PHASE ONE - 3 Steps to Receive Request for Proposal (RFP)
– Case Industrial Gases
1. Establish Program Team
2. Identify Baseline Costs
3. Manage RFP Process Successfully
Introduction
Every time you reduce industrial gas use, you reduce cost and
exposure to liabilities.
Beyond tangible expenditures, there are not so quantifiable benefits
to well-managed total cost ownership programs:
• Reduced accidents
• Maintaining a good reputation in the community
• Staying clear of environmental agencies’ spotlights etc.
Stakeholders are paying attention to the environmental, safety and
health impact of companies.
Savvy companies start optimizing safety, health, environmental and
total cost ownership of the entire industrial gas supply chain.
How to get started?
To execute this in practice you’ll need a proven, practical process.
Here is our proven 3-step process to receive RFP from would be
industrial gas service providers rapidly (see graphic next page)
3
Step 1 Establish Program Team
The first step is identifying a team leader charged with development
and leading the program.
The leader must have an intimate knowledge of the facility and
industrial gas management systems, be influential with upper
management and his/her peers; and have strong leadership and
communication skills. (see graphic)
Next the team leader will define team roles and responsibilities.
The team will develop goals and objective:
4
• Reduce total cost of industrial gas supply
• Improve production quality and efficiency
• Using know-how of industrial gas suppliers (logistics,
application, safety, health and environment, liability)
Step 2 Identify Baseline Costs
The team’s first task is to identify baseline costs of industrial gas
supply.
You’ll select a facility and start documenting industrial gas use.
The goal is to generate a list of industrial gas used in the last 12
months and their volumes.
Industrial Gas Consumption last 12 month (in tsd m3/t)
Gases 1 2 3 4 5 6 7 8 9 10 11 12
Oxygen 100 110 120 125 130 135 140 110 100 90 80 70
Acetylene 50 52 55 54 55 40 55 45 40 30 25 35
Ar-Mix 20 30 35 40 60 65 70 20 25 23 22 23
Next, your team will document industrial gas purchase costs.
The purchasing department will provide the unit prices of gases and
related services (cylinder rents, tank rents, manifold rents etc.)
The value of this documentation is that it provides a baseline for
measuring future price reductions when consolidating your
entire industrial gas purchase.
Step 3 Manage RFP Process Successfully
Next, you’ll present your findings to the top management champion
or steering group to determine portion of the industrial gas range
and supply chain should be transferred to an industrial gas
service provider.
5
Industrial Gas Supply Chain
Procure Inspection Inventory Use EHS
Now the team will develop a request for proposal (RFP).
The request for proposal is developed from your team’s original
objectives, baseline data, required scope of services and industrial
gases.
A TCO service provider (bidder) will need sufficient information
about your objectives, needs, and specified scope of services to
accurately estimate the industrial gas service costs.
See sample RFP next page
Deliver
Industrial Gases
The Provider will own all
industrial gas inventory.
It will become the property of
company x upon receipt of
industrial gases and services
requesr
Manage
Inventory
Regularly industrial gases (as
defined) will be delivered to
designated points within one
business day of the request
items (e.g. specialty gases) will
be delivered within 5 days
6
Elements of an RFP
We found the broad elements to be essential in clearly and
systematically describing your industrial gas service requirements:
• Cover Letter
• Introduction
• Scope of Services
• Scope of Industrial Gases
• Performance Metrics
• Compensation and Incentives
Develop a List of Suppliers
With the text of the RFP complete, your task will shift to determining
who should receive the RFP.
Begin your list by naming current suppliers with whom you have
had positive experiences.
These three criteria will help you narrow your list:
1. Experience providing industrial gas services that optimize
entire supply chain costs
2. Capability of assuming liability for stock-outs
3. Multi-regional presence if you want standardized services
across geographical areas and business segments.
Inform key facility personnel that an RFP will be released
Through your earlier communications, you have already informed
people affected by the new program of the team’s progress.
Once the RFPs are distributed, however, its public knowledge that
your company has intentions of significantly changing your
industrial gas management operations.
Therefore, it is important to inform a broader circle of people within
your company that they may be receiving inquiries about the RFP.
Facility personnel should direct all inquiries to the team-designated
point person.
7
Convene a Bidders Conference
One challenge in managing the RFP process is ensuring that all
bidders are provided the same information.
The agenda for the conference should be flexible and include:
• Introduction
• Industrial Gas Service Provider Program Goals & Purpose
• Company & Facility Overview
• Facility Tour
• RFP Discussion and Q&A
- General
- Scope Elements
- Compensation
- Concluding Remarks and Restatement of Schedule
Receive Proposals and Send Out Conformation of Receipt
As you receive proposals, you should carefully log what you have
received and scan the proposals for completeness.
For each RFP recipient, you should send a written communication
following the proposal submission deadline.
Use these simple letter formats:
Thank you for your proposal. We will contact you on __________
We have received your proposal and found it to be incomplete in
the following areas: ___________________
We have not received a proposal from you.
Please let us know if you plan to submit one or, if not, why you
chose not to submit one.
Once you have received all the proposals, you’re ready to begin the
difficult task of evaluating them.
The challenges at this stage are to evaluate each proposal on the
same basis and to determine if the response is credible.
8
Ask the critical question:
How likely is It that the bidder can support the response in
practice?
After analysing the costs and benefits of the proposals, you’ll start
selecting your primary industrial gas service provider.
Our next RAPIDKNOWHOW report will deal with how to select a
primary service provider.
Optimizing Total Cost Ownership Blueprint
You want to optimize your total cost of ownership of the entire
industrial gas supply chain & get out in front.
Here is our total cost ownership optimizing blueprint to optimize
your entire industrial gas supply chain costs.
July 2017 – Josef David www.rapidknowhow.com

Mais conteúdo relacionado

Semelhante a Deliver Strategic Partnership

RFP execution a practical guideline to improve selection process
RFP execution a practical guideline to improve selection processRFP execution a practical guideline to improve selection process
RFP execution a practical guideline to improve selection processMario Navarro
 
Conflict Mineral Compliance Toolkit For Executives
Conflict Mineral Compliance Toolkit For Executives Conflict Mineral Compliance Toolkit For Executives
Conflict Mineral Compliance Toolkit For Executives Matt Whitteker
 
ProTech training presentation
ProTech training presentationProTech training presentation
ProTech training presentationGiselle Duran
 
DirectionsThis exam consists of seven problems and is an open-boo.docx
DirectionsThis exam consists of seven problems and is an open-boo.docxDirectionsThis exam consists of seven problems and is an open-boo.docx
DirectionsThis exam consists of seven problems and is an open-boo.docxduketjoy27252
 
Measuring Sprint review
Measuring Sprint reviewMeasuring Sprint review
Measuring Sprint reviewRohit Midha
 
Om0013 advanced production and operations management
Om0013   advanced production and operations managementOm0013   advanced production and operations management
Om0013 advanced production and operations managementsmumbahelp
 
Denis Ford, International Leader EMEA at Cummins - Supplier Evaluation & Incl...
Denis Ford, International Leader EMEA at Cummins - Supplier Evaluation & Incl...Denis Ford, International Leader EMEA at Cummins - Supplier Evaluation & Incl...
Denis Ford, International Leader EMEA at Cummins - Supplier Evaluation & Incl...Global Business Events
 
Redspin HIPAA Security Risk Analysis RFP Template
Redspin HIPAA Security Risk Analysis RFP TemplateRedspin HIPAA Security Risk Analysis RFP Template
Redspin HIPAA Security Risk Analysis RFP TemplateRedspin, Inc.
 
(DRAFT)Assessment 2 Appendix B – Learning and de.docx
 (DRAFT)Assessment 2  Appendix B  – Learning and de.docx (DRAFT)Assessment 2  Appendix B  – Learning and de.docx
(DRAFT)Assessment 2 Appendix B – Learning and de.docxShiraPrater50
 
MRM-16 (2020).pptx
MRM-16 (2020).pptxMRM-16 (2020).pptx
MRM-16 (2020).pptxxego1
 
Leading global excellence in procurement and supply Corp.docx
Leading global excellence in procurement and supply Corp.docxLeading global excellence in procurement and supply Corp.docx
Leading global excellence in procurement and supply Corp.docxcroysierkathey
 
Leading global excellence in procurement and supply Corp.docx
Leading global excellence in procurement and supply Corp.docxLeading global excellence in procurement and supply Corp.docx
Leading global excellence in procurement and supply Corp.docxjeremylockett77
 
RFP1. Project Initiation Phase The purpose of the RFP document.docx
RFP1. Project Initiation Phase The purpose of the RFP document.docxRFP1. Project Initiation Phase The purpose of the RFP document.docx
RFP1. Project Initiation Phase The purpose of the RFP document.docxhealdkathaleen
 
Assignment Objectives for Unit 5Influence ProcessesYou have.docx
Assignment Objectives for Unit 5Influence ProcessesYou have.docxAssignment Objectives for Unit 5Influence ProcessesYou have.docx
Assignment Objectives for Unit 5Influence ProcessesYou have.docxhoward4little59962
 
CRM Consulting Services RFP
CRM Consulting Services RFPCRM Consulting Services RFP
CRM Consulting Services RFPDemand Metric
 
Supply Chain Management Plan(Project Name)Studen.docx
Supply Chain Management Plan(Project Name)Studen.docxSupply Chain Management Plan(Project Name)Studen.docx
Supply Chain Management Plan(Project Name)Studen.docxpicklesvalery
 
Supply Chain Management Plan(Project Name).docx
Supply Chain Management Plan(Project Name).docxSupply Chain Management Plan(Project Name).docx
Supply Chain Management Plan(Project Name).docxpicklesvalery
 
Sample sem 2 spring 2015
Sample sem 2 spring 2015Sample sem 2 spring 2015
Sample sem 2 spring 2015Tushar Ahuja
 

Semelhante a Deliver Strategic Partnership (20)

RFP execution a practical guideline to improve selection process
RFP execution a practical guideline to improve selection processRFP execution a practical guideline to improve selection process
RFP execution a practical guideline to improve selection process
 
Conflict Mineral Compliance Toolkit For Executives
Conflict Mineral Compliance Toolkit For Executives Conflict Mineral Compliance Toolkit For Executives
Conflict Mineral Compliance Toolkit For Executives
 
ProTech training presentation
ProTech training presentationProTech training presentation
ProTech training presentation
 
DirectionsThis exam consists of seven problems and is an open-boo.docx
DirectionsThis exam consists of seven problems and is an open-boo.docxDirectionsThis exam consists of seven problems and is an open-boo.docx
DirectionsThis exam consists of seven problems and is an open-boo.docx
 
Measuring Sprint review
Measuring Sprint reviewMeasuring Sprint review
Measuring Sprint review
 
Om0013 advanced production and operations management
Om0013   advanced production and operations managementOm0013   advanced production and operations management
Om0013 advanced production and operations management
 
Denis Ford, International Leader EMEA at Cummins - Supplier Evaluation & Incl...
Denis Ford, International Leader EMEA at Cummins - Supplier Evaluation & Incl...Denis Ford, International Leader EMEA at Cummins - Supplier Evaluation & Incl...
Denis Ford, International Leader EMEA at Cummins - Supplier Evaluation & Incl...
 
Redspin HIPAA Security Risk Analysis RFP Template
Redspin HIPAA Security Risk Analysis RFP TemplateRedspin HIPAA Security Risk Analysis RFP Template
Redspin HIPAA Security Risk Analysis RFP Template
 
(DRAFT)Assessment 2 Appendix B – Learning and de.docx
 (DRAFT)Assessment 2  Appendix B  – Learning and de.docx (DRAFT)Assessment 2  Appendix B  – Learning and de.docx
(DRAFT)Assessment 2 Appendix B – Learning and de.docx
 
BPR case study
BPR case study BPR case study
BPR case study
 
MRM-16 (2020).pptx
MRM-16 (2020).pptxMRM-16 (2020).pptx
MRM-16 (2020).pptx
 
Leading global excellence in procurement and supply Corp.docx
Leading global excellence in procurement and supply Corp.docxLeading global excellence in procurement and supply Corp.docx
Leading global excellence in procurement and supply Corp.docx
 
Leading global excellence in procurement and supply Corp.docx
Leading global excellence in procurement and supply Corp.docxLeading global excellence in procurement and supply Corp.docx
Leading global excellence in procurement and supply Corp.docx
 
RFP1. Project Initiation Phase The purpose of the RFP document.docx
RFP1. Project Initiation Phase The purpose of the RFP document.docxRFP1. Project Initiation Phase The purpose of the RFP document.docx
RFP1. Project Initiation Phase The purpose of the RFP document.docx
 
Assignment Objectives for Unit 5Influence ProcessesYou have.docx
Assignment Objectives for Unit 5Influence ProcessesYou have.docxAssignment Objectives for Unit 5Influence ProcessesYou have.docx
Assignment Objectives for Unit 5Influence ProcessesYou have.docx
 
ISC Brochure
ISC BrochureISC Brochure
ISC Brochure
 
CRM Consulting Services RFP
CRM Consulting Services RFPCRM Consulting Services RFP
CRM Consulting Services RFP
 
Supply Chain Management Plan(Project Name)Studen.docx
Supply Chain Management Plan(Project Name)Studen.docxSupply Chain Management Plan(Project Name)Studen.docx
Supply Chain Management Plan(Project Name)Studen.docx
 
Supply Chain Management Plan(Project Name).docx
Supply Chain Management Plan(Project Name).docxSupply Chain Management Plan(Project Name).docx
Supply Chain Management Plan(Project Name).docx
 
Sample sem 2 spring 2015
Sample sem 2 spring 2015Sample sem 2 spring 2015
Sample sem 2 spring 2015
 

Mais de Josef David

How to Turn Your Business Goal into Cash Flow Rapidly
How to Turn Your Business Goal into Cash Flow RapidlyHow to Turn Your Business Goal into Cash Flow Rapidly
How to Turn Your Business Goal into Cash Flow RapidlyJosef David
 
The One Hour Digital Starter
The One Hour Digital StarterThe One Hour Digital Starter
The One Hour Digital StarterJosef David
 
The One Hour Digital Starter
The One Hour Digital StarterThe One Hour Digital Starter
The One Hour Digital StarterJosef David
 
Deliver Sales Objectives in ONE Hour
Deliver Sales Objectives in ONE HourDeliver Sales Objectives in ONE Hour
Deliver Sales Objectives in ONE HourJosef David
 
Deliver Sales Capacity in ONE Hour
Deliver Sales Capacity in ONE HourDeliver Sales Capacity in ONE Hour
Deliver Sales Capacity in ONE HourJosef David
 
Become Interim Manager in One Week
Become Interim Manager in One WeekBecome Interim Manager in One Week
Become Interim Manager in One WeekJosef David
 
Deliver Subscribers Rapidly
Deliver Subscribers RapidlyDeliver Subscribers Rapidly
Deliver Subscribers RapidlyJosef David
 
Deliver Sales People Actions
Deliver Sales People ActionsDeliver Sales People Actions
Deliver Sales People ActionsJosef David
 
Linde - Praxair Merger : The Devil is in the Detail
Linde - Praxair Merger : The Devil is in the DetailLinde - Praxair Merger : The Devil is in the Detail
Linde - Praxair Merger : The Devil is in the DetailJosef David
 

Mais de Josef David (9)

How to Turn Your Business Goal into Cash Flow Rapidly
How to Turn Your Business Goal into Cash Flow RapidlyHow to Turn Your Business Goal into Cash Flow Rapidly
How to Turn Your Business Goal into Cash Flow Rapidly
 
The One Hour Digital Starter
The One Hour Digital StarterThe One Hour Digital Starter
The One Hour Digital Starter
 
The One Hour Digital Starter
The One Hour Digital StarterThe One Hour Digital Starter
The One Hour Digital Starter
 
Deliver Sales Objectives in ONE Hour
Deliver Sales Objectives in ONE HourDeliver Sales Objectives in ONE Hour
Deliver Sales Objectives in ONE Hour
 
Deliver Sales Capacity in ONE Hour
Deliver Sales Capacity in ONE HourDeliver Sales Capacity in ONE Hour
Deliver Sales Capacity in ONE Hour
 
Become Interim Manager in One Week
Become Interim Manager in One WeekBecome Interim Manager in One Week
Become Interim Manager in One Week
 
Deliver Subscribers Rapidly
Deliver Subscribers RapidlyDeliver Subscribers Rapidly
Deliver Subscribers Rapidly
 
Deliver Sales People Actions
Deliver Sales People ActionsDeliver Sales People Actions
Deliver Sales People Actions
 
Linde - Praxair Merger : The Devil is in the Detail
Linde - Praxair Merger : The Devil is in the DetailLinde - Praxair Merger : The Devil is in the Detail
Linde - Praxair Merger : The Devil is in the Detail
 

Último

ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSMae Pangan
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Dust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEDust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEaurabinda banchhor
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataBabyAnnMotar
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...JojoEDelaCruz
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 

Último (20)

ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
Dust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEDust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSE
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped data
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 

Deliver Strategic Partnership

  • 1.
  • 2. 2 PHASE ONE - 3 Steps to Receive Request for Proposal (RFP) – Case Industrial Gases 1. Establish Program Team 2. Identify Baseline Costs 3. Manage RFP Process Successfully Introduction Every time you reduce industrial gas use, you reduce cost and exposure to liabilities. Beyond tangible expenditures, there are not so quantifiable benefits to well-managed total cost ownership programs: • Reduced accidents • Maintaining a good reputation in the community • Staying clear of environmental agencies’ spotlights etc. Stakeholders are paying attention to the environmental, safety and health impact of companies. Savvy companies start optimizing safety, health, environmental and total cost ownership of the entire industrial gas supply chain. How to get started? To execute this in practice you’ll need a proven, practical process. Here is our proven 3-step process to receive RFP from would be industrial gas service providers rapidly (see graphic next page)
  • 3. 3 Step 1 Establish Program Team The first step is identifying a team leader charged with development and leading the program. The leader must have an intimate knowledge of the facility and industrial gas management systems, be influential with upper management and his/her peers; and have strong leadership and communication skills. (see graphic) Next the team leader will define team roles and responsibilities. The team will develop goals and objective:
  • 4. 4 • Reduce total cost of industrial gas supply • Improve production quality and efficiency • Using know-how of industrial gas suppliers (logistics, application, safety, health and environment, liability) Step 2 Identify Baseline Costs The team’s first task is to identify baseline costs of industrial gas supply. You’ll select a facility and start documenting industrial gas use. The goal is to generate a list of industrial gas used in the last 12 months and their volumes. Industrial Gas Consumption last 12 month (in tsd m3/t) Gases 1 2 3 4 5 6 7 8 9 10 11 12 Oxygen 100 110 120 125 130 135 140 110 100 90 80 70 Acetylene 50 52 55 54 55 40 55 45 40 30 25 35 Ar-Mix 20 30 35 40 60 65 70 20 25 23 22 23 Next, your team will document industrial gas purchase costs. The purchasing department will provide the unit prices of gases and related services (cylinder rents, tank rents, manifold rents etc.) The value of this documentation is that it provides a baseline for measuring future price reductions when consolidating your entire industrial gas purchase. Step 3 Manage RFP Process Successfully Next, you’ll present your findings to the top management champion or steering group to determine portion of the industrial gas range and supply chain should be transferred to an industrial gas service provider.
  • 5. 5 Industrial Gas Supply Chain Procure Inspection Inventory Use EHS Now the team will develop a request for proposal (RFP). The request for proposal is developed from your team’s original objectives, baseline data, required scope of services and industrial gases. A TCO service provider (bidder) will need sufficient information about your objectives, needs, and specified scope of services to accurately estimate the industrial gas service costs. See sample RFP next page Deliver Industrial Gases The Provider will own all industrial gas inventory. It will become the property of company x upon receipt of industrial gases and services requesr Manage Inventory Regularly industrial gases (as defined) will be delivered to designated points within one business day of the request items (e.g. specialty gases) will be delivered within 5 days
  • 6. 6 Elements of an RFP We found the broad elements to be essential in clearly and systematically describing your industrial gas service requirements: • Cover Letter • Introduction • Scope of Services • Scope of Industrial Gases • Performance Metrics • Compensation and Incentives Develop a List of Suppliers With the text of the RFP complete, your task will shift to determining who should receive the RFP. Begin your list by naming current suppliers with whom you have had positive experiences. These three criteria will help you narrow your list: 1. Experience providing industrial gas services that optimize entire supply chain costs 2. Capability of assuming liability for stock-outs 3. Multi-regional presence if you want standardized services across geographical areas and business segments. Inform key facility personnel that an RFP will be released Through your earlier communications, you have already informed people affected by the new program of the team’s progress. Once the RFPs are distributed, however, its public knowledge that your company has intentions of significantly changing your industrial gas management operations. Therefore, it is important to inform a broader circle of people within your company that they may be receiving inquiries about the RFP. Facility personnel should direct all inquiries to the team-designated point person.
  • 7. 7 Convene a Bidders Conference One challenge in managing the RFP process is ensuring that all bidders are provided the same information. The agenda for the conference should be flexible and include: • Introduction • Industrial Gas Service Provider Program Goals & Purpose • Company & Facility Overview • Facility Tour • RFP Discussion and Q&A - General - Scope Elements - Compensation - Concluding Remarks and Restatement of Schedule Receive Proposals and Send Out Conformation of Receipt As you receive proposals, you should carefully log what you have received and scan the proposals for completeness. For each RFP recipient, you should send a written communication following the proposal submission deadline. Use these simple letter formats: Thank you for your proposal. We will contact you on __________ We have received your proposal and found it to be incomplete in the following areas: ___________________ We have not received a proposal from you. Please let us know if you plan to submit one or, if not, why you chose not to submit one. Once you have received all the proposals, you’re ready to begin the difficult task of evaluating them. The challenges at this stage are to evaluate each proposal on the same basis and to determine if the response is credible.
  • 8. 8 Ask the critical question: How likely is It that the bidder can support the response in practice? After analysing the costs and benefits of the proposals, you’ll start selecting your primary industrial gas service provider. Our next RAPIDKNOWHOW report will deal with how to select a primary service provider. Optimizing Total Cost Ownership Blueprint You want to optimize your total cost of ownership of the entire industrial gas supply chain & get out in front. Here is our total cost ownership optimizing blueprint to optimize your entire industrial gas supply chain costs. July 2017 – Josef David www.rapidknowhow.com