PHASE I: PROJECT PREPARATION
7. Selecting NDT
with land use
15. Approval of housing
development project
investment/appraisal,
decision to permit investment
in new urban area project
5. Investment project proposal
10. Preparation, appraisal and approval of detailed planning / master plan
•a) Grant planning permit (if that area has not yet approved the
1/2000 master plan 1/500); •b) Issuing
a planning certificate (if there is a 1/500 master plan)/ or an agreement on
architectural planning (if there is a 1/2000 master plan...)/ or information on
planning and architecture
(if there is no master plan); •c) Apply for additional sector planning, construction
planning (if not available); •d) Formulate detailed planning
1/2000 (if there is no master plan); • dd) Formulate detailed construction planning
TL 1:500 or Total ground and architectural plan (if there is
a 1/2000 CSO); •e) Appraisal of construction planning TL 1/500/ QH TMB and
preliminary architectural design plan;
22. Application for land
allocation/
land lease
(form of land allocation,
land lease)
9. Prepare construction investment
project • Report on
technical feasibility study (if any)
and •
report on technical feasibility study
11. Notice of land
acquisition •
Form of bidding
18. Commitment to
environmental protection/
Appraisal and approval of
the environmental
impact assessment report
2. Market
exploration
exposure
24. Overall plan on
compensation and
resettlement
support (form of land
allocation, land lease)
25. Land acquisition. The notice of land
recovery is the legal basis for the
organization in charge of compensation
and site clearance to carry out
compensation, support and resettlement
and the investor to survey and formulate
investment projects (Figure 1). land
allocation, land lease)
23. Extraction of cadastral
maps to adjust land area
boundaries, verify maps
(form of land allocation,
land lease)
4. Please
recommend the place
3. Search and
discover land for making
investment plans
1. Research on
investment necessity
and investment size
14. Appraisal of fire
prevention design
16. Appraisal; Verification for
appraisal work
21. Investigate data, prepare, approve and publicize
the plan for compensation for site clearance,
payment of compensation, and receipt of the ground;
Hire a unit to compile land use levy and land rent
valuation dossiers; Appraisal of valuation dossiers,
determination of land use levies and land rents;
Approving the unit price of land use levy, land rent
(form of land allocation, land lease)
19. Decision on land
allocation, land lease,
permission to change
land use purpose
12. Get opinions
on basic design
6. Venue rental agreement; proposal for land use
demand • (if the project
does not request the State to allocate or lease
land, or permit the change of land use
purpose, a copy of the location lease agreement
or other document certifying the investor must be
submitted). the investor has the right to use
the site to implement the investment project)
17. Adjustment of
construction
investment project,
basic design (if any)
20. Publicize and implement
the compensation plan for site
clearance • Auction form
13. Information/
agreement on
water supply,
drainage, electricity supply
•g) Approving the construction planning of TL 1/500/ Approving the TMB master plan and preliminary
architectural plan.
CP Article 10 Clause 7 Point b
and Article 11 Clause 5
8. Preparation, appraisal and
approval of investment policies and
investment decisions •
Investment registration certificate
(for projects of foreign investors,
conditional business projects...)
•Decree No. 59/2015/ND
• Investor implementing the project
•Investment objective
•Investment scale, investment capital and capital mobilization plan
•Location
•Terms and progress of
investment •Need for labor
•Property proposal Investment
incentives •Assessment of the project's socio-economic impact
and efficiency • (according to the provisions of
the Investment Law and Decree 118/2015/ND-CP dated November 12, 2015)
QSDD
Machine Translated by Google
Phase II: INVESTMENT PROJECT IMPLEMENTATION
37. Quality inspection of
construction works by state
management agencies upon
completion of acceptance test to
put the works into use
34. Construction of works:
35. Notice of
commencement of
construction (investor)
27. Issuance of land use
right certificates
29. Construction survey (can be divided into 2 phases: preliminary survey for
making investment report and detailed survey for design).
38. Inspecting and certifying the implementation of
environmental protection works and measures in
service of the project operation phase
28. Preparation of construction
site, mine clearance (if any);
agreement on leveling canals
and rivers (if the project includes
leveling canals and rivers)
30. Work construction design consists of steps: preliminary design (in case of making pre-feasibility study
report), basic design (to be carried out during the formulation of construction investment project), design
technical design; construction drawing design and other design steps (if any). The investment decider decides
to implement the design according to the following steps:
32. Construction
Permit
26. Land allocation/land lease:
33. Construction bidding: •a)
Selection of project management consulting contractors (in
case of hiring project
management consultants); •b) Selection of construction survey contractors.
31. The order of execution of work construction design: •a) Formulating
the task of designing and designing the work construction; •b)
Examination and selection of architectural designs of construction works (if any); •c)
Selection of contractors for design and construction of works; •d) Design
and construction of works; • dd)
Appraisal of the basic design (to be done at the same time as the appraisal of the investment project); Appraisal of economic - technical reports; •e)
Appraisal of technical design (3-step design) and construction cost estimate; construction drawing design (2-step design) and construction estimate; carry
out design verification to serve the appraisal; •g) Approve technical design (3-
step design) and construction cost estimate; construction drawing design (2-step design) and construction estimate; •h) Appraisal; approve technical
design
(3-step design) and construction estimate; construction drawing design (2-step design) and construction estimate; •i) Design changes (if any); •k) Acceptance
of work
construction design; •l) Author
supervision.
•a) Formulate and approve construction survey tasks (construction
design); •b) Selection of construction
design contractors; •c) Prepare and approve the technical
plan of construction design; •d) Carry
out construction survey; • dd) Supervision of
construction survey work; •e)
Additional survey (if any); •g) Acceptance of
construction survey results; •h) Archive construction survey results.
•c) Three-step design: Includes basic design step, technical design step and construction drawing design step
(for large-scale and complex projects).
•a) Selection of construction contractors; •b) Select a construction
supervision contractor; •c) Prepare and verify
dossiers of invitation for expression of interest, dossiers of invitation for pre-qualification, bidding dossiers, dossiers of
requirements, and evaluate dossiers of expression of expression of interest, dossiers of participation in pre-qualification, bid
dossiers, dossiers of proposals. for selection of contractors in construction activities; verify the contractor selection results
in construction activities.
•Signing land lease contracts/ performing financial
obligations to the State (paying land use fees, registration
fees, land rents); receive land handover on the map and
in the field
36. Executing construction works: •a) Managing quality,
volume, progress, construction cost, construction contract, labor safety on construction site, construction environment build...; •b) Implement
and manage the construction information system; •c)
Construction testing (on request); •d) Acceptance of works,
stages and completed works; •dd) Advance payment for completed
volume.
•a) One-step design: three design steps are combined into one step called construction drawing design (works
only prepare economic - technical reports); •b) Two-step
design: the basic design step and the construction drawing design step (works subject to project formulation);
Machine Translated by Google
45. Insurance, warranty and
maintenance of construction works
40. Payment and settlement of
work construction investment
capital
46. International quality
registration (if any)
Phase III: FINISHING CONSTRUCTION
41. Auditing, verifying and
approving the settlement of work
construction investment capital
44. Certificate of ownership of works/
houses
PROJECT'S SUBJECT TO OPERATION AND USE
39. Handing over completed works
to put them into use; operate,
test run
43. Issuance of operation license/
Opening of industry/ Operation
permit/ Certificate of eligibility
(Projects in the field of conditional
investment)
42. Supervision and evaluation of
work construction investment
projects (in case of hiring
consultants)
Machine Translated by Google

More Related Content

Similar to CAC BUOC DAU TU DU AN.pdf

Construction Stages and Construction Teams
Construction Stages and Construction TeamsConstruction Stages and Construction Teams
Construction Stages and Construction TeamsMOHDFIRRDHAUSBINMOHD
 
Quantity surveyor (ici+itd)-pdf
Quantity surveyor (ici+itd)-pdfQuantity surveyor (ici+itd)-pdf
Quantity surveyor (ici+itd)-pdfChong Yi Hui
 
Quantity surveyor (ici+itd)
Quantity surveyor (ici+itd)Quantity surveyor (ici+itd)
Quantity surveyor (ici+itd)ALISON TANG
 
Quantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdfQuantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdfChong Yi Hui
 
ICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptxICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptxmkyong1996
 
Tor afg road
Tor   afg roadTor   afg road
Tor afg roadfalcon158
 
ANDHRA PRADESH TOWN PLANNING ACT 1920.pptx
ANDHRA PRADESH TOWN PLANNING ACT 1920.pptxANDHRA PRADESH TOWN PLANNING ACT 1920.pptx
ANDHRA PRADESH TOWN PLANNING ACT 1920.pptxsantu75
 
Kick-Off Meeting Habibiyyah (FINAL).pdf
Kick-Off Meeting Habibiyyah (FINAL).pdfKick-Off Meeting Habibiyyah (FINAL).pdf
Kick-Off Meeting Habibiyyah (FINAL).pdfMOHDFIRRDHAUSBINMOHD
 
Approval Process Summary for Major Subdivisions and Planned Developments
Approval Process Summary for Major Subdivisions and Planned DevelopmentsApproval Process Summary for Major Subdivisions and Planned Developments
Approval Process Summary for Major Subdivisions and Planned DevelopmentsBrunswick County
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviromentjuwes
 
Building Construction 3. responsibilities of participants
Building Construction 3. responsibilities of participantsBuilding Construction 3. responsibilities of participants
Building Construction 3. responsibilities of participantsHamdija Velagic
 
Qs(ici&itd) (1)
Qs(ici&itd) (1)Qs(ici&itd) (1)
Qs(ici&itd) (1)Js Cheok
 
Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)Jy Chong
 
Present status of apartment building approval and construction
Present status of apartment building approval and constructionPresent status of apartment building approval and construction
Present status of apartment building approval and constructionBinay Shrestha
 

Similar to CAC BUOC DAU TU DU AN.pdf (20)

Construction Stages and Construction Teams
Construction Stages and Construction TeamsConstruction Stages and Construction Teams
Construction Stages and Construction Teams
 
Quantity surveyor (ici+itd)-pdf
Quantity surveyor (ici+itd)-pdfQuantity surveyor (ici+itd)-pdf
Quantity surveyor (ici+itd)-pdf
 
Quantity surveyor (ici+itd)
Quantity surveyor (ici+itd)Quantity surveyor (ici+itd)
Quantity surveyor (ici+itd)
 
Quantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdfQuantity-Surveyor (ICI+ITD)-pdf.pdf
Quantity-Surveyor (ICI+ITD)-pdf.pdf
 
ITD project.pdf
ITD project.pdfITD project.pdf
ITD project.pdf
 
ICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptxICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptx
 
Tor afg road
Tor   afg roadTor   afg road
Tor afg road
 
BIM Application in Hong Kong Housing Authority by Mr. Lawrence K.W. CHUNG
BIM Application in Hong Kong Housing Authority by Mr. Lawrence K.W. CHUNGBIM Application in Hong Kong Housing Authority by Mr. Lawrence K.W. CHUNG
BIM Application in Hong Kong Housing Authority by Mr. Lawrence K.W. CHUNG
 
ANDHRA PRADESH TOWN PLANNING ACT 1920.pptx
ANDHRA PRADESH TOWN PLANNING ACT 1920.pptxANDHRA PRADESH TOWN PLANNING ACT 1920.pptx
ANDHRA PRADESH TOWN PLANNING ACT 1920.pptx
 
Kick-Off Meeting Habibiyyah (FINAL).pdf
Kick-Off Meeting Habibiyyah (FINAL).pdfKick-Off Meeting Habibiyyah (FINAL).pdf
Kick-Off Meeting Habibiyyah (FINAL).pdf
 
Approval Process Summary for Major Subdivisions and Planned Developments
Approval Process Summary for Major Subdivisions and Planned DevelopmentsApproval Process Summary for Major Subdivisions and Planned Developments
Approval Process Summary for Major Subdivisions and Planned Developments
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviroment
 
Building Construction 3. responsibilities of participants
Building Construction 3. responsibilities of participantsBuilding Construction 3. responsibilities of participants
Building Construction 3. responsibilities of participants
 
QSS
QSSQSS
QSS
 
Qs(ici&itd) (1)
Qs(ici&itd) (1)Qs(ici&itd) (1)
Qs(ici&itd) (1)
 
Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)
 
Present status of apartment building approval and construction
Present status of apartment building approval and constructionPresent status of apartment building approval and construction
Present status of apartment building approval and construction
 
Ddg architecture
Ddg architectureDdg architecture
Ddg architecture
 
Qsx
QsxQsx
Qsx
 
Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)
 

Recently uploaded

Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 

Recently uploaded (20)

Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 

CAC BUOC DAU TU DU AN.pdf

  • 1. PHASE I: PROJECT PREPARATION 7. Selecting NDT with land use 15. Approval of housing development project investment/appraisal, decision to permit investment in new urban area project 5. Investment project proposal 10. Preparation, appraisal and approval of detailed planning / master plan •a) Grant planning permit (if that area has not yet approved the 1/2000 master plan 1/500); •b) Issuing a planning certificate (if there is a 1/500 master plan)/ or an agreement on architectural planning (if there is a 1/2000 master plan...)/ or information on planning and architecture (if there is no master plan); •c) Apply for additional sector planning, construction planning (if not available); •d) Formulate detailed planning 1/2000 (if there is no master plan); • dd) Formulate detailed construction planning TL 1:500 or Total ground and architectural plan (if there is a 1/2000 CSO); •e) Appraisal of construction planning TL 1/500/ QH TMB and preliminary architectural design plan; 22. Application for land allocation/ land lease (form of land allocation, land lease) 9. Prepare construction investment project • Report on technical feasibility study (if any) and • report on technical feasibility study 11. Notice of land acquisition • Form of bidding 18. Commitment to environmental protection/ Appraisal and approval of the environmental impact assessment report 2. Market exploration exposure 24. Overall plan on compensation and resettlement support (form of land allocation, land lease) 25. Land acquisition. The notice of land recovery is the legal basis for the organization in charge of compensation and site clearance to carry out compensation, support and resettlement and the investor to survey and formulate investment projects (Figure 1). land allocation, land lease) 23. Extraction of cadastral maps to adjust land area boundaries, verify maps (form of land allocation, land lease) 4. Please recommend the place 3. Search and discover land for making investment plans 1. Research on investment necessity and investment size 14. Appraisal of fire prevention design 16. Appraisal; Verification for appraisal work 21. Investigate data, prepare, approve and publicize the plan for compensation for site clearance, payment of compensation, and receipt of the ground; Hire a unit to compile land use levy and land rent valuation dossiers; Appraisal of valuation dossiers, determination of land use levies and land rents; Approving the unit price of land use levy, land rent (form of land allocation, land lease) 19. Decision on land allocation, land lease, permission to change land use purpose 12. Get opinions on basic design 6. Venue rental agreement; proposal for land use demand • (if the project does not request the State to allocate or lease land, or permit the change of land use purpose, a copy of the location lease agreement or other document certifying the investor must be submitted). the investor has the right to use the site to implement the investment project) 17. Adjustment of construction investment project, basic design (if any) 20. Publicize and implement the compensation plan for site clearance • Auction form 13. Information/ agreement on water supply, drainage, electricity supply •g) Approving the construction planning of TL 1/500/ Approving the TMB master plan and preliminary architectural plan. CP Article 10 Clause 7 Point b and Article 11 Clause 5 8. Preparation, appraisal and approval of investment policies and investment decisions • Investment registration certificate (for projects of foreign investors, conditional business projects...) •Decree No. 59/2015/ND • Investor implementing the project •Investment objective •Investment scale, investment capital and capital mobilization plan •Location •Terms and progress of investment •Need for labor •Property proposal Investment incentives •Assessment of the project's socio-economic impact and efficiency • (according to the provisions of the Investment Law and Decree 118/2015/ND-CP dated November 12, 2015) QSDD Machine Translated by Google
  • 2. Phase II: INVESTMENT PROJECT IMPLEMENTATION 37. Quality inspection of construction works by state management agencies upon completion of acceptance test to put the works into use 34. Construction of works: 35. Notice of commencement of construction (investor) 27. Issuance of land use right certificates 29. Construction survey (can be divided into 2 phases: preliminary survey for making investment report and detailed survey for design). 38. Inspecting and certifying the implementation of environmental protection works and measures in service of the project operation phase 28. Preparation of construction site, mine clearance (if any); agreement on leveling canals and rivers (if the project includes leveling canals and rivers) 30. Work construction design consists of steps: preliminary design (in case of making pre-feasibility study report), basic design (to be carried out during the formulation of construction investment project), design technical design; construction drawing design and other design steps (if any). The investment decider decides to implement the design according to the following steps: 32. Construction Permit 26. Land allocation/land lease: 33. Construction bidding: •a) Selection of project management consulting contractors (in case of hiring project management consultants); •b) Selection of construction survey contractors. 31. The order of execution of work construction design: •a) Formulating the task of designing and designing the work construction; •b) Examination and selection of architectural designs of construction works (if any); •c) Selection of contractors for design and construction of works; •d) Design and construction of works; • dd) Appraisal of the basic design (to be done at the same time as the appraisal of the investment project); Appraisal of economic - technical reports; •e) Appraisal of technical design (3-step design) and construction cost estimate; construction drawing design (2-step design) and construction estimate; carry out design verification to serve the appraisal; •g) Approve technical design (3- step design) and construction cost estimate; construction drawing design (2-step design) and construction estimate; •h) Appraisal; approve technical design (3-step design) and construction estimate; construction drawing design (2-step design) and construction estimate; •i) Design changes (if any); •k) Acceptance of work construction design; •l) Author supervision. •a) Formulate and approve construction survey tasks (construction design); •b) Selection of construction design contractors; •c) Prepare and approve the technical plan of construction design; •d) Carry out construction survey; • dd) Supervision of construction survey work; •e) Additional survey (if any); •g) Acceptance of construction survey results; •h) Archive construction survey results. •c) Three-step design: Includes basic design step, technical design step and construction drawing design step (for large-scale and complex projects). •a) Selection of construction contractors; •b) Select a construction supervision contractor; •c) Prepare and verify dossiers of invitation for expression of interest, dossiers of invitation for pre-qualification, bidding dossiers, dossiers of requirements, and evaluate dossiers of expression of expression of interest, dossiers of participation in pre-qualification, bid dossiers, dossiers of proposals. for selection of contractors in construction activities; verify the contractor selection results in construction activities. •Signing land lease contracts/ performing financial obligations to the State (paying land use fees, registration fees, land rents); receive land handover on the map and in the field 36. Executing construction works: •a) Managing quality, volume, progress, construction cost, construction contract, labor safety on construction site, construction environment build...; •b) Implement and manage the construction information system; •c) Construction testing (on request); •d) Acceptance of works, stages and completed works; •dd) Advance payment for completed volume. •a) One-step design: three design steps are combined into one step called construction drawing design (works only prepare economic - technical reports); •b) Two-step design: the basic design step and the construction drawing design step (works subject to project formulation); Machine Translated by Google
  • 3. 45. Insurance, warranty and maintenance of construction works 40. Payment and settlement of work construction investment capital 46. International quality registration (if any) Phase III: FINISHING CONSTRUCTION 41. Auditing, verifying and approving the settlement of work construction investment capital 44. Certificate of ownership of works/ houses PROJECT'S SUBJECT TO OPERATION AND USE 39. Handing over completed works to put them into use; operate, test run 43. Issuance of operation license/ Opening of industry/ Operation permit/ Certificate of eligibility (Projects in the field of conditional investment) 42. Supervision and evaluation of work construction investment projects (in case of hiring consultants) Machine Translated by Google