SlideShare uma empresa Scribd logo
1 de 1
Baixar para ler offline
Tint Back Project
Advanced
Manikin Original Level
(Bottom Left)
Natural level 4 with warm
undertones.
Matching all other quads to this
quad!
Manikin Starting Level: 7 Neutral/
Warm
(Top Right)
Fill: CT 15gr 6/75, 30gr 6 vol.
Process: 20 mins.
Final Color: KP 20gr 5/0, 20gr 10
vol.
Process: 45 mins
Results: This quad had the best
results to matching the original
quad. Similar warm, red
undertones and level.
Manikin Starting Level: 8 Warm
(Top Left)
Fill: CT 15gr 7/43, 30gr 6 vol.
Process: 20 mins.
Final Color: KP 20gr 4/0, 20gr 10
vol.
Process: 45 mins.
Results: This quad turned out a
half level darker than original
quad. Had similar warm, red
undertones.
Grey Coverage Quad
After completing project for
intermediate, I was not satisfied
with final result.
Deposited with CT 5/4 and 4/77
Equal parts with 6vol.
Final Result: Grey quad has
orange and gold tones, with a
similar level to original quad.
Designed By: Kelsey A. Dunham

Mais conteúdo relacionado

Destaque

Gatorloop Presentation Texas_1-30-2016
Gatorloop Presentation Texas_1-30-2016Gatorloop Presentation Texas_1-30-2016
Gatorloop Presentation Texas_1-30-2016Jared S. Feldman
 
Gli ecomusei e il Piano regionale del turismo
Gli ecomusei e il Piano regionale del turismoGli ecomusei e il Piano regionale del turismo
Gli ecomusei e il Piano regionale del turismoPatrimonio culturale FVG
 
Appunti di Finanza aziendale
Appunti di Finanza aziendaleAppunti di Finanza aziendale
Appunti di Finanza aziendaleprofman
 
Proyecto Técnico Industrial
Proyecto Técnico IndustrialProyecto Técnico Industrial
Proyecto Técnico IndustrialAli Bautista
 
8 ejemplos Prácticos de IPER
8 ejemplos Prácticos de IPER8 ejemplos Prácticos de IPER
8 ejemplos Prácticos de IPERArnaldo Brito
 

Destaque (7)

Gatorloop Presentation Texas_1-30-2016
Gatorloop Presentation Texas_1-30-2016Gatorloop Presentation Texas_1-30-2016
Gatorloop Presentation Texas_1-30-2016
 
Gli ecomusei e il Piano regionale del turismo
Gli ecomusei e il Piano regionale del turismoGli ecomusei e il Piano regionale del turismo
Gli ecomusei e il Piano regionale del turismo
 
Appunti di Finanza aziendale
Appunti di Finanza aziendaleAppunti di Finanza aziendale
Appunti di Finanza aziendale
 
Media - press, radio, television
Media - press, radio, televisionMedia - press, radio, television
Media - press, radio, television
 
News Gatekeeping
News GatekeepingNews Gatekeeping
News Gatekeeping
 
Proyecto Técnico Industrial
Proyecto Técnico IndustrialProyecto Técnico Industrial
Proyecto Técnico Industrial
 
8 ejemplos Prácticos de IPER
8 ejemplos Prácticos de IPER8 ejemplos Prácticos de IPER
8 ejemplos Prácticos de IPER
 

Kelsey Dunham TINT BACK

  • 1. Tint Back Project Advanced Manikin Original Level (Bottom Left) Natural level 4 with warm undertones. Matching all other quads to this quad! Manikin Starting Level: 7 Neutral/ Warm (Top Right) Fill: CT 15gr 6/75, 30gr 6 vol. Process: 20 mins. Final Color: KP 20gr 5/0, 20gr 10 vol. Process: 45 mins Results: This quad had the best results to matching the original quad. Similar warm, red undertones and level. Manikin Starting Level: 8 Warm (Top Left) Fill: CT 15gr 7/43, 30gr 6 vol. Process: 20 mins. Final Color: KP 20gr 4/0, 20gr 10 vol. Process: 45 mins. Results: This quad turned out a half level darker than original quad. Had similar warm, red undertones. Grey Coverage Quad After completing project for intermediate, I was not satisfied with final result. Deposited with CT 5/4 and 4/77 Equal parts with 6vol. Final Result: Grey quad has orange and gold tones, with a similar level to original quad. Designed By: Kelsey A. Dunham