COVERED CONDUCTOR
Covered conductors consist of a conductor
surrounded by a covering made of insulating
material as protection against accidental
contacts with other covered conductors and
with grounded parts such as tree branches,
etc.– As BS EN 50397-1: 2006.
CAUTION
3
 Conductors must be handled with care
 Only accessories designed and approved for the conductor may be
used
 Arc protection devices must be used on lines vulnerable to over
voltages
 Substations must have tripping earth-fault protection devices and
alarming secondary devices
INTERRUPTION FREE ELECTRICITY SUPPLY
OCCUPY 40 % LESS SPACE THAN BARE LINES
6
INSULATING MATERIAL:
XLPE (Cross-Linked Polyethylene)
HDPE (High Density Polyethylene)
CONDUCTOR MATERIAL
COPPER ALUMINIUM ACSR
7
OTHER DIFFERENT
TYPES OF COVERED
CONDUCTOR SYSTEM
SPACER CABLE SYSTEM
ABC
AERIAL BUNDLE CONDUCTOR
Bare conductor - 4.5 faults / 100 km
Covered conductor - 0.9 faults / 100 km
FAILURE RATE
Ref: EA Technology on Covered Conductor System for Distribution
BARE COVERED CONDUCTOR SPACER CABLE AERIAL BUNDLED
CABLE
RELIABILITY COST
ACCESSORIES OF
COVERED CONDUCTOR
SYSTEM
COVER ALUMINIUM SLEEVE
MIDSPAN JOINT FOR COVERED CONDUCTOR
INSULATION PIERCING CONNECTOR
PARTS
Body – Glass Reinforced Thermoplastic
Bolt & Nut – Galvanized Steel
Piercing Teeth – Tinned Copper
Cap – Glass Reinforced Thermoplastic
Shearing Head – Glass Reinforced Thermoplastic
INSULATION PIERCING CONNECTOR
TENSION CLAMP
LOW VOLTAGE
AERIAL BUNDLED
CONDUCTOR FITTING
INSULATION PIERCING
CONNECTOR
INSULATION
COMPRESSION JOINT
SUSPENSION CLAMP
ASSEMBLY
TENSION CLAMP
ASSEMBLY
HIGH VOLTAGE AERIAL
BUNDLED CONDUCTOR
FITTING
MIDSPAN JOINT FOR BARE MESSENGER
STRAIGHT THROUGH JOINT T-JOINT
CABLE TRAY
TENSION CLAMP SUSPENSION CLAMP
ARC PROTECTION SYSTEM
INTEGRATED INSULATOR – ARC PROTECTION
AND LIGHTNING ARRESTER (IIAPLA)
 Protects lines up to 33 kV against
Direct Lightning and Back Flashover.
 It performs the function of Composite
Insulator and a Lightning Arrestor
simultaneously.
 In-built Rapid Arc Quenching System
THIS PRODUCT IS UNDER DEVELOPMENT IN SUPREME.

Mais conteúdo relacionado

Mais procurados

Power Cables, Electrical Power & Industrial Cable, Electrical Wire, PVC Wire ...
Power Cables, Electrical Power & Industrial Cable, Electrical Wire, PVC Wire ...Power Cables, Electrical Power & Industrial Cable, Electrical Wire, PVC Wire ...
Power Cables, Electrical Power & Industrial Cable, Electrical Wire, PVC Wire ...Ajjay Kumar Gupta
 
UNDERGROUND CABLES PRESENTATION
UNDERGROUND CABLES  PRESENTATIONUNDERGROUND CABLES  PRESENTATION
UNDERGROUND CABLES PRESENTATIONPANKAJ KUMAR
 
construction of underground cable
construction of underground cableconstruction of underground cable
construction of underground cableRajal Patel
 
Short circuit analysis
Short circuit analysisShort circuit analysis
Short circuit analysisVB Engineering
 
Substation grounding
Substation groundingSubstation grounding
Substation groundingSyed Ubaid
 
Grounding in power system
Grounding in power systemGrounding in power system
Grounding in power systemvardhan k
 
Electric substation
Electric substation Electric substation
Electric substation ANNU KUMAR
 
Electronics Basic Concepts
Electronics Basic ConceptsElectronics Basic Concepts
Electronics Basic ConceptsA B Shinde
 
JOINTS IN ELECTRICAL CONDUCTORS.pptx
JOINTS IN ELECTRICAL CONDUCTORS.pptxJOINTS IN ELECTRICAL CONDUCTORS.pptx
JOINTS IN ELECTRICAL CONDUCTORS.pptxraghuRAGHU56
 
Designing and testing of metal oxide surge arrester for EHV line
Designing and testing of metal oxide surge arrester for EHV lineDesigning and testing of metal oxide surge arrester for EHV line
Designing and testing of metal oxide surge arrester for EHV lineRohit Khare
 
Coordinación de Protecciones Baja Tensión
Coordinación de Protecciones Baja TensiónCoordinación de Protecciones Baja Tensión
Coordinación de Protecciones Baja TensiónCristofer Torres Torres
 
Industrial Star Delta Starter for a 3-Phase Induction Motor
Industrial Star Delta Starter for a 3-Phase Induction MotorIndustrial Star Delta Starter for a 3-Phase Induction Motor
Industrial Star Delta Starter for a 3-Phase Induction Motorelprocus
 

Mais procurados (20)

Power Cables, Electrical Power & Industrial Cable, Electrical Wire, PVC Wire ...
Power Cables, Electrical Power & Industrial Cable, Electrical Wire, PVC Wire ...Power Cables, Electrical Power & Industrial Cable, Electrical Wire, PVC Wire ...
Power Cables, Electrical Power & Industrial Cable, Electrical Wire, PVC Wire ...
 
Lightening Arrester.pptx
Lightening Arrester.pptxLightening Arrester.pptx
Lightening Arrester.pptx
 
Grounding
GroundingGrounding
Grounding
 
UNDERGROUND CABLES PRESENTATION
UNDERGROUND CABLES  PRESENTATIONUNDERGROUND CABLES  PRESENTATION
UNDERGROUND CABLES PRESENTATION
 
Protection and Switchgear
Protection and SwitchgearProtection and Switchgear
Protection and Switchgear
 
Eat105 chapter 2
Eat105 chapter 2Eat105 chapter 2
Eat105 chapter 2
 
construction of underground cable
construction of underground cableconstruction of underground cable
construction of underground cable
 
Lightning arresters
Lightning arrestersLightning arresters
Lightning arresters
 
Short circuit analysis
Short circuit analysisShort circuit analysis
Short circuit analysis
 
Power cables
Power cablesPower cables
Power cables
 
Substation grounding
Substation groundingSubstation grounding
Substation grounding
 
Covered conductor
Covered conductorCovered conductor
Covered conductor
 
Grounding in power system
Grounding in power systemGrounding in power system
Grounding in power system
 
Electric substation
Electric substation Electric substation
Electric substation
 
Electronics Basic Concepts
Electronics Basic ConceptsElectronics Basic Concepts
Electronics Basic Concepts
 
JOINTS IN ELECTRICAL CONDUCTORS.pptx
JOINTS IN ELECTRICAL CONDUCTORS.pptxJOINTS IN ELECTRICAL CONDUCTORS.pptx
JOINTS IN ELECTRICAL CONDUCTORS.pptx
 
Designing and testing of metal oxide surge arrester for EHV line
Designing and testing of metal oxide surge arrester for EHV lineDesigning and testing of metal oxide surge arrester for EHV line
Designing and testing of metal oxide surge arrester for EHV line
 
Coordinación de Protecciones Baja Tensión
Coordinación de Protecciones Baja TensiónCoordinación de Protecciones Baja Tensión
Coordinación de Protecciones Baja Tensión
 
Underground cables
Underground cablesUnderground cables
Underground cables
 
Industrial Star Delta Starter for a 3-Phase Induction Motor
Industrial Star Delta Starter for a 3-Phase Induction MotorIndustrial Star Delta Starter for a 3-Phase Induction Motor
Industrial Star Delta Starter for a 3-Phase Induction Motor
 

Semelhante a Covered conductor

Semelhante a Covered conductor (20)

Cableshjtuy uifchgnhmj,kuytdfghjytfgkuhj
Cableshjtuy uifchgnhmj,kuytdfghjytfgkuhjCableshjtuy uifchgnhmj,kuytdfghjytfgkuhj
Cableshjtuy uifchgnhmj,kuytdfghjytfgkuhj
 
Introduction cable engineering
Introduction cable engineeringIntroduction cable engineering
Introduction cable engineering
 
2010fall ch7 zolboo
2010fall ch7 zolboo2010fall ch7 zolboo
2010fall ch7 zolboo
 
T&D GP.ppt
T&D GP.pptT&D GP.ppt
T&D GP.ppt
 
Communication - Line Communication Class 12 Part-6
Communication - Line Communication Class 12 Part-6Communication - Line Communication Class 12 Part-6
Communication - Line Communication Class 12 Part-6
 
Underground cables
Underground cablesUnderground cables
Underground cables
 
Underground cables
Underground cablesUnderground cables
Underground cables
 
6_line_communication.ppt
6_line_communication.ppt6_line_communication.ppt
6_line_communication.ppt
 
chapter 3.1.pptx
chapter 3.1.pptxchapter 3.1.pptx
chapter 3.1.pptx
 
PCCN unit 4 physical layer notes
PCCN unit 4 physical layer notesPCCN unit 4 physical layer notes
PCCN unit 4 physical layer notes
 
PL_Media.ppt
PL_Media.pptPL_Media.ppt
PL_Media.ppt
 
Presentation
PresentationPresentation
Presentation
 
Lesson 7 - Structured cabling.ppt
Lesson 7 - Structured cabling.pptLesson 7 - Structured cabling.ppt
Lesson 7 - Structured cabling.ppt
 
Lec transmission line
Lec transmission lineLec transmission line
Lec transmission line
 
Low voltage cables
Low voltage cablesLow voltage cables
Low voltage cables
 
Earthing Arrangements 17th
Earthing  Arrangements 17thEarthing  Arrangements 17th
Earthing Arrangements 17th
 
ELETRICAL WIRING, BRANDS, PRICE ,TYPES,
ELETRICAL WIRING, BRANDS, PRICE ,TYPES, ELETRICAL WIRING, BRANDS, PRICE ,TYPES,
ELETRICAL WIRING, BRANDS, PRICE ,TYPES,
 
Highvoltageundergroundcables 160405085258
Highvoltageundergroundcables 160405085258Highvoltageundergroundcables 160405085258
Highvoltageundergroundcables 160405085258
 
High voltage underground cables
High voltage underground cablesHigh voltage underground cables
High voltage underground cables
 
High voltage underground cables
High voltage underground cablesHigh voltage underground cables
High voltage underground cables
 

Mais de Harish Agarwal

Koshika cause & impact kolkata meetings 16.01.18
Koshika cause & impact kolkata meetings 16.01.18Koshika cause & impact kolkata meetings 16.01.18
Koshika cause & impact kolkata meetings 16.01.18Harish Agarwal
 
Case study sterlite deadend grip
Case study  sterlite deadend gripCase study  sterlite deadend grip
Case study sterlite deadend gripHarish Agarwal
 
Innovative solution for line uprating
Innovative solution for line upratingInnovative solution for line uprating
Innovative solution for line upratingHarish Agarwal
 
Innovative solution for line uprating
Innovative solution for line upratingInnovative solution for line uprating
Innovative solution for line upratingHarish Agarwal
 
Effect of GST in solar industry
Effect of GST in solar industryEffect of GST in solar industry
Effect of GST in solar industryHarish Agarwal
 
Development and testing of ipc
Development and testing of ipcDevelopment and testing of ipc
Development and testing of ipcHarish Agarwal
 
Solar water pumping_solution
Solar water pumping_solutionSolar water pumping_solution
Solar water pumping_solutionHarish Agarwal
 

Mais de Harish Agarwal (17)

Aerial fibre optics
Aerial fibre opticsAerial fibre optics
Aerial fibre optics
 
Line upgrade
Line upgradeLine upgrade
Line upgrade
 
Monopole
MonopoleMonopole
Monopole
 
Koshika cause & impact kolkata meetings 16.01.18
Koshika cause & impact kolkata meetings 16.01.18Koshika cause & impact kolkata meetings 16.01.18
Koshika cause & impact kolkata meetings 16.01.18
 
Line upgrade
Line upgradeLine upgrade
Line upgrade
 
Fittings for lv abc
Fittings for lv abcFittings for lv abc
Fittings for lv abc
 
Harish aggarwal
Harish aggarwalHarish aggarwal
Harish aggarwal
 
Case study sterlite deadend grip
Case study  sterlite deadend gripCase study  sterlite deadend grip
Case study sterlite deadend grip
 
Hpc new
Hpc newHpc new
Hpc new
 
Innovative solution for line uprating
Innovative solution for line upratingInnovative solution for line uprating
Innovative solution for line uprating
 
Pole type structures
Pole type structuresPole type structures
Pole type structures
 
Innovative solution for line uprating
Innovative solution for line upratingInnovative solution for line uprating
Innovative solution for line uprating
 
Effect of GST in solar industry
Effect of GST in solar industryEffect of GST in solar industry
Effect of GST in solar industry
 
Line upgrade
Line upgradeLine upgrade
Line upgrade
 
Development and testing of ipc
Development and testing of ipcDevelopment and testing of ipc
Development and testing of ipc
 
Solar water pumping_solution
Solar water pumping_solutionSolar water pumping_solution
Solar water pumping_solution
 
INTER PHASE SPACERS
INTER PHASE SPACERS INTER PHASE SPACERS
INTER PHASE SPACERS
 

Último

IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 

Último (20)

IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 

Covered conductor