Greater use of modular construction could
help construction productivity catch up
with other industries, but every project
seems to start from scratch and many hit a
glass ceiling at 10 floors, as tolerance
accumulation and loads overwhelm
unsophisticated structural approaches.
Does the modular
industry need a
standardized
structural solution?
Imagine standardized, pre-
qualified and pre-engineered
“building blocks” that come
from multiple suppliers and
assemble efficiently to create
complete, operational
buildings……
Imagine designing and bidding
a tower in a few days…..
A standardized
construction system
would make that
possible!
A standardized, scalable, modular
connection system for HSS
• Vectorbloc was inspired by
the ISO corner that is used to
lift and lock ocean freight
containers
• The infrastructure of the
ocean freight business is
standardized on the ISO
corner and multiples of its 8’
x 20’ dimensional grid
• The advantages of a single
system being used by all
shipbuilders, container
fabricators and freight
handlers are obvious
Due to these advantages
containers are widely used as
temporary and even permanent
housing
However the
vertical tension
capacity of the
ISO corners that
joins stacks of
containers limits
the height of
buildings, and
the fixed grid
limits space
planning options
Typical structural
steel connections
don’t work for
modular
construction
either, as
connections
occur in
inaccessible
locations and
splices cross
matelines
For modular
construction to be
successful, there are
actually 7 challenges
to be overcome, and
they all become
exaggerated as buildings
get taller and wider…….
Challenge 1:
The accumulating tolerances of low-
precision modules can result in interior
finish defects, assembly clashes and
façade failure
The Fix:
Jig-built precision modules and a simple
system for monitoring and adjusting the
dimensions of the assembled structure
Challenge 2:
A separate brace frame or brace core
adds erection time, adds cost,
complicates waterproofing during
construction and reduces the GFA
The Fix:
Interconnected, stackable load bearing
modules, which eliminate the need for the
fabrication and erection of a separate
brace structure and eliminates the gaps
around the frame
Challenge 3:
Re-rigging for level hoisting of the
module variants within each floor is slow
and costly
The Fix:
A quick-connect rigging attachment and
halo that can be quickly and reliably
levelled and released
Challenge 4:
Tasks which require work under a
suspended load are inherently unsafe
The Fix:
Integral walkways and stairs, modules that
are easily rigged with safety barriers, and
modules that connect from inside
Challenge 5:
Projections beyond the mateline result in
gasket / facade damage during
placement
The Fix:
A field-extendable gasket that is closed
and mated from inside the module after
modules are placed
Challenge 6:
Precipitation which falls during building
assembly penetrates voids, damages
module finishes and compromises
insulation
The Fix:
Eliminating the brace frame makes it easy
to waterproof the top level during building
assembly
Challenge 7:
Modular systems are costly to develop
because they require high-end software
and expert knowledge
The Fix:
An off-the-shelf design and engineering
process
The Vectorbloc strategy:
Reduce the cost of design,
coordination, fabrication
and building assembly by
concentrating the load-
bearing and connection
functions in a standard,
scalable, precision
component used by all
suppliers to a project
To be a standard, the solution has to be
economical at all scales. In fact scalability is so
important to modular systems that we say:
”By solving tall, you solve it all”
Vector Praxis delivers the industry-leading Vectorbloc
modular solution via 7 categories of products and services:
Vectorbloc
Connection
System
Factory
Setup
Vectorjig
Precision
Fabrication
System
Vectorloc
Extendable
Gasket
System
Vectorig
Hoisting
System
Vectorsight
Surveying and
Levelling
System
Modular
Building
Design
1 Vectorbloc Standardized Precision Structural Connection
System
Vectorbloc
Connection
System
Factory
Setup
Vectorjig
Precision
Fabrication
System
Vectorloc
Extendable
Gasket
System
Vectorig
Hoisting
System
Vectorsight
Surveying and
Levelling
System
Modular
Building
Design
The heart of the Vectorbloc system
is a connector assembly specifically
designed to build robust modules
with integral building structure
Vectorblocs have many advantages over both the
ISO corner and competing modular systems:
• Builds modules of any size, including wider,
longer, taller modules
• Provides the scalable vertical tension and
gravity capacity needed for real buildings
• Assembles safely from inside the module
• Provides accessory connection points for
connecting balconies, floors and façade
cassettes
• Does not rely on continuous walls for
structure
Vectorbloc
Anatomy
• Tension bolts
• Lower Vectorbloc
• Façade assembly
• Accessory connection
points
• Hallway or balcony slab
• Gusset plate
• Tapered locating pins
• Upper Vectorbloc
• Hoisting point
The Vectorbloc structural connectors are
located at the corners of the modules and at
intermediate points, if required by loading.
Modules are stacked
and held together
horizontally with
gusset plates, then
vertical bolts are
then inserted
through the
Vectorbloc
connectors to hold
the building together.
Accurate, loadbearing,
volumetric modules
built with Vectorbloc
connectors can be
outfitted with
interiors and MEP
systems in plant, then
easily hoisted and
quickly assembled to
create cost-effective,
tight and energy-
efficient buildings,
ranging from low-rise
to high-rise.
So that building tolerances can be maintained and columns effectively grouped, a precision
assembly fixture is used during chassis manufacturing to ensure that no intermediate part
of a module frame crosses the mateline and prevents the Vectorbloc corners from touching.
Buildings have many unique
conditions, so the Vectorbloc
system is comprehensive
Vectorbloc modules can be created with the
tapering shapes required to assemble
buildings with curves
Like the ISO fittings used to build
containers, Vectorblocs are cast and
machined from a weldable steel alloy.
Vectorblocs provides integral points
for structural connection, hoisting
and connection of balconies and
hallways all in an easy-to-weld
precision connection
Module frames supplied by
Vector Praxis are welded in
our CWB-certified facility
Vectorblocs come in 4”, 6” and 10”
series, so that in compression,
tension and bending modes,
Vectorblocs are not the limiting
factor in the strength of the
structure.
When HSS are
welded to the
Vectorblocs a
moment
connection is
created, which
resists lateral
forces in all
directions
The tapered pin on the Vectorbloc
gusset plate accurately locates the
modules during assembly and the
gusset plate connects the modules
horizontally.
When the vertical tension bolts
between modules are tightened, a
horizontal connection between the
floors of the modules is created.
The result is a structural “diaphragm”
which extends the bracing within stair
towers and elevator shafts to the
entire structure.
The vertical tension
bolts are hidden
behind removable
feature panels in the
hallways, or behind
the baseboard at the
outer wall
After the gusset
plates and stanchions
are installed on top
of the modules, the
Vectorsight system
provides a stable
surveying platform
and a fall arrest
system
MEP modules with compatible
facades built in identical jigs
simply “plug in” to a
Vectorbloc building,
eliminating countless hours of
trade and supplier
coordination
Pre-fabricated elevator shafts
and stairwells are likewise easily
and quickly erected at the same
time as the building itself, with the
additional benefit of improving
access for workers and materials
Premium over-
height studio
apartments,
lobbies and
gathering spaces
can be created by
stacking floorless /
roofless modules
Vectorbloc’s accurate,
pre-configured
accessory connection
points are ideal for
the integration of
high-performance
building features such
as “facade cassettes”
and thermally-
broken balconies
…..and Vectorblocs can be used
to build Data Center modules
Vectorblocs are also ideal for the
production of Precision Modular
Armatures (PMA’s) for resource
industry applications………
By reducing sitework and re-work to its
theoretical minimum, Vectorbloc makes it
feasible to deliver the all-trade, 95%
factory completion that realizes the full
cost-saving potential of modular
construction.
Appropriate building types include:
• Apartments
• Hotels and dormitories
• Hospitals and clinics
• Offices
• Industrial facilities
• Urban infill
• Relocatable / emergency facilities
Stacked and Bundled
Vectorbloc Systems
Explained!
Entire contents copyright February 2015
Vectorbloc and related systems US, Canada and WIPO Patent pending
Because loads in a
building vary,
Vectorblocs are
designed to support a
wide range of column
configurations
This means that the minimum of
steel and labour can be used to
build a member which suits specific
load conditions
Each bolt in the standard connector
series has a clamping strength of
60kips, so a group of 8 delivers over
400 kips, adequate for buildings
well over 30 stories
Vector Praxis production office
Vectorbloc offers two ways to build modules, which we call “Stacked” and
“Bundled”. The stacked system scales with load using modules with progressively
larger HSS, while the bundled system adds horizontal tiers of HSS in ever wider
assemblies. These wide assemblies also function as shear walls.
Top: Stacked
Bottom: Bundled
The two systems are interchangeable, so
designers can select the connection and member
configuration that best suits each project, or
even each part of a project.
“Stacked”
Typical details
Typical
transition block
4”x 4” to 6”x 6”
The “structural bundling” of columns is similar to the story of the boy
who was challenged to break a bundle of sticks……
……and found it impossible because a group of members acting together
are stronger than the sum of the parts……..
Robust groupings can be created using one size of HSS welded
corner to corner and joined in groups with flat-bar ears.
“Bundled”
Typical details
“Bundled”
Typical details
Section
transitions
A Vectorbloc
building designer
using FEA software
selects the column
configuration that
best suits the
loading on each
module.
By joining bundled columns in adjacent modules, configurations ranging
from a 24 lbs / foot grouping of 4” x 4” HSS , to massive built-up
columns weighing over 400 lbs per foot, can all fit in a 10-1/2” wall
Vectorbloc Prototypes
3D Printing
Casting and Machining
February 2015
Vectorbloc and related systems US, Canada and WIPO Patent pending
3D-printed
investments and
application of
ceramic coating
Investment
casting and
machining
Checks of
material
quality,
alignment
and
dimensions
Complete
prototype
of typical
connection
with
cutaways
Prototype of typical
module with detail of
fireproofing and
baseboard leave-out
at Vectorbloc
connection
Vectorbloc
Concept Building
February 2015
Vectorbloc and related systems US, Canada and WIPO Patent pending
By examining a
Vectorbloc-based
concept building
we can better
understand the
practical
application of the
Vectorbloc
structural system
Vectorbloc
concept
building:
Renders
Plan of typical floor
Apartment buildings and condominiums are highly optimized and every square foot is
utilized. Vectorbloc’s bundled column reduces lost GFA by packing load-bearing structures
in to the wall cavities, eliminating inconvenient “bumpouts”
Brace locations
Lateral brace frames (blue) are concentrated in the party walls, while the longitudinal
system (pink) is loaded in to areas where the diagonal bracing does not obstruct openings
Module size matrix
Minimizing module size variants is not essential, but it is desirable
Vectorbloc
sectional frame
elevations
showing
conventionally-
constructed
parking
structure,
podium and
transfer beams
Vectorbloc
Frame
Typical two-
module grouping
Typical two module grouping
with finishes and furnishings
Typical single
module frame
construction
The brace frame is
created when
modules are
interconnected to
unite the integral
diagonal bracing in
the modules.
Bracing can be
integrated in
locations such as
the party walls,
elevator shafts and
stairwells.
Lateral
Frame
Frame
Details
Deep spandrel
beams can be
integrated in
to the framing
if required to
eliminate
diagonal
bracing which
obstructs
openings
Longitudinal
Frame
The longitudinal
brace frame is
created on the upper
floors by
interconnecting
modules to combine
the moment action of
the module frames.
On lower floors,
bracing is added to
the shaft, stairwell
and hallway
modules.
Vectorbloc modules incorporate the ideal vertical load bearing capacity at each level in the
building, they provide a moment connection and they are interconnected connected
horizontally.
As a result, a separate brace frame or brace tower can be eliminated, saving
valuable space and reducing construction complexity.
Eliminating the separate
brace frame confers
numerous benefits:
• The additional work of fabricating and
erecting the brace frame is eliminated,
and the number of required crane cycles
and super-elevation differentials are
both reduced
• Party wall voids are eliminated, so
wasted GFA is reduced and
waterproofing during erection is
simplified
• Movement of workers across the top
surface of the structure is safer and
clashes with the Halo are eliminated
The accessory connection points on a
Vectorbloc module are precisely located in
3D space, making it easy and cost-effective to
deliver desirable and progressive building
features:
• Panelized facades with thermally-broken
hanging, cantilevered or suspended
balconies
• Hallways with factory-integrated MEP
trains
• Over-height studio spaces, lofts, roof
decks and parapets
• Pre-fabricated elevators, stairs and waste
disposal chutes
• Factory-integrated MEP systems
Using the hall
slabs as MEP
carriers, the
Vectorbloc system
supports factory-
integrated wiring,
piping and ducts in
trains up to 50’ in
length.
During building
assembly, the
hallways also
double as access
platforms.
Vectorbloc
Connection
System
Factory
Setup
Vectorjig
Precision
Fabrication
System
Vectorloc
Extendable
Gasket
System
Vectorig
Hoisting
System
Vectorsight
Surveying and
Levelling
System
Modular
Building
Design
2 Vectorjig Precision Fabrication System
Model VJS (Vectorjig Standard Model VJA) utilizes screw clamps. Model VJA (Vectorjig Auto) features hydraulic locking and release to further reduce cycle time
Replace with images from SW tooling model
It’s expensive to make something accurate!
Accurate = cheap!
Traditional modular frame construction relies on cutting, fitting and
welding of steel members to establish the finished dimensions of the
modules. However even the highest AISC specifications have proven
unworkable. As a result, it is considered standard practice to adjust
abutting work on site so it fits.
Site work is expensive, in fact modular construction exists to reduce site
work!
To build a Vectorbloc
module frame, HSS
columns, floor beams and
ceiling joists are joined to
Vectorblocs by welding in
precision fixtures.
All spatial relationships in a
Vectorbloc-based structure
are established by the
relative position of the
Vectorblocs, which is
established in the factory
by the logical grid of the
fabrication fixtures
Since connections of a
Vectorbloc-based building
takes place through the
Vectorblocs, precision
drilling and cutting of the
HSS members is not required
Using the same techniques as the automotive and aerospace industries,
Vectorjig allows modular fabricators to build precision structural modules
using inexpensive materials processed with just three pieces of
equipment.
BandsawVectorjig Welding machine
The root of Vectorjig
precision:
Rock-solid building geometry
created in a precision fixture
aligned by Vector Praxis
technicians using LASER
Metrology, the same technique
used to calibrate precision
tooling.
The Vectorjig system ensures a Go / No
Go tolerance regimen which locates
the Vectorblocs and structural
members to a + 0” – 1/16” accuracy
This assembly methodology ensures
that no intermediate part exceeds
the mateline, resulting in tight
structural connections.
The Vectorjig also elevates the
members ideally for manual or
robotic welding.
Each cycle begins with the jig in closed position to
receive the Vectorblocs and adjoining members
Once the unit is welded, the jig opens to release the
completed frame.
The application of floor material, wall board and the façade can be completed
before opening the Vectorjig and removing the modules, or the bare “chassis”
can be removed for offline completion in a “Vectorjig Lite”
Precision fixtures are a pre-requisite
for robotic welding!
Testing on the
Vectorjig
assembly system
has been
completed using
“Moc Blocs”;
Connectors built
from plate
instead of
castings
Vectorjig is available in
two versions:
VJM: manual clamping
VJA: Automatic
clamping
The pin rotating mechanism of
the automatic version
(prototype shown at left in the
Vector Praxis toolroom) is
actuated by a heavy-duty rack
powered by a hydraulic
cylinder which is entirely
enclosed to protect it from
weld spatter
Vectorbloc
Connection
System
Factory
Setup
Vectorjig
Precision
Fabrication
System
Vectorloc
Extendable
Gasket
System
Vectorig
Hoisting
System
Vectorsight
Surveying and
Levelling
System
Modular
Building
Design
3 Vectorig Rigging, Leveling and Hoisting System
A single story in a modular
building can have numerous
module variants, making
constant re-rigging for level
hoisting a key schedule driver
Vectorblocs feature prepared
connection points for the
Vectorig quick-connect rigging
and CG compensating system.
Time-consuming and labour-
intensive “iterative rigging” is
required to level modules when the
CG of the load is unknown or
cannot be predicted
The Vectorig connector features a positive lock
which prevents accidental release of the load.
Modules are shipped with
rigging notes generated by CG
simulation, based on the
behavior of the combined
parasolid models of the module
and the Vectorig halo.
The rigging notes tell the rigger
exactly how to set up the
rigging blocks on the halo
frame.
The sliding rigging points are
quickly adjusted at ground level,
then the module is connected
and hoisted level.
Spreaders Beam A End 1 Beam A End 2 Beam B End A Beam B End 2
Position 17 Position 4 Position 4 Position 6 Position 6
Precision locating pins mounted on LASER-
cut gusset plates engage with holes
machined in the Vectorblocs, ensuring
accurate module location.
Using parasolid modeling
and predictive CG
determination together
with the Vectorig fitting
and halo, rigging and
release time is reduced
by 75% and crew size is
also reduced
Vectorbloc
Connection
System
Factory
Setup
Vectorjig
Precision
Fabrication
System
Vectorloc
Extendable
Gasket
System
Vectorig
Hoisting
System
Vectorsight
Surveying and
Levelling
System
Modular
Building
Design
4 Vectorsight Surveying, Levelling and Safety System
Because modules often “stack” or “rack” in numbers of 20 or
more, in both horizontal and vertical dimensions, even tight
tolerances accumulate quickly.
Example: A 20-unit stack built of units 1/16” too high next to a
stack of units 1/16” too short creates a 2-1/2” difference!
So it is easy to see how standard +- tolerances are simply
unworkable for a large modular building
During building assembly,
elevation and distance
measurements are taken
relative to receivers placed
on Vectorsight posts rigged
to the tops of the gusset
plates
Vectorsight posts are
precisely machined to
length ensuring consistent
receiver height and
accurate measurement
Vectorsight posts also
function as safety barriers
and are rigged at the same
time that gusset plates are
installed
A modular project based on the Vectorbloc system is conceived with
all components conforming to a + 0”, - 1/16” tolerance envelope. This
ensures that no part exceeds the tolerance envelope and causes
positive tolerance accumulation.
Excessive negative variations (undersized stacks or racks) are
minimized using sophisticated manufacturing techniques. During
building assembly, module groupings are monitored and variations
are compensated with a systematic and efficient shimming system.
Measure ShimAnalyze
Vectorsight combination
survey post and guardrail
Vectorbloc
Connection
System
Factory
Setup
Vectorjig
Precision
Fabrication
System
Vectorloc
Extendable
Gasket
System
Vectorig
Hoisting
System
Vectorsight
Surveying and
Levelling
System
Modular
Building
Design
5 Vectorloc Extendable Façade Gasket System
Gasket and
façade panel
damage during
module
placement and
poor sealing
after placement
are significant
issues in
modular
construction.
The Vectorloc façade system leverages
the precision of the Vectorbloc
modules to accurately locate factory-
installed windows, sealing and
insulating features.
The Vectorloc factory-installed
façade system features a
mechanically extendable gasket
that is closed and mated from
inside the module after
modules are placed and bolted
in position.
Cruciform closure takes place at the
same time that outer-wall gusset
plates are installed.
The next layer of modules completes
the flashing grouping.
The Vectorbloc system does its part
by ensuring precise location between
modules, resulting in factory-
installed façade panels that fit
accurately on site and develop their
full specification.
Gasket sealing is positive and
multi-chambered, improving
envelope performance
An additional benefit is a
field-releasable and
repairable façade, reducing
both the risk and the cost of
troubleshooting,
maintenance and renewal
Vectorbloc
Connection
System
Factory
Setup
Vectorjig
Precision
Fabrication
System
Vectorloc
Extendable
Gasket
System
Vectorig
Hoisting
System
Vectorsight
Surveying and
Levelling
System
Modular
Building
Design
7 Factory Design and Management
Fast = Cheap
To build a modular
building, you need
to make a lot of
perfect
modules….and you
need to make them
quickly.
Our experience in
factory design and
management is
your best
guarantee of a
successful
entry in to this
dynamic and
growing market.
Vectorbloc
Connection
System
Factory
Setup
Vectorjig
Precision
Fabrication
System
Vectorloc
Extendable
Gasket
System
Vectorig
Hoisting
System
Vectorsight
Surveying and
Levelling
System
Modular
Building
Design
About Vectorbloc and Vector Praxis
The Vectorbloc System is covered by
Patents Pending in over 100 countries
The Vectorbloc System was inspired by
the experience of the Vector Praxis team:
• 30+ years of precision offsite architectural fabrication
• 15+ years of 3D / model-driven architectural fabrication
• 40+ tours of off-site fabrication plants
• Setting up, staffing and running a successful plant
creating AAA modules for a Norman Foster-designed
tower
• Detailed study of numerous modular and structural
projects in the USA, Canada, Asia
• Development of modular buildings and systems in
collaboration with prominent architectural firms and
panelized builders
• Detailed study of residential tower envelope renewal
strategies
R&D
To support ongoing improvement
of the Vectorbloc system and
development of additional
features in response to market
demands, Vector Praxis maintains
a 10,000 square foot research
and development facility in
Toronto, Canada. Our fully-
equipped design and production
facility includes a machine shop,
metal fabricating and wood
working equipment.
The Greater Toronto Area (GTA)
supports a globally significant
cluster of leading custom
architectural fabricators,
providing our product
development team with quick,
world-class access to a wide
range of materials and CNC
processing services.
For more information please contact:
Vector Praxis
www.vectorpraxis.com
Phone: 416 766 9018 Mobile: 416 575 1630
530 Keele Street, unit 403,
Toronto, Ontario, Canada
M6N 3C9
Vectorbloc
The sky’s the limit
http://meshcities.com/index.php/meshcities/com
ments/can_vectorblocs_patented_building_system
_make_cities_more_energy_efficient#.VCXAb_ldU
9J
http://atlanticyardsreport.blogspot.ca/2014/09/in-
dispute-over-stalled-modular-tower.html
Links to chatter about Vectorbloc and
related subjects:
http://therealdeal.com/blog/2013/03/13/prefabr
icated-broadway-stack-project-makes-headway/

Mais conteúdo relacionado

Mais procurados

Verbus System Design Manual
Verbus System Design ManualVerbus System Design Manual
Verbus System Design ManualHugh Miller
 
CE 72.32 (January 2016 Semester) Lecture 4 - Selection of Structural Systems
CE 72.32 (January 2016 Semester) Lecture 4 - Selection of Structural SystemsCE 72.32 (January 2016 Semester) Lecture 4 - Selection of Structural Systems
CE 72.32 (January 2016 Semester) Lecture 4 - Selection of Structural SystemsFawad Najam
 
Composite structure of concrete and steel.
Composite structure of concrete and steel.Composite structure of concrete and steel.
Composite structure of concrete and steel.Suhailkhan204
 
Connection and Bracing
Connection and BracingConnection and Bracing
Connection and Bracingsuddal
 
Tube structures and its type with comparison .
Tube structures and its type with comparison .Tube structures and its type with comparison .
Tube structures and its type with comparison .Udayram Patil
 
Session 5 design of rcc structural elements PROF YADUNANDAN
Session 5 design of rcc structural elements  PROF YADUNANDANSession 5 design of rcc structural elements  PROF YADUNANDAN
Session 5 design of rcc structural elements PROF YADUNANDANAjit Sabnis
 
Composite Concrete-Steel Construction in Tall Buildings by Dr. Naveed
Composite Concrete-Steel Construction in Tall Buildings by Dr. NaveedComposite Concrete-Steel Construction in Tall Buildings by Dr. Naveed
Composite Concrete-Steel Construction in Tall Buildings by Dr. NaveedAIT Solutions
 
PLANNING AND DESIGNING OF PRECAST STRUCTURES
PLANNING AND DESIGNING OF PRECAST STRUCTURESPLANNING AND DESIGNING OF PRECAST STRUCTURES
PLANNING AND DESIGNING OF PRECAST STRUCTURESAjit Sabnis
 
Composite Construction Method for Engineering and Architecture
Composite Construction Method for Engineering and ArchitectureComposite Construction Method for Engineering and Architecture
Composite Construction Method for Engineering and ArchitectureMimi Alguidano
 

Mais procurados (20)

Verbus System Design Manual
Verbus System Design ManualVerbus System Design Manual
Verbus System Design Manual
 
CE 72.32 (January 2016 Semester) Lecture 4 - Selection of Structural Systems
CE 72.32 (January 2016 Semester) Lecture 4 - Selection of Structural SystemsCE 72.32 (January 2016 Semester) Lecture 4 - Selection of Structural Systems
CE 72.32 (January 2016 Semester) Lecture 4 - Selection of Structural Systems
 
Composite structure of concrete and steel.
Composite structure of concrete and steel.Composite structure of concrete and steel.
Composite structure of concrete and steel.
 
Connection and Bracing
Connection and BracingConnection and Bracing
Connection and Bracing
 
Space frame
Space frameSpace frame
Space frame
 
Tube structures and its type with comparison .
Tube structures and its type with comparison .Tube structures and its type with comparison .
Tube structures and its type with comparison .
 
Fox Blocks ICF Guidebook
Fox Blocks ICF GuidebookFox Blocks ICF Guidebook
Fox Blocks ICF Guidebook
 
Tensile Fabric Structures
Tensile Fabric StructuresTensile Fabric Structures
Tensile Fabric Structures
 
Tube structures
Tube structuresTube structures
Tube structures
 
Rigid frame systems
Rigid frame systemsRigid frame systems
Rigid frame systems
 
Tos syllabus
Tos syllabusTos syllabus
Tos syllabus
 
Long span structure
Long span structureLong span structure
Long span structure
 
The cables structure system
The cables structure systemThe cables structure system
The cables structure system
 
Peb ss
Peb ssPeb ss
Peb ss
 
4204740.ppt
4204740.ppt4204740.ppt
4204740.ppt
 
Session 5 design of rcc structural elements PROF YADUNANDAN
Session 5 design of rcc structural elements  PROF YADUNANDANSession 5 design of rcc structural elements  PROF YADUNANDAN
Session 5 design of rcc structural elements PROF YADUNANDAN
 
shear wall
shear wallshear wall
shear wall
 
Composite Concrete-Steel Construction in Tall Buildings by Dr. Naveed
Composite Concrete-Steel Construction in Tall Buildings by Dr. NaveedComposite Concrete-Steel Construction in Tall Buildings by Dr. Naveed
Composite Concrete-Steel Construction in Tall Buildings by Dr. Naveed
 
PLANNING AND DESIGNING OF PRECAST STRUCTURES
PLANNING AND DESIGNING OF PRECAST STRUCTURESPLANNING AND DESIGNING OF PRECAST STRUCTURES
PLANNING AND DESIGNING OF PRECAST STRUCTURES
 
Composite Construction Method for Engineering and Architecture
Composite Construction Method for Engineering and ArchitectureComposite Construction Method for Engineering and Architecture
Composite Construction Method for Engineering and Architecture
 

Destaque

ZETA Design + Build Product Design VP Taeko Takagi: Hack the Housing Crisis s...
ZETA Design + Build Product Design VP Taeko Takagi: Hack the Housing Crisis s...ZETA Design + Build Product Design VP Taeko Takagi: Hack the Housing Crisis s...
ZETA Design + Build Product Design VP Taeko Takagi: Hack the Housing Crisis s...San Francisco Public Press
 
Advanced Modular Structures
Advanced Modular StructuresAdvanced Modular Structures
Advanced Modular StructuresAdvanced Modular
 
Education systems in the world
Education systems in the worldEducation systems in the world
Education systems in the worldNavneet Shally
 
Offsite Construction fro Developers and Builders
Offsite Construction fro Developers and BuildersOffsite Construction fro Developers and Builders
Offsite Construction fro Developers and BuildersMatthew Egan
 
Modular Buildings:Misconception-vs-Truth
Modular Buildings:Misconception-vs-TruthModular Buildings:Misconception-vs-Truth
Modular Buildings:Misconception-vs-TruthM SPACE
 
Tube Frame Structures:An overview
Tube Frame Structures:An overviewTube Frame Structures:An overview
Tube Frame Structures:An overviewzafrin mohamed
 
Modular Construction Advancements
Modular Construction AdvancementsModular Construction Advancements
Modular Construction AdvancementsAkhil Saxena
 
Bundled Tube Structure
Bundled Tube StructureBundled Tube Structure
Bundled Tube StructureErsa Sitompul
 
The Time Is Now For Modular Construction
The Time Is Now For Modular ConstructionThe Time Is Now For Modular Construction
The Time Is Now For Modular ConstructionRob Coyle CDCP
 
Production Management
Production ManagementProduction Management
Production ManagementUmar Khan
 
Highrise lecture
Highrise lectureHighrise lecture
Highrise lectureliza00
 
Building model-sap2000-tutorial-guide
Building model-sap2000-tutorial-guideBuilding model-sap2000-tutorial-guide
Building model-sap2000-tutorial-guideVanz Einstein
 
MODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSMODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSShourya Puri
 

Destaque (20)

архитектура Prefab city
архитектура Prefab city архитектура Prefab city
архитектура Prefab city
 
ZETA Design + Build Product Design VP Taeko Takagi: Hack the Housing Crisis s...
ZETA Design + Build Product Design VP Taeko Takagi: Hack the Housing Crisis s...ZETA Design + Build Product Design VP Taeko Takagi: Hack the Housing Crisis s...
ZETA Design + Build Product Design VP Taeko Takagi: Hack the Housing Crisis s...
 
Advanced Modular Structures
Advanced Modular StructuresAdvanced Modular Structures
Advanced Modular Structures
 
Education systems in the world
Education systems in the worldEducation systems in the world
Education systems in the world
 
Offsite Construction fro Developers and Builders
Offsite Construction fro Developers and BuildersOffsite Construction fro Developers and Builders
Offsite Construction fro Developers and Builders
 
082 Offsite Construction (4)
082 Offsite Construction (4)082 Offsite Construction (4)
082 Offsite Construction (4)
 
Modular Buildings:Misconception-vs-Truth
Modular Buildings:Misconception-vs-TruthModular Buildings:Misconception-vs-Truth
Modular Buildings:Misconception-vs-Truth
 
GOING MOD- Modular Construction Solutions in Urban- Metro areas
GOING MOD- Modular Construction Solutions in Urban- Metro areasGOING MOD- Modular Construction Solutions in Urban- Metro areas
GOING MOD- Modular Construction Solutions in Urban- Metro areas
 
JOHN HANCOCK CENTER
JOHN HANCOCK CENTERJOHN HANCOCK CENTER
JOHN HANCOCK CENTER
 
Tube Frame Structures:An overview
Tube Frame Structures:An overviewTube Frame Structures:An overview
Tube Frame Structures:An overview
 
Modular Construction Advancements
Modular Construction AdvancementsModular Construction Advancements
Modular Construction Advancements
 
Bundled Tube Structure
Bundled Tube StructureBundled Tube Structure
Bundled Tube Structure
 
The Time Is Now For Modular Construction
The Time Is Now For Modular ConstructionThe Time Is Now For Modular Construction
The Time Is Now For Modular Construction
 
Production Management
Production ManagementProduction Management
Production Management
 
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
 
076 Modular Construction
076 Modular Construction076 Modular Construction
076 Modular Construction
 
Highrise lecture
Highrise lectureHighrise lecture
Highrise lecture
 
Building model-sap2000-tutorial-guide
Building model-sap2000-tutorial-guideBuilding model-sap2000-tutorial-guide
Building model-sap2000-tutorial-guide
 
Tall buildings
Tall buildingsTall buildings
Tall buildings
 
MODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODSMODERN CONSTRUCTION METHODS
MODERN CONSTRUCTION METHODS
 

Semelhante a Vectorbloc presentation online Feb 2015

Building technology report
Building technology reportBuilding technology report
Building technology reportChong Yi Hui
 
Pre fabricated structures
Pre fabricated structuresPre fabricated structures
Pre fabricated structuresjamali husain
 
documents.pub_pre-fabricated-structures.pdf
documents.pub_pre-fabricated-structures.pdfdocuments.pub_pre-fabricated-structures.pdf
documents.pub_pre-fabricated-structures.pdfBiswaKeshanPanda1
 
IRJET - Economy in Building Construction Systems of Prefabricated Structures
IRJET - Economy in Building Construction Systems of Prefabricated StructuresIRJET - Economy in Building Construction Systems of Prefabricated Structures
IRJET - Economy in Building Construction Systems of Prefabricated StructuresIRJET Journal
 
Technical data sheet for post-installed rebar according to EC2
Technical data sheet for post-installed rebar according to EC2Technical data sheet for post-installed rebar according to EC2
Technical data sheet for post-installed rebar according to EC2Nguyen The Dzung
 
study of usage factor in low cost construction
study of usage factor in low cost constructionstudy of usage factor in low cost construction
study of usage factor in low cost constructionManisha Singh
 
Building Technology 1 (P1)
Building Technology 1 (P1)Building Technology 1 (P1)
Building Technology 1 (P1)Nicole Foo
 
Pre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable DevelopmentPre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable Developmentijsrd.com
 
PRE-CAST-CONSTRUCTION-Expertcivil.pptx
PRE-CAST-CONSTRUCTION-Expertcivil.pptxPRE-CAST-CONSTRUCTION-Expertcivil.pptx
PRE-CAST-CONSTRUCTION-Expertcivil.pptxatiulla001
 
Modular High Rise Construction.pptx
Modular High Rise Construction.pptxModular High Rise Construction.pptx
Modular High Rise Construction.pptxGeethikaSV
 
Structural buildings system and steel bracing
 Structural buildings system and steel bracing Structural buildings system and steel bracing
Structural buildings system and steel bracingabdulhakim mawas
 
08 - Portal Frame.pptx
08 - Portal Frame.pptx08 - Portal Frame.pptx
08 - Portal Frame.pptx2022786965
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniqueIEI GSC
 
Muscat scaffolding Cuplock System
Muscat scaffolding Cuplock SystemMuscat scaffolding Cuplock System
Muscat scaffolding Cuplock SystemAlthaf Ahmed
 
PREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdfPREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdfGourhariBiswas1
 
Unistrut Construction Brochure
Unistrut Construction BrochureUnistrut Construction Brochure
Unistrut Construction BrochureRICHARD GORDON
 
Modular Volumetric Construction
Modular Volumetric ConstructionModular Volumetric Construction
Modular Volumetric Constructionphilwdm
 
KTU CE 204 Construction Technology - Module 5
KTU CE 204 Construction Technology - Module 5KTU CE 204 Construction Technology - Module 5
KTU CE 204 Construction Technology - Module 5Bennet Kuriakose, PhD
 

Semelhante a Vectorbloc presentation online Feb 2015 (20)

Building technology report
Building technology reportBuilding technology report
Building technology report
 
Pre fabricated structures
Pre fabricated structuresPre fabricated structures
Pre fabricated structures
 
documents.pub_pre-fabricated-structures.pdf
documents.pub_pre-fabricated-structures.pdfdocuments.pub_pre-fabricated-structures.pdf
documents.pub_pre-fabricated-structures.pdf
 
IRJET - Economy in Building Construction Systems of Prefabricated Structures
IRJET - Economy in Building Construction Systems of Prefabricated StructuresIRJET - Economy in Building Construction Systems of Prefabricated Structures
IRJET - Economy in Building Construction Systems of Prefabricated Structures
 
Technical data sheet for post-installed rebar according to EC2
Technical data sheet for post-installed rebar according to EC2Technical data sheet for post-installed rebar according to EC2
Technical data sheet for post-installed rebar according to EC2
 
study of usage factor in low cost construction
study of usage factor in low cost constructionstudy of usage factor in low cost construction
study of usage factor in low cost construction
 
Building Technology 1 (P1)
Building Technology 1 (P1)Building Technology 1 (P1)
Building Technology 1 (P1)
 
Pre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable DevelopmentPre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable Development
 
PRE-CAST-CONSTRUCTION-Expertcivil.pptx
PRE-CAST-CONSTRUCTION-Expertcivil.pptxPRE-CAST-CONSTRUCTION-Expertcivil.pptx
PRE-CAST-CONSTRUCTION-Expertcivil.pptx
 
Modular High Rise Construction.pptx
Modular High Rise Construction.pptxModular High Rise Construction.pptx
Modular High Rise Construction.pptx
 
Structural buildings system and steel bracing
 Structural buildings system and steel bracing Structural buildings system and steel bracing
Structural buildings system and steel bracing
 
08 - Portal Frame.pptx
08 - Portal Frame.pptx08 - Portal Frame.pptx
08 - Portal Frame.pptx
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction technique
 
Ct3
Ct3Ct3
Ct3
 
Muscat scaffolding Cuplock System
Muscat scaffolding Cuplock SystemMuscat scaffolding Cuplock System
Muscat scaffolding Cuplock System
 
PREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdfPREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdf
 
Unistrut Construction Brochure
Unistrut Construction BrochureUnistrut Construction Brochure
Unistrut Construction Brochure
 
Modular Volumetric Construction
Modular Volumetric ConstructionModular Volumetric Construction
Modular Volumetric Construction
 
Open Building Toolkits
Open Building ToolkitsOpen Building Toolkits
Open Building Toolkits
 
KTU CE 204 Construction Technology - Module 5
KTU CE 204 Construction Technology - Module 5KTU CE 204 Construction Technology - Module 5
KTU CE 204 Construction Technology - Module 5
 

Vectorbloc presentation online Feb 2015

  • 1. Precision HSS Connection System For Modular Buildings by Entire contents protected by Copyright. US and International Patents Pending
  • 2. Greater use of modular construction could help construction productivity catch up with other industries, but every project seems to start from scratch and many hit a glass ceiling at 10 floors, as tolerance accumulation and loads overwhelm unsophisticated structural approaches. Does the modular industry need a standardized structural solution?
  • 3. Imagine standardized, pre- qualified and pre-engineered “building blocks” that come from multiple suppliers and assemble efficiently to create complete, operational buildings…… Imagine designing and bidding a tower in a few days….. A standardized construction system would make that possible!
  • 4. A standardized, scalable, modular connection system for HSS
  • 5. • Vectorbloc was inspired by the ISO corner that is used to lift and lock ocean freight containers • The infrastructure of the ocean freight business is standardized on the ISO corner and multiples of its 8’ x 20’ dimensional grid • The advantages of a single system being used by all shipbuilders, container fabricators and freight handlers are obvious
  • 6. Due to these advantages containers are widely used as temporary and even permanent housing
  • 7. However the vertical tension capacity of the ISO corners that joins stacks of containers limits the height of buildings, and the fixed grid limits space planning options
  • 8. Typical structural steel connections don’t work for modular construction either, as connections occur in inaccessible locations and splices cross matelines
  • 9. For modular construction to be successful, there are actually 7 challenges to be overcome, and they all become exaggerated as buildings get taller and wider…….
  • 10. Challenge 1: The accumulating tolerances of low- precision modules can result in interior finish defects, assembly clashes and façade failure The Fix: Jig-built precision modules and a simple system for monitoring and adjusting the dimensions of the assembled structure
  • 11. Challenge 2: A separate brace frame or brace core adds erection time, adds cost, complicates waterproofing during construction and reduces the GFA The Fix: Interconnected, stackable load bearing modules, which eliminate the need for the fabrication and erection of a separate brace structure and eliminates the gaps around the frame
  • 12. Challenge 3: Re-rigging for level hoisting of the module variants within each floor is slow and costly The Fix: A quick-connect rigging attachment and halo that can be quickly and reliably levelled and released
  • 13. Challenge 4: Tasks which require work under a suspended load are inherently unsafe The Fix: Integral walkways and stairs, modules that are easily rigged with safety barriers, and modules that connect from inside
  • 14. Challenge 5: Projections beyond the mateline result in gasket / facade damage during placement The Fix: A field-extendable gasket that is closed and mated from inside the module after modules are placed
  • 15. Challenge 6: Precipitation which falls during building assembly penetrates voids, damages module finishes and compromises insulation The Fix: Eliminating the brace frame makes it easy to waterproof the top level during building assembly
  • 16. Challenge 7: Modular systems are costly to develop because they require high-end software and expert knowledge The Fix: An off-the-shelf design and engineering process
  • 17. The Vectorbloc strategy: Reduce the cost of design, coordination, fabrication and building assembly by concentrating the load- bearing and connection functions in a standard, scalable, precision component used by all suppliers to a project
  • 18. To be a standard, the solution has to be economical at all scales. In fact scalability is so important to modular systems that we say: ”By solving tall, you solve it all”
  • 19. Vector Praxis delivers the industry-leading Vectorbloc modular solution via 7 categories of products and services: Vectorbloc Connection System Factory Setup Vectorjig Precision Fabrication System Vectorloc Extendable Gasket System Vectorig Hoisting System Vectorsight Surveying and Levelling System Modular Building Design
  • 20. 1 Vectorbloc Standardized Precision Structural Connection System Vectorbloc Connection System Factory Setup Vectorjig Precision Fabrication System Vectorloc Extendable Gasket System Vectorig Hoisting System Vectorsight Surveying and Levelling System Modular Building Design
  • 21. The heart of the Vectorbloc system is a connector assembly specifically designed to build robust modules with integral building structure Vectorblocs have many advantages over both the ISO corner and competing modular systems: • Builds modules of any size, including wider, longer, taller modules • Provides the scalable vertical tension and gravity capacity needed for real buildings • Assembles safely from inside the module • Provides accessory connection points for connecting balconies, floors and façade cassettes • Does not rely on continuous walls for structure
  • 22. Vectorbloc Anatomy • Tension bolts • Lower Vectorbloc • Façade assembly • Accessory connection points • Hallway or balcony slab • Gusset plate • Tapered locating pins • Upper Vectorbloc • Hoisting point
  • 23. The Vectorbloc structural connectors are located at the corners of the modules and at intermediate points, if required by loading. Modules are stacked and held together horizontally with gusset plates, then vertical bolts are then inserted through the Vectorbloc connectors to hold the building together.
  • 24. Accurate, loadbearing, volumetric modules built with Vectorbloc connectors can be outfitted with interiors and MEP systems in plant, then easily hoisted and quickly assembled to create cost-effective, tight and energy- efficient buildings, ranging from low-rise to high-rise.
  • 25. So that building tolerances can be maintained and columns effectively grouped, a precision assembly fixture is used during chassis manufacturing to ensure that no intermediate part of a module frame crosses the mateline and prevents the Vectorbloc corners from touching.
  • 26. Buildings have many unique conditions, so the Vectorbloc system is comprehensive
  • 27. Vectorbloc modules can be created with the tapering shapes required to assemble buildings with curves
  • 28. Like the ISO fittings used to build containers, Vectorblocs are cast and machined from a weldable steel alloy. Vectorblocs provides integral points for structural connection, hoisting and connection of balconies and hallways all in an easy-to-weld precision connection Module frames supplied by Vector Praxis are welded in our CWB-certified facility
  • 29. Vectorblocs come in 4”, 6” and 10” series, so that in compression, tension and bending modes, Vectorblocs are not the limiting factor in the strength of the structure.
  • 30. When HSS are welded to the Vectorblocs a moment connection is created, which resists lateral forces in all directions
  • 31. The tapered pin on the Vectorbloc gusset plate accurately locates the modules during assembly and the gusset plate connects the modules horizontally. When the vertical tension bolts between modules are tightened, a horizontal connection between the floors of the modules is created. The result is a structural “diaphragm” which extends the bracing within stair towers and elevator shafts to the entire structure.
  • 32. The vertical tension bolts are hidden behind removable feature panels in the hallways, or behind the baseboard at the outer wall After the gusset plates and stanchions are installed on top of the modules, the Vectorsight system provides a stable surveying platform and a fall arrest system
  • 33. MEP modules with compatible facades built in identical jigs simply “plug in” to a Vectorbloc building, eliminating countless hours of trade and supplier coordination
  • 34. Pre-fabricated elevator shafts and stairwells are likewise easily and quickly erected at the same time as the building itself, with the additional benefit of improving access for workers and materials
  • 35. Premium over- height studio apartments, lobbies and gathering spaces can be created by stacking floorless / roofless modules
  • 36. Vectorbloc’s accurate, pre-configured accessory connection points are ideal for the integration of high-performance building features such as “facade cassettes” and thermally- broken balconies
  • 37. …..and Vectorblocs can be used to build Data Center modules Vectorblocs are also ideal for the production of Precision Modular Armatures (PMA’s) for resource industry applications………
  • 38. By reducing sitework and re-work to its theoretical minimum, Vectorbloc makes it feasible to deliver the all-trade, 95% factory completion that realizes the full cost-saving potential of modular construction. Appropriate building types include: • Apartments • Hotels and dormitories • Hospitals and clinics • Offices • Industrial facilities • Urban infill • Relocatable / emergency facilities
  • 39. Stacked and Bundled Vectorbloc Systems Explained! Entire contents copyright February 2015 Vectorbloc and related systems US, Canada and WIPO Patent pending
  • 40. Because loads in a building vary, Vectorblocs are designed to support a wide range of column configurations This means that the minimum of steel and labour can be used to build a member which suits specific load conditions Each bolt in the standard connector series has a clamping strength of 60kips, so a group of 8 delivers over 400 kips, adequate for buildings well over 30 stories
  • 41. Vector Praxis production office Vectorbloc offers two ways to build modules, which we call “Stacked” and “Bundled”. The stacked system scales with load using modules with progressively larger HSS, while the bundled system adds horizontal tiers of HSS in ever wider assemblies. These wide assemblies also function as shear walls. Top: Stacked Bottom: Bundled
  • 42. The two systems are interchangeable, so designers can select the connection and member configuration that best suits each project, or even each part of a project.
  • 45. The “structural bundling” of columns is similar to the story of the boy who was challenged to break a bundle of sticks…… ……and found it impossible because a group of members acting together are stronger than the sum of the parts……..
  • 46. Robust groupings can be created using one size of HSS welded corner to corner and joined in groups with flat-bar ears.
  • 49. Section transitions A Vectorbloc building designer using FEA software selects the column configuration that best suits the loading on each module.
  • 50. By joining bundled columns in adjacent modules, configurations ranging from a 24 lbs / foot grouping of 4” x 4” HSS , to massive built-up columns weighing over 400 lbs per foot, can all fit in a 10-1/2” wall
  • 51. Vectorbloc Prototypes 3D Printing Casting and Machining February 2015 Vectorbloc and related systems US, Canada and WIPO Patent pending
  • 56. Prototype of typical module with detail of fireproofing and baseboard leave-out at Vectorbloc connection
  • 57. Vectorbloc Concept Building February 2015 Vectorbloc and related systems US, Canada and WIPO Patent pending
  • 58. By examining a Vectorbloc-based concept building we can better understand the practical application of the Vectorbloc structural system
  • 60. Plan of typical floor Apartment buildings and condominiums are highly optimized and every square foot is utilized. Vectorbloc’s bundled column reduces lost GFA by packing load-bearing structures in to the wall cavities, eliminating inconvenient “bumpouts”
  • 61. Brace locations Lateral brace frames (blue) are concentrated in the party walls, while the longitudinal system (pink) is loaded in to areas where the diagonal bracing does not obstruct openings
  • 62. Module size matrix Minimizing module size variants is not essential, but it is desirable
  • 66. Typical two module grouping with finishes and furnishings
  • 68. The brace frame is created when modules are interconnected to unite the integral diagonal bracing in the modules. Bracing can be integrated in locations such as the party walls, elevator shafts and stairwells.
  • 70. Frame Details Deep spandrel beams can be integrated in to the framing if required to eliminate diagonal bracing which obstructs openings
  • 71. Longitudinal Frame The longitudinal brace frame is created on the upper floors by interconnecting modules to combine the moment action of the module frames. On lower floors, bracing is added to the shaft, stairwell and hallway modules.
  • 72. Vectorbloc modules incorporate the ideal vertical load bearing capacity at each level in the building, they provide a moment connection and they are interconnected connected horizontally. As a result, a separate brace frame or brace tower can be eliminated, saving valuable space and reducing construction complexity.
  • 73. Eliminating the separate brace frame confers numerous benefits: • The additional work of fabricating and erecting the brace frame is eliminated, and the number of required crane cycles and super-elevation differentials are both reduced • Party wall voids are eliminated, so wasted GFA is reduced and waterproofing during erection is simplified • Movement of workers across the top surface of the structure is safer and clashes with the Halo are eliminated
  • 74. The accessory connection points on a Vectorbloc module are precisely located in 3D space, making it easy and cost-effective to deliver desirable and progressive building features: • Panelized facades with thermally-broken hanging, cantilevered or suspended balconies • Hallways with factory-integrated MEP trains • Over-height studio spaces, lofts, roof decks and parapets • Pre-fabricated elevators, stairs and waste disposal chutes • Factory-integrated MEP systems
  • 75. Using the hall slabs as MEP carriers, the Vectorbloc system supports factory- integrated wiring, piping and ducts in trains up to 50’ in length. During building assembly, the hallways also double as access platforms.
  • 77. Model VJS (Vectorjig Standard Model VJA) utilizes screw clamps. Model VJA (Vectorjig Auto) features hydraulic locking and release to further reduce cycle time Replace with images from SW tooling model It’s expensive to make something accurate! Accurate = cheap! Traditional modular frame construction relies on cutting, fitting and welding of steel members to establish the finished dimensions of the modules. However even the highest AISC specifications have proven unworkable. As a result, it is considered standard practice to adjust abutting work on site so it fits. Site work is expensive, in fact modular construction exists to reduce site work!
  • 78. To build a Vectorbloc module frame, HSS columns, floor beams and ceiling joists are joined to Vectorblocs by welding in precision fixtures. All spatial relationships in a Vectorbloc-based structure are established by the relative position of the Vectorblocs, which is established in the factory by the logical grid of the fabrication fixtures
  • 79. Since connections of a Vectorbloc-based building takes place through the Vectorblocs, precision drilling and cutting of the HSS members is not required
  • 80. Using the same techniques as the automotive and aerospace industries, Vectorjig allows modular fabricators to build precision structural modules using inexpensive materials processed with just three pieces of equipment. BandsawVectorjig Welding machine
  • 81. The root of Vectorjig precision: Rock-solid building geometry created in a precision fixture aligned by Vector Praxis technicians using LASER Metrology, the same technique used to calibrate precision tooling.
  • 82. The Vectorjig system ensures a Go / No Go tolerance regimen which locates the Vectorblocs and structural members to a + 0” – 1/16” accuracy This assembly methodology ensures that no intermediate part exceeds the mateline, resulting in tight structural connections. The Vectorjig also elevates the members ideally for manual or robotic welding.
  • 83. Each cycle begins with the jig in closed position to receive the Vectorblocs and adjoining members Once the unit is welded, the jig opens to release the completed frame.
  • 84. The application of floor material, wall board and the façade can be completed before opening the Vectorjig and removing the modules, or the bare “chassis” can be removed for offline completion in a “Vectorjig Lite”
  • 85. Precision fixtures are a pre-requisite for robotic welding!
  • 86. Testing on the Vectorjig assembly system has been completed using “Moc Blocs”; Connectors built from plate instead of castings
  • 87. Vectorjig is available in two versions: VJM: manual clamping VJA: Automatic clamping The pin rotating mechanism of the automatic version (prototype shown at left in the Vector Praxis toolroom) is actuated by a heavy-duty rack powered by a hydraulic cylinder which is entirely enclosed to protect it from weld spatter
  • 89. A single story in a modular building can have numerous module variants, making constant re-rigging for level hoisting a key schedule driver
  • 90. Vectorblocs feature prepared connection points for the Vectorig quick-connect rigging and CG compensating system. Time-consuming and labour- intensive “iterative rigging” is required to level modules when the CG of the load is unknown or cannot be predicted
  • 91. The Vectorig connector features a positive lock which prevents accidental release of the load.
  • 92. Modules are shipped with rigging notes generated by CG simulation, based on the behavior of the combined parasolid models of the module and the Vectorig halo. The rigging notes tell the rigger exactly how to set up the rigging blocks on the halo frame. The sliding rigging points are quickly adjusted at ground level, then the module is connected and hoisted level. Spreaders Beam A End 1 Beam A End 2 Beam B End A Beam B End 2 Position 17 Position 4 Position 4 Position 6 Position 6
  • 93. Precision locating pins mounted on LASER- cut gusset plates engage with holes machined in the Vectorblocs, ensuring accurate module location. Using parasolid modeling and predictive CG determination together with the Vectorig fitting and halo, rigging and release time is reduced by 75% and crew size is also reduced
  • 95. Because modules often “stack” or “rack” in numbers of 20 or more, in both horizontal and vertical dimensions, even tight tolerances accumulate quickly. Example: A 20-unit stack built of units 1/16” too high next to a stack of units 1/16” too short creates a 2-1/2” difference! So it is easy to see how standard +- tolerances are simply unworkable for a large modular building
  • 96. During building assembly, elevation and distance measurements are taken relative to receivers placed on Vectorsight posts rigged to the tops of the gusset plates Vectorsight posts are precisely machined to length ensuring consistent receiver height and accurate measurement Vectorsight posts also function as safety barriers and are rigged at the same time that gusset plates are installed
  • 97. A modular project based on the Vectorbloc system is conceived with all components conforming to a + 0”, - 1/16” tolerance envelope. This ensures that no part exceeds the tolerance envelope and causes positive tolerance accumulation. Excessive negative variations (undersized stacks or racks) are minimized using sophisticated manufacturing techniques. During building assembly, module groupings are monitored and variations are compensated with a systematic and efficient shimming system. Measure ShimAnalyze Vectorsight combination survey post and guardrail
  • 99. Gasket and façade panel damage during module placement and poor sealing after placement are significant issues in modular construction.
  • 100. The Vectorloc façade system leverages the precision of the Vectorbloc modules to accurately locate factory- installed windows, sealing and insulating features.
  • 101. The Vectorloc factory-installed façade system features a mechanically extendable gasket that is closed and mated from inside the module after modules are placed and bolted in position.
  • 102. Cruciform closure takes place at the same time that outer-wall gusset plates are installed. The next layer of modules completes the flashing grouping.
  • 103. The Vectorbloc system does its part by ensuring precise location between modules, resulting in factory- installed façade panels that fit accurately on site and develop their full specification.
  • 104. Gasket sealing is positive and multi-chambered, improving envelope performance An additional benefit is a field-releasable and repairable façade, reducing both the risk and the cost of troubleshooting, maintenance and renewal
  • 106. Fast = Cheap To build a modular building, you need to make a lot of perfect modules….and you need to make them quickly. Our experience in factory design and management is your best guarantee of a successful entry in to this dynamic and growing market.
  • 108. The Vectorbloc System is covered by Patents Pending in over 100 countries
  • 109. The Vectorbloc System was inspired by the experience of the Vector Praxis team: • 30+ years of precision offsite architectural fabrication • 15+ years of 3D / model-driven architectural fabrication • 40+ tours of off-site fabrication plants • Setting up, staffing and running a successful plant creating AAA modules for a Norman Foster-designed tower • Detailed study of numerous modular and structural projects in the USA, Canada, Asia • Development of modular buildings and systems in collaboration with prominent architectural firms and panelized builders • Detailed study of residential tower envelope renewal strategies
  • 110. R&D To support ongoing improvement of the Vectorbloc system and development of additional features in response to market demands, Vector Praxis maintains a 10,000 square foot research and development facility in Toronto, Canada. Our fully- equipped design and production facility includes a machine shop, metal fabricating and wood working equipment. The Greater Toronto Area (GTA) supports a globally significant cluster of leading custom architectural fabricators, providing our product development team with quick, world-class access to a wide range of materials and CNC processing services. For more information please contact: Vector Praxis www.vectorpraxis.com Phone: 416 766 9018 Mobile: 416 575 1630 530 Keele Street, unit 403, Toronto, Ontario, Canada M6N 3C9
  • 111. Vectorbloc The sky’s the limit http://meshcities.com/index.php/meshcities/com ments/can_vectorblocs_patented_building_system _make_cities_more_energy_efficient#.VCXAb_ldU 9J http://atlanticyardsreport.blogspot.ca/2014/09/in- dispute-over-stalled-modular-tower.html Links to chatter about Vectorbloc and related subjects: http://therealdeal.com/blog/2013/03/13/prefabr icated-broadway-stack-project-makes-headway/