CONTENTS
 ABOUT RIVER KRISHNA
 OVERVIEW OF UKP
 ABOUT ALMATTI DAM
 WHY DAM WAS BUILT
 ISSUES
 REHABILITATION
 BACKWATER
 SOIL ALKALINITY
 INTER STATE DISPUTES
 GOVERNMENT GREAT DECISION
 CONCLUSION
 REFERENCE
10/11/2015
2
ABOUT RIVER KRISHNA
 The Krishna River is the second biggest river in peninsular India.
 It originates near Mahabaleshwar in Maharashtra from the statue of a
cow in a temple.
 It then runs for a distance of 303 km in Maharashtra, 480 km through
the breadth of North Karnataka and the rest of its 1300 km journey
in Telangana and Andhra Pradesh before it empties into the Bay of
Bengal.
 The river basinis 257,000 km² and the States of Maharastra, Karnataka
and Andhra Pradesh contributes 68,800 km² (26.8%), 112,600 sq.k.m
(43.8%) and 75,600 km² (29.4%) respectively.
10/11/2015
3
An overview of UKP I
FIRST REPORT ( 31ST MAY 1976)
SCHEME A
OUT 0F 2060 TMC
Maharashtra 560 TMC
Karnataka 700 TMC
Andhra Pradesh 800 TMC
SECOND REPOT ( 31ST DEC 2010) OUT OF 2578 TMC AVG
Maharashtra 666 TMC
Karnataka 911 TMC
Andhra Pradesh 1001 TMC
AS PER KWDT AWARD 1
AS PER KWDT AWARD 2
10/11/2015
4
LAL BAHADUR SHASTRI SAGAR
 138 VILLAGES SUBMERGED
 1,80,000 PEOPLE RELOCATED
 ONE WHOLE TOWN RELOCATED
 SUPPLIES WATER FOR IRRIGATION TO 10 DISTRICTS INCLUDING 5 DISTRICTS OF
ANDHRA PRADESH
 ANNUAL POWER PRODUCTION OF 590 MU OF ELECTRICITY
 SUCCESSFUL IN SOLVING DROUGHT , DRINKING WATER , CANAL IRRIGATION AND
FLOOD CONTROL
 MINIMUM TREES WERE CUT
 LESS ENVIRONMENTAL ISSUES BUT MORE SOCIOLOGICAL ISSUES
 HOME FOR 100 OF SPECIES OF MIGRATORY BIRDS SPECIALLY FLAMINGOES.
Height: 52.25m
Length: 1.565.15 km
Spillways: 26
Catchment area: 33,375
sqkm
Irrigation area: 0.16lakh ha
10/11/2015
5
WHY WAS THE DAM BUILT ???
 Dam comes under UPPER KRISHNA PROJECT I (UKP I)
Main purpose:
 Drought control
 Irrigation
 Drinking water
 Effective use of flowing water.
Difficulties:
 Relocation of 134 villages, population upto 1,80,000.
 Construction of rehabilitation centers for these people.
10/11/2015
6
Overall cost
 During the initial stages of the project, estimated costs were projected
as Rs.14.70 billion
 The transfer of project's management to the Karnataka Power Corporation
Limited (KPCL).
 The estimated cost was reduced by over fifty percent to Rs. 6.74 billion.
 The KPCL eventually completed the project at an even lower cost of Rs.
5.20 billion.
 ONE OF THE EFFICIENT ACHIEVEMENT OF KPCL IN THE MIDST OF HIGH
CORRUPTION
10/11/2015
7
REHABILITATION
 The families displaced by the Upper Krishna Project in Karnataka are unhappy
at the rehabilitation centres.
 The irrigation project, which has taken over 40 years to complete, dislocated
93,263 families (a vast majority of whom are dependent on agriculture).
 S.N. Cheluvadi, a landless farm labourer and resident of the Biligi rehabilitation
centre, said: "It's been 10 years since I was shifted to this place, but I still have
no work
 Annasaheb Sirur, who lost his land and has been rehabilitated in the nearby
Korati rehabilitation centre, said: "At least in Goa I can catch fish and eat! Here I
am forced to serve tea in the school.“
 "More than 40 per cent of the 4.25 lakh displaced persons fall in this category.
Where do we put them? What kind of non-agricultural occupation do we find for
them? Shifting them from manual labour to semi-skilled labour is difficult.
10/11/2015
8
 But a new problem has cropped up; that of educated unemployed.
 These youth do not want to work in the fields but look for government
jobs.
 The government has reserved 5 per cent of Class C and D jobs for them,
but that is hardly sufficient in an era when government-run factories
are getting closed.
10/11/2015
9
FORMATION OF NAVNAGAR A BACKWATER ISSUE
 Whole Bagalkot town( District place ) was
submerged in back water of Alamatti dam.
 A higher location and the formation of
Bagalkot Town Development Authority
(BTDA) under the Karnataka Improvement
Boards Act, 1976.
 For locating the New Township of Bagalkot ,
an area of 4,320 acres has been acquired.
 22,000 structures, 91,596 people
10/11/2015
10
cont’d
 Various benefits to the displaced families :
free site allotment ,free houses, free stamp duty in
purchasing immovable properties, free transport, free
compensation…etc.
 4,467 structures, Rs. 117.97 Crores has been paid as
compensation, 7,579 plots have been distributed.
 The total estimated cost of Bagalkot relocation is Rs.
1037.49 Crores and the expenditure incurred upto end
of June 2003.
 All basic amenities like drinking water supply, electricity,
under ground drainage, roads, storm water drains,
public utility buildings etc. have been provided in the
New Township.
10/11/2015
11
SOIL ALKALINITY
 The uplands of Krishna river basin located in Maharashtra and Karnataka are
situated on the Deccan Traps which comprises thick seems of basalt rock
formations.
 Basalt rock is prone to chemical weathering contributing more TDS to the river
water.
 Water is not safe for drinking if the TDS exceeds 500 mg/l.
 The average yearly salt export requirement is nearly 12 million tons in Krishna
basin area up to Prakasam Barrage.
 At least 850 TMC water is required for salt export purpose to maintain water
TDS below 500 mg/l.
 The water TDS is around 450 mg/l during peak monsoon months which is
highest among the major Indian rivers. 10/11/2015
12
INTER STATE DISPUTES
 This is regarding height raising of Dam from 519.6m to 524.26m.
 On Nov 30 2013
 Setback to Andhra Pradesh as Brijesh Tribunal allows raising Almatti dam
height.
 Since the decision of the tribunal is equivalent to a judgment of the Supreme
Court, no appeal against the award can be filed in any court until May 2050
when the tribunal is to review the final allocations.
 "Only after the Supreme Court delivers its judgment on our SLP that the award
of the tribunal will be implemented," said D Sudershan Reddy, counsel for the
state before the tribunal.
 The tribunal, however, directed Karnataka to make regulated releases of 8 to 10
thousand million cubic feet (TMC) from the dam to Andhra Pradesh in June and
July.
10/11/2015
13
CASE STUDY
 The louder you shout and the more noise you make, the greater is your chance
of succeeding: this seems to be the mantra of both Karnataka and Andhra
Pradesh (ap) politicians on the contentious issue of the Alamatti dam.
 BOTH THE STATES HAS PROBLEMS IN RAISING THE HEIGHT
KARNATAKA ANDHRA PRADESH
22 villages will be fully submerged Reduced water flow to nagarjunasagar,
jerula dam
192 partly submerged Jeopardizing the economy of ap's rice bowl
1.2 lakh acres should be acquired for
relocation
Karnataka will get more control
Pros : It can irrigate 5.4 lakh hectares
more,
Upstream states gets more benefit
100 MU more energy production
10/11/2015
14
 The Andhra Pradesh Reorganisation Bill, 2014
 Regulation of supply of water from the projects to the successor States having
regard to awards.
 Regulation of supply of power generated to the authority in-charge of the
distribution of power having regard to any agreement.
 Construction of such of the remaining on-going or new works connected with
the development of the water resources projects relating to the rivers.
 Making an appraisal of any proposal for construction of new projects on
Krishna rivers and giving technical clearance.
 Telangana state demands
 The newly formed Telangana state is fourth riparian state in the Krishna river
basin.
 To start again the tribunal proceeding afresh as it was not party to the earlier
KWDT1 and KWDT2 adjudications.
10/11/2015
15
CONCLUSION
 Proper review of all the rehabilitation centres and problems associated
with it.
 Inspection of problems at Dam.
 Infrastructure development.
 Afforestation.
 Adopt new technologies of irrigation.
 Conservation of water.
 Effective utilization of Dam water.
 Increase of medical aids for water borne diseases.
10/11/2015
16
GOVERNMENT GREAT DECISION
 “Don't Give Nod to New Dams, Water Ministry Tells CWC”.
 Ministry of Water Resources Secretary Shashi Shekhar had on August 25 written to
Central Water Commission Chairman A B Pandya that Minister of Water Resources
Uma Bharti.
 An expert panel has been studying the impact of existing and proposed dams on
the flow of rivers and the report will decide fate of dams.
 “In the process, not only have the rivers become fragmented, but most of the floral
and faunal species have become extinct. There are certain stretches where a river
has become completely dry,” said the letter.
 He stated that the environmental flow (e-flow) in rivers was a necessity for the
survival of a river, for it to perform its ecological functions and also to ensure that
the cultural dependence a community has on the river is maintained.
 No dam or barrage be designed or approved by the Central Water
Commission without factoring in adequate e-flow.
10/11/2015
17
STATE
Thermal (in MW)
Nuclear
(in MW)
Renewable (in MW)
Total
(in MW)
Coal Gas Diesel
Sub-
Total
Thermal
Hydel
Other
Renewa
ble(MW)
subtotal
Tamil Nadu 10,075.10 1026.30 411.66 11,513.06 986.50 2,182.20 8,423.15 10,605.35 23,104.91
Karnataka 6,408.46 - 234.42 6,642.88 475.86 3,599.80 4552.48 8,152.28 15,271.02
Andhra
Pradesh 5,849.21 1,672.65 16.97 7,538.83 127.16 1,721.99 2,002.65 3,724.64 11,390.64
Telangana 5,598.47 1,697.75 19.83 7,316.05 148.62 2012.54 62.75 2,075.29 9,539.96
Kerala 1,038.69 533.58 234.60 1,806.87 228.60 1881.50 204.05 2,085.55 4,121.02
FOR YOUR INFORMATION
10/11/2015
18
Bibliography
 http://www.kbjnl.com
 http://www.newindianexpress.com/nation/Dont-Give-Nod-to-New-Dams-
Water-Ministry-Tells-CWC/2015/09/04/article3009758.ece
 http://www.indiaenvironmentportal.org.in/content/3489/all-about-
alamatti/
 http://www.cea.nic.in/monthly_gen.html
 https://en.wikipedia.org/wiki/Krishna_Water_Disputes_Tribunal
 Report on 40 years of Upper krishna project by UKP documentation
committee.
 www.soils.org
10/11/2015
19
DAM GALLERY
SAVE WATER SAVE LIFE
QUERIES ???
10/11/2015
20

More Related Content

What's hot

50427872 narmada-dam-talhah-ppt[1]
50427872 narmada-dam-talhah-ppt[1]50427872 narmada-dam-talhah-ppt[1]
50427872 narmada-dam-talhah-ppt[1]
sachindk
 

What's hot (20)

Ganga action plan: As a case study in Environmental Legislation
Ganga action plan: As a case study in Environmental LegislationGanga action plan: As a case study in Environmental Legislation
Ganga action plan: As a case study in Environmental Legislation
 
EIA for development projects
EIA for development projectsEIA for development projects
EIA for development projects
 
Methods of water conservation
Methods of water conservationMethods of water conservation
Methods of water conservation
 
Ppt on water pollution
Ppt on water pollutionPpt on water pollution
Ppt on water pollution
 
Case study ganga action plan
Case study ganga action plan Case study ganga action plan
Case study ganga action plan
 
River Pollution In India
River Pollution In IndiaRiver Pollution In India
River Pollution In India
 
NATURAL AND ANTHAOPOGENIC RADIATIVE FORCING BASED ON IPCC AR5
NATURAL AND ANTHAOPOGENIC RADIATIVE FORCING BASED ON IPCC AR5NATURAL AND ANTHAOPOGENIC RADIATIVE FORCING BASED ON IPCC AR5
NATURAL AND ANTHAOPOGENIC RADIATIVE FORCING BASED ON IPCC AR5
 
Environmental legislation & water pollution acts
Environmental legislation & water pollution actsEnvironmental legislation & water pollution acts
Environmental legislation & water pollution acts
 
Water pollution in Dhaka City (Hatirjheel dhaka , bangladesh)
Water pollution in Dhaka City (Hatirjheel    dhaka , bangladesh)Water pollution in Dhaka City (Hatirjheel    dhaka , bangladesh)
Water pollution in Dhaka City (Hatirjheel dhaka , bangladesh)
 
Namami gange
Namami gangeNamami gange
Namami gange
 
Groung water pollution
Groung water pollutionGroung water pollution
Groung water pollution
 
50427872 narmada-dam-talhah-ppt[1]
50427872 narmada-dam-talhah-ppt[1]50427872 narmada-dam-talhah-ppt[1]
50427872 narmada-dam-talhah-ppt[1]
 
Water pollution ganga
Water pollution gangaWater pollution ganga
Water pollution ganga
 
Environmental impact assessement patrind hydropower project
Environmental impact assessement patrind hydropower projectEnvironmental impact assessement patrind hydropower project
Environmental impact assessement patrind hydropower project
 
Emerging contaminants and precautionary principle
Emerging contaminants and precautionary principleEmerging contaminants and precautionary principle
Emerging contaminants and precautionary principle
 
Ganga action plan
Ganga action planGanga action plan
Ganga action plan
 
Water Pollution
Water PollutionWater Pollution
Water Pollution
 
Effect of dam on biodiversity
Effect of dam on biodiversityEffect of dam on biodiversity
Effect of dam on biodiversity
 
Ganga Action Plan
Ganga Action PlanGanga Action Plan
Ganga Action Plan
 
EIA thermal power plant
EIA thermal power plantEIA thermal power plant
EIA thermal power plant
 

Similar to Issues almatti dam_gurudath_ret15004

Interlinking of rivers
Interlinking of riversInterlinking of rivers
Interlinking of rivers
Ashwath Sriram
 
River inter linking is it really a mirage
River inter linking   is it really a mirageRiver inter linking   is it really a mirage
River inter linking is it really a mirage
Periasamy K
 
Inter linking of river in india
Inter linking of river in indiaInter linking of river in india
Inter linking of river in india
Puspendu Samanta
 
1_interlinking of rivers_22, 26.pptf
1_interlinking of rivers_22,     26.pptf1_interlinking of rivers_22,     26.pptf
1_interlinking of rivers_22, 26.pptf
AtharvaNaikMU
 
Inter-StateWaterDispute.pptx
Inter-StateWaterDispute.pptxInter-StateWaterDispute.pptx
Inter-StateWaterDispute.pptx
PapuKumarNaik1
 

Similar to Issues almatti dam_gurudath_ret15004 (20)

Interlinking of rivers
Interlinking of riversInterlinking of rivers
Interlinking of rivers
 
Interlinking of rivers in india
Interlinking of rivers in indiaInterlinking of rivers in india
Interlinking of rivers in india
 
River Interlinking Projects for Socio Economic Transformation
River Interlinking Projects for Socio Economic TransformationRiver Interlinking Projects for Socio Economic Transformation
River Interlinking Projects for Socio Economic Transformation
 
Interlinking of rivers in India
Interlinking of rivers in IndiaInterlinking of rivers in India
Interlinking of rivers in India
 
River inter linking is it really a mirage
River inter linking   is it really a mirageRiver inter linking   is it really a mirage
River inter linking is it really a mirage
 
River interlinking
River interlinkingRiver interlinking
River interlinking
 
Yettinahole Project - Diverting west flowing water to an arid land
Yettinahole Project - Diverting west flowing water to an arid landYettinahole Project - Diverting west flowing water to an arid land
Yettinahole Project - Diverting west flowing water to an arid land
 
Issue of Kalabagh Dam in Pakistan
Issue of Kalabagh Dam in PakistanIssue of Kalabagh Dam in Pakistan
Issue of Kalabagh Dam in Pakistan
 
Inter linking of river in india...
Inter linking of river in india...Inter linking of river in india...
Inter linking of river in india...
 
Inter linking of river in india
Inter linking of river in indiaInter linking of river in india
Inter linking of river in india
 
Kala bagh dam by engr sabir rehman
Kala bagh dam by engr sabir rehmanKala bagh dam by engr sabir rehman
Kala bagh dam by engr sabir rehman
 
1_interlinking of rivers_22, 26.pptf
1_interlinking of rivers_22,     26.pptf1_interlinking of rivers_22,     26.pptf
1_interlinking of rivers_22, 26.pptf
 
A Study on interlinking of Rivers in A.P & on Kundu River in YSR District
A Study on interlinking of Rivers in A.P & on Kundu River in YSR DistrictA Study on interlinking of Rivers in A.P & on Kundu River in YSR District
A Study on interlinking of Rivers in A.P & on Kundu River in YSR District
 
final-170310124056.pdf
final-170310124056.pdffinal-170310124056.pdf
final-170310124056.pdf
 
Sardar Sarovar Dam, Gujarat, India.
Sardar Sarovar Dam, Gujarat, India.Sardar Sarovar Dam, Gujarat, India.
Sardar Sarovar Dam, Gujarat, India.
 
chapter; 13 general karnali psc.pdf
chapter; 13 general karnali psc.pdfchapter; 13 general karnali psc.pdf
chapter; 13 general karnali psc.pdf
 
Project management - JICA Project In Abbottabad (Knowledge Gain Purpose)
Project management - JICA Project In Abbottabad (Knowledge Gain Purpose)Project management - JICA Project In Abbottabad (Knowledge Gain Purpose)
Project management - JICA Project In Abbottabad (Knowledge Gain Purpose)
 
Inter-StateWaterDispute.pptx
Inter-StateWaterDispute.pptxInter-StateWaterDispute.pptx
Inter-StateWaterDispute.pptx
 
Kalabagh damm
Kalabagh dammKalabagh damm
Kalabagh damm
 
Kalabagh dam
Kalabagh damKalabagh dam
Kalabagh dam
 

Recently uploaded

Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
ZAPPAC1
 
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
zubnm
 
case-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdfcase-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdf
garthraymundo123
 
Dubai Escorts Service 0508644382 Escorts in Dubai
Dubai Escorts Service 0508644382 Escorts in DubaiDubai Escorts Service 0508644382 Escorts in Dubai
Dubai Escorts Service 0508644382 Escorts in Dubai
Monica Sydney
 

Recently uploaded (20)

Top Call Girls in Bishnupur 9332606886 High Profile Call Girls You Can Get...
Top Call Girls in Bishnupur   9332606886  High Profile Call Girls You Can Get...Top Call Girls in Bishnupur   9332606886  High Profile Call Girls You Can Get...
Top Call Girls in Bishnupur 9332606886 High Profile Call Girls You Can Get...
 
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterYil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
 
Call girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl servicesCall girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl services
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
 
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
 
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
 
Climate Change
Climate ChangeClimate Change
Climate Change
 
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptxEnvironmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
 
Fuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An IntroductionFuel Cells and Hydrogen in Transportation - An Introduction
Fuel Cells and Hydrogen in Transportation - An Introduction
 
High Profile Call Girls Service in Udhampur 9332606886 High Profile Call G...
High Profile Call Girls Service in Udhampur   9332606886  High Profile Call G...High Profile Call Girls Service in Udhampur   9332606886  High Profile Call G...
High Profile Call Girls Service in Udhampur 9332606886 High Profile Call G...
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
 
Russian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girlsRussian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girls
 
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
Sensual Call Girls in Surajpur { 9332606886 } VVIP NISHA Call Girls Near 5 St...
 
case-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdfcase-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdf
 
Jumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptxJumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptx
 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...
 
Deforestation
DeforestationDeforestation
Deforestation
 
Dubai Escorts Service 0508644382 Escorts in Dubai
Dubai Escorts Service 0508644382 Escorts in DubaiDubai Escorts Service 0508644382 Escorts in Dubai
Dubai Escorts Service 0508644382 Escorts in Dubai
 

Issues almatti dam_gurudath_ret15004

  • 1. A Report On Issues and Disputes of Almatti dam. By Gurudath G Prabhu (CB.EN.P2RET15004) AMRITA SCHOOL OF ENGINEERING ETTIMADAI, COIMBATORE – 641112 Email: gurudathprabhu1993@gmail.com 10/11/2015 1
  • 2. CONTENTS  ABOUT RIVER KRISHNA  OVERVIEW OF UKP  ABOUT ALMATTI DAM  WHY DAM WAS BUILT  ISSUES  REHABILITATION  BACKWATER  SOIL ALKALINITY  INTER STATE DISPUTES  GOVERNMENT GREAT DECISION  CONCLUSION  REFERENCE 10/11/2015 2
  • 3. ABOUT RIVER KRISHNA  The Krishna River is the second biggest river in peninsular India.  It originates near Mahabaleshwar in Maharashtra from the statue of a cow in a temple.  It then runs for a distance of 303 km in Maharashtra, 480 km through the breadth of North Karnataka and the rest of its 1300 km journey in Telangana and Andhra Pradesh before it empties into the Bay of Bengal.  The river basinis 257,000 km² and the States of Maharastra, Karnataka and Andhra Pradesh contributes 68,800 km² (26.8%), 112,600 sq.k.m (43.8%) and 75,600 km² (29.4%) respectively. 10/11/2015 3
  • 4. An overview of UKP I FIRST REPORT ( 31ST MAY 1976) SCHEME A OUT 0F 2060 TMC Maharashtra 560 TMC Karnataka 700 TMC Andhra Pradesh 800 TMC SECOND REPOT ( 31ST DEC 2010) OUT OF 2578 TMC AVG Maharashtra 666 TMC Karnataka 911 TMC Andhra Pradesh 1001 TMC AS PER KWDT AWARD 1 AS PER KWDT AWARD 2 10/11/2015 4
  • 5. LAL BAHADUR SHASTRI SAGAR  138 VILLAGES SUBMERGED  1,80,000 PEOPLE RELOCATED  ONE WHOLE TOWN RELOCATED  SUPPLIES WATER FOR IRRIGATION TO 10 DISTRICTS INCLUDING 5 DISTRICTS OF ANDHRA PRADESH  ANNUAL POWER PRODUCTION OF 590 MU OF ELECTRICITY  SUCCESSFUL IN SOLVING DROUGHT , DRINKING WATER , CANAL IRRIGATION AND FLOOD CONTROL  MINIMUM TREES WERE CUT  LESS ENVIRONMENTAL ISSUES BUT MORE SOCIOLOGICAL ISSUES  HOME FOR 100 OF SPECIES OF MIGRATORY BIRDS SPECIALLY FLAMINGOES. Height: 52.25m Length: 1.565.15 km Spillways: 26 Catchment area: 33,375 sqkm Irrigation area: 0.16lakh ha 10/11/2015 5
  • 6. WHY WAS THE DAM BUILT ???  Dam comes under UPPER KRISHNA PROJECT I (UKP I) Main purpose:  Drought control  Irrigation  Drinking water  Effective use of flowing water. Difficulties:  Relocation of 134 villages, population upto 1,80,000.  Construction of rehabilitation centers for these people. 10/11/2015 6
  • 7. Overall cost  During the initial stages of the project, estimated costs were projected as Rs.14.70 billion  The transfer of project's management to the Karnataka Power Corporation Limited (KPCL).  The estimated cost was reduced by over fifty percent to Rs. 6.74 billion.  The KPCL eventually completed the project at an even lower cost of Rs. 5.20 billion.  ONE OF THE EFFICIENT ACHIEVEMENT OF KPCL IN THE MIDST OF HIGH CORRUPTION 10/11/2015 7
  • 8. REHABILITATION  The families displaced by the Upper Krishna Project in Karnataka are unhappy at the rehabilitation centres.  The irrigation project, which has taken over 40 years to complete, dislocated 93,263 families (a vast majority of whom are dependent on agriculture).  S.N. Cheluvadi, a landless farm labourer and resident of the Biligi rehabilitation centre, said: "It's been 10 years since I was shifted to this place, but I still have no work  Annasaheb Sirur, who lost his land and has been rehabilitated in the nearby Korati rehabilitation centre, said: "At least in Goa I can catch fish and eat! Here I am forced to serve tea in the school.“  "More than 40 per cent of the 4.25 lakh displaced persons fall in this category. Where do we put them? What kind of non-agricultural occupation do we find for them? Shifting them from manual labour to semi-skilled labour is difficult. 10/11/2015 8
  • 9.  But a new problem has cropped up; that of educated unemployed.  These youth do not want to work in the fields but look for government jobs.  The government has reserved 5 per cent of Class C and D jobs for them, but that is hardly sufficient in an era when government-run factories are getting closed. 10/11/2015 9
  • 10. FORMATION OF NAVNAGAR A BACKWATER ISSUE  Whole Bagalkot town( District place ) was submerged in back water of Alamatti dam.  A higher location and the formation of Bagalkot Town Development Authority (BTDA) under the Karnataka Improvement Boards Act, 1976.  For locating the New Township of Bagalkot , an area of 4,320 acres has been acquired.  22,000 structures, 91,596 people 10/11/2015 10
  • 11. cont’d  Various benefits to the displaced families : free site allotment ,free houses, free stamp duty in purchasing immovable properties, free transport, free compensation…etc.  4,467 structures, Rs. 117.97 Crores has been paid as compensation, 7,579 plots have been distributed.  The total estimated cost of Bagalkot relocation is Rs. 1037.49 Crores and the expenditure incurred upto end of June 2003.  All basic amenities like drinking water supply, electricity, under ground drainage, roads, storm water drains, public utility buildings etc. have been provided in the New Township. 10/11/2015 11
  • 12. SOIL ALKALINITY  The uplands of Krishna river basin located in Maharashtra and Karnataka are situated on the Deccan Traps which comprises thick seems of basalt rock formations.  Basalt rock is prone to chemical weathering contributing more TDS to the river water.  Water is not safe for drinking if the TDS exceeds 500 mg/l.  The average yearly salt export requirement is nearly 12 million tons in Krishna basin area up to Prakasam Barrage.  At least 850 TMC water is required for salt export purpose to maintain water TDS below 500 mg/l.  The water TDS is around 450 mg/l during peak monsoon months which is highest among the major Indian rivers. 10/11/2015 12
  • 13. INTER STATE DISPUTES  This is regarding height raising of Dam from 519.6m to 524.26m.  On Nov 30 2013  Setback to Andhra Pradesh as Brijesh Tribunal allows raising Almatti dam height.  Since the decision of the tribunal is equivalent to a judgment of the Supreme Court, no appeal against the award can be filed in any court until May 2050 when the tribunal is to review the final allocations.  "Only after the Supreme Court delivers its judgment on our SLP that the award of the tribunal will be implemented," said D Sudershan Reddy, counsel for the state before the tribunal.  The tribunal, however, directed Karnataka to make regulated releases of 8 to 10 thousand million cubic feet (TMC) from the dam to Andhra Pradesh in June and July. 10/11/2015 13
  • 14. CASE STUDY  The louder you shout and the more noise you make, the greater is your chance of succeeding: this seems to be the mantra of both Karnataka and Andhra Pradesh (ap) politicians on the contentious issue of the Alamatti dam.  BOTH THE STATES HAS PROBLEMS IN RAISING THE HEIGHT KARNATAKA ANDHRA PRADESH 22 villages will be fully submerged Reduced water flow to nagarjunasagar, jerula dam 192 partly submerged Jeopardizing the economy of ap's rice bowl 1.2 lakh acres should be acquired for relocation Karnataka will get more control Pros : It can irrigate 5.4 lakh hectares more, Upstream states gets more benefit 100 MU more energy production 10/11/2015 14
  • 15.  The Andhra Pradesh Reorganisation Bill, 2014  Regulation of supply of water from the projects to the successor States having regard to awards.  Regulation of supply of power generated to the authority in-charge of the distribution of power having regard to any agreement.  Construction of such of the remaining on-going or new works connected with the development of the water resources projects relating to the rivers.  Making an appraisal of any proposal for construction of new projects on Krishna rivers and giving technical clearance.  Telangana state demands  The newly formed Telangana state is fourth riparian state in the Krishna river basin.  To start again the tribunal proceeding afresh as it was not party to the earlier KWDT1 and KWDT2 adjudications. 10/11/2015 15
  • 16. CONCLUSION  Proper review of all the rehabilitation centres and problems associated with it.  Inspection of problems at Dam.  Infrastructure development.  Afforestation.  Adopt new technologies of irrigation.  Conservation of water.  Effective utilization of Dam water.  Increase of medical aids for water borne diseases. 10/11/2015 16
  • 17. GOVERNMENT GREAT DECISION  “Don't Give Nod to New Dams, Water Ministry Tells CWC”.  Ministry of Water Resources Secretary Shashi Shekhar had on August 25 written to Central Water Commission Chairman A B Pandya that Minister of Water Resources Uma Bharti.  An expert panel has been studying the impact of existing and proposed dams on the flow of rivers and the report will decide fate of dams.  “In the process, not only have the rivers become fragmented, but most of the floral and faunal species have become extinct. There are certain stretches where a river has become completely dry,” said the letter.  He stated that the environmental flow (e-flow) in rivers was a necessity for the survival of a river, for it to perform its ecological functions and also to ensure that the cultural dependence a community has on the river is maintained.  No dam or barrage be designed or approved by the Central Water Commission without factoring in adequate e-flow. 10/11/2015 17
  • 18. STATE Thermal (in MW) Nuclear (in MW) Renewable (in MW) Total (in MW) Coal Gas Diesel Sub- Total Thermal Hydel Other Renewa ble(MW) subtotal Tamil Nadu 10,075.10 1026.30 411.66 11,513.06 986.50 2,182.20 8,423.15 10,605.35 23,104.91 Karnataka 6,408.46 - 234.42 6,642.88 475.86 3,599.80 4552.48 8,152.28 15,271.02 Andhra Pradesh 5,849.21 1,672.65 16.97 7,538.83 127.16 1,721.99 2,002.65 3,724.64 11,390.64 Telangana 5,598.47 1,697.75 19.83 7,316.05 148.62 2012.54 62.75 2,075.29 9,539.96 Kerala 1,038.69 533.58 234.60 1,806.87 228.60 1881.50 204.05 2,085.55 4,121.02 FOR YOUR INFORMATION 10/11/2015 18
  • 19. Bibliography  http://www.kbjnl.com  http://www.newindianexpress.com/nation/Dont-Give-Nod-to-New-Dams- Water-Ministry-Tells-CWC/2015/09/04/article3009758.ece  http://www.indiaenvironmentportal.org.in/content/3489/all-about- alamatti/  http://www.cea.nic.in/monthly_gen.html  https://en.wikipedia.org/wiki/Krishna_Water_Disputes_Tribunal  Report on 40 years of Upper krishna project by UKP documentation committee.  www.soils.org 10/11/2015 19
  • 20. DAM GALLERY SAVE WATER SAVE LIFE QUERIES ??? 10/11/2015 20