SlideShare a Scribd company logo
1 of 4
Download to read offline
GOAL: Achieve ecosystem stability on degraded lands of Karakalpakstan and 
Kyzylkum desert, thus arresting advance of desertification, increasing carbon 
sequestration, expanding biodiversity habitats and ensuring socioeconomic benefits for the 
population on sustainable basis. 
OBJECTIVE: To test, evaluate and implement innovative solutions addressing the land 
degradation problem at experimental scale in designated sites near the Aral Sea and in 
Kyzylkum desert 
OUTPUT 1 – Identify desert plant species with 
ecological and economic benefits and test methods of 
sustainable land resource management 
OUTPUT 2 – Stabilize moving sands and rehabilitate 
degraded lands jointly with the local communities 
OUTPUT 3 – Strengthen institutional and legal 
framework for integrated land resource planning and 
management 
Project implementation term was: April 2008 – March 2013 
1 
UNDP-GEF Project 
Achieving ecosystem stability on degraded land 
in Karakalpakstan and Kyzylkum desert 
Under Umbrella of CACILM 
Output 1. 
24 plant species were identified for sand 
stabilization and desert pastures 
enrichment activities; 
12 fruit bearing tree species were identified 
for gardening in the household plots; 
Nurseries were created to grow trees and 
forage plants under desert ecosystem 
conditions; 
Study materials and manuals on the use of 
various plant species under desert 
conditions were prepared; 
Population was trained in the use of modern 
methods of land cropping, ensuring 
agricultural products supply. 
2 
Output 2. 
Tested 5 methods of stabilization of mobile sands and 2 
methods of creation of forest plantations in the desert 
areas; 
Established and equipped 2 veterinary service stations and 
created pasture users commission under the Rural 
Community Assembly; 
Two submersible pump facilities allowed more than 15000 
hectares of pasture land to be used; 
Population awareness raised on land cropping methods; 
Livestock production management plans facilitate sustainable 
use of pastures in each of the project areas; 
Irrigation water supply of the villages restored (8 pump 
units); 
Institutional changes in the use of water resources (creation of 
water users groups); 
Implementation of four business plans created alternative 
source of income for the population. 
3 
Output 3. 
459 decision makers were involved in capacity 
development actions of project 
320 people improved their knowledge on sustainable 
use of land resources at the local level; 
60 experts improved their skills in planning of 
integrated use of land resources; 
65 managing officers of government institutions 
familiarized with methods of addressing ecological 
problems; 
14 experts of the Main Forestry Department trained in 
the use of GIS technologies; 
Draft amendments prepared to supplement legislative 
documents regulating pastures use; 
Capacity strengthening activities aimed at land resource 
management (LRM) approved at the district level and 
ILRM Work Group created; 
Regional Extension service Center for zoo veterinary and 
livestock keep in desert pasture conditions established. 
4 
Output 4. 
Economic evaluation of the project activities on sand 
stabilization and sustainable livestock production 
under desert pastures conditions. 
Cooperation with other programs and projects 
aimed to combat desertification and land 
degradation (ICBA, GIZ, WOCAT); 
Regular meetings with project areas communities in 
order to perform joint planning of activities; 
Analysis of the economic activity of Kyzyl Ravat 
shirkat farm; 
Popular science film on the project activity; 
Training workshops on the project topics at various 
decision making levels; 
Information materials for the project areas and the 
experts (Farmers Field Schools, pasture based 
livestock production, capacity building). 
5 
RISKS and ISSUES 
 Force-Majeure (climate change, weather conditions, 
water availability etc.) 
 Predominance of traditionalism in the problem solving approaches 
 Predominance of directive-based approach in implementation of 
decisions (top-down execution) 
 Complicated and prolonged process of implementation of the 
project achievements (change in the legislation, acceptance of the 
project results by the beneficiaries, etc.) 
 Financial risk (planning, inflation, etc.) 
 Organizational issue (local infrastructure, local experts’ capacity, 
etc.) 
6
The Project of UNDP-GEF 
and Government of the Republic Uzbekistan 
Under Umbrella of CACILM 
Reducing pressures on natural resources from competing land 
use in non-irrigated arid mountain, semi-desert and desert 
landscapes of Uzbekistan 
Duration: 2014-2018 
Environment and Energy Unit UNDP in Uzbekistan 
The project goal and objective 
Objective 
To promote integrated management of 
rangeland and forests at the landscape level 
(focus on non-irrigated, arid mountain, semi-desert, 
and desert landscapes) to reduce 
pressures on natural resources from competing 
land uses and improve the socio-economic 
stability of communities 
Проект SLM-UNDP/GEF 
SGP.UZ 
The project goal is 
to reduce competing land use pressures on 
natural resources of arid non-irrigated 
landscapes in Uzbekistan 
Barriers to achieving the solution 
Barrier 1. Practical know-how barriers with 
limited practical capacity. Currently, 
land use is seen in a very stratified, 
narrow way. 
Barrier 2. Inappropriate structure 
(institutional, legislative and policy) and 
absence of mechanisms and experience 
to undertake cross-sector, integrated 
natural resource use planning. There is a 
need to adjust development objectives 
for arid desert, semi-desert and 
mountain land use. 
Details of Agricultural, Forestry and Reserve Land Use, 
in hectares 
Arable (irrigated 82%, rain-fed 18%) 4 045 600 
Perennial crops (orchards, vineyards, mulberry, nurseries etc.) 343 000 
Household plot land 616 200 
Hayfields 104 900 
Rangeland 19 667 900 
Forested land (including windbreaks, poplar tree plantations) 3 199 300 
Shrubs 31 100 
Land requiring melioration/improvement 70 700 
Abandoned land (fallow land) 78 400 
Others 14 215 000 
Total 42 372 100 
Grazing pressure by livestock in natural rangeland Components of the project 
Component 1:Field level investment to 
transform the baseline approach. 
Promising best practices on sustainable 
rangeland and forestry management 
and INRM planning up-scaled in target 
districts of Uzbekistan. 
Component 2: Policy, legal and 
institutional mechanisms. An enabling 
cross-sector environment and in-country 
capacity (at system, 
institutional and individual levels) for 
applying integrated landscape 
management in arid mountain, semi-desert 
and desert areas of Uzbekistan. 
Фото А. Раббимова
Component 1. Practical Part 
Outcome 1.1: Improvement in the vegetative cover of 
approximately 6,000 ha of rangeland and 1,000 ha of forestry fund 
territory due to enhanced land use management using sustainable 
INRM best practices, accompanied with approximately 50,000 
people with secure and sustainable livelihoods. 
Outcome 1.2: Enhanced mechanisms for cross-sector integrated 
planning of sustainable natural resources management at district 
level to improve vegetation and forest cover, decrease moving 
sands and erosion, and reduce dust storms and other such events. 
Component 2. legal and institutional part 
Outcome 2.1: Enhanced policy, legal, and institutional framework 
for implementing integrated and sustainable management of 
rangeland and forests. 
Outcome 2.2: Adequate technical and managerial capacity for 
INRM at all levels of land use institutions for the development of 
policies, legislation and field operations. 
Outcome 2.3: Improved access of policy makers to tested INRM 
best practices and methodologies for improved land management. 
National scientific and educational iinnssttiittuuttiioonnss 
OCSE; 
World Bank; 
MASHAW (Israel); 
JICA (Japan); 
ICARDA; 
ICBA 
CACILM; 
US Embassy in Uzbekistan; 
Within the inception period collaboration with TIKA, KOICA and IDB 
planned. 
Project Demonstration sites 
The two pilot districts where demonstrations are 
to take place are the Zaamin district located in 
Djizak province, and Karakul district in Bukhara 
province. 
These districts were selected from all relevant 
districts in Uzbekistan via a systematic process 
that utilized a clear set of criteria.
Thank you! 
Wells, Pasture Use and Degradation Budget sources 
Total resources required 12,193,600$ 
Total allocated resources (grants) 10,753,600$ 
- UNDP 700,000$ 
- GEF 2,313,600$ 
- Government 6,700,000$ 
- Forestry Enterprises 220,000$ 
- ICBA 500,000$ 
- Sheep Breeding Farms 320,000 
In-kind Contributions 1,440,000$ 
Budget annually distribution 
Amount 
Year 1 
(USD) 
Amount 
Year 2 
(USD) 
Amount 
Year 3 
(USD) 
Amount 
Year 4 
(USD) 
Amount 
Year 5 
(USD) 
Total 
(USD) 
Total Outcome 1 317,694 503,488 430,767 382,767 296,899 1,931,615 
Total Outcome 2 39,587 71,507 90,892 66,592 109,965 378,543 
Total Management 
costs 
87,600 64,138 66,104 62,846 62,754 343,442 
Total Project (GEF 
and UNDP) 
444,881 639,133 587,763 512,205 469,618 2,653,600

More Related Content

What's hot

What's hot (20)

Diana Felicicano Spring 2016
Diana Felicicano Spring 2016Diana Felicicano Spring 2016
Diana Felicicano Spring 2016
 
Unlocking the potential of soil organic carbon - Ronald Vargas
Unlocking the potential of soil organic carbon - Ronald VargasUnlocking the potential of soil organic carbon - Ronald Vargas
Unlocking the potential of soil organic carbon - Ronald Vargas
 
Assessing and Capitalizing on the Potential to Enhance Forest Carbon Sinks th...
Assessing and Capitalizing on the Potential to Enhance Forest Carbon Sinks th...Assessing and Capitalizing on the Potential to Enhance Forest Carbon Sinks th...
Assessing and Capitalizing on the Potential to Enhance Forest Carbon Sinks th...
 
ToR-watershed management
ToR-watershed managementToR-watershed management
ToR-watershed management
 
Grp5 outlook bot53
Grp5 outlook bot53Grp5 outlook bot53
Grp5 outlook bot53
 
Pillar 3 of GSP: Promote targeted soil research
Pillar 3 of GSP: Promote targeted soil researchPillar 3 of GSP: Promote targeted soil research
Pillar 3 of GSP: Promote targeted soil research
 
Item 2. ASP work from December 2016 to May 2018: Philippines
Item 2. ASP work from December 2016 to May 2018: PhilippinesItem 2. ASP work from December 2016 to May 2018: Philippines
Item 2. ASP work from December 2016 to May 2018: Philippines
 
Rakotobe madagascar project
Rakotobe   madagascar projectRakotobe   madagascar project
Rakotobe madagascar project
 
Item 3. Current initiatives, new proposals and next steps on GSP pillar 1
Item 3. Current initiatives, new proposals and next steps on GSP pillar 1Item 3. Current initiatives, new proposals and next steps on GSP pillar 1
Item 3. Current initiatives, new proposals and next steps on GSP pillar 1
 
WG1: Pillar 1- Sustainable soil management, protection and restoration (frame...
WG1: Pillar 1- Sustainable soil management, protection and restoration (frame...WG1: Pillar 1- Sustainable soil management, protection and restoration (frame...
WG1: Pillar 1- Sustainable soil management, protection and restoration (frame...
 
Review and planning of activities with IPBES
Review and planning of activities with IPBESReview and planning of activities with IPBES
Review and planning of activities with IPBES
 
The 4th NENA workshop - Morocco
The 4th NENA workshop - MoroccoThe 4th NENA workshop - Morocco
The 4th NENA workshop - Morocco
 
Government Policy and Budget Allocation to Tackle Deforestation and Forest Fire
Government Policy and Budget Allocation to Tackle Deforestation and Forest FireGovernment Policy and Budget Allocation to Tackle Deforestation and Forest Fire
Government Policy and Budget Allocation to Tackle Deforestation and Forest Fire
 
Item 4: Presentation of the TCP/RAB/3802 project
Item 4: Presentation of the TCP/RAB/3802 projectItem 4: Presentation of the TCP/RAB/3802 project
Item 4: Presentation of the TCP/RAB/3802 project
 
Item 2. National updates on soil - Jordan
Item 2. National updates on soil - JordanItem 2. National updates on soil - Jordan
Item 2. National updates on soil - Jordan
 
Sciences Challenges for Soil Policy
Sciences Challenges for Soil PolicySciences Challenges for Soil Policy
Sciences Challenges for Soil Policy
 
REDD+ experience: Pilot project in Davao Oriental, Philippines
REDD+ experience: Pilot project in Davao Oriental, PhilippinesREDD+ experience: Pilot project in Davao Oriental, Philippines
REDD+ experience: Pilot project in Davao Oriental, Philippines
 
Introductory Slides for the EbA Webinar
 Introductory Slides for the EbA Webinar Introductory Slides for the EbA Webinar
Introductory Slides for the EbA Webinar
 
Effects of climate change and deforestation on potential of carbon sequestrat...
Effects of climate change and deforestation on potential of carbon sequestrat...Effects of climate change and deforestation on potential of carbon sequestrat...
Effects of climate change and deforestation on potential of carbon sequestrat...
 
Sudan: National Action Program(NAP)
Sudan: National Action Program(NAP)Sudan: National Action Program(NAP)
Sudan: National Action Program(NAP)
 

Similar to Achieving ecosystem stability on degraded land

Vikrant saini 3rd sem 1333
Vikrant saini 3rd sem 1333Vikrant saini 3rd sem 1333
Vikrant saini 3rd sem 1333
vikrant saini
 
Climate change and development project iucn - regional workshop
Climate change and development project   iucn - regional workshopClimate change and development project   iucn - regional workshop
Climate change and development project iucn - regional workshop
Strengthening Climate Resilience
 
EU DG Climate Action Initiative
EU DG Climate Action InitiativeEU DG Climate Action Initiative
EU DG Climate Action Initiative
climasouth
 
Enhancing Community Resilience CACENA WACDEP
Enhancing Community Resilience CACENA WACDEPEnhancing Community Resilience CACENA WACDEP
Enhancing Community Resilience CACENA WACDEP
Global Water Partnership
 
Cacena wacdep demo projects session 4
Cacena wacdep demo projects session 4Cacena wacdep demo projects session 4
Cacena wacdep demo projects session 4
GWP CACENA
 

Similar to Achieving ecosystem stability on degraded land (20)

Vikrant saini 3rd sem 1333
Vikrant saini 3rd sem 1333Vikrant saini 3rd sem 1333
Vikrant saini 3rd sem 1333
 
Restoration of degraded peatlands: connecting science with policy and practice
Restoration of degraded peatlands: connecting science with policy and practiceRestoration of degraded peatlands: connecting science with policy and practice
Restoration of degraded peatlands: connecting science with policy and practice
 
National plans and lessons learnt on restoring peatland in Indonesia: Peatlan...
National plans and lessons learnt on restoring peatland in Indonesia: Peatlan...National plans and lessons learnt on restoring peatland in Indonesia: Peatlan...
National plans and lessons learnt on restoring peatland in Indonesia: Peatlan...
 
Functional zoning and implementation of the ecosystem approach kerteshev wet...
Functional zoning and implementation of the ecosystem approach  kerteshev wet...Functional zoning and implementation of the ecosystem approach  kerteshev wet...
Functional zoning and implementation of the ecosystem approach kerteshev wet...
 
Management Plan on Knuckles Conservation Area Sri Lanka
Management Plan on Knuckles Conservation Area Sri LankaManagement Plan on Knuckles Conservation Area Sri Lanka
Management Plan on Knuckles Conservation Area Sri Lanka
 
Kenya part 2
Kenya part 2Kenya part 2
Kenya part 2
 
Presentation: Romania Agricultural Pollution Control Project [4th Global Nitr...
Presentation: Romania Agricultural Pollution Control Project [4th Global Nitr...Presentation: Romania Agricultural Pollution Control Project [4th Global Nitr...
Presentation: Romania Agricultural Pollution Control Project [4th Global Nitr...
 
The water-land-food-energy-climate Nexus for a resource efficient Europe
The water-land-food-energy-climate Nexus for a resource efficient EuropeThe water-land-food-energy-climate Nexus for a resource efficient Europe
The water-land-food-energy-climate Nexus for a resource efficient Europe
 
Watershed/Landscape Management for Multiple Benefits and Climate Resilience 
...
Watershed/Landscape Management for Multiple Benefits and Climate Resilience 
...Watershed/Landscape Management for Multiple Benefits and Climate Resilience 
...
Watershed/Landscape Management for Multiple Benefits and Climate Resilience 
...
 
Climate change and development project iucn - regional workshop
Climate change and development project   iucn - regional workshopClimate change and development project   iucn - regional workshop
Climate change and development project iucn - regional workshop
 
Enhancing communities’ adaptive capacity to climate-change induced water scar...
Enhancing communities’ adaptive capacity to climate-change induced water scar...Enhancing communities’ adaptive capacity to climate-change induced water scar...
Enhancing communities’ adaptive capacity to climate-change induced water scar...
 
EU DG Climate Action Initiative
EU DG Climate Action InitiativeEU DG Climate Action Initiative
EU DG Climate Action Initiative
 
UTANRMP_Presentation to learning route on Natural Resource Management July 2014
UTANRMP_Presentation to learning route on Natural Resource Management July 2014UTANRMP_Presentation to learning route on Natural Resource Management July 2014
UTANRMP_Presentation to learning route on Natural Resource Management July 2014
 
Sustainable Land Management
Sustainable Land ManagementSustainable Land Management
Sustainable Land Management
 
Status of Implementation of Peatland Ecosystem Protection and Management i...
Status of Implementation of  Peatland Ecosystem  Protection and Management  i...Status of Implementation of  Peatland Ecosystem  Protection and Management  i...
Status of Implementation of Peatland Ecosystem Protection and Management i...
 
Knowledge exchange and stakeholder empowerment for peatland management in Ind...
Knowledge exchange and stakeholder empowerment for peatland management in Ind...Knowledge exchange and stakeholder empowerment for peatland management in Ind...
Knowledge exchange and stakeholder empowerment for peatland management in Ind...
 
Michel Jerome Tankoana - Burkina Faso’s Experiences with Integrated Landscape...
Michel Jerome Tankoana - Burkina Faso’s Experiences with Integrated Landscape...Michel Jerome Tankoana - Burkina Faso’s Experiences with Integrated Landscape...
Michel Jerome Tankoana - Burkina Faso’s Experiences with Integrated Landscape...
 
Enhancing Community Resilience CACENA WACDEP
Enhancing Community Resilience CACENA WACDEPEnhancing Community Resilience CACENA WACDEP
Enhancing Community Resilience CACENA WACDEP
 
Cacena wacdep demo projects session 4
Cacena wacdep demo projects session 4Cacena wacdep demo projects session 4
Cacena wacdep demo projects session 4
 
EGYPT/DRC: Content
EGYPT/DRC: ContentEGYPT/DRC: Content
EGYPT/DRC: Content
 

More from ICARDA

More from ICARDA (20)

Can we measure female social entrepreneurship?
Can we measure female social entrepreneurship? Can we measure female social entrepreneurship?
Can we measure female social entrepreneurship?
 
Impact of Climate Change and possible steps for Reversal”
Impact of Climate Change and possible steps for Reversal”Impact of Climate Change and possible steps for Reversal”
Impact of Climate Change and possible steps for Reversal”
 
Building Climate Smart FARMERS The Indian Perspective
Building Climate Smart FARMERSThe Indian PerspectiveBuilding Climate Smart FARMERSThe Indian Perspective
Building Climate Smart FARMERS The Indian Perspective
 
Dryland Agriculture R&I in China: Actions towards SDGs 2030
Dryland Agriculture R&I in China:Actions towards SDGs 2030Dryland Agriculture R&I in China:Actions towards SDGs 2030
Dryland Agriculture R&I in China: Actions towards SDGs 2030
 
FEW Three in One Food Energy and Water
FEW Three in One  Food Energy and Water FEW Three in One  Food Energy and Water
FEW Three in One Food Energy and Water
 
Just Add Water: Approaches to Smart Agricultural Water Management
Just Add Water: Approaches to Smart Agricultural Water ManagementJust Add Water: Approaches to Smart Agricultural Water Management
Just Add Water: Approaches to Smart Agricultural Water Management
 
Building a research-for-development partnership for thriving drylands in a ch...
Building a research-for-development partnership for thriving drylands in a ch...Building a research-for-development partnership for thriving drylands in a ch...
Building a research-for-development partnership for thriving drylands in a ch...
 
The Dry arc in brief
The Dry arc in briefThe Dry arc in brief
The Dry arc in brief
 
SUSTAINABLE SILVOPASTORAL RESTORATION TO PROMOTE ECOSYSTEM SERVICES IN TUNISIA
SUSTAINABLE SILVOPASTORAL RESTORATION TO PROMOTE ECOSYSTEM SERVICES IN TUNISIASUSTAINABLE SILVOPASTORAL RESTORATION TO PROMOTE ECOSYSTEM SERVICES IN TUNISIA
SUSTAINABLE SILVOPASTORAL RESTORATION TO PROMOTE ECOSYSTEM SERVICES IN TUNISIA
 
Highlights on 2019 research outputs and outcomes​
Highlights on 2019 research outputs and outcomes​Highlights on 2019 research outputs and outcomes​
Highlights on 2019 research outputs and outcomes​
 
Introduction to mobile data collection
Introduction to mobile data collectionIntroduction to mobile data collection
Introduction to mobile data collection
 
BRINGING INNOVATION AND SUSTAINABILITY ALONG THE WHOLE VALUE CHAIN IN THE MED...
BRINGING INNOVATION AND SUSTAINABILITY ALONG THE WHOLE VALUE CHAIN IN THE MED...BRINGING INNOVATION AND SUSTAINABILITY ALONG THE WHOLE VALUE CHAIN IN THE MED...
BRINGING INNOVATION AND SUSTAINABILITY ALONG THE WHOLE VALUE CHAIN IN THE MED...
 
Utilizing the reject brine from desalination for implementing integrated agri...
Utilizing the reject brine from desalination for implementing integrated agri...Utilizing the reject brine from desalination for implementing integrated agri...
Utilizing the reject brine from desalination for implementing integrated agri...
 
The role of higher and vocational education and training in developing knowle...
The role of higher and vocational education and training in developing knowle...The role of higher and vocational education and training in developing knowle...
The role of higher and vocational education and training in developing knowle...
 
Characteristics of a winning research proposal
Characteristics of a winning research proposal Characteristics of a winning research proposal
Characteristics of a winning research proposal
 
Bio-wonder, Tunisia
Bio-wonder, TunisiaBio-wonder, Tunisia
Bio-wonder, Tunisia
 
Powering dry areas by empowering food security under the context of climat...
Powering  dry areas  by empowering food security  under the context of climat...Powering  dry areas  by empowering food security  under the context of climat...
Powering dry areas by empowering food security under the context of climat...
 
The DryArc Initiative
The DryArc InitiativeThe DryArc Initiative
The DryArc Initiative
 
Funding networks and mechanisms to support EU AU FNSSA R&I
Funding networks and mechanisms  to support EU AU FNSSA R&I Funding networks and mechanisms  to support EU AU FNSSA R&I
Funding networks and mechanisms to support EU AU FNSSA R&I
 
Mapping suitable niche for cactus and legumes in diversified farming in drylands
Mapping suitable niche for cactus and legumes in diversified farming in drylandsMapping suitable niche for cactus and legumes in diversified farming in drylands
Mapping suitable niche for cactus and legumes in diversified farming in drylands
 

Recently uploaded

💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
nirzagarg
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Anamikakaur10
 

Recently uploaded (20)

Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
Deforestation
DeforestationDeforestation
Deforestation
 
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate action
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
 
celebrity 💋 Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...
celebrity 💋 Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...celebrity 💋 Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...
celebrity 💋 Kanpur Escorts Just Dail 8250092165 service available anytime 24 ...
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Water Pollution
Water Pollution Water Pollution
Water Pollution
 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptx
 
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
 
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 

Achieving ecosystem stability on degraded land

  • 1. GOAL: Achieve ecosystem stability on degraded lands of Karakalpakstan and Kyzylkum desert, thus arresting advance of desertification, increasing carbon sequestration, expanding biodiversity habitats and ensuring socioeconomic benefits for the population on sustainable basis. OBJECTIVE: To test, evaluate and implement innovative solutions addressing the land degradation problem at experimental scale in designated sites near the Aral Sea and in Kyzylkum desert OUTPUT 1 – Identify desert plant species with ecological and economic benefits and test methods of sustainable land resource management OUTPUT 2 – Stabilize moving sands and rehabilitate degraded lands jointly with the local communities OUTPUT 3 – Strengthen institutional and legal framework for integrated land resource planning and management Project implementation term was: April 2008 – March 2013 1 UNDP-GEF Project Achieving ecosystem stability on degraded land in Karakalpakstan and Kyzylkum desert Under Umbrella of CACILM Output 1. 24 plant species were identified for sand stabilization and desert pastures enrichment activities; 12 fruit bearing tree species were identified for gardening in the household plots; Nurseries were created to grow trees and forage plants under desert ecosystem conditions; Study materials and manuals on the use of various plant species under desert conditions were prepared; Population was trained in the use of modern methods of land cropping, ensuring agricultural products supply. 2 Output 2. Tested 5 methods of stabilization of mobile sands and 2 methods of creation of forest plantations in the desert areas; Established and equipped 2 veterinary service stations and created pasture users commission under the Rural Community Assembly; Two submersible pump facilities allowed more than 15000 hectares of pasture land to be used; Population awareness raised on land cropping methods; Livestock production management plans facilitate sustainable use of pastures in each of the project areas; Irrigation water supply of the villages restored (8 pump units); Institutional changes in the use of water resources (creation of water users groups); Implementation of four business plans created alternative source of income for the population. 3 Output 3. 459 decision makers were involved in capacity development actions of project 320 people improved their knowledge on sustainable use of land resources at the local level; 60 experts improved their skills in planning of integrated use of land resources; 65 managing officers of government institutions familiarized with methods of addressing ecological problems; 14 experts of the Main Forestry Department trained in the use of GIS technologies; Draft amendments prepared to supplement legislative documents regulating pastures use; Capacity strengthening activities aimed at land resource management (LRM) approved at the district level and ILRM Work Group created; Regional Extension service Center for zoo veterinary and livestock keep in desert pasture conditions established. 4 Output 4. Economic evaluation of the project activities on sand stabilization and sustainable livestock production under desert pastures conditions. Cooperation with other programs and projects aimed to combat desertification and land degradation (ICBA, GIZ, WOCAT); Regular meetings with project areas communities in order to perform joint planning of activities; Analysis of the economic activity of Kyzyl Ravat shirkat farm; Popular science film on the project activity; Training workshops on the project topics at various decision making levels; Information materials for the project areas and the experts (Farmers Field Schools, pasture based livestock production, capacity building). 5 RISKS and ISSUES Force-Majeure (climate change, weather conditions, water availability etc.) Predominance of traditionalism in the problem solving approaches Predominance of directive-based approach in implementation of decisions (top-down execution) Complicated and prolonged process of implementation of the project achievements (change in the legislation, acceptance of the project results by the beneficiaries, etc.) Financial risk (planning, inflation, etc.) Organizational issue (local infrastructure, local experts’ capacity, etc.) 6
  • 2. The Project of UNDP-GEF and Government of the Republic Uzbekistan Under Umbrella of CACILM Reducing pressures on natural resources from competing land use in non-irrigated arid mountain, semi-desert and desert landscapes of Uzbekistan Duration: 2014-2018 Environment and Energy Unit UNDP in Uzbekistan The project goal and objective Objective To promote integrated management of rangeland and forests at the landscape level (focus on non-irrigated, arid mountain, semi-desert, and desert landscapes) to reduce pressures on natural resources from competing land uses and improve the socio-economic stability of communities Проект SLM-UNDP/GEF SGP.UZ The project goal is to reduce competing land use pressures on natural resources of arid non-irrigated landscapes in Uzbekistan Barriers to achieving the solution Barrier 1. Practical know-how barriers with limited practical capacity. Currently, land use is seen in a very stratified, narrow way. Barrier 2. Inappropriate structure (institutional, legislative and policy) and absence of mechanisms and experience to undertake cross-sector, integrated natural resource use planning. There is a need to adjust development objectives for arid desert, semi-desert and mountain land use. Details of Agricultural, Forestry and Reserve Land Use, in hectares Arable (irrigated 82%, rain-fed 18%) 4 045 600 Perennial crops (orchards, vineyards, mulberry, nurseries etc.) 343 000 Household plot land 616 200 Hayfields 104 900 Rangeland 19 667 900 Forested land (including windbreaks, poplar tree plantations) 3 199 300 Shrubs 31 100 Land requiring melioration/improvement 70 700 Abandoned land (fallow land) 78 400 Others 14 215 000 Total 42 372 100 Grazing pressure by livestock in natural rangeland Components of the project Component 1:Field level investment to transform the baseline approach. Promising best practices on sustainable rangeland and forestry management and INRM planning up-scaled in target districts of Uzbekistan. Component 2: Policy, legal and institutional mechanisms. An enabling cross-sector environment and in-country capacity (at system, institutional and individual levels) for applying integrated landscape management in arid mountain, semi-desert and desert areas of Uzbekistan. Фото А. Раббимова
  • 3. Component 1. Practical Part Outcome 1.1: Improvement in the vegetative cover of approximately 6,000 ha of rangeland and 1,000 ha of forestry fund territory due to enhanced land use management using sustainable INRM best practices, accompanied with approximately 50,000 people with secure and sustainable livelihoods. Outcome 1.2: Enhanced mechanisms for cross-sector integrated planning of sustainable natural resources management at district level to improve vegetation and forest cover, decrease moving sands and erosion, and reduce dust storms and other such events. Component 2. legal and institutional part Outcome 2.1: Enhanced policy, legal, and institutional framework for implementing integrated and sustainable management of rangeland and forests. Outcome 2.2: Adequate technical and managerial capacity for INRM at all levels of land use institutions for the development of policies, legislation and field operations. Outcome 2.3: Improved access of policy makers to tested INRM best practices and methodologies for improved land management. National scientific and educational iinnssttiittuuttiioonnss OCSE; World Bank; MASHAW (Israel); JICA (Japan); ICARDA; ICBA CACILM; US Embassy in Uzbekistan; Within the inception period collaboration with TIKA, KOICA and IDB planned. Project Demonstration sites The two pilot districts where demonstrations are to take place are the Zaamin district located in Djizak province, and Karakul district in Bukhara province. These districts were selected from all relevant districts in Uzbekistan via a systematic process that utilized a clear set of criteria.
  • 4. Thank you! Wells, Pasture Use and Degradation Budget sources Total resources required 12,193,600$ Total allocated resources (grants) 10,753,600$ - UNDP 700,000$ - GEF 2,313,600$ - Government 6,700,000$ - Forestry Enterprises 220,000$ - ICBA 500,000$ - Sheep Breeding Farms 320,000 In-kind Contributions 1,440,000$ Budget annually distribution Amount Year 1 (USD) Amount Year 2 (USD) Amount Year 3 (USD) Amount Year 4 (USD) Amount Year 5 (USD) Total (USD) Total Outcome 1 317,694 503,488 430,767 382,767 296,899 1,931,615 Total Outcome 2 39,587 71,507 90,892 66,592 109,965 378,543 Total Management costs 87,600 64,138 66,104 62,846 62,754 343,442 Total Project (GEF and UNDP) 444,881 639,133 587,763 512,205 469,618 2,653,600