- Utility solar farm market drivers
- Minimizing solar farm capital costs
- Crystalline silicon supersized module manufacturing
- Solar farm systems cost reduction through the use of supersized modules
- Minimizing utility solar farm LCOE by on-site deployment of supersized modules
Roger Little, Chairman & CEO, SPIRE
11. Super Sized Module
Overview 1005 W
Module Size: 5.4 ft x 12.6 ft
Module weight: 331 lbs
Pmax: 1005 W DC module
240 cells
230 W
η cell: 17.2%
η module : 16.1%
1 kW AC inverter
14. Super Sized KW Module Installation Comparison
BOS Component 1005 W 4 x 230 W
Grounding Points 1 4
Wire Connections 1 4
Module to Rail Fasteners N/A 16
Materials & Transportation $5.28 $100.84
Assembly Labor 0.19 hrs 1.25 hr
Assembly Cost $3.79 $25.46
Micro‐inverter $320 $624
Total Cost $329.07 $750.29
15. Systems Cost ($/watt) - 2012
Module BOS
$3.50
Total $3.07
$3.00
Total $2.57
$2.50
$1.62
$2.00 $1.13
$/W
$1.50
$1.00
$1.44 $1.45
$0.50
$-
1005W module 4 x 230W
16. Levelized Cost of Energy
Estimated LCoE LCoE After FTC
$0.25
$0.20 $0.194
$0.145 $0.135
$0.15
LCoE $0.102
($/kWh) $0.10
$0.05
$0.00
1005 W Module: 4 x 230 W:
$2.57/W $3.07/W
17. Achieving 1GW Solar Farm
Investment in Facility: $15M
Annual Facility Output: 40MW (cumulative over 25 years: 1 GW Project Capacity)
PPA: $0.10/kWh
SREC: $0.08/kWh
System Install Cost: $1.80/W after 30% FTC
Solar Intensity: 1.573kWh/Wp
Degradation: 0.5% / year
O&M Costs: 0.5% Install Cost / Year
18. Cash Flow over Life of Project
$2,000
1 GW Solar Farm Achieved
$1,500
$1,000
Cumulative Free
Cash Flow ($M)
$500
$0
0 5 10 15 20 25 30
‐$500
Years from Investmemt
19. Summary
• Utility Systems heading toward 1 GW.
• Specialty Modules integrated with downstream needs
for competitive advantage.
• Solar Farm Onsite Manufacturing of supersized
modules for lowest LCOE.
22. Super Sized PV Module Onsite Factory
• Utility market • Solar “farms” Supersized • Transportation
expanding (250MW – 1GW) 1 kW modules for considerations
will favor onsite
• 20 GW by 2020 • Due to RPS • lower materials manufacturing
• lower BOS
expenses
System Cost Reductions, Local Manufacturing, U.S. Job Creation
23. Module Line Process Flow
Feed, Cut &
Load Glass on Wash, Rinse,
Glass In Place EVA on
Conveyor Dry Glass
Glass
Test & Sort Fabricate Cell Inspect Cell Align Strings & Place Strings
Cells In
Cells Strings Strings Trim End Tabs on EVA/Glass
QC QC
Dark I-V & Feed, Cut &
Attach Buses Visual Place EVA &
Laminate Trim Edges
& Diodes Inspection Back Sheet on
Strings
QC
Performance High Voltage
Attach Frame Install J-boxes Modules Out
(I-V) Test Isolation Test
QC QC
24. Spire Across the Value Chain
x‐Si & CPV
PV PV Systems
PV Material
Research Production EPC, Design
Turnkey Lines Supplies and Integration
and Equipment
Development
25. Minimizing solar farm capital costs ($/W)
Component • Reduce Rack Requirements
Cost Reduction • Reduce Electrical Connections
Labor Cost • Minimize in field installation labor
• Plug‐and‐Play electrical installation
Reduction • Specialized on‐site installation
Improve System • Improve cell efficiency
Efficiency • Increase module level AC efficiency