WORK STUDY
WORK MEASUREMENT
JOSEPH GEORGE KONNULLY
Definition of Work Measurement
Objectives and uses of WM
OBJECTIVES AND USES OF WORK MEASUREMENT
The main objectives of work measurement:
1. Manpower planning.
2. Production planning and scheduling.
3. Estimating productions costs.
4. Cost reduction and control.
5. Rational basis for incentives.
6. Performance appraisal.
7. Training of employees.
8. Comparing alternative methods.
9. Accepting new orders.
10. Fixing the selling cost.
Techniques/Methods/Types of WM
METHODS OF WORK MEASUREMENT
1. Historical data method
Historical data method uses the past-performance data. Here, past performance is used as a
guideline for setting work performance standards. The main advantage of this technique is that
it is simple to understand, quicker to estimate and easier to implement. However, past
performance is not the best basis for fixing performance standards. This is because there may
be many changes in technology, employees’ behavior, abilities, etc.
2. Time study
Time study with the help of a stop watch is the most commonly used work measurement
method. This technique was developed by Frederick Winslow Taylor (1856-1915).
Time study is best suited for short-cycle repetitive jobs. Most of the production jobs can be
easily timed by a time-study.
Time study procedure consists of the following steps:
Select the job to be timed.
Standardize the method of doing the job.
Select the worker to be studied.
Record the necessary details of the job and conditions of work.
Divide the job into elements. Here, ’element’ is a part of the job.
Find out the time taken to do every single element.
Keep provisions for relaxation, etc.
Fix the standard time for doing the job.
METHODS OF WORK MEASUREMENT
3. Work sampling
Work sampling method was original developed by Leonard Henry Caleb Tippett (1902-1985) in Britain in 1934. In this
technique, the workers are observed many times at random. It is done to find out for how much time the worker is actually
on the job. It checks how long he is working and how much time he is not working (idle time).
Work sampling method does not involve stop watch measurement. The purpose of work sampling technique is to estimate
what proportion of a worker’s time is devoted to work-related activities.
Work sampling method involves following three main steps:
Deciding what activities are defined as ’working’. Non-working are those activities which are not defined as working.
Observe the worker at selected intervals and record (write down) whether he is working or not.
Calculate the portion of time (P), a worker is working.
A portion of time (P) a worker is working equals to ’Number of observations during which working occurred’ divided by ’Total
Number of observations.’
The above calculation is used as a performance standard.
Advantages of Work Sampling
The benefits or advantages of work sampling method are as follows:
Work sampling gives an unbiased result since workmen are not under close observation.
A work sampling study may be interrupted at any time without affecting the results.
Work sampling can be conducted by anyone with limited training. There is no need to have experts.
Team work can be studied by work sampling and not by the time-study.
Work sampling is economical and less time-consuming than time study. This is because more than one worker can be
studied at the same time. Secondly, observer needs not to be present himself for a long time.
Disadvantages of Work Sampling
The limitations or disadvantages of work sampling method are as follows:
Work sampling is not economical for short cycle jobs. It is also uneconomical to study a single worker or even small group of
workers.
Unlike time study, it does not allow a small breakdown of activities and delays.
Working men may change their normal method of working when they see an observer. Therefore, the results from the work
study may not be accurate.
In work sampling method, the observations are limited or insufficient. So, the results may not be accurate.
This method normally does not record the workers' speed of working.
METHODS OF WORK MEASUREMENT
4. Synthesis method
In synthesis method, the full job is first divided into elements (parts). Then the time taken
to do each element of the job is found out and synthesized (totaled). This gives the total
time taken for doing the full job. In this technique, the time taken to do each element of
the job is found out from previous time studies. So, this technique gives importance to
past-time studies of similar jobs. It also uses standard data.
Standard-data is the normal time taken for doing routine jobs. Standard data is easily
available for routine-jobs like fitting screws, drilling holes, etc. So there is no need of
calculating these times repeatedly. Most companies use Standard-data. They do not
waste time doing studies for all elements of the job. This is because standard time is
already available for most elements of a job.
For example, a job of publishing a book contains four elements viz; typing, editing,
printing and binding. The time taken for doing each element is first found out. Suppose,
typing takes 40 days, editing takes 30 days; printing takes 20 days and binding takes 10
days. Then the time taken to do all the elements are totaled. That is, it takes 40 + 30 + 20
+ 10 = 100 days to publish a book. This information is taken from previous time studies of
other printing jobs or from the standard data.
Synthesis technique also considers the level of performance. Level of performance refers
to the speed of performance, which is either, normal, fast, or very-fast.
The benefits or advantages of synthesis method:
It provides reliable information about standard time for doing different jobs. This is
because it is based on many past time studies.
It is economical because there is no need to conduct new time studies.
METHODS OF WORK MEASUREMENT
5. Predetermined motion time system
In ’Predetermined Motion Time System’ method or simply PMTS technique,
the normal times are fixed for basic human motions. These time values are
used to fix the time required for doing a job. Normally, three times are fixed for
one job. That is, one time is fixed for each level of performance. The level of
performance may be normal, fast and very-fast.
PTMS is better than motion studies because it gives the detailed analysis of
the motion, and it fixes the standard time for doing that motion.
PTMS technique is used mostly for jobs, which are planned for future.
However, it can also be used for current jobs as an alternative to time study.
The benefits or advantages of PMTS method:
It is a very accurate method. It avoids subjective judgement or bias of rater.
It is an effective and economical method for repetitive jobs of short duration.
There is no interference in the normal work routine, and so it does not face any
resistance from the employees.
It helps to improve the work methods because it gives a detailed analysis of
the motions.
It is more economical and fast compared to normal time studies.
METHODS OF WORK MEASUREMENT
• 6. Analytical estimating
• Analytical estimating method or technique is used for fixing the
standard time for jobs, which are very long and repetitive. The
standard-time is fixed by using standard-data. However, if standard
data is not available, then the standard time is fixed based on the
experience of the work-study engineer.
• The benefits or advantages of analytical estimating technique:
• It helps in planning and scheduling the production activities.
• It provides a basis for fixing labor rate for non-repetitive jobs.
• It is economical because it uses standard data for fixing the standard
time of each job.
• One disadvantage or limitation of analytical estimating method:
• When standard-data is not available for a job, then the standard time
is fixed by the work-study engineer. He uses his experience and
judgement for estimating the standard-time. This is not accurate
compared to a scientific time study.
• So, these are different techniques of work measurement.
SUMMARY OF WORK MEASUREMENT METHODS AND ITS USES
Techniques Applications Unit of measurement
1. Time study
2. Synthetic Data
3. Working sampling
4. MTM/PMTS
5. Analytical estimation
Short cycle repetitive jobs
Widely used for direct work.
Short cycle repetitive jobs.
Long cycle jobs/heterogeneous
Manual Operations confined to
one work centre
Long-cycle non-repetitive job.
Centiminute (0.01 min)
Centiminute(0.01 min)
Minutes
TMU (1 TMU = 0.006 min)
Minutes
Method of measuring time with a Stop Watch
There are two methods of timing using a stop watch. They are
1.Fly back or Snap back method.
2.Continuous or Cumulative method.
Fly back method
Here the stop watch is started at the beginning of the first element. At the end of
the element the reading is noted in the study sheet (in the WR column). At the
same time, the stop watch hand is snapped back to zero. This is done by pressing
down the knob, immediately the knob is released. The hand starts moving from
zero for timing the next element. In this way the timing for each element is found
out. This is called observed time (O.T.) .
Continuous method
Here the stop watch is started at the beginning of the first element. The watch runs
continuously throughout the study. At the end of each element the watch readings
are recorded on the study sheet. The time for each element is calculated by
successive subtraction. The final reading of the stop watch gives the total time.
This is the observed time (O.T.).
Steps in making Stop watch Time Study
Stop watch time is the basic technique for determining accurate time standards. They are
economical for repetitive type of work. Steps in taking the time study are:
1. Select the work to be studied.
2. Obtain and record all the information available about the job, the operator and the
working conditions likely to affect the time study work.
3. Breakdown the operation into elements. An element is a instinct part of a specified
activity composed of one or more fundamental motions selected for convenience of
observation and timing.
4. Measure the time by means of a stop watch taken by the operator to perform each
element of the operation. Either continuous method or snap back method of timing could
be used.
5. At the same time, assess the operators effective speed of work relative to the observer’s
concept of ‘normal’ speed. This is called performance rating.
6. Adjust the observed time by rating factor to obtain normal time for each element
Normal Time = Observed time × Rating ÷ 100
7. Add the suitable allowances to compensate for fatigue, personal needs, contingencies.
etc. to give standard time for each element.
8. Compute allowed time for the entire job by adding elemental standard times considering
frequency of occurrence of each element.
9. Make a detailed job description describing the method for which the standard time is
established.
10. Test and review standards wherever necessary.
Definitions of Standard time
Standard time is the time allowed to an operator to carry out the specified task
under specified conditions and defined level of performance. The various
allowances are added to the normal time as applicable to get the standard time as
shown in Fig. 7.6.
Standard time may be defined as the, amount of time required to complete a unit of
work:
(a) under existing working conditions, (b) using the specified method and
machinery, (c) by an operator, able to the work in a proper manner, and (d) at a
standard pace.
Thus basic constituents of standard time are:
1. Elemental (observed time).
2. Performance rating to compensate for difference in pace of working.(PRF)
3. Relaxation allowance.
4. Interference and contingency allowance.
5. Policy allowance.
Components of Standard Time
• OT – Observed Time
• PRF – Performance Rating Factor
• NT – Normal Time
• PA – Process Allowances
• RPA – Rest and Personal Allowances (Relaxation Allowance)
• SA – Special Allowances( Interference and Contingency Allowances)
• PoA – Policy Allowances
• PFD – Personal , Fatigue and Delay Allowances = (PA+RPA+SA)
• The Standard Time is the product of three factors:
• 1.Observed time: The time measured to complete the task.
• 2.Performance rating factor: The pace the person is working at. 90% is working slower than normal, 110% is working faster
than normal, 100% is normal. This factor is calculated by an experienced worker who is trained to observe and determine the
rating.
• 3.Personal, fatigue, and delay (PFD) allowance.
• The standard time can then be calculated by using the formula:
•
Computation of Standard Time Illustrations
• ILLUSTRATION 1: Assuming that the total observed time for an operation of
• assembling an electric switch is 1.00 min. If the rating is 120%, find normal time. If an
• allowance of 10% is allowed for the operation, determine the standard time.
• SOLUTION:
• Obsersved time (or) selected time = 1.00 min
• Rating = 120%
• Allowance = 10%
• As we know that, normal time = Observed time × Rating % ÷ 100 = 1.00 ×120 ÷10=1.20min
• Allowance @ 10% = 1.20 ×10 ÷ 100 = 0.12 min
• ∴ Standard time = Normal time + Allowances
• = 1.20 + 0.12 = 1.32 min.
• ILLUSTRATION 2: An operator manufactures 50 jobs in 6 hours and 30 minutes.
• If this time includes the time for setting his machine. Calculate the operator’s efficiency.
• Standard time allowed for the job was:
• Setting time = 35 min
• Allowed time per piece = 8 min
• SOLUTION:
• As standard time = Set up time + Time per piece × No. of pieces produced
• ∴ Standard time for manufacturing 50 jobs
• = 35 + 8 × 50
• = 435 min
• = 7 hours and 15 min.
• Efficiency of operator =Standard time × 100 ÷ Actual time = 435× 100 ÷ 390 = 111.5%.
Computation of Standard Time Illustrations
ILLUSTRATION 3: Following datas were obtained by a work study. Man from a
study conducted by hours.
(i) Maintenance time
(a) Get out and put away tools = 12.0 min/day
(b) Cleaning of machine = 5.0 min/day
(c) Oiling of machine = 5.0 min/day
(d) Replenish coolant supply = 3.0 min/day
(ii) Interruption
(a) Interruption by foreman = 5.0 min/day
(b) Interruption by porter etc. = 4.0 min/day
(iii) Delay time due to power failure etc. = 6.0 min/day
(iv) Personal time = 20.0 min/day
Calculate total allowances, total available cycle time productive hours, considering a
working day of 8 hours.
SOLUTION:
Total allowance (sometimes also known as station time)
= Total maintenance time + Interruption time
+ Delay time + Personal time
= (12.0 + 5 + 5 + 3.0) + (5.0 + 4.0) + 6.0 + 20.0
= 25.0 + 9.0 + 6.0 + 20.0
= 60.0 min per day
∴ Total available cycle time = Total work period – Total allowances
= 480 – 60 = 420 min/day
Productive hours =Time available Number of hours = 420 ÷60 = 7 hrs
Computation of Standard Time Illustrations
ILLUSTRATION 4: Find out the standard time using the following
data:
Average time for machine elements = 6 min
Average time for manual elements = 4 min
Performance rating = 110%
Allowances = 10%
SOLUTION:
Normal time = Machinery time + Manual time × Rating
= 6 + 4 × 1.1
= 6 + 4.4 = 10.4 min
∴ Standard time = Normal time + Allowances
= 10.4 + 10.4 ×10 ÷ 100
= 10.4 (1 + 0.1) = 11.44 min.

More Related Content

What's hot

3 work measurement ppt
3 work measurement ppt3 work measurement ppt
3 work measurement ppt
Lizzette Danan
 
7. work study and method measurement
7. work study and method measurement7. work study and method measurement
7. work study and method measurement
Akash Bakshi
 
Work Study: Method Study & Work Measurement
Work Study: Method Study & Work MeasurementWork Study: Method Study & Work Measurement
Work Study: Method Study & Work Measurement
Harinadh Karimikonda
 

What's hot (20)

Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
 
Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 
Line balancing
Line balancingLine balancing
Line balancing
 
Work study method study-work measurement
Work study method study-work measurementWork study method study-work measurement
Work study method study-work measurement
 
3 work measurement ppt
3 work measurement ppt3 work measurement ppt
3 work measurement ppt
 
Work Study
Work StudyWork Study
Work Study
 
Method study
Method studyMethod study
Method study
 
TIME STUDY
TIME STUDYTIME STUDY
TIME STUDY
 
Method study
Method studyMethod study
Method study
 
7. work study and method measurement
7. work study and method measurement7. work study and method measurement
7. work study and method measurement
 
Work study
Work studyWork study
Work study
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
 
Work measurement (1)
Work measurement (1)Work measurement (1)
Work measurement (1)
 
Work Study: Method Study & Work Measurement
Work Study: Method Study & Work MeasurementWork Study: Method Study & Work Measurement
Work Study: Method Study & Work Measurement
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
 
Work study
Work studyWork study
Work study
 
Application Of Workstudy
Application Of WorkstudyApplication Of Workstudy
Application Of Workstudy
 
Work sampling
Work samplingWork sampling
Work sampling
 
Work study ......operational management presentation
Work study ......operational management presentationWork study ......operational management presentation
Work study ......operational management presentation
 
work measurement_operation management
work measurement_operation managementwork measurement_operation management
work measurement_operation management
 

Viewers also liked (6)

Work measurement
Work measurementWork measurement
Work measurement
 
Time & motion study
Time & motion studyTime & motion study
Time & motion study
 
Vendor rating
Vendor ratingVendor rating
Vendor rating
 
Types of maintenance
Types of maintenanceTypes of maintenance
Types of maintenance
 
Time And Motion Study
Time And  Motion  StudyTime And  Motion  Study
Time And Motion Study
 
SUPPLIER SELECTION AND EVALUATION
SUPPLIER SELECTION AND EVALUATIONSUPPLIER SELECTION AND EVALUATION
SUPPLIER SELECTION AND EVALUATION
 

Similar to Work study work measurement

Industrial egineering
Industrial egineeringIndustrial egineering
Industrial egineering
Rajeev Sharan
 
Worksampling - Methods Engineering
Worksampling - Methods EngineeringWorksampling - Methods Engineering
Worksampling - Methods Engineering
Angelica Angelo Ocon
 
Om4 bbm(l) 25.03.11
Om4 bbm(l) 25.03.11Om4 bbm(l) 25.03.11
Om4 bbm(l) 25.03.11
Rahul Jain
 

Similar to Work study work measurement (20)

Measurment techniques
Measurment techniquesMeasurment techniques
Measurment techniques
 
137 work study
137 work study137 work study
137 work study
 
Work sampling
Work samplingWork sampling
Work sampling
 
Work study Training Manual
Work study Training ManualWork study Training Manual
Work study Training Manual
 
Work measurement
Work measurementWork measurement
Work measurement
 
Chapter 28 swts
Chapter 28 swtsChapter 28 swts
Chapter 28 swts
 
Work measurement
Work measurementWork measurement
Work measurement
 
Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 
Work Measurement
Work MeasurementWork Measurement
Work Measurement
 
Industrial egineering
Industrial egineeringIndustrial egineering
Industrial egineering
 
Good work measurement
Good work measurementGood work measurement
Good work measurement
 
Production and material management
Production and material managementProduction and material management
Production and material management
 
work sampling.pptx
work sampling.pptxwork sampling.pptx
work sampling.pptx
 
cumulative and flyback timing.pdf
cumulative and flyback timing.pdfcumulative and flyback timing.pdf
cumulative and flyback timing.pdf
 
Cumulative and flyback timing
Cumulative and flyback timingCumulative and flyback timing
Cumulative and flyback timing
 
Worksampling - Methods Engineering
Worksampling - Methods EngineeringWorksampling - Methods Engineering
Worksampling - Methods Engineering
 
Garments
Garments Garments
Garments
 
Work study and productivity index
Work study and productivity indexWork study and productivity index
Work study and productivity index
 
Om4 bbm(l) 25.03.11
Om4 bbm(l) 25.03.11Om4 bbm(l) 25.03.11
Om4 bbm(l) 25.03.11
 
1.1 Work study and method study -Industrial Engineering Basics
1.1 Work study and method study -Industrial Engineering Basics1.1 Work study and method study -Industrial Engineering Basics
1.1 Work study and method study -Industrial Engineering Basics
 

More from Joseph Konnully

Ddb29 ccceba547209ddab45a17330016
Ddb29 ccceba547209ddab45a17330016Ddb29 ccceba547209ddab45a17330016
Ddb29 ccceba547209ddab45a17330016
Joseph Konnully
 
403 e86280b994e71948f9e0c1b385947
403 e86280b994e71948f9e0c1b385947403 e86280b994e71948f9e0c1b385947
403 e86280b994e71948f9e0c1b385947
Joseph Konnully
 
Simplex method - Maximisation Case
Simplex method - Maximisation CaseSimplex method - Maximisation Case
Simplex method - Maximisation Case
Joseph Konnully
 
Linear programming - Model formulation, Graphical Method
Linear programming  - Model formulation, Graphical MethodLinear programming  - Model formulation, Graphical Method
Linear programming - Model formulation, Graphical Method
Joseph Konnully
 
Aggregate Planning Problem
Aggregate Planning ProblemAggregate Planning Problem
Aggregate Planning Problem
Joseph Konnully
 
Principles of Motion Economy
Principles of Motion EconomyPrinciples of Motion Economy
Principles of Motion Economy
Joseph Konnully
 

More from Joseph Konnully (20)

Workshop Practice manual 2016
 Workshop Practice manual 2016  Workshop Practice manual 2016
Workshop Practice manual 2016
 
Worksampling
WorksamplingWorksampling
Worksampling
 
Work Study- Methods Study
Work Study- Methods StudyWork Study- Methods Study
Work Study- Methods Study
 
Plantlocationandlayoutplanning
PlantlocationandlayoutplanningPlantlocationandlayoutplanning
Plantlocationandlayoutplanning
 
Plant location
Plant locationPlant location
Plant location
 
Prniciples of Management
Prniciples   of  ManagementPrniciples   of  Management
Prniciples of Management
 
Functionsofmanagement
FunctionsofmanagementFunctionsofmanagement
Functionsofmanagement
 
Organisation - organisation structures
Organisation - organisation structuresOrganisation - organisation structures
Organisation - organisation structures
 
Formsof businessorg
Formsof businessorgFormsof businessorg
Formsof businessorg
 
Ddb29 ccceba547209ddab45a17330016
Ddb29 ccceba547209ddab45a17330016Ddb29 ccceba547209ddab45a17330016
Ddb29 ccceba547209ddab45a17330016
 
403 e86280b994e71948f9e0c1b385947
403 e86280b994e71948f9e0c1b385947403 e86280b994e71948f9e0c1b385947
403 e86280b994e71948f9e0c1b385947
 
Work Study Part- I
Work Study Part- IWork Study Part- I
Work Study Part- I
 
Simplex method - Maximisation Case
Simplex method - Maximisation CaseSimplex method - Maximisation Case
Simplex method - Maximisation Case
 
Linear programming - Model formulation, Graphical Method
Linear programming  - Model formulation, Graphical MethodLinear programming  - Model formulation, Graphical Method
Linear programming - Model formulation, Graphical Method
 
Operations research - an overview
Operations research -  an overviewOperations research -  an overview
Operations research - an overview
 
Aggregate Planning Problem
Aggregate Planning ProblemAggregate Planning Problem
Aggregate Planning Problem
 
Mechanical Technology
Mechanical TechnologyMechanical Technology
Mechanical Technology
 
Principles of Motion Economy
Principles of Motion EconomyPrinciples of Motion Economy
Principles of Motion Economy
 
79971255 assembly-line-balancing
79971255 assembly-line-balancing79971255 assembly-line-balancing
79971255 assembly-line-balancing
 
79971255 assembly-line-balancing
79971255 assembly-line-balancing79971255 assembly-line-balancing
79971255 assembly-line-balancing
 

Recently uploaded

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Recently uploaded (20)

MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 

Work study work measurement

  • 2. Definition of Work Measurement
  • 3. Objectives and uses of WM OBJECTIVES AND USES OF WORK MEASUREMENT The main objectives of work measurement: 1. Manpower planning. 2. Production planning and scheduling. 3. Estimating productions costs. 4. Cost reduction and control. 5. Rational basis for incentives. 6. Performance appraisal. 7. Training of employees. 8. Comparing alternative methods. 9. Accepting new orders. 10. Fixing the selling cost.
  • 5. METHODS OF WORK MEASUREMENT 1. Historical data method Historical data method uses the past-performance data. Here, past performance is used as a guideline for setting work performance standards. The main advantage of this technique is that it is simple to understand, quicker to estimate and easier to implement. However, past performance is not the best basis for fixing performance standards. This is because there may be many changes in technology, employees’ behavior, abilities, etc. 2. Time study Time study with the help of a stop watch is the most commonly used work measurement method. This technique was developed by Frederick Winslow Taylor (1856-1915). Time study is best suited for short-cycle repetitive jobs. Most of the production jobs can be easily timed by a time-study. Time study procedure consists of the following steps: Select the job to be timed. Standardize the method of doing the job. Select the worker to be studied. Record the necessary details of the job and conditions of work. Divide the job into elements. Here, ’element’ is a part of the job. Find out the time taken to do every single element. Keep provisions for relaxation, etc. Fix the standard time for doing the job.
  • 6. METHODS OF WORK MEASUREMENT 3. Work sampling Work sampling method was original developed by Leonard Henry Caleb Tippett (1902-1985) in Britain in 1934. In this technique, the workers are observed many times at random. It is done to find out for how much time the worker is actually on the job. It checks how long he is working and how much time he is not working (idle time). Work sampling method does not involve stop watch measurement. The purpose of work sampling technique is to estimate what proportion of a worker’s time is devoted to work-related activities. Work sampling method involves following three main steps: Deciding what activities are defined as ’working’. Non-working are those activities which are not defined as working. Observe the worker at selected intervals and record (write down) whether he is working or not. Calculate the portion of time (P), a worker is working. A portion of time (P) a worker is working equals to ’Number of observations during which working occurred’ divided by ’Total Number of observations.’ The above calculation is used as a performance standard. Advantages of Work Sampling The benefits or advantages of work sampling method are as follows: Work sampling gives an unbiased result since workmen are not under close observation. A work sampling study may be interrupted at any time without affecting the results. Work sampling can be conducted by anyone with limited training. There is no need to have experts. Team work can be studied by work sampling and not by the time-study. Work sampling is economical and less time-consuming than time study. This is because more than one worker can be studied at the same time. Secondly, observer needs not to be present himself for a long time. Disadvantages of Work Sampling The limitations or disadvantages of work sampling method are as follows: Work sampling is not economical for short cycle jobs. It is also uneconomical to study a single worker or even small group of workers. Unlike time study, it does not allow a small breakdown of activities and delays. Working men may change their normal method of working when they see an observer. Therefore, the results from the work study may not be accurate. In work sampling method, the observations are limited or insufficient. So, the results may not be accurate. This method normally does not record the workers' speed of working.
  • 7. METHODS OF WORK MEASUREMENT 4. Synthesis method In synthesis method, the full job is first divided into elements (parts). Then the time taken to do each element of the job is found out and synthesized (totaled). This gives the total time taken for doing the full job. In this technique, the time taken to do each element of the job is found out from previous time studies. So, this technique gives importance to past-time studies of similar jobs. It also uses standard data. Standard-data is the normal time taken for doing routine jobs. Standard data is easily available for routine-jobs like fitting screws, drilling holes, etc. So there is no need of calculating these times repeatedly. Most companies use Standard-data. They do not waste time doing studies for all elements of the job. This is because standard time is already available for most elements of a job. For example, a job of publishing a book contains four elements viz; typing, editing, printing and binding. The time taken for doing each element is first found out. Suppose, typing takes 40 days, editing takes 30 days; printing takes 20 days and binding takes 10 days. Then the time taken to do all the elements are totaled. That is, it takes 40 + 30 + 20 + 10 = 100 days to publish a book. This information is taken from previous time studies of other printing jobs or from the standard data. Synthesis technique also considers the level of performance. Level of performance refers to the speed of performance, which is either, normal, fast, or very-fast. The benefits or advantages of synthesis method: It provides reliable information about standard time for doing different jobs. This is because it is based on many past time studies. It is economical because there is no need to conduct new time studies.
  • 8. METHODS OF WORK MEASUREMENT 5. Predetermined motion time system In ’Predetermined Motion Time System’ method or simply PMTS technique, the normal times are fixed for basic human motions. These time values are used to fix the time required for doing a job. Normally, three times are fixed for one job. That is, one time is fixed for each level of performance. The level of performance may be normal, fast and very-fast. PTMS is better than motion studies because it gives the detailed analysis of the motion, and it fixes the standard time for doing that motion. PTMS technique is used mostly for jobs, which are planned for future. However, it can also be used for current jobs as an alternative to time study. The benefits or advantages of PMTS method: It is a very accurate method. It avoids subjective judgement or bias of rater. It is an effective and economical method for repetitive jobs of short duration. There is no interference in the normal work routine, and so it does not face any resistance from the employees. It helps to improve the work methods because it gives a detailed analysis of the motions. It is more economical and fast compared to normal time studies.
  • 9. METHODS OF WORK MEASUREMENT • 6. Analytical estimating • Analytical estimating method or technique is used for fixing the standard time for jobs, which are very long and repetitive. The standard-time is fixed by using standard-data. However, if standard data is not available, then the standard time is fixed based on the experience of the work-study engineer. • The benefits or advantages of analytical estimating technique: • It helps in planning and scheduling the production activities. • It provides a basis for fixing labor rate for non-repetitive jobs. • It is economical because it uses standard data for fixing the standard time of each job. • One disadvantage or limitation of analytical estimating method: • When standard-data is not available for a job, then the standard time is fixed by the work-study engineer. He uses his experience and judgement for estimating the standard-time. This is not accurate compared to a scientific time study. • So, these are different techniques of work measurement.
  • 10. SUMMARY OF WORK MEASUREMENT METHODS AND ITS USES Techniques Applications Unit of measurement 1. Time study 2. Synthetic Data 3. Working sampling 4. MTM/PMTS 5. Analytical estimation Short cycle repetitive jobs Widely used for direct work. Short cycle repetitive jobs. Long cycle jobs/heterogeneous Manual Operations confined to one work centre Long-cycle non-repetitive job. Centiminute (0.01 min) Centiminute(0.01 min) Minutes TMU (1 TMU = 0.006 min) Minutes
  • 11. Method of measuring time with a Stop Watch There are two methods of timing using a stop watch. They are 1.Fly back or Snap back method. 2.Continuous or Cumulative method. Fly back method Here the stop watch is started at the beginning of the first element. At the end of the element the reading is noted in the study sheet (in the WR column). At the same time, the stop watch hand is snapped back to zero. This is done by pressing down the knob, immediately the knob is released. The hand starts moving from zero for timing the next element. In this way the timing for each element is found out. This is called observed time (O.T.) . Continuous method Here the stop watch is started at the beginning of the first element. The watch runs continuously throughout the study. At the end of each element the watch readings are recorded on the study sheet. The time for each element is calculated by successive subtraction. The final reading of the stop watch gives the total time. This is the observed time (O.T.).
  • 12. Steps in making Stop watch Time Study Stop watch time is the basic technique for determining accurate time standards. They are economical for repetitive type of work. Steps in taking the time study are: 1. Select the work to be studied. 2. Obtain and record all the information available about the job, the operator and the working conditions likely to affect the time study work. 3. Breakdown the operation into elements. An element is a instinct part of a specified activity composed of one or more fundamental motions selected for convenience of observation and timing. 4. Measure the time by means of a stop watch taken by the operator to perform each element of the operation. Either continuous method or snap back method of timing could be used. 5. At the same time, assess the operators effective speed of work relative to the observer’s concept of ‘normal’ speed. This is called performance rating. 6. Adjust the observed time by rating factor to obtain normal time for each element Normal Time = Observed time × Rating ÷ 100 7. Add the suitable allowances to compensate for fatigue, personal needs, contingencies. etc. to give standard time for each element. 8. Compute allowed time for the entire job by adding elemental standard times considering frequency of occurrence of each element. 9. Make a detailed job description describing the method for which the standard time is established. 10. Test and review standards wherever necessary.
  • 13. Definitions of Standard time Standard time is the time allowed to an operator to carry out the specified task under specified conditions and defined level of performance. The various allowances are added to the normal time as applicable to get the standard time as shown in Fig. 7.6. Standard time may be defined as the, amount of time required to complete a unit of work: (a) under existing working conditions, (b) using the specified method and machinery, (c) by an operator, able to the work in a proper manner, and (d) at a standard pace. Thus basic constituents of standard time are: 1. Elemental (observed time). 2. Performance rating to compensate for difference in pace of working.(PRF) 3. Relaxation allowance. 4. Interference and contingency allowance. 5. Policy allowance.
  • 14. Components of Standard Time • OT – Observed Time • PRF – Performance Rating Factor • NT – Normal Time • PA – Process Allowances • RPA – Rest and Personal Allowances (Relaxation Allowance) • SA – Special Allowances( Interference and Contingency Allowances) • PoA – Policy Allowances • PFD – Personal , Fatigue and Delay Allowances = (PA+RPA+SA) • The Standard Time is the product of three factors: • 1.Observed time: The time measured to complete the task. • 2.Performance rating factor: The pace the person is working at. 90% is working slower than normal, 110% is working faster than normal, 100% is normal. This factor is calculated by an experienced worker who is trained to observe and determine the rating. • 3.Personal, fatigue, and delay (PFD) allowance. • The standard time can then be calculated by using the formula: •
  • 15. Computation of Standard Time Illustrations • ILLUSTRATION 1: Assuming that the total observed time for an operation of • assembling an electric switch is 1.00 min. If the rating is 120%, find normal time. If an • allowance of 10% is allowed for the operation, determine the standard time. • SOLUTION: • Obsersved time (or) selected time = 1.00 min • Rating = 120% • Allowance = 10% • As we know that, normal time = Observed time × Rating % ÷ 100 = 1.00 ×120 ÷10=1.20min • Allowance @ 10% = 1.20 ×10 ÷ 100 = 0.12 min • ∴ Standard time = Normal time + Allowances • = 1.20 + 0.12 = 1.32 min. • ILLUSTRATION 2: An operator manufactures 50 jobs in 6 hours and 30 minutes. • If this time includes the time for setting his machine. Calculate the operator’s efficiency. • Standard time allowed for the job was: • Setting time = 35 min • Allowed time per piece = 8 min • SOLUTION: • As standard time = Set up time + Time per piece × No. of pieces produced • ∴ Standard time for manufacturing 50 jobs • = 35 + 8 × 50 • = 435 min • = 7 hours and 15 min. • Efficiency of operator =Standard time × 100 ÷ Actual time = 435× 100 ÷ 390 = 111.5%.
  • 16. Computation of Standard Time Illustrations ILLUSTRATION 3: Following datas were obtained by a work study. Man from a study conducted by hours. (i) Maintenance time (a) Get out and put away tools = 12.0 min/day (b) Cleaning of machine = 5.0 min/day (c) Oiling of machine = 5.0 min/day (d) Replenish coolant supply = 3.0 min/day (ii) Interruption (a) Interruption by foreman = 5.0 min/day (b) Interruption by porter etc. = 4.0 min/day (iii) Delay time due to power failure etc. = 6.0 min/day (iv) Personal time = 20.0 min/day Calculate total allowances, total available cycle time productive hours, considering a working day of 8 hours. SOLUTION: Total allowance (sometimes also known as station time) = Total maintenance time + Interruption time + Delay time + Personal time = (12.0 + 5 + 5 + 3.0) + (5.0 + 4.0) + 6.0 + 20.0 = 25.0 + 9.0 + 6.0 + 20.0 = 60.0 min per day ∴ Total available cycle time = Total work period – Total allowances = 480 – 60 = 420 min/day Productive hours =Time available Number of hours = 420 ÷60 = 7 hrs
  • 17. Computation of Standard Time Illustrations ILLUSTRATION 4: Find out the standard time using the following data: Average time for machine elements = 6 min Average time for manual elements = 4 min Performance rating = 110% Allowances = 10% SOLUTION: Normal time = Machinery time + Manual time × Rating = 6 + 4 × 1.1 = 6 + 4.4 = 10.4 min ∴ Standard time = Normal time + Allowances = 10.4 + 10.4 ×10 ÷ 100 = 10.4 (1 + 0.1) = 11.44 min.