BIM Algorithmic Workflow Case Study
Mr. Eugenio FONTAN BIM Director and Co Founder, Enzyme APD Ltd.
HKIBIM Annual Conference 2017
Theme: Transforming BIM to Action
Date: 22-Nov-2017 (Wed)
Time: 9:00 a.m. – 4:30 p.m.
Venue: Grand Ballroom I-III, Level 6, Royal Plaza Hotel, Hong Kong
Organizers:
The Hong Kong Institute of Building Information Modelling (HKIBIM)
http://www.hkibim.org
HKIBIM Annual Conference 2017 is the 8th Annual Conference organized by the Hong Kong Institute of Building Information Modelling (HKIBIM). It is the premier annual event for experienced professionals to demonstrate the practical use of Building Information Modelling (BIM) processes using real cases. The speakers are encouraged to illustrate lessons learned in practical projects so that more professionals from different disciplines can improve their productivity through efficient use of BIM and advance practical knowledge. This is an exciting opportunity to share your knowledge and experience with the larger BIM community.
20. Testing The Potential..
DURING THE PAST YEARS WE HAVE ALSO
BEEN EXPERIMENTING WITH ALGORITHMIC
TOOLS TO ENHANCE THE DESIGN AND
OPTIMISE CERTAIN WORKFLOWS
57. Wall Schedule
Element Classification
Wall
Wall
Element ID
SW - 001
W - 001
3D Axonometry Quantity
296
1752
Wall Type
Reinforced Concre…
Glass
Height [m]
5.000
4.300
Thickness [m]
0.500
0.010
Area [m2]
3,581.60
116.48
Net Volume [m3]
17,908.00
422.99
Perimeter of the Wall [m]
14,743.76
23,283.44
Gross Surface Area of the Wall on the Outside Face
36,556.00
49,987.00
IES-01 STR Columns
Building Material / Composite / Profile / Fill
Reinforced Concrete - Structural
Building Materials (All)
Reinforced Concrete - Structural
Quantity
516
Gross Volume of the Column
6,269.40
Maximum Height of the Column
4.05
IES-01 Facade Fins
Building Material / Composite / Profile / Fill
FACADE PROFILE
Building Materials (All)
Aluminium
Quantity
4047
Gross Volume of the Column
202.35
Maximum Height of the Column
4.15
ICS-01 Reinforced Concrete
ID
ST-06
Name
Reinforced Concrete - Structural
Volume [m3]
24,177.40
IES-01 Beam Schedule
Perimeter
44,286.74
Wall Schedule
Element Classification
Wall
Wall
Element ID
SW - 001
W - 001
3D Axonometry Quantity
296
1752
Wall Type
Reinforced Concre…
Glass
Height [m]
5.000
4.300
Thickness [m]
0.500
0.010
Area [m2]
3,581.60
116.48
Net Volume [m3]
17,908.00
422.99
Perimeter of the Wall [m]
14,743.76
23,283.44
Gross Surface
36,556.00
49,987.00
IES-01 STR Columns
Building Material / Composite / Profile / Fill
Reinforced Concrete - Structural
Building Materials (All)
Reinforced Concrete - Structural
Quantity
516
Gross Volume of the Column
6,269.40
Maximum Height of the Column
4.05
IES-01 Facade Fins
Building Material / Composite / Profile / Fill
FACADE PROFILE
Building Materials (All)
Aluminium
Quantity
4047
Gross Volume of the Column
202.35
Maximum Height of the Column
4.15
ICS-01 Reinforced Concrete
ID
ST-06
Name
Reinforced Concrete - Structural
Volume [m3]
24,177.40
IES-01 Beam Schedule
Perimeter
44,286.74
58.
59. From the Early Design:
BIM + Algorithmic Workflow
Smart Design Process
78. Start from the Beginning of the Project:
Smart Design Process
If we want to transform BIM Into Action..
79. Start from the Beginning of the Project:
1. BIM - Control of the Project
Efficiency, Precision, Avoid errors.
Smart Design Process
If we want to transform BIM Into Action..
80. Start from the Beginning of the Project:
1. BIM - Control of the Project
Efficiency, Precision, Avoid errors.
2. Algorithmic Logic - Design Freedom
Design Options, Iterations, Optimization
Smart Design Process
If we want to transform BIM Into Action..