Our Latest Project
Nyakoi Upper Basic and Senior Secondary School
Madina Koto Village, Wuli West Division, The Gambia
• Water Pump Replacement Project Background
The Nyakoi Upper Basic and Senior Secondary School is located in Madina Koto Village,
Wuli West District of The Gambia's Upper River Region. The school's population consists of
449 students which includes 258 boys and 191 girls. There are also 14 teachers and 5 ancillary
staff for a total campus community of 468 individuals. Since 2010 there has been no running
water at the school. The purpose of this project is to make repairs to an existing, non-
functional solar-powered water pumping system at the school.
A school with 468 staff and students requires a substantial amount of water in order to satisfy
drinking water, sanitation, and the 'per student' requirements of the school kitchen.
Additionally, as a result of the lack of an on-campus water supply, the school garden and
banana orchard had to be discontinued due to the garden's high water demand.
The School’s Philosophy
The flow of water will free up the administration, caretakers, and teachers so they can focus on the school's
vision and mission.
Outdated Panels, Inoperable Pump
The project will replace the existing inoperative Lawrence
PS200 water pump with a new pump. The project will also
add six new solar panels for increased solar collection
capacity, resulting in increased pumping capability.
Dried up and Dirty Facilities
This project will accomplish the following: The defective pump will be removed from
the bore hole, a new pump, 6 new solar panels, a circuit breaker and new wiring will be
installed. As a result, the school will have sufficient water to meet its daily needs, and
to supply water to bathrooms, and sinks. There will also be enough water for the fruit
trees to be replanted in the school garden.
The Current Remedy for the Water
Problem
Water for the school has to be carried by the caretakers on bikes up to 20 times per day using large
containers filled from taps located 200 meters (Madina Village) and 325 meters (Taibatu Village) from the
school. Everyone in the school who needs water comes and collects it from the containers.
• The equipment will restore water which is a basic need of any educational center of this size.
• Water will pump to all faucets, bathrooms, drinking fountains, classrooms, and administrative
buildings.
• The fruit trees in the garden will be replanted and enjoyed by all.
• Students will not have to interrupt class to get water.
• Hand washing and good hygiene will increase with flowing water.
• The use of a renewable resource is a great learning opportunity for the students
• This project will impact the local community by eliminating the daily need to transport water to the
school from an outside source.
What are the Benefits of this Project?
Putting the Plan Into Action
Community Involvement
The school administration is driving the project. The school staff have made
arrangements with the contractor for completing the work within one week and they have
obtained cost estimates for the labor, parts, and materials needed to complete the project.
Implementation
Completion of the project will be accomplished in the following stages: First, the
defective pump will be removed from the bore hole and the new pump will be installed with
new electrical cable. Second, the inverter circuit breaker will be removed and replaced with
a new one. Third, six new solar panels will be installed and wired into the existing circuitry.
Fourth, new electrical cable will be run to the water tank's water flow cut-off mechanism to
stop the pump when the desired tank capacity is reached.
Sustainability
Designated school personnel will be trained on basic system theory, function of major
components and operation of the system. These individuals will also learn the basic
maintenance requirements for daily upkeep, ensuring sustained operation based on the
manufacturer's recommendations. The Principal plans to establish a maintenance fund to
plan for any future costs associated with the pump and panels.
Equipment Information
Project Costs
The school has promised to contribute 20,000 dalasi and the regional education office has promised 25,000 dalasi. The community is working on their
contribution as well. Right now approximately 163,000 dalasi is needed to carry out this project that converts to about $4527 or 3480€.
Contact Information in The Gambia
US Peace Corps Community Volunteer
Lacy Szuwalski
Email: lacyszuwalski@gmail.com
Tel: 220 794 7054
School Address
Nyakoi Upper Basic and Senior Secondary School
Madina Koto Village
Wuli West District
Upper River Region
The Gambia, West Africa
Nyakoi Senior Secondary School
Pump Replacement Project
Individuals Involved in the Project
Contact
Number
Headmaster 6712721
Ansu Kinteh 7712724
School Member in Charge of the Project
Ansumana Camara (Chairman) 9234077
Mechanic / Electrican
Essa Fatty 6653136
How to Get Involved
Please send questions to our international project coordinator, Justin Spees via email: justinspees@yahoo.com
telephone: +34 693545004
To make a charitable donations to our charity in the United States, which is supporting this project, please make checks
payable to Incline Skateboard Park Foundation. This is a charity founded July 11, 1997 and it is a US 501 (c) 3 that
supports various community facilities around the world. The charity’s US tax identification number is EIN 86-0882426,
and this is a public charity. Please make a reference to Nyakoi School Water Pump Replacement Project when donating.
An invoice and photo book from the project will be sent to your return address or email as soon as possible.
Send Donations to:
Incline Skateboard Park Foundation
P.O. Box 3464
Incline Village, NV 89451

Mais conteúdo relacionado

Mais procurados

A Rahman-ID (Deep-2)-66676)
A Rahman-ID (Deep-2)-66676)A Rahman-ID (Deep-2)-66676)
A Rahman-ID (Deep-2)-66676)GM Anam Ahmed
 
Commissioning of PEOCHAR Microhydel Project
Commissioning of PEOCHAR Microhydel ProjectCommissioning of PEOCHAR Microhydel Project
Commissioning of PEOCHAR Microhydel ProjectSRSP
 
Sept 2017 ghs master plan update
Sept 2017 ghs master plan updateSept 2017 ghs master plan update
Sept 2017 ghs master plan updateKenneth Hogge Sr
 
Presentation of Green School Project by ADRC
Presentation of Green School Project by ADRCPresentation of Green School Project by ADRC
Presentation of Green School Project by ADRCAhmed Shareef Chairperson
 
Presentation of Wan Miana model at Khushab & Mirpur AJK
Presentation of Wan Miana model at Khushab & Mirpur AJKPresentation of Wan Miana model at Khushab & Mirpur AJK
Presentation of Wan Miana model at Khushab & Mirpur AJKAkhuwat
 
Sarjapura Road Cluster presentation at 8th Curated session of KSWNKSWN
Sarjapura Road Cluster presentation at 8th Curated session of KSWNKSWNSarjapura Road Cluster presentation at 8th Curated session of KSWNKSWN
Sarjapura Road Cluster presentation at 8th Curated session of KSWNKSWNbiomeshubha
 
Renfrewshire ASSIST Seminar 2013
Renfrewshire ASSIST Seminar 2013Renfrewshire ASSIST Seminar 2013
Renfrewshire ASSIST Seminar 2013cunners
 

Mais procurados (10)

Photo album for web
Photo album for webPhoto album for web
Photo album for web
 
A Rahman-ID (Deep-2)-66676)
A Rahman-ID (Deep-2)-66676)A Rahman-ID (Deep-2)-66676)
A Rahman-ID (Deep-2)-66676)
 
Commissioning of PEOCHAR Microhydel Project
Commissioning of PEOCHAR Microhydel ProjectCommissioning of PEOCHAR Microhydel Project
Commissioning of PEOCHAR Microhydel Project
 
Sept 2017 ghs master plan update
Sept 2017 ghs master plan updateSept 2017 ghs master plan update
Sept 2017 ghs master plan update
 
Presentation of Green School Project by ADRC
Presentation of Green School Project by ADRCPresentation of Green School Project by ADRC
Presentation of Green School Project by ADRC
 
Presentation of Wan Miana model at Khushab & Mirpur AJK
Presentation of Wan Miana model at Khushab & Mirpur AJKPresentation of Wan Miana model at Khushab & Mirpur AJK
Presentation of Wan Miana model at Khushab & Mirpur AJK
 
Sarjapura Road Cluster presentation at 8th Curated session of KSWNKSWN
Sarjapura Road Cluster presentation at 8th Curated session of KSWNKSWNSarjapura Road Cluster presentation at 8th Curated session of KSWNKSWN
Sarjapura Road Cluster presentation at 8th Curated session of KSWNKSWN
 
Renfrewshire ASSIST Seminar 2013
Renfrewshire ASSIST Seminar 2013Renfrewshire ASSIST Seminar 2013
Renfrewshire ASSIST Seminar 2013
 
Janasewa school
Janasewa schoolJanasewa school
Janasewa school
 
Action time NSGF Zambia
Action time NSGF Zambia Action time NSGF Zambia
Action time NSGF Zambia
 

Destaque

Heat Pump, TUV Techindo, Bali 18-19 juli 2013
Heat Pump, TUV Techindo, Bali 18-19 juli 2013Heat Pump, TUV Techindo, Bali 18-19 juli 2013
Heat Pump, TUV Techindo, Bali 18-19 juli 2013Herry Widjanarko
 
Physics Investigatory Project Class XII.. Water Level Controller.!!
Physics Investigatory Project Class XII.. Water Level Controller.!!Physics Investigatory Project Class XII.. Water Level Controller.!!
Physics Investigatory Project Class XII.. Water Level Controller.!!Aryavarta Giri
 
STRUCTURAL DESIGN AND MANUFACTURING USING PENDULUM PRINCIPLE FOR BUCKET TYPE ...
STRUCTURAL DESIGN AND MANUFACTURING USING PENDULUM PRINCIPLE FOR BUCKET TYPE ...STRUCTURAL DESIGN AND MANUFACTURING USING PENDULUM PRINCIPLE FOR BUCKET TYPE ...
STRUCTURAL DESIGN AND MANUFACTURING USING PENDULUM PRINCIPLE FOR BUCKET TYPE ...Pranita Thorat
 
Pedal Powered Water Pump
Pedal Powered Water PumpPedal Powered Water Pump
Pedal Powered Water PumpNEERAJ KUMAR
 
Physics Investigatory Project(Water Level Indicating System)
Physics Investigatory Project(Water Level Indicating System)Physics Investigatory Project(Water Level Indicating System)
Physics Investigatory Project(Water Level Indicating System)Piyush Gaur
 
Presentation plumbing
Presentation plumbingPresentation plumbing
Presentation plumbingLiguidliguid
 

Destaque (7)

Physics project
Physics projectPhysics project
Physics project
 
Heat Pump, TUV Techindo, Bali 18-19 juli 2013
Heat Pump, TUV Techindo, Bali 18-19 juli 2013Heat Pump, TUV Techindo, Bali 18-19 juli 2013
Heat Pump, TUV Techindo, Bali 18-19 juli 2013
 
Physics Investigatory Project Class XII.. Water Level Controller.!!
Physics Investigatory Project Class XII.. Water Level Controller.!!Physics Investigatory Project Class XII.. Water Level Controller.!!
Physics Investigatory Project Class XII.. Water Level Controller.!!
 
STRUCTURAL DESIGN AND MANUFACTURING USING PENDULUM PRINCIPLE FOR BUCKET TYPE ...
STRUCTURAL DESIGN AND MANUFACTURING USING PENDULUM PRINCIPLE FOR BUCKET TYPE ...STRUCTURAL DESIGN AND MANUFACTURING USING PENDULUM PRINCIPLE FOR BUCKET TYPE ...
STRUCTURAL DESIGN AND MANUFACTURING USING PENDULUM PRINCIPLE FOR BUCKET TYPE ...
 
Pedal Powered Water Pump
Pedal Powered Water PumpPedal Powered Water Pump
Pedal Powered Water Pump
 
Physics Investigatory Project(Water Level Indicating System)
Physics Investigatory Project(Water Level Indicating System)Physics Investigatory Project(Water Level Indicating System)
Physics Investigatory Project(Water Level Indicating System)
 
Presentation plumbing
Presentation plumbingPresentation plumbing
Presentation plumbing
 

Semelhante a Nyakoi School Water Pump and Solar Project

081013 rgh corporate social responsibility_gambia
081013 rgh corporate social responsibility_gambia081013 rgh corporate social responsibility_gambia
081013 rgh corporate social responsibility_gambiagttrental
 
Rainwater harvesting at Govt Higher Primary School, Sonnappanahalli.pdf
Rainwater harvesting at Govt Higher Primary School, Sonnappanahalli.pdfRainwater harvesting at Govt Higher Primary School, Sonnappanahalli.pdf
Rainwater harvesting at Govt Higher Primary School, Sonnappanahalli.pdfbiometrust
 
Marsur School RWH.pdf
Marsur School RWH.pdfMarsur School RWH.pdf
Marsur School RWH.pdfbiometrust
 
WQD2011 – INNOVATION – GOLD WINNER – Liquid of Life - Implementing a sustaina...
WQD2011 – INNOVATION – GOLD WINNER – Liquid of Life - Implementing a sustaina...WQD2011 – INNOVATION – GOLD WINNER – Liquid of Life - Implementing a sustaina...
WQD2011 – INNOVATION – GOLD WINNER – Liquid of Life - Implementing a sustaina...Dubai Quality Group
 
SUU Sorenson Child & Family Center
SUU Sorenson Child & Family CenterSUU Sorenson Child & Family Center
SUU Sorenson Child & Family CenterHigherEdUtah
 
Ayanagar impact
Ayanagar impactAyanagar impact
Ayanagar impactSwati_UWM
 
Report of rainwater harvesting at Panathur Government School
Report of rainwater harvesting at Panathur Government SchoolReport of rainwater harvesting at Panathur Government School
Report of rainwater harvesting at Panathur Government Schoolbiometrust
 
TapEffect - Piped Water Networks, Cambodia
TapEffect - Piped Water Networks, CambodiaTapEffect - Piped Water Networks, Cambodia
TapEffect - Piped Water Networks, CambodiaNick Boerema
 
Tas Charity-Schools in Chiang Mai
Tas Charity-Schools in Chiang MaiTas Charity-Schools in Chiang Mai
Tas Charity-Schools in Chiang MaiPatrick Kumpitsch
 
Mbezi community water_project
Mbezi community water_projectMbezi community water_project
Mbezi community water_projectDonn Helela
 
QUIBALA FINAL REPORT 2016
QUIBALA FINAL REPORT 2016QUIBALA FINAL REPORT 2016
QUIBALA FINAL REPORT 2016Lynn Roberts
 
Sustainable school design Case study- Discovery elementary school
Sustainable school design Case study- Discovery elementary schoolSustainable school design Case study- Discovery elementary school
Sustainable school design Case study- Discovery elementary schoolRohan Narvekar
 
Meluf water Committee project
Meluf water Committee projectMeluf water Committee project
Meluf water Committee projectNkainin Edwin
 
Watsan training sample proposal
Watsan training sample proposalWatsan training sample proposal
Watsan training sample proposalTony
 
Bigavu Rural Community Development
Bigavu Rural Community DevelopmentBigavu Rural Community Development
Bigavu Rural Community DevelopmentMegan Harper
 

Semelhante a Nyakoi School Water Pump and Solar Project (20)

081013 rgh corporate social responsibility_gambia
081013 rgh corporate social responsibility_gambia081013 rgh corporate social responsibility_gambia
081013 rgh corporate social responsibility_gambia
 
Rainwater harvesting at Govt Higher Primary School, Sonnappanahalli.pdf
Rainwater harvesting at Govt Higher Primary School, Sonnappanahalli.pdfRainwater harvesting at Govt Higher Primary School, Sonnappanahalli.pdf
Rainwater harvesting at Govt Higher Primary School, Sonnappanahalli.pdf
 
Marsur School RWH.pdf
Marsur School RWH.pdfMarsur School RWH.pdf
Marsur School RWH.pdf
 
WQD2011 – INNOVATION – GOLD WINNER – Liquid of Life - Implementing a sustaina...
WQD2011 – INNOVATION – GOLD WINNER – Liquid of Life - Implementing a sustaina...WQD2011 – INNOVATION – GOLD WINNER – Liquid of Life - Implementing a sustaina...
WQD2011 – INNOVATION – GOLD WINNER – Liquid of Life - Implementing a sustaina...
 
SUU Sorenson Child & Family Center
SUU Sorenson Child & Family CenterSUU Sorenson Child & Family Center
SUU Sorenson Child & Family Center
 
AFEW Kenya 2017 Eastern M & E Report
AFEW Kenya 2017 Eastern M & E ReportAFEW Kenya 2017 Eastern M & E Report
AFEW Kenya 2017 Eastern M & E Report
 
Ayanagar impact
Ayanagar impactAyanagar impact
Ayanagar impact
 
Report of rainwater harvesting at Panathur Government School
Report of rainwater harvesting at Panathur Government SchoolReport of rainwater harvesting at Panathur Government School
Report of rainwater harvesting at Panathur Government School
 
TapEffect - Piped Water Networks, Cambodia
TapEffect - Piped Water Networks, CambodiaTapEffect - Piped Water Networks, Cambodia
TapEffect - Piped Water Networks, Cambodia
 
Dikshant International School
Dikshant International SchoolDikshant International School
Dikshant International School
 
Tas Charity-Schools in Chiang Mai
Tas Charity-Schools in Chiang MaiTas Charity-Schools in Chiang Mai
Tas Charity-Schools in Chiang Mai
 
Solarize Uganda Now Update
Solarize Uganda Now UpdateSolarize Uganda Now Update
Solarize Uganda Now Update
 
Mbezi community water_project
Mbezi community water_projectMbezi community water_project
Mbezi community water_project
 
QUIBALA FINAL REPORT 2016
QUIBALA FINAL REPORT 2016QUIBALA FINAL REPORT 2016
QUIBALA FINAL REPORT 2016
 
Sustainable school design Case study- Discovery elementary school
Sustainable school design Case study- Discovery elementary schoolSustainable school design Case study- Discovery elementary school
Sustainable school design Case study- Discovery elementary school
 
Meluf water Committee project
Meluf water Committee projectMeluf water Committee project
Meluf water Committee project
 
Andhra Pradesh Smart Villages CEE224X Final Presentation
Andhra Pradesh Smart Villages CEE224X Final PresentationAndhra Pradesh Smart Villages CEE224X Final Presentation
Andhra Pradesh Smart Villages CEE224X Final Presentation
 
Project Proposal.pptx
Project Proposal.pptxProject Proposal.pptx
Project Proposal.pptx
 
Watsan training sample proposal
Watsan training sample proposalWatsan training sample proposal
Watsan training sample proposal
 
Bigavu Rural Community Development
Bigavu Rural Community DevelopmentBigavu Rural Community Development
Bigavu Rural Community Development
 

Último

Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCRashishs7044
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 

Último (20)

Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 

Nyakoi School Water Pump and Solar Project

  • 1. Our Latest Project Nyakoi Upper Basic and Senior Secondary School Madina Koto Village, Wuli West Division, The Gambia • Water Pump Replacement Project Background The Nyakoi Upper Basic and Senior Secondary School is located in Madina Koto Village, Wuli West District of The Gambia's Upper River Region. The school's population consists of 449 students which includes 258 boys and 191 girls. There are also 14 teachers and 5 ancillary staff for a total campus community of 468 individuals. Since 2010 there has been no running water at the school. The purpose of this project is to make repairs to an existing, non- functional solar-powered water pumping system at the school. A school with 468 staff and students requires a substantial amount of water in order to satisfy drinking water, sanitation, and the 'per student' requirements of the school kitchen. Additionally, as a result of the lack of an on-campus water supply, the school garden and banana orchard had to be discontinued due to the garden's high water demand.
  • 2. The School’s Philosophy The flow of water will free up the administration, caretakers, and teachers so they can focus on the school's vision and mission.
  • 3. Outdated Panels, Inoperable Pump The project will replace the existing inoperative Lawrence PS200 water pump with a new pump. The project will also add six new solar panels for increased solar collection capacity, resulting in increased pumping capability.
  • 4. Dried up and Dirty Facilities This project will accomplish the following: The defective pump will be removed from the bore hole, a new pump, 6 new solar panels, a circuit breaker and new wiring will be installed. As a result, the school will have sufficient water to meet its daily needs, and to supply water to bathrooms, and sinks. There will also be enough water for the fruit trees to be replanted in the school garden.
  • 5. The Current Remedy for the Water Problem Water for the school has to be carried by the caretakers on bikes up to 20 times per day using large containers filled from taps located 200 meters (Madina Village) and 325 meters (Taibatu Village) from the school. Everyone in the school who needs water comes and collects it from the containers.
  • 6. • The equipment will restore water which is a basic need of any educational center of this size. • Water will pump to all faucets, bathrooms, drinking fountains, classrooms, and administrative buildings. • The fruit trees in the garden will be replanted and enjoyed by all. • Students will not have to interrupt class to get water. • Hand washing and good hygiene will increase with flowing water. • The use of a renewable resource is a great learning opportunity for the students • This project will impact the local community by eliminating the daily need to transport water to the school from an outside source. What are the Benefits of this Project?
  • 7. Putting the Plan Into Action Community Involvement The school administration is driving the project. The school staff have made arrangements with the contractor for completing the work within one week and they have obtained cost estimates for the labor, parts, and materials needed to complete the project. Implementation Completion of the project will be accomplished in the following stages: First, the defective pump will be removed from the bore hole and the new pump will be installed with new electrical cable. Second, the inverter circuit breaker will be removed and replaced with a new one. Third, six new solar panels will be installed and wired into the existing circuitry. Fourth, new electrical cable will be run to the water tank's water flow cut-off mechanism to stop the pump when the desired tank capacity is reached. Sustainability Designated school personnel will be trained on basic system theory, function of major components and operation of the system. These individuals will also learn the basic maintenance requirements for daily upkeep, ensuring sustained operation based on the manufacturer's recommendations. The Principal plans to establish a maintenance fund to plan for any future costs associated with the pump and panels.
  • 9. Project Costs The school has promised to contribute 20,000 dalasi and the regional education office has promised 25,000 dalasi. The community is working on their contribution as well. Right now approximately 163,000 dalasi is needed to carry out this project that converts to about $4527 or 3480€.
  • 10. Contact Information in The Gambia US Peace Corps Community Volunteer Lacy Szuwalski Email: lacyszuwalski@gmail.com Tel: 220 794 7054 School Address Nyakoi Upper Basic and Senior Secondary School Madina Koto Village Wuli West District Upper River Region The Gambia, West Africa Nyakoi Senior Secondary School Pump Replacement Project Individuals Involved in the Project Contact Number Headmaster 6712721 Ansu Kinteh 7712724 School Member in Charge of the Project Ansumana Camara (Chairman) 9234077 Mechanic / Electrican Essa Fatty 6653136
  • 11. How to Get Involved Please send questions to our international project coordinator, Justin Spees via email: justinspees@yahoo.com telephone: +34 693545004 To make a charitable donations to our charity in the United States, which is supporting this project, please make checks payable to Incline Skateboard Park Foundation. This is a charity founded July 11, 1997 and it is a US 501 (c) 3 that supports various community facilities around the world. The charity’s US tax identification number is EIN 86-0882426, and this is a public charity. Please make a reference to Nyakoi School Water Pump Replacement Project when donating. An invoice and photo book from the project will be sent to your return address or email as soon as possible. Send Donations to: Incline Skateboard Park Foundation P.O. Box 3464 Incline Village, NV 89451