SlideShare uma empresa Scribd logo
1 de 10
IBS Strategy
VMS Project
Selection the IBS carriers
• Purpose: Selection IBS carrier for 2nd layering
• Currently, VMS under using IBS in F3 (10612), this solution is very good due to use separate
frequency with other sites, so the less interference.
• In order to increasing capacity for IBS, upgrade to 2nd carrier for all IBS and all sites neighbor
upgrade to 3/3/3. in this case we propose to change change frequency IBS from F3 to the
F1/F2 or F1/F3 , with2 carriers, Therefore IBS will operation like 2nd Carriers macro site but in
Neighbor strategy need to define to limited the over shooting and interference from outdoor
sites by one way neighbors
Option 1: F1 & F2: in case all sites neighbur operation with 3 carrier, same load and coverage
so the Ec/No and CQI, RSCP are the same between 3 layers, this option is simple for setting
and operating like as macro site, the interference and HSDPA throughput is not difference F2
and F3.
Option 2: F1&F3: in case in IBS area uses only 2nd carrier (F1&F2), therefore F3 will be better
Ec/No and CQI, due to very low interference UL and DL. The HSDPA throughput is better in
F3.
For VMS2 case with IBS NSN area in down town and most of sites will be upgrade to 3 layers
so we proposal F1 & F2 for IBS. In case using F1 & F3 is same setting but have lightly differ
in neighbor strategy to reduce overshooting RSCP. In this propose we present the case F1 &
F2.
IBS Strategy – 2RF Carriers Mobility
F2
F1
GSM 2G Layer
Cell reselection ISHO
IFHO
Cell reselection
DRRC for
HSDPA
Layer
Connected modeIdle mode
Service Type Setting EcNo (dB) RSCP (dBm) Remarks
R99 Voice
Threshold -15 -105
IFHO/ISHOCancellation -12 -102
R99 PS
Threshold -15 -105
ISHOCancellation -12 -102
HSDPA
Threshold -15 -105
IFHOCancellation -12 -102
AMR+HSDPA
Threshold -15 -105
IFHOCancellation -12 -102
Parameter Value Unit
Sintrasearch 12 dB
Sinterseach 18 dB
Ssearch_RAT 2 dB
Qqualmin -19 dB
Qrxlevmin -99 dBm
F1 – HSPA+R99
F2 – HSPA
ptxprimaryCPICH=300 (30dBm)
Cell weight=1
Cell weight=0.5
AdjiOffset 2=-50 for RT
UMTS F3
Mobility Parameters
SsearchRAT: 2 dB (-16 dB) RT / NRT
RSCP: -105
Ec/No: -15
UMTS F2
SinterSearch: 18 dB (0 dB)
Qhyst2: 2 dB
AdjiQqualmin = -18dB
AdjiQrxlevmin = -105dBm
HHoRscpThreshold: -100
AdjiMinRSCP: -99dBm
UMTS F1
2G
HHoEcNoThreshold: -15
AdjiMinEcNo = - 13 dBAdjiSIB = 1
AdjiQoffset2 = -50 dB(for RT)
HHoRscpThreshold: -100
AdjiMinRSCP: -99dBm
HHoEcNoThreshold: -12
AdjiMinEcNo = - 13 dB
IFCR (F2→F1)
ISCR (F1→GSM)
IFHO (F2→F1)
ISHO (F1→GSM)
Connected modeIdle mode
IFHO (F3→F1)
CellWeightForHSDPALayering:
Weight : F1= 0.5
Weight: F2= 1
IBS Neighbors Planning
Intra IBS
• ADJI : F1<-> F2
• ADJS : cells within same carrier
• ADJG : F1->GSM
Inter BTS
Macro to IBS
• ADJI : F3  F1
• ADJS : F2<->F2, F1<->F1
ADJI
IBS including 3G and GSM co-sites, we just need define ADJG for intra-IBS
One way
two way
F3
F1
GSM
F2
F1
GSM
Intra IBS
ADJG
ADJS
ADJS
ADJI
F3
ADJI
F1: 10562
F2: 10587
F3: 10612
Mobility – Idle mode
In idle mode, UE can be forced to camp certain carrier or allow UE to camp
to any layer by nature of signal quality, With IBS site we propose to use
Idle mode in F1 and DRRC to F2 with HSDPA
Cell Reselection parameters
• Negative AdjiQoffset in RT HOPI (RT HOPI parameter set is used for all idle mode
UEs) can be used to force idle mode UEs to certain frequency
Radio features
DRRC connection setup features works between layers (with equal coverage areas)
within same BTS and under common sector id
• Directed RRC Connection Setup – DirectedRRCEnabled
• Directed RRC Connection setup for HSDPA layer
– Basic – DirectedRRCForHSDPAEnabled
– Enhanced – DirectedRRCForHSDPALayerEnhanc
• HSDPA layering for UEs in common channels HSDPALayeringCommonChEnabled
Config 1 Config 2 Config 3 Config 4 Config 5
Number of carriers Single Multiple Max 2 Multiple Multiple
HSDPA enabled NO NO YES YES YES
Load Balancing for R99 traffic NO YES NO NO YES
Load Balancing for HSDPA traffic NO NO NO YES YES
Establishment cause NO NO NO YES YES
DirectedRRCEnabled Disabled Enabled Disabled Disable Enabled
DirectedRRCForHSDPAEnabled Disabled Disabled Enabled Enabled Enabled
DirectedRRCForHSDPALayerEnhanc* Disabled Disabled Disabled Enabled Enabled
Radio features
• DRRC for HSDPA Layer
– UEs are directed to correct layer based on UE category only
▪ R5 or newer UEs stay on HS(D)PA support layer
▪ R99 or R4 UEs remain on the R99 layer
– Not applicable in our case
• DRRC for HSDPA Layer Enhanced
– DRRC load sharing between layers to balance the HSDPA loading, based on cell weight
and power
• HSPA layering for UEs in Common Channels
– HS(D)PA UE in CELL_FACH state on R99 layer will be redirected to HS layer
– Only PS RAB type is allowed (ServicesToHSDPALayer=1)
– Not applicable in our case
F3
F1
F2
• convention for 2/2
configuration:
Cell ID = 1: xxxx1
Cell ID = 2: xxxx2
Cell ID = 4: xxxx4
Cell ID = 5: xxxx5
IBS Site ID Planning
UARFCN Allocation (DL):
Carrier 1: 10562
Carrier 2: 10587
Carrier 3: 10612
Tcell Grouping and LCG
System Module
2 HSDPA cells1HSDPA schedulers activated
RF
modules
Tcell =
1
Tcell =
0
f1
Scheduler
Tcell =
7
Tcell =
6
f2
f2
f1
Local Cell Grouping
 Option:
 LCG1: cell1  cell4
 simple config, but cannot allocate BB
resources to each group of cells
Use only one Scheduler for both
layers
2 sector ID
Tcell = 0f1
Scheduler
Tcell = 6f2
1 sector ID

Mais conteúdo relacionado

Mais procurados

5G NR parameters
5G NR parameters5G NR parameters
5G NR parametersSasi Reddy
 
Gp3 pho-11-1-xfp-cpl-interop-public-20110502
Gp3 pho-11-1-xfp-cpl-interop-public-20110502Gp3 pho-11-1-xfp-cpl-interop-public-20110502
Gp3 pho-11-1-xfp-cpl-interop-public-20110502P Palai
 
1 omo112050 bsc6000 gsm v9 r8c12 cell parameters issue1.00
1 omo112050 bsc6000 gsm v9 r8c12 cell parameters issue1.001 omo112050 bsc6000 gsm v9 r8c12 cell parameters issue1.00
1 omo112050 bsc6000 gsm v9 r8c12 cell parameters issue1.00Ahmed Gad
 
3 g parameter ericsson
3 g parameter ericsson3 g parameter ericsson
3 g parameter ericssonMitul Shah
 
Introduction to modern receiver
Introduction to modern receiverIntroduction to modern receiver
Introduction to modern receivercriterion123
 
Cwte_Wi-Fii6-presentation_dec_7_2021
Cwte_Wi-Fii6-presentation_dec_7_2021Cwte_Wi-Fii6-presentation_dec_7_2021
Cwte_Wi-Fii6-presentation_dec_7_2021Mayur Sarode
 
TDM Traffic Migration into IP Backhaul
TDM Traffic Migration into IP BackhaulTDM Traffic Migration into IP Backhaul
TDM Traffic Migration into IP BackhaulKhalil Al-Alami
 
39540950 gsm-ion-course
39540950 gsm-ion-course39540950 gsm-ion-course
39540950 gsm-ion-courseHoài Hà
 
3G Drive test procedure by Md Joynal Abaden@ Myanmar
3G Drive test procedure  by Md Joynal Abaden@ Myanmar3G Drive test procedure  by Md Joynal Abaden@ Myanmar
3G Drive test procedure by Md Joynal Abaden@ MyanmarMd Joynal Abaden
 
56990278 umts-interview-questions-and-answer
56990278 umts-interview-questions-and-answer56990278 umts-interview-questions-and-answer
56990278 umts-interview-questions-and-answerMoses Daramola
 
3 g drive-test
3 g drive-test3 g drive-test
3 g drive-testAniekhan
 
RSCP RSSI EC/NO CQI
RSCP RSSI EC/NO CQIRSCP RSSI EC/NO CQI
RSCP RSSI EC/NO CQIFaraz Husain
 

Mais procurados (20)

LTE: OFDM pilots
LTE: OFDM pilotsLTE: OFDM pilots
LTE: OFDM pilots
 
5G NR parameters
5G NR parameters5G NR parameters
5G NR parameters
 
Gp3 pho-11-1-xfp-cpl-interop-public-20110502
Gp3 pho-11-1-xfp-cpl-interop-public-20110502Gp3 pho-11-1-xfp-cpl-interop-public-20110502
Gp3 pho-11-1-xfp-cpl-interop-public-20110502
 
1 omo112050 bsc6000 gsm v9 r8c12 cell parameters issue1.00
1 omo112050 bsc6000 gsm v9 r8c12 cell parameters issue1.001 omo112050 bsc6000 gsm v9 r8c12 cell parameters issue1.00
1 omo112050 bsc6000 gsm v9 r8c12 cell parameters issue1.00
 
3 g basics
3 g basics3 g basics
3 g basics
 
3 g parameter ericsson
3 g parameter ericsson3 g parameter ericsson
3 g parameter ericsson
 
Introduction to modern receiver
Introduction to modern receiverIntroduction to modern receiver
Introduction to modern receiver
 
Cwte_Wi-Fii6-presentation_dec_7_2021
Cwte_Wi-Fii6-presentation_dec_7_2021Cwte_Wi-Fii6-presentation_dec_7_2021
Cwte_Wi-Fii6-presentation_dec_7_2021
 
TDM Traffic Migration into IP Backhaul
TDM Traffic Migration into IP BackhaulTDM Traffic Migration into IP Backhaul
TDM Traffic Migration into IP Backhaul
 
PMC_6G
PMC_6GPMC_6G
PMC_6G
 
LTE Planning
LTE PlanningLTE Planning
LTE Planning
 
Ch 04 HANDOVER_gvl
Ch 04 HANDOVER_gvlCh 04 HANDOVER_gvl
Ch 04 HANDOVER_gvl
 
coverage_enhancement
coverage_enhancementcoverage_enhancement
coverage_enhancement
 
39540950 gsm-ion-course
39540950 gsm-ion-course39540950 gsm-ion-course
39540950 gsm-ion-course
 
Home nodeb
Home nodebHome nodeb
Home nodeb
 
3G Drive test procedure by Md Joynal Abaden@ Myanmar
3G Drive test procedure  by Md Joynal Abaden@ Myanmar3G Drive test procedure  by Md Joynal Abaden@ Myanmar
3G Drive test procedure by Md Joynal Abaden@ Myanmar
 
Hsdpa analysis
Hsdpa analysisHsdpa analysis
Hsdpa analysis
 
56990278 umts-interview-questions-and-answer
56990278 umts-interview-questions-and-answer56990278 umts-interview-questions-and-answer
56990278 umts-interview-questions-and-answer
 
3 g drive-test
3 g drive-test3 g drive-test
3 g drive-test
 
RSCP RSSI EC/NO CQI
RSCP RSSI EC/NO CQIRSCP RSSI EC/NO CQI
RSCP RSSI EC/NO CQI
 

Semelhante a Ibs planning-vms2-v2

AIRCOM LTE Webinar 6 - Comparison between GSM, UMTS & LTE
AIRCOM LTE Webinar 6 - Comparison between GSM, UMTS & LTEAIRCOM LTE Webinar 6 - Comparison between GSM, UMTS & LTE
AIRCOM LTE Webinar 6 - Comparison between GSM, UMTS & LTEAIRCOM International
 
Knowledge Sharing - Mobility_Strategy.pdf
Knowledge Sharing - Mobility_Strategy.pdfKnowledge Sharing - Mobility_Strategy.pdf
Knowledge Sharing - Mobility_Strategy.pdfAbdillaRais
 
Irat handover basics
Irat handover basicsIrat handover basics
Irat handover basicsZIZI Yahia
 
Irathandoverbasics 120523054755-phpapp02
Irathandoverbasics 120523054755-phpapp02Irathandoverbasics 120523054755-phpapp02
Irathandoverbasics 120523054755-phpapp02bahareh jalali farahani
 
Irathandoverbasics 120523054755-phpapp02
Irathandoverbasics 120523054755-phpapp02Irathandoverbasics 120523054755-phpapp02
Irathandoverbasics 120523054755-phpapp02bahareh jalali farahani
 
Eric irat handover basics
Eric irat handover basicsEric irat handover basics
Eric irat handover basicsThang Dang
 
LTE-RF Drive test .pdf
LTE-RF Drive test .pdfLTE-RF Drive test .pdf
LTE-RF Drive test .pdfssuser3be61c1
 
03 150323115803-conversion-gate01
03 150323115803-conversion-gate0103 150323115803-conversion-gate01
03 150323115803-conversion-gate01Farhan Saeed
 
AAAAAAAAAAAA,,,.....$$AAAAAAA
AAAAAAAAAAAA,,,.....$$AAAAAAAAAAAAAAAAAAA,,,.....$$AAAAAAA
AAAAAAAAAAAA,,,.....$$AAAAAAAcharanThakur1
 
Owa200002 wcdma basic principle issue1.0
Owa200002 wcdma basic principle issue1.0Owa200002 wcdma basic principle issue1.0
Owa200002 wcdma basic principle issue1.0Szymon Nowak
 
EMERSON EDUARDO RODRIGUES wcdma-optimization-related-questions-m-com-academy
EMERSON EDUARDO RODRIGUES wcdma-optimization-related-questions-m-com-academyEMERSON EDUARDO RODRIGUES wcdma-optimization-related-questions-m-com-academy
EMERSON EDUARDO RODRIGUES wcdma-optimization-related-questions-m-com-academyEMERSON EDUARDO RODRIGUES
 
AIRCOM LTE Webinar 3 - LTE Carriers
AIRCOM LTE Webinar 3 - LTE CarriersAIRCOM LTE Webinar 3 - LTE Carriers
AIRCOM LTE Webinar 3 - LTE CarriersAIRCOM International
 
Graduation Project Presentation
Graduation Project PresentationGraduation Project Presentation
Graduation Project Presentationahmedm177
 
Wcdma Radio Network Planning And Optimization
Wcdma Radio Network Planning And OptimizationWcdma Radio Network Planning And Optimization
Wcdma Radio Network Planning And OptimizationPengpeng Song
 

Semelhante a Ibs planning-vms2-v2 (20)

AIRCOM LTE Webinar 6 - Comparison between GSM, UMTS & LTE
AIRCOM LTE Webinar 6 - Comparison between GSM, UMTS & LTEAIRCOM LTE Webinar 6 - Comparison between GSM, UMTS & LTE
AIRCOM LTE Webinar 6 - Comparison between GSM, UMTS & LTE
 
Irat handover basics
Irat handover basicsIrat handover basics
Irat handover basics
 
Lte tutorial
Lte tutorialLte tutorial
Lte tutorial
 
ASEAN hspa.pdf
ASEAN hspa.pdfASEAN hspa.pdf
ASEAN hspa.pdf
 
Knowledge Sharing - Mobility_Strategy.pdf
Knowledge Sharing - Mobility_Strategy.pdfKnowledge Sharing - Mobility_Strategy.pdf
Knowledge Sharing - Mobility_Strategy.pdf
 
Irat handover basics
Irat handover basicsIrat handover basics
Irat handover basics
 
Irathandoverbasics 120523054755-phpapp02
Irathandoverbasics 120523054755-phpapp02Irathandoverbasics 120523054755-phpapp02
Irathandoverbasics 120523054755-phpapp02
 
Irathandoverbasics 120523054755-phpapp02
Irathandoverbasics 120523054755-phpapp02Irathandoverbasics 120523054755-phpapp02
Irathandoverbasics 120523054755-phpapp02
 
Eric irat handover basics
Eric irat handover basicsEric irat handover basics
Eric irat handover basics
 
LTE-RF Drive test .pdf
LTE-RF Drive test .pdfLTE-RF Drive test .pdf
LTE-RF Drive test .pdf
 
03 150323115803-conversion-gate01
03 150323115803-conversion-gate0103 150323115803-conversion-gate01
03 150323115803-conversion-gate01
 
AAAAAAAAAAAA,,,.....$$AAAAAAA
AAAAAAAAAAAA,,,.....$$AAAAAAAAAAAAAAAAAAA,,,.....$$AAAAAAA
AAAAAAAAAAAA,,,.....$$AAAAAAA
 
Owa200002 wcdma basic principle issue1.0
Owa200002 wcdma basic principle issue1.0Owa200002 wcdma basic principle issue1.0
Owa200002 wcdma basic principle issue1.0
 
EMERSON EDUARDO RODRIGUES wcdma-optimization-related-questions-m-com-academy
EMERSON EDUARDO RODRIGUES wcdma-optimization-related-questions-m-com-academyEMERSON EDUARDO RODRIGUES wcdma-optimization-related-questions-m-com-academy
EMERSON EDUARDO RODRIGUES wcdma-optimization-related-questions-m-com-academy
 
AIRCOM LTE Webinar 3 - LTE Carriers
AIRCOM LTE Webinar 3 - LTE CarriersAIRCOM LTE Webinar 3 - LTE Carriers
AIRCOM LTE Webinar 3 - LTE Carriers
 
45651639 total-umts
45651639 total-umts45651639 total-umts
45651639 total-umts
 
Graduation Project Presentation
Graduation Project PresentationGraduation Project Presentation
Graduation Project Presentation
 
Wcdma Radio Network Planning And Optimization
Wcdma Radio Network Planning And OptimizationWcdma Radio Network Planning And Optimization
Wcdma Radio Network Planning And Optimization
 
3G basic good
3G basic good3G basic good
3G basic good
 
3g basic
3g basic3g basic
3g basic
 

Último

Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 

Último (20)

Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 

Ibs planning-vms2-v2

  • 2. Selection the IBS carriers • Purpose: Selection IBS carrier for 2nd layering • Currently, VMS under using IBS in F3 (10612), this solution is very good due to use separate frequency with other sites, so the less interference. • In order to increasing capacity for IBS, upgrade to 2nd carrier for all IBS and all sites neighbor upgrade to 3/3/3. in this case we propose to change change frequency IBS from F3 to the F1/F2 or F1/F3 , with2 carriers, Therefore IBS will operation like 2nd Carriers macro site but in Neighbor strategy need to define to limited the over shooting and interference from outdoor sites by one way neighbors Option 1: F1 & F2: in case all sites neighbur operation with 3 carrier, same load and coverage so the Ec/No and CQI, RSCP are the same between 3 layers, this option is simple for setting and operating like as macro site, the interference and HSDPA throughput is not difference F2 and F3. Option 2: F1&F3: in case in IBS area uses only 2nd carrier (F1&F2), therefore F3 will be better Ec/No and CQI, due to very low interference UL and DL. The HSDPA throughput is better in F3. For VMS2 case with IBS NSN area in down town and most of sites will be upgrade to 3 layers so we proposal F1 & F2 for IBS. In case using F1 & F3 is same setting but have lightly differ in neighbor strategy to reduce overshooting RSCP. In this propose we present the case F1 & F2.
  • 3. IBS Strategy – 2RF Carriers Mobility F2 F1 GSM 2G Layer Cell reselection ISHO IFHO Cell reselection DRRC for HSDPA Layer Connected modeIdle mode Service Type Setting EcNo (dB) RSCP (dBm) Remarks R99 Voice Threshold -15 -105 IFHO/ISHOCancellation -12 -102 R99 PS Threshold -15 -105 ISHOCancellation -12 -102 HSDPA Threshold -15 -105 IFHOCancellation -12 -102 AMR+HSDPA Threshold -15 -105 IFHOCancellation -12 -102 Parameter Value Unit Sintrasearch 12 dB Sinterseach 18 dB Ssearch_RAT 2 dB Qqualmin -19 dB Qrxlevmin -99 dBm F1 – HSPA+R99 F2 – HSPA ptxprimaryCPICH=300 (30dBm) Cell weight=1 Cell weight=0.5 AdjiOffset 2=-50 for RT
  • 4. UMTS F3 Mobility Parameters SsearchRAT: 2 dB (-16 dB) RT / NRT RSCP: -105 Ec/No: -15 UMTS F2 SinterSearch: 18 dB (0 dB) Qhyst2: 2 dB AdjiQqualmin = -18dB AdjiQrxlevmin = -105dBm HHoRscpThreshold: -100 AdjiMinRSCP: -99dBm UMTS F1 2G HHoEcNoThreshold: -15 AdjiMinEcNo = - 13 dBAdjiSIB = 1 AdjiQoffset2 = -50 dB(for RT) HHoRscpThreshold: -100 AdjiMinRSCP: -99dBm HHoEcNoThreshold: -12 AdjiMinEcNo = - 13 dB IFCR (F2→F1) ISCR (F1→GSM) IFHO (F2→F1) ISHO (F1→GSM) Connected modeIdle mode IFHO (F3→F1) CellWeightForHSDPALayering: Weight : F1= 0.5 Weight: F2= 1
  • 5. IBS Neighbors Planning Intra IBS • ADJI : F1<-> F2 • ADJS : cells within same carrier • ADJG : F1->GSM Inter BTS Macro to IBS • ADJI : F3  F1 • ADJS : F2<->F2, F1<->F1 ADJI IBS including 3G and GSM co-sites, we just need define ADJG for intra-IBS One way two way F3 F1 GSM F2 F1 GSM Intra IBS ADJG ADJS ADJS ADJI F3 ADJI F1: 10562 F2: 10587 F3: 10612
  • 6. Mobility – Idle mode In idle mode, UE can be forced to camp certain carrier or allow UE to camp to any layer by nature of signal quality, With IBS site we propose to use Idle mode in F1 and DRRC to F2 with HSDPA Cell Reselection parameters • Negative AdjiQoffset in RT HOPI (RT HOPI parameter set is used for all idle mode UEs) can be used to force idle mode UEs to certain frequency
  • 7. Radio features DRRC connection setup features works between layers (with equal coverage areas) within same BTS and under common sector id • Directed RRC Connection Setup – DirectedRRCEnabled • Directed RRC Connection setup for HSDPA layer – Basic – DirectedRRCForHSDPAEnabled – Enhanced – DirectedRRCForHSDPALayerEnhanc • HSDPA layering for UEs in common channels HSDPALayeringCommonChEnabled Config 1 Config 2 Config 3 Config 4 Config 5 Number of carriers Single Multiple Max 2 Multiple Multiple HSDPA enabled NO NO YES YES YES Load Balancing for R99 traffic NO YES NO NO YES Load Balancing for HSDPA traffic NO NO NO YES YES Establishment cause NO NO NO YES YES DirectedRRCEnabled Disabled Enabled Disabled Disable Enabled DirectedRRCForHSDPAEnabled Disabled Disabled Enabled Enabled Enabled DirectedRRCForHSDPALayerEnhanc* Disabled Disabled Disabled Enabled Enabled
  • 8. Radio features • DRRC for HSDPA Layer – UEs are directed to correct layer based on UE category only ▪ R5 or newer UEs stay on HS(D)PA support layer ▪ R99 or R4 UEs remain on the R99 layer – Not applicable in our case • DRRC for HSDPA Layer Enhanced – DRRC load sharing between layers to balance the HSDPA loading, based on cell weight and power • HSPA layering for UEs in Common Channels – HS(D)PA UE in CELL_FACH state on R99 layer will be redirected to HS layer – Only PS RAB type is allowed (ServicesToHSDPALayer=1) – Not applicable in our case
  • 9. F3 F1 F2 • convention for 2/2 configuration: Cell ID = 1: xxxx1 Cell ID = 2: xxxx2 Cell ID = 4: xxxx4 Cell ID = 5: xxxx5 IBS Site ID Planning UARFCN Allocation (DL): Carrier 1: 10562 Carrier 2: 10587 Carrier 3: 10612
  • 10. Tcell Grouping and LCG System Module 2 HSDPA cells1HSDPA schedulers activated RF modules Tcell = 1 Tcell = 0 f1 Scheduler Tcell = 7 Tcell = 6 f2 f2 f1 Local Cell Grouping  Option:  LCG1: cell1  cell4  simple config, but cannot allocate BB resources to each group of cells Use only one Scheduler for both layers 2 sector ID Tcell = 0f1 Scheduler Tcell = 6f2 1 sector ID