango
 
Guiorelatriovisitadeestudo
GuiorelatriovisitadeestudoGuiorelatriovisitadeestudo
Guiorelatriovisitadeestudo
 
resume orlando
resume orlandoresume orlando
resume orlando
 
Cà phê sáng Phi lợi nhuận 03/2016: Trách nhiệm với đối tượng thụ hưởng
Cà phê sáng Phi lợi nhuận 03/2016: Trách nhiệm với đối tượng thụ hưởngCà phê sáng Phi lợi nhuận 03/2016: Trách nhiệm với đối tượng thụ hưởng
Cà phê sáng Phi lợi nhuận 03/2016: Trách nhiệm với đối tượng thụ hưởng
 
Prezentace 2016 17 - text
Prezentace 2016 17 - textPrezentace 2016 17 - text
Prezentace 2016 17 - text
 
Contrarios
Contrarios Contrarios
Contrarios
 
O pensamento crítico através do letramento visual
O pensamento crítico através do letramento visualO pensamento crítico através do letramento visual
O pensamento crítico através do letramento visual
 
GIMP como alternativa para processamento de imagens - Leandro Stachlewski
GIMP como alternativa para processamento de imagens - Leandro StachlewskiGIMP como alternativa para processamento de imagens - Leandro Stachlewski
GIMP como alternativa para processamento de imagens - Leandro Stachlewski
 
Penanganan ikan-segar
Penanganan ikan-segarPenanganan ikan-segar
Penanganan ikan-segar
 
Hills Leadership PPT 2015
Hills Leadership PPT 2015Hills Leadership PPT 2015
Hills Leadership PPT 2015
 
Tema: Trabalho
Tema: TrabalhoTema: Trabalho
Tema: Trabalho
 
civilización egipcia 4
civilización egipcia 4civilización egipcia 4
civilización egipcia 4
 
5 р анги
5 р анги5 р анги
5 р анги
 

Semelhante a resume for Mngr position 4-13-16

Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015David Karbach
 
Wendell Spencer Resume Mar 2015
Wendell Spencer Resume Mar 2015Wendell Spencer Resume Mar 2015
Wendell Spencer Resume Mar 2015wendell spencer
 
PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015gufron gufron
 
Luz McGrath Resume2 April 2012
Luz McGrath Resume2 April 2012Luz McGrath Resume2 April 2012
Luz McGrath Resume2 April 2012Luz Hoyos-McGrath
 
Ronald J Kunz Resume C
Ronald J Kunz Resume CRonald J Kunz Resume C
Ronald J Kunz Resume CRon Kunz
 
Evan Gritman Lewis
Evan Gritman LewisEvan Gritman Lewis
Evan Gritman LewisEvan Lewis
 
Hively-Resume 2016
Hively-Resume 2016Hively-Resume 2016
Hively-Resume 2016Kirk Hively
 
Resume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalResume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalSam DiPasquale
 
Project Manager Resume
Project Manager ResumeProject Manager Resume
Project Manager ResumeJohn Bloom
 
Michael E Burns Resume
Michael E Burns ResumeMichael E Burns Resume
Michael E Burns Resumemichael burns
 
John Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Snyder
 
Taylor, Michael J Resume
Taylor, Michael J   ResumeTaylor, Michael J   Resume
Taylor, Michael J Resumemjtaylor52
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerTarun Sharna
 
Todd Dickey_ resume June 2016 gov
Todd Dickey_ resume June 2016 govTodd Dickey_ resume June 2016 gov
Todd Dickey_ resume June 2016 govTodd Dickey
 

Semelhante a resume for Mngr position 4-13-16 (20)

SNeshevich_2016
SNeshevich_2016SNeshevich_2016
SNeshevich_2016
 
Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015Resume David Karbach_Feb 2015
Resume David Karbach_Feb 2015
 
Wendell Spencer Resume Mar 2015
Wendell Spencer Resume Mar 2015Wendell Spencer Resume Mar 2015
Wendell Spencer Resume Mar 2015
 
PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
Luz McGrath Resume2 April 2012
Luz McGrath Resume2 April 2012Luz McGrath Resume2 April 2012
Luz McGrath Resume2 April 2012
 
Ronald J Kunz Resume C
Ronald J Kunz Resume CRonald J Kunz Resume C
Ronald J Kunz Resume C
 
Evan Gritman Lewis
Evan Gritman LewisEvan Gritman Lewis
Evan Gritman Lewis
 
Henrys Resume 2016 Q3
Henrys Resume 2016 Q3Henrys Resume 2016 Q3
Henrys Resume 2016 Q3
 
Hively-Resume 2016
Hively-Resume 2016Hively-Resume 2016
Hively-Resume 2016
 
Resume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - ElectricalResume - DiPasquale -Principal Project Engineer - Electrical
Resume - DiPasquale -Principal Project Engineer - Electrical
 
Project Manager Resume
Project Manager ResumeProject Manager Resume
Project Manager Resume
 
Michael E Burns Resume
Michael E Burns ResumeMichael E Burns Resume
Michael E Burns Resume
 
John Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resume
 
CV_2016_rev_4_RW
CV_2016_rev_4_RWCV_2016_rev_4_RW
CV_2016_rev_4_RW
 
David Lawrence11
David Lawrence11David Lawrence11
David Lawrence11
 
Taylor, Michael J Resume
Taylor, Michael J   ResumeTaylor, Michael J   Resume
Taylor, Michael J Resume
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineer
 
Todd Dickey_ resume June 2016 gov
Todd Dickey_ resume June 2016 govTodd Dickey_ resume June 2016 gov
Todd Dickey_ resume June 2016 gov
 
Leacock steven resume
Leacock steven   resumeLeacock steven   resume
Leacock steven resume
 

resume for Mngr position 4-13-16

  • 1. Kenneth Todd Meyers 4824 Nightingale Lane Chesapeake, VA 23321 (H) (757) 606-2738 (W) (757) 688-8364 (C) (757) 262-7004 OBJECTIVE: To obtain a challenging position, which will utilize my management and engineering skills and provide opportunities for advancement. EXPERIENCE: Supervisor Experience January 1, 2006 to Present – Engineering Manager 2 (Refueling Technical - Head Area Disassembly Group) Newport News Shipbuilding – Reactor Services Project January 1, 2005 to December 31, 2005 – Acting Supervisor/Senior Project Engineer Northrop Grumman Newport News – Reactor Services Project (Fluids/HVAC Group) I am currently the Engineering Manager 2 of the Reactor Servicing Operations Head Area Disassembly group. This position has provides me the opportunity to manage the day-to-day operations of this group. This role requires assigning and prioritizing work to ensure our products are developed on-schedule. It also necessitates attending and conducting staff meetings to facilitate good communication within the group, as well as between the group and upper management. It requires counseling and mentoring Junior Engineers, conducting Performance Reviews and reviewing technical documents for accuracy. In addition to these duties I have been the interim Manger 2 for the Radiological Support Group and the Fuel Disassembly and Shipout Group. My current and previous Engineering Manager has also assigned me Acting Manager 3 duties during scheduled absences. In addition to these duties I am the lead manager for CVN 73 Planning for E82. In this role I provide leadership and guidance to all Project Technical engineers in E82 that are developing scopes for the CVN 73 Refueling.
  • 2. Technical Experience January 1, 2003 to December 31, 2004 – Project Engineer Northrop Grumman Newport News – Reactor Services Project I was assigned the task of managing the D&D program at DD#3 and DD#4 for Reactor Servicing. This task includes prioritizing work and positioning of personnel to ensure the work is performed on time and meets the needs of the customer. To accomplish this task, I have worked with NRRO, X73, E85 and the Trades. The product issued is the Technical Work Documents (TWDs) that will reduce the radiological risks associated with these Facilities. 1988 to 2003 - Associate Engineer, Engineer and Senior Engineer. Northrop Grumman Newport News – Reactor Services Project During this time I provided technical services to E82. • Maintained drawings, technical work documents, and monitored all maintenance and cleaning and testing of the radioactive liquid waste (RLW) tanks at NGNN. This included the development and implementation of a new high-pressure wash- down system for RLW tanks that eliminated the need to enter the tanks for cleaning purposes. • Developed/Implemented new radioactive liquid waste tank inspection method. • Designed Hydrovac/Pump down Systems for various ships. • Developed the water based hydraulic system (CDRS) used on the SSSB. • Member of NGNN Quality Team that selected Flowmaster Software. • Designed HVAC Systems for control of contamination. • Resolved discrepancies associated with the DI Water System • Writing, certifying and reviewing procedures for technical quality and proper radiological controls. • Resolved numerous discrepancy reports on shipyard equipment and refueling equipment. • Written numerous OFI’s (NGNN Opportunity for Improvement Program) from 1993 to Present that has resulted in annual savings of approximately $200,000, savings every three years of over $600,000 as well as improved numerous NNS processes. EDUCATION: Bachelor of Science in Mechanical Engineering from Old Dominion University CONTINUOUS EDUCATION: • RTNE Qualified • RADCON 106.5 Qualified • ASME Professional Development Short Course on Pump and Valve Selection for Optimum System Performance • Flowmaster (Pressure Drop/Pipe Sizing Software) • I-Deas Master Series – Parts Modeling (FEA Modeling Software) • I-Deas Master Series – Simulation (FEA Modeling Software) • CFDesign (Finite Element Code for Fluid Flow and Heat Transfer Solver) • TechPro Class on Pumps and Seals