RaviRavi SundaramSundaram & Sanjay Gupta& Sanjay Gupta
Cengrs Geotechnica Pvt. Ltd.
Noida
A-100 Sector 63, Noida
Ph: (O): 0120-42067111 (M): 9810538095
Ground Improvement Process
Modification of soil properties to achieveModification of soil properties to achieve
improvementimprovement
Densification of loose soils
Mitigation of liquefaction potential
Strengthen soft clays
Increase safe bearing capacity
Reduce foundation settlement
Ensure that foundation behavior is
within the acceptable limits
Success of Ground Improvement Process
Identify target soil properties to beIdentify target soil properties to be
achieved after improvement, whatachieved after improvement, what
minimum value is acceptableminimum value is acceptable
InIn--situ testing is essential to ensuresitu testing is essential to ensure
that the desired improvement isthat the desired improvement is
achievedachieved
The soil characteristics afterThe soil characteristics after
improvement should be comparedimprovement should be compared
with the target soil propertieswith the target soil properties
This presentation covers
Two case studiesTwo case studies
Ground improvement for a Gas Based Power Plant inGround improvement for a Gas Based Power Plant in
North Delhi byNorth Delhi by VibroVibro--ReplacementReplacement
In-situ tests:
dynamic cone penetration tests, and
Load test on the stone columns
Ground Improvement for a university at GreaterGround Improvement for a university at Greater
NoidaNoida by Dynamic Compactionby Dynamic Compaction
In-situ tests:
Boreholes with SPT
Static Cone Penetration tests
VibroVibro--Replacement for a PowerReplacement for a Power
Plant in DelhiPlant in Delhi
Case Study-1: Vibro-Compaction
108 MW Gas Based Power Plant in north
Delhi
Facilities planned include STG, GTG, Steam
Turbine, Boiler, Chimney, Cooling Water
System, Switchyard, etc.
Alluvial Plains of River Yamuna
Earthquake Zone IV as per IS 1893-2002
Loose sands to 8 m depth prone to
liquefaction during major earthquakes
Site Layout Plan
15 boreholes – 30 m
depth
6 static cone
penetration tests(SCPT)
Spectral Analysis of
Surface Waves (SASW)
tests along 8 lines
3 cross-hole seismic
tests (CHST)
Typical Borehole Data
Loose surficial fill
to 0.5-2 m depth
Natural deposits
primarily fine
sand / silty sand
with intermediate
minor layers of
sandy silt
Groundwater at
5.2 – 6.4 m
depth
Static Cone Penetration Test
SASW and CHST
Design Profile
Liquefaction Assessment
Seed & Idris (1971) method – NEERI
Summary Report
Project area in Earthquake Zone IV
Maximum Credible Earthquake
Design Earthquake Magnitude: 6.7 on
Richter scale
Peak Ground Acceleration: 0.24g
Cyclic Resistance Ratio (CRR) determined
from SPT & SCPT
Liquefaction analysis results
A critical factor of safety of 1.2 was considered for the
analysis
Soils to a depth of 8.0 m are be susceptible to
liquefaction during earthquakes
Foundation System
Open foundations bearing on natural soils -
Not feasible
Critical or heavily loaded plant facilities –
STG, GTG, Steam Turbine, Boiler, Chimney
600600 mm diameter bored castmm diameter bored cast--inin--situsitu
piles extending well below thepiles extending well below the
liquefiable zoneliquefiable zone
Foundation System
Medium loaded plant facilities –
Cooling Tower,Cooling Tower,
ClariflocculatorsClariflocculators & other facilities of the& other facilities of the
Water Treatment system,Water Treatment system,
SwitchyardSwitchyard
Ground improvement doneGround improvement done
byby vibrovibro--replacement methodreplacement method
Vibro-Replacement Method
Dry Vibro Stone
columns
installed by bottom-
feed method
500 mm dia extending
to 10 m depth
Centre-to-centre
spacing: 1.5 m
Design Net Bearing
Pressure: 160 kPa
In-Situ Tests
Dynamic Cone Penetration Tests
(DCPT)
Evaluates extent of improvement
achieved with depth
Load Test on Stone Columns
Evaluates load-settlement behavior of
improved ground
Dynamic Cone Penetration Tests
After CompactionAfter Compaction
Blow Counts exceed 15
below 2 m depth
Substantial improvement
in penetration resistance
Medium dense to 4-5 m
depth
Dense below 5 m depth
Improved soils not likely
to liquefy during
earthquake
Load Test on Vibro-Columns
Plate size 1.51.5 m xm x
1.51.5 mm, square,
30 mm thick,
Loading intensity:
1st cycle – 240 kPa
2nd cycle – 500 kPa
Safe bearing pressure
> 160 kPa
Loading Intensity vs. Settlement
Liquefaction Mitigation
Untreated ground (before compaction) is
susceptible to liquefaction to 8 m depth
After compaction, Factor of Safety against
liquefaction > 1.2
Susceptibility to liquefactionSusceptibility to liquefaction
successfully mitigatedsuccessfully mitigated
Dynamic Compaction for aDynamic Compaction for a
University in GreaterUniversity in Greater NoidaNoida
Case StudyCase Study--2: Dynamic Compaction2: Dynamic Compaction
A major university
at Greater Noida,
UP
Covers an area of
about 500 acres
84,000 m2 of
constructed area,
30% green cover
Site in the flood
plains of the River
Yamuna, about 2
km from river
Vicinity Map
25
Site Conditions
Loose alluvium - fine sand (Yamuna
Sand) met in project area
Site is in Earthquake Zone IV - IS
1893: 2002
Groundwater met at shallow depth
Every structure individually assessed
to evaluate liquefaction potential
Sand to 8-12 m depth is prone to
liquefaction during major earthquakes
Geotechnical Investigations
Over 600 boreholes and 150 SCPT’s
done all over the university area
Each structure assessed to evaluate
liquefaction potential
THIS PRESENTATIONTHIS PRESENTATION covers
geotechnical investigation before & after
improvement for
Boys Hostel 8.1KBoys Hostel 8.1K
Site Layout Plan – Boys Hostel No. 8.1KBoys Hostel No. 8.1K
Before
Improvement
4 BH – 15 m
1 SCPT – 15 m
After
Improvement
4 BH – 15 m
1 SCPT – 15 m
Typical Borehole Data
The soils at the
site classify
primarily as sandy
silt / clayey silt to
1.5~2 m depth,
underlain by fine
sand to 15 m depth
Fines content:3-
10 %
Groundwater at
3.5-4 m depth, may
rise to GL
Liquefaction Assessment
Seed & Idris (1971) method – NEERI
Summary Report
Project area in Earthquake Zone IV
Design Earthquake Magnitude: 6.7 on Richter
scale
Peak Ground Acceleration: 0.24g
Cyclic Resistance Ratio (CRR) determined
from SPT & SCPT
Fine sands to 8 m depth at Boy’s Hostel is
susceptible to earthquake during the design
earthquake
Foundation System
Open foundations bearing on natural
soils - Not feasible
Pile foundations - high foundation
cost and time of construction – Not
preferred by client
Solution - Ground improvementGround improvement
by dynamic compactionby dynamic compaction
Dynamic Compaction
Dropping a heavy weight
can compact loose sands
to substantial depth
Done on a grid pattern
Next cycle: Weight
dropped at intermediate
points
Effective for sands only
with little fines
Conceptual Illustration
Crane & Pounder
Conventional Crane
– TLC 955A
11.65 T pounder
falling from height
of 14 m
Energy: 1600 kN-m
Corresponding
depth of
improvement: 9 m
Compaction – 2 phases
1 week time lag in
between – to allow
pore pressures to
dissipate
1st Phase
4 x 4 m grids
2nd Phase staggered 2 m
No. of drops: 10 at each
grid point
Depth of the craters
formed: 1.0-1.5 m approx
Ironing Phase
Craters filled with GSB
Grade II material
Hammer weight: 11.65 T
Height of fall: 6 m
No. of drops: 5
Energy: 2114 kN-m
Area graded with 10
passes of 10 T vibratory
roller
In-Situ Tests
Standard Penetration Tests (SPT) in
boreholes
Static Cone Penetration Test (SCPT)
Compare SPT and qCompare SPT and qcc valuesvalues
before and after compactionbefore and after compaction
Assess Liquefaction PotentialAssess Liquefaction Potential
after densificationafter densification
SPT & SCPT before & after improvement
Extent of Improvement Achieved
After compaction, N>16After compaction, N>16--20, qc > 520, qc > 5
MPaMPa
Peak improvement: between 1 and 5 m
depth
Improvement below 10-11 m depth is
marginal
Liquefaction susceptibility analysis
before and after compaction
Before CompactionBefore Compaction
-- Liquefaction to 12 m depthLiquefaction to 12 m depth
After CompactionAfter Compaction
-- No LiquefactionNo Liquefaction
Susceptibility to liquefaction successfully mitigatedSusceptibility to liquefaction successfully mitigated
Liquefaction Mitigation
Untreated ground (before compaction) is
susceptible to liquefaction to 13 m depth
After compaction, Factor of Safety againstFactor of Safety against
liquefaction > 1liquefaction > 1
Foundation for the Boys Hostel building
8.1K: Isolated column footings withIsolated column footings with
interinter--connecting plinth beamsconnecting plinth beams
Net allowable bearing pressure:Net allowable bearing pressure:
175175 kPakPa
Concluding Remarks
Conducting in-situ tests is essential to verify
effectiveness of ground improvement
For reliable and effective improvement,
sufficient tests should be performed before
and after improvement
The testing should ensure that the target soil
properties are achieved
Mitigating liquefaction
Densification of loose soils
Desired Bearing Capacity
Thank You!

Mais conteúdo relacionado

Mais procurados

Stress distribution of the soil
Stress distribution of the soilStress distribution of the soil
Stress distribution of the soilDharmik Navadiya
 
Geotechnical Engineering-I [Lec #29: Soil Exploration - II]
Geotechnical Engineering-I [Lec #29: Soil Exploration - II]Geotechnical Engineering-I [Lec #29: Soil Exploration - II]
Geotechnical Engineering-I [Lec #29: Soil Exploration - II]Muhammad Irfan
 
Geo Technical Engineering (Soil compaction)
Geo Technical Engineering (Soil compaction)Geo Technical Engineering (Soil compaction)
Geo Technical Engineering (Soil compaction)Latif Hyder Wadho
 
Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma ABHISHEK SHARMA
 
Soil Bearing Capacity and Case study of Black Cotton Soil
Soil Bearing Capacity and Case study of Black Cotton SoilSoil Bearing Capacity and Case study of Black Cotton Soil
Soil Bearing Capacity and Case study of Black Cotton SoilPraveen S.K
 
Swelling correlations
Swelling correlationsSwelling correlations
Swelling correlationsAli Rehman
 
Effect of expansive soils on buildings and its prevention
Effect of expansive soils on buildings and its preventionEffect of expansive soils on buildings and its prevention
Effect of expansive soils on buildings and its preventionSailish Cephas
 
Ground imrovement introduction
Ground imrovement   introductionGround imrovement   introduction
Ground imrovement introductionSanjay Thakare
 
Ge i-module4-rajesh sir
Ge i-module4-rajesh sirGe i-module4-rajesh sir
Ge i-module4-rajesh sirSHAMJITH KM
 
SOIL EXPLORATION
SOIL EXPLORATIONSOIL EXPLORATION
SOIL EXPLORATIONserinsara
 
Foundation and its types and detailed explanation
Foundation and its types and detailed explanationFoundation and its types and detailed explanation
Foundation and its types and detailed explanationTarun kumar
 
Lateral earth pressure
Lateral earth pressureLateral earth pressure
Lateral earth pressureAlind Pasha
 
Bearing capacity of Soil
Bearing capacity of SoilBearing capacity of Soil
Bearing capacity of SoilPirpasha Ujede
 
Chapter 1.0 soil exploration
Chapter 1.0   soil explorationChapter 1.0   soil exploration
Chapter 1.0 soil explorationDYPCET
 

Mais procurados (20)

Stress distribution of the soil
Stress distribution of the soilStress distribution of the soil
Stress distribution of the soil
 
Geotechnical Engineering-I [Lec #29: Soil Exploration - II]
Geotechnical Engineering-I [Lec #29: Soil Exploration - II]Geotechnical Engineering-I [Lec #29: Soil Exploration - II]
Geotechnical Engineering-I [Lec #29: Soil Exploration - II]
 
Geo Technical Engineering (Soil compaction)
Geo Technical Engineering (Soil compaction)Geo Technical Engineering (Soil compaction)
Geo Technical Engineering (Soil compaction)
 
Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma Bearing capacity of shallow foundations by abhishek sharma
Bearing capacity of shallow foundations by abhishek sharma
 
Bearing failure
Bearing failureBearing failure
Bearing failure
 
Liquefaction final
Liquefaction finalLiquefaction final
Liquefaction final
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
ground improvement
ground improvementground improvement
ground improvement
 
Soil Bearing Capacity and Case study of Black Cotton Soil
Soil Bearing Capacity and Case study of Black Cotton SoilSoil Bearing Capacity and Case study of Black Cotton Soil
Soil Bearing Capacity and Case study of Black Cotton Soil
 
Swelling correlations
Swelling correlationsSwelling correlations
Swelling correlations
 
Effect of expansive soils on buildings and its prevention
Effect of expansive soils on buildings and its preventionEffect of expansive soils on buildings and its prevention
Effect of expansive soils on buildings and its prevention
 
Ground imrovement introduction
Ground imrovement   introductionGround imrovement   introduction
Ground imrovement introduction
 
Ge i-module4-rajesh sir
Ge i-module4-rajesh sirGe i-module4-rajesh sir
Ge i-module4-rajesh sir
 
Lecture 3 foundation settlement
Lecture 3 foundation settlementLecture 3 foundation settlement
Lecture 3 foundation settlement
 
SOIL EXPLORATION
SOIL EXPLORATIONSOIL EXPLORATION
SOIL EXPLORATION
 
GROUND IMPROVEMENT TECHNIQUES
GROUND IMPROVEMENT TECHNIQUES GROUND IMPROVEMENT TECHNIQUES
GROUND IMPROVEMENT TECHNIQUES
 
Foundation and its types and detailed explanation
Foundation and its types and detailed explanationFoundation and its types and detailed explanation
Foundation and its types and detailed explanation
 
Lateral earth pressure
Lateral earth pressureLateral earth pressure
Lateral earth pressure
 
Bearing capacity of Soil
Bearing capacity of SoilBearing capacity of Soil
Bearing capacity of Soil
 
Chapter 1.0 soil exploration
Chapter 1.0   soil explorationChapter 1.0   soil exploration
Chapter 1.0 soil exploration
 

Semelhante a Ground Improvement Case Studies

Dynamic compaction to mitigate liquefaction potential
Dynamic compaction to mitigate liquefaction potentialDynamic compaction to mitigate liquefaction potential
Dynamic compaction to mitigate liquefaction potentialInfocengrs63
 
Building a mega-power plant on liquefiable sands
Building a mega-power plant on liquefiable sandsBuilding a mega-power plant on liquefiable sands
Building a mega-power plant on liquefiable sandsInfocengrs63
 
Liquefaction risk mitigation for a power plant in the indo gengatic alluvium
Liquefaction risk mitigation for a power plant in the indo gengatic alluviumLiquefaction risk mitigation for a power plant in the indo gengatic alluvium
Liquefaction risk mitigation for a power plant in the indo gengatic alluviumInfocengrs63
 
TL_Cons_present_Kishanpur_20[1].08.09.ppt
TL_Cons_present_Kishanpur_20[1].08.09.pptTL_Cons_present_Kishanpur_20[1].08.09.ppt
TL_Cons_present_Kishanpur_20[1].08.09.pptAshokKumar561399
 
HORIZONTAL ANCHOR IN REINFORCED EARTH.pptx
HORIZONTAL ANCHOR IN REINFORCED EARTH.pptxHORIZONTAL ANCHOR IN REINFORCED EARTH.pptx
HORIZONTAL ANCHOR IN REINFORCED EARTH.pptxSamirsinh Parmar
 
Miraculous Solution to Asia Pacific Soft Ground Improvement
Miraculous Solution to Asia Pacific Soft Ground ImprovementMiraculous Solution to Asia Pacific Soft Ground Improvement
Miraculous Solution to Asia Pacific Soft Ground ImprovementADFIAP
 
Isee paper - Uttam Blastech
Isee paper - Uttam Blastech Isee paper - Uttam Blastech
Isee paper - Uttam Blastech Uttam Blastech
 
Applicability, quality control and quality assurance in
Applicability, quality control and quality assurance inApplicability, quality control and quality assurance in
Applicability, quality control and quality assurance inKulbir Singh gill
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
 
In situ testing – current trends in geotechnical investigations
In situ testing – current trends in geotechnical investigationsIn situ testing – current trends in geotechnical investigations
In situ testing – current trends in geotechnical investigationsInfocengrs63
 
ING IABSE December 2015 Paper 8
ING IABSE December 2015 Paper 8ING IABSE December 2015 Paper 8
ING IABSE December 2015 Paper 8Anusha Nandavaram
 
Ground Improvement solutions to mitigate liquefaction
Ground Improvement solutions to mitigate liquefactionGround Improvement solutions to mitigate liquefaction
Ground Improvement solutions to mitigate liquefactionSumanthBhat11
 
1.0 Flyover 0+620.pdf
1.0 Flyover 0+620.pdf1.0 Flyover 0+620.pdf
1.0 Flyover 0+620.pdfssuser471126
 
Practical Application of GI Technique Rev 0 HAKI pdf
Practical Application of GI Technique Rev 0 HAKI pdfPractical Application of GI Technique Rev 0 HAKI pdf
Practical Application of GI Technique Rev 0 HAKI pdfKeat Wei, Gavin Chung
 
George Dounis_PID_509
George Dounis_PID_509George Dounis_PID_509
George Dounis_PID_509George Dounis
 
Stull_31_ICGCM_Ultra-CloseMultSeam_7
Stull_31_ICGCM_Ultra-CloseMultSeam_7Stull_31_ICGCM_Ultra-CloseMultSeam_7
Stull_31_ICGCM_Ultra-CloseMultSeam_7Luke Stull
 
Amit pandit presentaion gautambuddha university
Amit pandit presentaion gautambuddha universityAmit pandit presentaion gautambuddha university
Amit pandit presentaion gautambuddha universityAman Jain
 
Coal Mining Technlogy Brief_Low Coal Seam_HOT Mining
Coal Mining Technlogy Brief_Low Coal Seam_HOT MiningCoal Mining Technlogy Brief_Low Coal Seam_HOT Mining
Coal Mining Technlogy Brief_Low Coal Seam_HOT MiningSerena Fu
 

Semelhante a Ground Improvement Case Studies (20)

Dynamic compaction to mitigate liquefaction potential
Dynamic compaction to mitigate liquefaction potentialDynamic compaction to mitigate liquefaction potential
Dynamic compaction to mitigate liquefaction potential
 
Building a mega-power plant on liquefiable sands
Building a mega-power plant on liquefiable sandsBuilding a mega-power plant on liquefiable sands
Building a mega-power plant on liquefiable sands
 
Geotechnical Investigation
Geotechnical InvestigationGeotechnical Investigation
Geotechnical Investigation
 
Liquefaction risk mitigation for a power plant in the indo gengatic alluvium
Liquefaction risk mitigation for a power plant in the indo gengatic alluviumLiquefaction risk mitigation for a power plant in the indo gengatic alluvium
Liquefaction risk mitigation for a power plant in the indo gengatic alluvium
 
TL_Cons_present_Kishanpur_20[1].08.09.ppt
TL_Cons_present_Kishanpur_20[1].08.09.pptTL_Cons_present_Kishanpur_20[1].08.09.ppt
TL_Cons_present_Kishanpur_20[1].08.09.ppt
 
HORIZONTAL ANCHOR IN REINFORCED EARTH.pptx
HORIZONTAL ANCHOR IN REINFORCED EARTH.pptxHORIZONTAL ANCHOR IN REINFORCED EARTH.pptx
HORIZONTAL ANCHOR IN REINFORCED EARTH.pptx
 
Miraculous Solution to Asia Pacific Soft Ground Improvement
Miraculous Solution to Asia Pacific Soft Ground ImprovementMiraculous Solution to Asia Pacific Soft Ground Improvement
Miraculous Solution to Asia Pacific Soft Ground Improvement
 
Isee paper - Uttam Blastech
Isee paper - Uttam Blastech Isee paper - Uttam Blastech
Isee paper - Uttam Blastech
 
Applicability, quality control and quality assurance in
Applicability, quality control and quality assurance inApplicability, quality control and quality assurance in
Applicability, quality control and quality assurance in
 
Compaction grouting hassan
Compaction  grouting hassanCompaction  grouting hassan
Compaction grouting hassan
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
In situ testing – current trends in geotechnical investigations
In situ testing – current trends in geotechnical investigationsIn situ testing – current trends in geotechnical investigations
In situ testing – current trends in geotechnical investigations
 
ING IABSE December 2015 Paper 8
ING IABSE December 2015 Paper 8ING IABSE December 2015 Paper 8
ING IABSE December 2015 Paper 8
 
Ground Improvement solutions to mitigate liquefaction
Ground Improvement solutions to mitigate liquefactionGround Improvement solutions to mitigate liquefaction
Ground Improvement solutions to mitigate liquefaction
 
1.0 Flyover 0+620.pdf
1.0 Flyover 0+620.pdf1.0 Flyover 0+620.pdf
1.0 Flyover 0+620.pdf
 
Practical Application of GI Technique Rev 0 HAKI pdf
Practical Application of GI Technique Rev 0 HAKI pdfPractical Application of GI Technique Rev 0 HAKI pdf
Practical Application of GI Technique Rev 0 HAKI pdf
 
George Dounis_PID_509
George Dounis_PID_509George Dounis_PID_509
George Dounis_PID_509
 
Stull_31_ICGCM_Ultra-CloseMultSeam_7
Stull_31_ICGCM_Ultra-CloseMultSeam_7Stull_31_ICGCM_Ultra-CloseMultSeam_7
Stull_31_ICGCM_Ultra-CloseMultSeam_7
 
Amit pandit presentaion gautambuddha university
Amit pandit presentaion gautambuddha universityAmit pandit presentaion gautambuddha university
Amit pandit presentaion gautambuddha university
 
Coal Mining Technlogy Brief_Low Coal Seam_HOT Mining
Coal Mining Technlogy Brief_Low Coal Seam_HOT MiningCoal Mining Technlogy Brief_Low Coal Seam_HOT Mining
Coal Mining Technlogy Brief_Low Coal Seam_HOT Mining
 

Mais de Infocengrs63

Foundation stabilization of the janmabhoomi temple at mangarh
Foundation stabilization of the janmabhoomi temple at mangarhFoundation stabilization of the janmabhoomi temple at mangarh
Foundation stabilization of the janmabhoomi temple at mangarhInfocengrs63
 
Geotechnics of artesian flow – case study of river shivganga, nepal
Geotechnics of artesian flow – case study of river shivganga, nepalGeotechnics of artesian flow – case study of river shivganga, nepal
Geotechnics of artesian flow – case study of river shivganga, nepalInfocengrs63
 
Geotechnical investigations dune sands of the thar desert
Geotechnical investigations  dune sands of the thar desertGeotechnical investigations  dune sands of the thar desert
Geotechnical investigations dune sands of the thar desertInfocengrs63
 
Mitigating foundation distress
Mitigating foundation distressMitigating foundation distress
Mitigating foundation distressInfocengrs63
 
Dynamic characteristics of alluvial deposits a case study
Dynamic characteristics of alluvial deposits a case studyDynamic characteristics of alluvial deposits a case study
Dynamic characteristics of alluvial deposits a case studyInfocengrs63
 
Geotechnical characterization of dune sands of the thar desert
Geotechnical characterization of dune sands of the thar desertGeotechnical characterization of dune sands of the thar desert
Geotechnical characterization of dune sands of the thar desertInfocengrs63
 
Pile integrity testing for monitoring pile construction
Pile integrity testing for monitoring pile constructionPile integrity testing for monitoring pile construction
Pile integrity testing for monitoring pile constructionInfocengrs63
 
Pump out tests in alluvial sands – a case study
Pump out tests in alluvial sands – a case studyPump out tests in alluvial sands – a case study
Pump out tests in alluvial sands – a case studyInfocengrs63
 
Liquefaction susceptibility study at commonwealth games village delhi
Liquefaction susceptibility study at commonwealth games village delhiLiquefaction susceptibility study at commonwealth games village delhi
Liquefaction susceptibility study at commonwealth games village delhiInfocengrs63
 
Performance of a large diameter oil storage tank on improved clay deposit
Performance of a large diameter oil storage tank on improved clay depositPerformance of a large diameter oil storage tank on improved clay deposit
Performance of a large diameter oil storage tank on improved clay depositInfocengrs63
 
Constructing foundations on red mud
Constructing foundations on red mudConstructing foundations on red mud
Constructing foundations on red mudInfocengrs63
 
Geotechnical characterizaton of soft clays of the godavari delta
Geotechnical characterizaton of soft clays of the godavari deltaGeotechnical characterizaton of soft clays of the godavari delta
Geotechnical characterizaton of soft clays of the godavari deltaInfocengrs63
 
Quality assurance for_deep_bored_piles
Quality assurance for_deep_bored_pilesQuality assurance for_deep_bored_piles
Quality assurance for_deep_bored_pilesInfocengrs63
 
DFI india 2014 defects in piles
DFI india 2014 defects in pilesDFI india 2014 defects in piles
DFI india 2014 defects in pilesInfocengrs63
 

Mais de Infocengrs63 (14)

Foundation stabilization of the janmabhoomi temple at mangarh
Foundation stabilization of the janmabhoomi temple at mangarhFoundation stabilization of the janmabhoomi temple at mangarh
Foundation stabilization of the janmabhoomi temple at mangarh
 
Geotechnics of artesian flow – case study of river shivganga, nepal
Geotechnics of artesian flow – case study of river shivganga, nepalGeotechnics of artesian flow – case study of river shivganga, nepal
Geotechnics of artesian flow – case study of river shivganga, nepal
 
Geotechnical investigations dune sands of the thar desert
Geotechnical investigations  dune sands of the thar desertGeotechnical investigations  dune sands of the thar desert
Geotechnical investigations dune sands of the thar desert
 
Mitigating foundation distress
Mitigating foundation distressMitigating foundation distress
Mitigating foundation distress
 
Dynamic characteristics of alluvial deposits a case study
Dynamic characteristics of alluvial deposits a case studyDynamic characteristics of alluvial deposits a case study
Dynamic characteristics of alluvial deposits a case study
 
Geotechnical characterization of dune sands of the thar desert
Geotechnical characterization of dune sands of the thar desertGeotechnical characterization of dune sands of the thar desert
Geotechnical characterization of dune sands of the thar desert
 
Pile integrity testing for monitoring pile construction
Pile integrity testing for monitoring pile constructionPile integrity testing for monitoring pile construction
Pile integrity testing for monitoring pile construction
 
Pump out tests in alluvial sands – a case study
Pump out tests in alluvial sands – a case studyPump out tests in alluvial sands – a case study
Pump out tests in alluvial sands – a case study
 
Liquefaction susceptibility study at commonwealth games village delhi
Liquefaction susceptibility study at commonwealth games village delhiLiquefaction susceptibility study at commonwealth games village delhi
Liquefaction susceptibility study at commonwealth games village delhi
 
Performance of a large diameter oil storage tank on improved clay deposit
Performance of a large diameter oil storage tank on improved clay depositPerformance of a large diameter oil storage tank on improved clay deposit
Performance of a large diameter oil storage tank on improved clay deposit
 
Constructing foundations on red mud
Constructing foundations on red mudConstructing foundations on red mud
Constructing foundations on red mud
 
Geotechnical characterizaton of soft clays of the godavari delta
Geotechnical characterizaton of soft clays of the godavari deltaGeotechnical characterizaton of soft clays of the godavari delta
Geotechnical characterizaton of soft clays of the godavari delta
 
Quality assurance for_deep_bored_piles
Quality assurance for_deep_bored_pilesQuality assurance for_deep_bored_piles
Quality assurance for_deep_bored_piles
 
DFI india 2014 defects in piles
DFI india 2014 defects in pilesDFI india 2014 defects in piles
DFI india 2014 defects in piles
 

Último

Risk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectRisk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectErbil Polytechnic University
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Crushers to screens in aggregate production
Crushers to screens in aggregate productionCrushers to screens in aggregate production
Crushers to screens in aggregate productionChinnuNinan
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Configuration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentConfiguration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentBharaniDharan195623
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 

Último (20)

Risk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectRisk Management in Engineering Construction Project
Risk Management in Engineering Construction Project
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Crushers to screens in aggregate production
Crushers to screens in aggregate productionCrushers to screens in aggregate production
Crushers to screens in aggregate production
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Configuration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentConfiguration of IoT devices - Systems managament
Configuration of IoT devices - Systems managament
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 

Ground Improvement Case Studies

  • 1. RaviRavi SundaramSundaram & Sanjay Gupta& Sanjay Gupta Cengrs Geotechnica Pvt. Ltd. Noida A-100 Sector 63, Noida Ph: (O): 0120-42067111 (M): 9810538095
  • 2. Ground Improvement Process Modification of soil properties to achieveModification of soil properties to achieve improvementimprovement Densification of loose soils Mitigation of liquefaction potential Strengthen soft clays Increase safe bearing capacity Reduce foundation settlement Ensure that foundation behavior is within the acceptable limits
  • 3. Success of Ground Improvement Process Identify target soil properties to beIdentify target soil properties to be achieved after improvement, whatachieved after improvement, what minimum value is acceptableminimum value is acceptable InIn--situ testing is essential to ensuresitu testing is essential to ensure that the desired improvement isthat the desired improvement is achievedachieved The soil characteristics afterThe soil characteristics after improvement should be comparedimprovement should be compared with the target soil propertieswith the target soil properties
  • 4. This presentation covers Two case studiesTwo case studies Ground improvement for a Gas Based Power Plant inGround improvement for a Gas Based Power Plant in North Delhi byNorth Delhi by VibroVibro--ReplacementReplacement In-situ tests: dynamic cone penetration tests, and Load test on the stone columns Ground Improvement for a university at GreaterGround Improvement for a university at Greater NoidaNoida by Dynamic Compactionby Dynamic Compaction In-situ tests: Boreholes with SPT Static Cone Penetration tests
  • 5. VibroVibro--Replacement for a PowerReplacement for a Power Plant in DelhiPlant in Delhi
  • 6. Case Study-1: Vibro-Compaction 108 MW Gas Based Power Plant in north Delhi Facilities planned include STG, GTG, Steam Turbine, Boiler, Chimney, Cooling Water System, Switchyard, etc. Alluvial Plains of River Yamuna Earthquake Zone IV as per IS 1893-2002 Loose sands to 8 m depth prone to liquefaction during major earthquakes
  • 7. Site Layout Plan 15 boreholes – 30 m depth 6 static cone penetration tests(SCPT) Spectral Analysis of Surface Waves (SASW) tests along 8 lines 3 cross-hole seismic tests (CHST)
  • 8. Typical Borehole Data Loose surficial fill to 0.5-2 m depth Natural deposits primarily fine sand / silty sand with intermediate minor layers of sandy silt Groundwater at 5.2 – 6.4 m depth
  • 12. Liquefaction Assessment Seed & Idris (1971) method – NEERI Summary Report Project area in Earthquake Zone IV Maximum Credible Earthquake Design Earthquake Magnitude: 6.7 on Richter scale Peak Ground Acceleration: 0.24g Cyclic Resistance Ratio (CRR) determined from SPT & SCPT
  • 13. Liquefaction analysis results A critical factor of safety of 1.2 was considered for the analysis Soils to a depth of 8.0 m are be susceptible to liquefaction during earthquakes
  • 14. Foundation System Open foundations bearing on natural soils - Not feasible Critical or heavily loaded plant facilities – STG, GTG, Steam Turbine, Boiler, Chimney 600600 mm diameter bored castmm diameter bored cast--inin--situsitu piles extending well below thepiles extending well below the liquefiable zoneliquefiable zone
  • 15. Foundation System Medium loaded plant facilities – Cooling Tower,Cooling Tower, ClariflocculatorsClariflocculators & other facilities of the& other facilities of the Water Treatment system,Water Treatment system, SwitchyardSwitchyard Ground improvement doneGround improvement done byby vibrovibro--replacement methodreplacement method
  • 16. Vibro-Replacement Method Dry Vibro Stone columns installed by bottom- feed method 500 mm dia extending to 10 m depth Centre-to-centre spacing: 1.5 m Design Net Bearing Pressure: 160 kPa
  • 17. In-Situ Tests Dynamic Cone Penetration Tests (DCPT) Evaluates extent of improvement achieved with depth Load Test on Stone Columns Evaluates load-settlement behavior of improved ground
  • 18. Dynamic Cone Penetration Tests After CompactionAfter Compaction Blow Counts exceed 15 below 2 m depth Substantial improvement in penetration resistance Medium dense to 4-5 m depth Dense below 5 m depth Improved soils not likely to liquefy during earthquake
  • 19. Load Test on Vibro-Columns
  • 20. Plate size 1.51.5 m xm x 1.51.5 mm, square, 30 mm thick, Loading intensity: 1st cycle – 240 kPa 2nd cycle – 500 kPa Safe bearing pressure > 160 kPa Loading Intensity vs. Settlement
  • 21. Liquefaction Mitigation Untreated ground (before compaction) is susceptible to liquefaction to 8 m depth After compaction, Factor of Safety against liquefaction > 1.2 Susceptibility to liquefactionSusceptibility to liquefaction successfully mitigatedsuccessfully mitigated
  • 22. Dynamic Compaction for aDynamic Compaction for a University in GreaterUniversity in Greater NoidaNoida
  • 23. Case StudyCase Study--2: Dynamic Compaction2: Dynamic Compaction A major university at Greater Noida, UP Covers an area of about 500 acres 84,000 m2 of constructed area, 30% green cover Site in the flood plains of the River Yamuna, about 2 km from river
  • 25. 25 Site Conditions Loose alluvium - fine sand (Yamuna Sand) met in project area Site is in Earthquake Zone IV - IS 1893: 2002 Groundwater met at shallow depth Every structure individually assessed to evaluate liquefaction potential Sand to 8-12 m depth is prone to liquefaction during major earthquakes
  • 26. Geotechnical Investigations Over 600 boreholes and 150 SCPT’s done all over the university area Each structure assessed to evaluate liquefaction potential THIS PRESENTATIONTHIS PRESENTATION covers geotechnical investigation before & after improvement for Boys Hostel 8.1KBoys Hostel 8.1K
  • 27. Site Layout Plan – Boys Hostel No. 8.1KBoys Hostel No. 8.1K Before Improvement 4 BH – 15 m 1 SCPT – 15 m After Improvement 4 BH – 15 m 1 SCPT – 15 m
  • 28. Typical Borehole Data The soils at the site classify primarily as sandy silt / clayey silt to 1.5~2 m depth, underlain by fine sand to 15 m depth Fines content:3- 10 % Groundwater at 3.5-4 m depth, may rise to GL
  • 29. Liquefaction Assessment Seed & Idris (1971) method – NEERI Summary Report Project area in Earthquake Zone IV Design Earthquake Magnitude: 6.7 on Richter scale Peak Ground Acceleration: 0.24g Cyclic Resistance Ratio (CRR) determined from SPT & SCPT Fine sands to 8 m depth at Boy’s Hostel is susceptible to earthquake during the design earthquake
  • 30. Foundation System Open foundations bearing on natural soils - Not feasible Pile foundations - high foundation cost and time of construction – Not preferred by client Solution - Ground improvementGround improvement by dynamic compactionby dynamic compaction
  • 31. Dynamic Compaction Dropping a heavy weight can compact loose sands to substantial depth Done on a grid pattern Next cycle: Weight dropped at intermediate points Effective for sands only with little fines
  • 33. Crane & Pounder Conventional Crane – TLC 955A 11.65 T pounder falling from height of 14 m Energy: 1600 kN-m Corresponding depth of improvement: 9 m
  • 34. Compaction – 2 phases 1 week time lag in between – to allow pore pressures to dissipate 1st Phase 4 x 4 m grids 2nd Phase staggered 2 m No. of drops: 10 at each grid point Depth of the craters formed: 1.0-1.5 m approx
  • 35. Ironing Phase Craters filled with GSB Grade II material Hammer weight: 11.65 T Height of fall: 6 m No. of drops: 5 Energy: 2114 kN-m Area graded with 10 passes of 10 T vibratory roller
  • 36. In-Situ Tests Standard Penetration Tests (SPT) in boreholes Static Cone Penetration Test (SCPT) Compare SPT and qCompare SPT and qcc valuesvalues before and after compactionbefore and after compaction Assess Liquefaction PotentialAssess Liquefaction Potential after densificationafter densification
  • 37. SPT & SCPT before & after improvement
  • 38. Extent of Improvement Achieved After compaction, N>16After compaction, N>16--20, qc > 520, qc > 5 MPaMPa Peak improvement: between 1 and 5 m depth Improvement below 10-11 m depth is marginal
  • 39. Liquefaction susceptibility analysis before and after compaction Before CompactionBefore Compaction -- Liquefaction to 12 m depthLiquefaction to 12 m depth After CompactionAfter Compaction -- No LiquefactionNo Liquefaction Susceptibility to liquefaction successfully mitigatedSusceptibility to liquefaction successfully mitigated
  • 40. Liquefaction Mitigation Untreated ground (before compaction) is susceptible to liquefaction to 13 m depth After compaction, Factor of Safety againstFactor of Safety against liquefaction > 1liquefaction > 1 Foundation for the Boys Hostel building 8.1K: Isolated column footings withIsolated column footings with interinter--connecting plinth beamsconnecting plinth beams Net allowable bearing pressure:Net allowable bearing pressure: 175175 kPakPa
  • 41. Concluding Remarks Conducting in-situ tests is essential to verify effectiveness of ground improvement For reliable and effective improvement, sufficient tests should be performed before and after improvement The testing should ensure that the target soil properties are achieved Mitigating liquefaction Densification of loose soils Desired Bearing Capacity