Mdot ea project_costs_p1031.
89
8.0 PROJECT COSTS
The following are the US‐23 Improvements preliminary engineering and construction costs
projected in fiscal year 2016 funds:
Active Traffic Management (ATM), M‐14/US‐23 to south of M‐36: .......................... $29,540,000
Intelligent Transportation System (ITS), M‐14/US‐23 to south of M‐36: ................... $14,000,000
Bridge replacements at 6 Mile, 8 Mile and N. Territorial Roads: ............................... $14,017,000
Bridge replacements of US‐23 bridge over the railroad: ................................................ $4,639,047
Widening of US‐23 bridge over Barker Road: .................................................................... $639,483
Northbound and southbound on‐ramp extensions: ...................................................... $6,305,000
US‐23 CPM, M‐14/US‐23 to Silver Lake Road: ................................................................ $6,440,000
CPM on the Joy Road and Warren Road bridges: ............................................................. $602,000