7. Project’s Time Frame
• a)- Funding the PIN (Project Identification Note) : 6-12
months. EUR.400,000
• b)- Preparation of PDD/PIN (Project Document Design)
5-8 month
• c)- Validation through issuing EUR’s/CER’s (Certified
Emission Reductions ); 3-4 months
• d)- Distribution of EUR’s/CER’s; 2-3 months
• e)- Project construction;(varies depends on the project
type)
• Solar: Up to 12 months from
• Waste: Up to 24 months
8. Project Profit Calculation Formula
• PV Solar Projects
• KW/hr(system size)(S)* (T)-(number of average
sunny hours/day)* Number of days/ year, month
, day (364)(D)*(F)Tariff*Project efficiency(%96)(E)
= (R) total project revenue per the given time(D).
• numbers can change in each project.
• S.T.D.F.E=R
• Estimates of the 25MW/Hr solar project in Riau
Province using the discounted international Tariff.
• 25000X6X360X0.11X(0.96)= $5,702400/year
9. Project Benefits
• Reducing the release of Hazardous Gases to
the Air; (Goal of the CDM Projects).
• Generating Jobs for local communities.
• Stimulating the local and surrounding
economies.
• Profit generating projects, ((money making
machines)).
• Reducing the respiratory and other diseases
caused by the air and soil pollution.