1. Review of the purpose, objectives, impacts
and indicators of performance of the network
• The purpose of GLOSOLAN is to improve the quality
of soil laboratory data to support decision making
at field and policy levels, in support of the
overarching goals of eradicating hunger by
achieving food security and improving nutrition,
and ensuring environmental quality. In this context,
the work of GLOSOLAN is connected to the GSP
Pillars of Action.
1. Review of the purpose, objectives, impacts
and indicators of performance of the network
• To strengthen the performance of laboratories
through use of standardized methods and protocols.
• To harmonize soil analysis methods so that soil
information would be comparable and interpretable
across laboratories, countries and regions.
• To provide a certification for technical competencies
in laboratory analysis.
1. Review of the purpose, objectives, impacts
and indicators of performance of the network
• To support decision making at field and policy levels;
• To support countries in reporting on the Sustainable Development Goals and on other
international commitments;
• To contribute to the development of international standards and indicators;
• To contribute to the establishment of the Global Soil Information System (GLOSIS);
• To contribute to the development of harmonized methods for the assessment and
monitoring of degraded lands and/or lands affected by climate change and other
threats, as identified in the Status of the World Soil Resources report;
• To improve the connection between soil chemistry, physics and biology;
• To contribute to and improve soil classification and description;
• To assist companies manufacturing laboratory equipment in improving their products;
• To expand the opportunities for technical and scientific cooperation;
• To strengthen the capability of extension services;
• To identify research needs; and
• To increase investments in research
2. Development of the GLOSOLAN work plan 2018-
2019
Activity Responsible party Deadline
Establishing the GLOSOLAN
Technical Working Group
GSP Secretariat NA
Developing/compiling
GLOSOLAN terminology
GLOSOLAN Technical Working
Group
15 April (for
presentation at 7th GSP
Plenary Assembly)
Revising the GSP Soil Data
Policy
GLOSOLAN Technical Working
Group
GSP Secretariat
15 April (for
presentation at 7th GSP
Plenary Assembly)
Developing the template for
reporting and publishing
GLOSOLAN SOPs
GLOSOLAN Technical Working
Group
GSP Secretariat
3rd GLOSOLAN meeting
(for presentation)
2. Development of the GLOSOLAN work plan 2018-
2019
Activity Responsible party Deadline
Developing the GLOSOLAN
SOPs for sample pre-treatment,
inorganic C (CaCO3 equivalent),
OC Walkley-Black and OC dry
combustion and writing the
related volumes in the Best
Practice Manual
GLOSOLAN Technical Working
Group
GSP Secretariat
RESOLANs
3rd GLOSOLAN meeting
(for presentation)
2. Standard Operating Procedures
Identification of top priority soil parameters to work
on and SOPs to develop
Soil parameter #SOP Note
Sample preparation 1
Moisture content 1
Organic C 2 Walkley-Black (not in USA)
Dry-combustion
Inorganic C 1 CaCO3 equivalent
Bulk density 1
Texture and coarse fraction 2 Pipette method
Hydrometer
pH in water, CaCl2 and KCl 1 TBC (SOP survey)
Electrical conductivity (EC) 2 Saturated paste
TBC (SOP survey)
Total nitrogen 2 Kjeldahl
Combustion
2. Standard Operating Procedures
Identification of top priority soil parameters to work
on and SOPs to develop
Soil parameter #SOP Note
Available phosphorus 3 Olsen
Bray I/II
Mehlich III
Ammonium lactate
CEC and exchangeable cations 2 or
more
Ammonium
acetate/chloride (2)
Cobalt Hexamine and BaCl2
TBC (SOP survey)
Total trace and major elements 1 Total digestion method
(aqua regia + HF)
Quasi-total trace and major elements 1 Partial digestion method
(aqua regia)
Extractable micronutrients (Zn, Fe, Mn, Cu, B) 3 DTPA
EDTA
Mehlich III
2. Standard Operating Procedures
Identification of top priority soil parameters to work
on and SOPs to develop
Soil parameter #SOP Note
Extractable micronutrients (B) 1 Hot water/CaCl2
Chloride 1 Mohr method
Sulfur 1 Barium chloride
2. Standard Operating Procedures
Development of the work plan to develop GLOSOLAN’s
SOPs
SOPs (on average 3 per year) 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
sample pre-treatment
inorganic C (CaCO3 equivalent)
OC Walkley-Black
OC dry combustion
moisture content
electrical conductivity (saturated paste + 1
depending on countries’ survey inputs)
pH in water, CaCl2 and KCl
texture and coarse fraction (pipette method
and hydrometer)
bulk density
total nitrogen Kjeldahl
total nitrogen combustion
available P Olsen and Bray I/II
available P Mehlich III and ammonium
lactate
CEC and exchangeable cations by
ammonium acetate
CEC and exchangeable cations by chloride
plus survey in the regions
total trace and major elements by total
digestion method
2. Development of the GLOSOLAN work plan 2018-
2019
Activity Responsible party Deadline
Launching RESOLAN Europe-
Eurasia, Pacific, NENA and
Africa
GSP Secretariat Before 3rd GLOSOLAN
meeting
Launch of RESOLAN-Africa: 21-24 May 2019
Launch of RESOLAN- Europe&Eurasia: 30 September- 4 October 2019
Launch of RESOLAN-NENA: June 2019 [postponed]
Launch of RESOLAN-Pacific: July 2019 [TBC]
2. Development of the GLOSOLAN work plan 2018-
2019
Activity Responsible party Deadline
Identifying regional pools of
experts to:
- Supervise the
implementation of
GLOSOLAN SOPs and GLP
- Provide specific training as
appropriate
GSP Secretariat and RESOLANs NA
Done at the time the GLOSOLAN Technical Working Group was
established. Each member to complete a survey. This would ensure
that experts are put to work on the topic they are confident the
most and are asked to do what they can actually contribute to
(writing, reviewing, training, etc.)
2. Development of the GLOSOLAN work plan 2018-
2019
Activity Responsible party Deadline
Surveying laboratories that
work on spectroscopy and
establishing a dedicated
working group to develop SOPs
on NIR and MIR
GSP Secretariat February 2019 for
establishment of
working group
3rd GLOSOLAN meeting
for presentation of
progress on SOPs for NIR
and MIR
We established the working group but things are slow moving, the
topic is quite complex
2. Development of the GLOSOLAN work plan 2018-
2019
Activity Responsible party Deadline
Developing criteria for
laboratories who want to join
the global PT and criteria for
samples to use in the PT
GLOSOLAN Technical Working
Group
GSP Secretariat
February 2019
• For laboratories to join the PT: “Laboratory
qualification to participate in GLOSOLAN’s
Proficiency Testing Programme”
2. Development of the GLOSOLAN work plan 2018-
2019
Activity Responsible party Deadline
Launching the first global PT GSP Secretariat May 2019
Writing a technical document
on the preparation of samples
to use in PT
GLOSOLAN Technical Working
Group
GSP Secretariat
15 April (for
presentation at 7th GSP
Plenary Assembly)
Samples are about to be sent out. The PT will interest:
- All National Reference Laboratories in Latin America and Asia
- Laboratories joining the First RESOLAN-Africa meeting
- Selected laboratories in Europe, Eurasia, NENA, Pacific and North
America
For laboratories to produce their own control samples: “Producing a
sample for the GLOSOLAN PT Scheme”
2. Development of the GLOSOLAN work plan 2018-
2019
Activity Responsible party Deadline
Writing a resolution for the
international exchange of soil
samples for research purposes
under GLOSOLAN
GLOSOLAN Technical Working
Group
GSP Secretariat
15 April (for
presentation at 7th GSP
Plenary Assembly)
Initiating the work on
harmonization
ASPAC
WEPAL
Other
GSP Secretariat
3rd GLOSOLAN meeting
(for presentation)
Harmonization strategy
1. Harmonization of data obtained using different GLOSOLAN SOPs
PROPOSAL ENDORSED (Rich, USDA, USA)
Implementation Strategy:
- Soil parameter to harmonize at first: soil organic carbon.
- Data to harmonize: SOC data obtained using the Walkley-Black and the dry
combustion methods (reference to the GLOSOLAN work plan)
- Transfer functions will be developed on historical databases at first and thereafter
improved as needed.
- Data need: SOC data from soil samples analyzed using both the Walkley-Black and
the dry combustion methods
Harmonization strategy
1. Harmonization of data obtained using different GLOSOLAN SOPs
PROPOSAL ENDORSED (Rich, USDA, USA)
Implementation Strategy:
- USDA will make available their historical databases. Other partners complying with
the above mentioned requirements will be invited to share their databases and the
SOPs for the methods used. Data can be anonymized before submission. The
provision of geo-located data is optional. The USDA volunteered to run the
statistical analysis and develop the transfer functions. In order to facilitate data
entry, a form for data submission will be sent to partners sharing their databases.
Form to be prepared by the USDA and sent by the GSP Secretariat
- In order to assist in the process, the GSP will do a literature review on the
comparison of methods on SOC determination. Results will be presented at the 3rd
GLOSOLAN meeting
Harmonization strategy
2. Harmonization of data obtained using GLOSOLAN SOPs and ISO standards
PROPOSAL ABOLISHED
Not needed
3. Harmonization of data obtained using national methods and GLOSOLAN SOPs
PROPOSAL ENDORSED (Louise, BGS UK to support)
Survey those laboratories that cannot use GLOSOLAN SOPs. Eventually organize
trainings on the development of transfer functions.
4. Harmonization of historical databases – DISCUSSION POST-PONED
Waiting for results from point 1. It is going to be very difficult.
3. Best Practice Manual
Definition of its structure and content
Manual 1: Site characterization, sampling and sample pre-treatment
Manual 2: Soil chemical analysis
Manual 3: Soil physical analysis
Manual 4: Soil biological analysis
Manual 5: Data quality, management and validation
Manual 6: Harmonization and correlation factors
Manual 7: Data processing: soil functions, classification and statistics
Manual 8: Soil contaminants
Manual 9: Standards or maximum allowed levels of nutrients – interpretation and recommendations
Manual 10: Security in the laboratory
Manual 11: Good Laboratory Practices
3. Best Practice Manual
Definition of its structure and content
Manual 1: Site characterization, sampling and sample pre-treatment
Volume 1.1 How to collect a soil sample for soil nutrient assessment: site selection and sampling
Information on equipment, sample transport and storage, and moisture conditions should be included. The writing of
Volume 1.1 was assigned to Pillar 4.
Volume 1.2 Generic characterization of sites and samples
The writing of Volume 1.2 was assigned to Pillar 4.
Volume 1.3 Soil sample pre-treatment
Manual 2: Soil chemical analysis
SOPs developed by GLOSOLAN will be presented in here. For each method, information on its relevance/use, principle of
measurement, apparatus, reagents, procedure, calculations, report and reference should be provided.
Volume 2.1 Organic carbon
Volume 2.2 pH
Volume 2.3 Available phosphorous
Volume 2.4 Available potassium
Volume 2.5 Total nitrogen
Volume 2.6 Exchangeable cations and CEC
Volume 2.7 …
4. Other decisions
Accreditation
It was the decision of GLOSOLAN to leave the issue of accreditation to the
countries, for now. In this regard, GLOSOLAN will focus on providing method-
specific certifications based on proficiency testing. GLOSOLAN may provide its
own accreditation only once a good certification system is developed and
operational.
Certificates
A list of certificates and letters to provide to laboratories and members of the
working group in different occasions was prepared
Capacity building and individual laboratory’s training
Will start as soon as possible
4. Other decisions
Interpretation of overall laboratory results
It was the decision of GLOSOLAN that a definition for “interpretation” should be
provided and included in the GLOSOLAN terminology. In the future, GLOSOLAN
will revise and harmonize available guidelines on the interpretation of
laboratory data results for the best use and management of soil resources. In
this regard, GLOSOLAN will cooperate with the Global Soil Information System
(GLOSIS).
Provision of recommendations
It was the decision of GLOSOLAN to cooperate with GSP Pillar 1 on the
laboratories’ provision of recommendations to land users and farmers.
Recommendations should lead to the implementation of the Voluntary Guidelines
for Sustainable Soil Management and the sustainable use of fertilizers.
GLOSOLAN

Mais conteúdo relacionado

Mais procurados

FREL Uncertainties Estimates
FREL Uncertainties EstimatesFREL Uncertainties Estimates
FREL Uncertainties EstimatesCIFOR-ICRAF
 
Item 17: Review of the GLOSOLAN work plan: targets, deliverables and timeline
Item 17: Review of the GLOSOLAN work plan: targets, deliverables and timelineItem 17: Review of the GLOSOLAN work plan: targets, deliverables and timeline
Item 17: Review of the GLOSOLAN work plan: targets, deliverables and timelineExternalEvents
 
2014-2016 work programmes thematic programmes and the knowledge chain_john me...
2014-2016 work programmes thematic programmes and the knowledge chain_john me...2014-2016 work programmes thematic programmes and the knowledge chain_john me...
2014-2016 work programmes thematic programmes and the knowledge chain_john me...Global Water Partnership
 
FAO capacity development activities with emphasis on institutional arrangemen...
FAO capacity development activities with emphasis on institutional arrangemen...FAO capacity development activities with emphasis on institutional arrangemen...
FAO capacity development activities with emphasis on institutional arrangemen...FAO
 
CCXG Forum, September 2020, Lornaliza Kogler
CCXG Forum, September 2020, Lornaliza KoglerCCXG Forum, September 2020, Lornaliza Kogler
CCXG Forum, September 2020, Lornaliza KoglerOECD Environment
 
FAO products in support of UNFCCC national reporting processes for the AFOLU ...
FAO products in support of UNFCCC national reporting processes for the AFOLU ...FAO products in support of UNFCCC national reporting processes for the AFOLU ...
FAO products in support of UNFCCC national reporting processes for the AFOLU ...FAO
 
Presentation ms. boca
Presentation   ms. bocaPresentation   ms. boca
Presentation ms. bocagboca
 
Boca romanian ghg inventory system and registry - zagreb
Boca    romanian ghg inventory system and registry - zagrebBoca    romanian ghg inventory system and registry - zagreb
Boca romanian ghg inventory system and registry - zagrebgboca
 
Description of TACC principles
Description of TACC principlesDescription of TACC principles
Description of TACC principlesCIFOR-ICRAF
 
Change Detection Research for the National Map
Change Detection Research for the National MapChange Detection Research for the National Map
Change Detection Research for the National MapGeCo in the Rockies
 
Item 1: Informe breve del trabajo realizado por GLOSOLAN desde su creación
Item 1: Informe breve del trabajo realizado por GLOSOLAN desde su creaciónItem 1: Informe breve del trabajo realizado por GLOSOLAN desde su creación
Item 1: Informe breve del trabajo realizado por GLOSOLAN desde su creaciónExternalEvents
 
CCXG Forum, September 2020, Sina Wartmann
CCXG Forum, September 2020, Sina WartmannCCXG Forum, September 2020, Sina Wartmann
CCXG Forum, September 2020, Sina WartmannOECD Environment
 
Diagnostic of how the submitted FREL could be improved to better align with ...
Diagnostic of how the submitted FREL could be  improved to better align with ...Diagnostic of how the submitted FREL could be  improved to better align with ...
Diagnostic of how the submitted FREL could be improved to better align with ...CIFOR-ICRAF
 
CCXG Workshop, February 2021, Nashib Kefle and Tomo Aizawa
CCXG Workshop, February 2021, Nashib Kefle and Tomo AizawaCCXG Workshop, February 2021, Nashib Kefle and Tomo Aizawa
CCXG Workshop, February 2021, Nashib Kefle and Tomo AizawaOECD Environment
 
2014 LOOP Verification - Members' Briefing
2014 LOOP Verification - Members' Briefing2014 LOOP Verification - Members' Briefing
2014 LOOP Verification - Members' Briefingloop_wwf
 
Item 8: Global Soil Laboratory Network (GLOSOLAN)
Item 8: Global Soil Laboratory Network (GLOSOLAN)Item 8: Global Soil Laboratory Network (GLOSOLAN)
Item 8: Global Soil Laboratory Network (GLOSOLAN)Soils FAO-GSP
 
Item 8: Progress on the implementation of the Fertilzer Code
Item 8: Progress on the implementation of the Fertilzer CodeItem 8: Progress on the implementation of the Fertilzer Code
Item 8: Progress on the implementation of the Fertilzer CodeSoils FAO-GSP
 
CCXG Workshop, February 2021, Jongikhaya Witi
CCXG Workshop, February 2021, Jongikhaya WitiCCXG Workshop, February 2021, Jongikhaya Witi
CCXG Workshop, February 2021, Jongikhaya WitiOECD Environment
 
CCXG Workshop, February 2021, Hyung-Wook Choi
CCXG Workshop, February 2021, Hyung-Wook ChoiCCXG Workshop, February 2021, Hyung-Wook Choi
CCXG Workshop, February 2021, Hyung-Wook ChoiOECD Environment
 

Mais procurados (19)

FREL Uncertainties Estimates
FREL Uncertainties EstimatesFREL Uncertainties Estimates
FREL Uncertainties Estimates
 
Item 17: Review of the GLOSOLAN work plan: targets, deliverables and timeline
Item 17: Review of the GLOSOLAN work plan: targets, deliverables and timelineItem 17: Review of the GLOSOLAN work plan: targets, deliverables and timeline
Item 17: Review of the GLOSOLAN work plan: targets, deliverables and timeline
 
2014-2016 work programmes thematic programmes and the knowledge chain_john me...
2014-2016 work programmes thematic programmes and the knowledge chain_john me...2014-2016 work programmes thematic programmes and the knowledge chain_john me...
2014-2016 work programmes thematic programmes and the knowledge chain_john me...
 
FAO capacity development activities with emphasis on institutional arrangemen...
FAO capacity development activities with emphasis on institutional arrangemen...FAO capacity development activities with emphasis on institutional arrangemen...
FAO capacity development activities with emphasis on institutional arrangemen...
 
CCXG Forum, September 2020, Lornaliza Kogler
CCXG Forum, September 2020, Lornaliza KoglerCCXG Forum, September 2020, Lornaliza Kogler
CCXG Forum, September 2020, Lornaliza Kogler
 
FAO products in support of UNFCCC national reporting processes for the AFOLU ...
FAO products in support of UNFCCC national reporting processes for the AFOLU ...FAO products in support of UNFCCC national reporting processes for the AFOLU ...
FAO products in support of UNFCCC national reporting processes for the AFOLU ...
 
Presentation ms. boca
Presentation   ms. bocaPresentation   ms. boca
Presentation ms. boca
 
Boca romanian ghg inventory system and registry - zagreb
Boca    romanian ghg inventory system and registry - zagrebBoca    romanian ghg inventory system and registry - zagreb
Boca romanian ghg inventory system and registry - zagreb
 
Description of TACC principles
Description of TACC principlesDescription of TACC principles
Description of TACC principles
 
Change Detection Research for the National Map
Change Detection Research for the National MapChange Detection Research for the National Map
Change Detection Research for the National Map
 
Item 1: Informe breve del trabajo realizado por GLOSOLAN desde su creación
Item 1: Informe breve del trabajo realizado por GLOSOLAN desde su creaciónItem 1: Informe breve del trabajo realizado por GLOSOLAN desde su creación
Item 1: Informe breve del trabajo realizado por GLOSOLAN desde su creación
 
CCXG Forum, September 2020, Sina Wartmann
CCXG Forum, September 2020, Sina WartmannCCXG Forum, September 2020, Sina Wartmann
CCXG Forum, September 2020, Sina Wartmann
 
Diagnostic of how the submitted FREL could be improved to better align with ...
Diagnostic of how the submitted FREL could be  improved to better align with ...Diagnostic of how the submitted FREL could be  improved to better align with ...
Diagnostic of how the submitted FREL could be improved to better align with ...
 
CCXG Workshop, February 2021, Nashib Kefle and Tomo Aizawa
CCXG Workshop, February 2021, Nashib Kefle and Tomo AizawaCCXG Workshop, February 2021, Nashib Kefle and Tomo Aizawa
CCXG Workshop, February 2021, Nashib Kefle and Tomo Aizawa
 
2014 LOOP Verification - Members' Briefing
2014 LOOP Verification - Members' Briefing2014 LOOP Verification - Members' Briefing
2014 LOOP Verification - Members' Briefing
 
Item 8: Global Soil Laboratory Network (GLOSOLAN)
Item 8: Global Soil Laboratory Network (GLOSOLAN)Item 8: Global Soil Laboratory Network (GLOSOLAN)
Item 8: Global Soil Laboratory Network (GLOSOLAN)
 
Item 8: Progress on the implementation of the Fertilzer Code
Item 8: Progress on the implementation of the Fertilzer CodeItem 8: Progress on the implementation of the Fertilzer Code
Item 8: Progress on the implementation of the Fertilzer Code
 
CCXG Workshop, February 2021, Jongikhaya Witi
CCXG Workshop, February 2021, Jongikhaya WitiCCXG Workshop, February 2021, Jongikhaya Witi
CCXG Workshop, February 2021, Jongikhaya Witi
 
CCXG Workshop, February 2021, Hyung-Wook Choi
CCXG Workshop, February 2021, Hyung-Wook ChoiCCXG Workshop, February 2021, Hyung-Wook Choi
CCXG Workshop, February 2021, Hyung-Wook Choi
 

Semelhante a GLOSOLAN

Item 1 glosolan 2018 2019
Item 1 glosolan 2018 2019Item 1 glosolan 2018 2019
Item 1 glosolan 2018 2019Soils FAO-GSP
 
Item 23: Report on GLOSOLAN
Item 23: Report on GLOSOLANItem 23: Report on GLOSOLAN
Item 23: Report on GLOSOLANSoils FAO-GSP
 
Global Soil Laboratory Network (GLOSOLAN)
Global Soil Laboratory Network (GLOSOLAN)Global Soil Laboratory Network (GLOSOLAN)
Global Soil Laboratory Network (GLOSOLAN)ExternalEvents
 
lobal Soil Laboratory Network (GLOSOLAN)
lobal Soil Laboratory Network (GLOSOLAN)lobal Soil Laboratory Network (GLOSOLAN)
lobal Soil Laboratory Network (GLOSOLAN)ExternalEvents
 
4th SEALNET meeting, item 3
4th SEALNET meeting, item 34th SEALNET meeting, item 3
4th SEALNET meeting, item 3Soils FAO-GSP
 
Item 1: Introduction to GLOSOLAN
Item 1: Introduction to GLOSOLANItem 1: Introduction to GLOSOLAN
Item 1: Introduction to GLOSOLANSoils FAO-GSP
 
1st NENALAB Meeting_Item 1: Introduction to the Global Soil Laboratory Networ...
1st NENALAB Meeting_Item 1: Introduction to the Global Soil Laboratory Networ...1st NENALAB Meeting_Item 1: Introduction to the Global Soil Laboratory Networ...
1st NENALAB Meeting_Item 1: Introduction to the Global Soil Laboratory Networ...Soils FAO-GSP
 
GLOSOLAN - Mission, status and way forward
GLOSOLAN - Mission, status and way forwardGLOSOLAN - Mission, status and way forward
GLOSOLAN - Mission, status and way forwardFAO
 
Item 13: Implementation of GLOSOLAN actions - Ms. Lucrezia Caon (GSP Secretar...
Item 13: Implementation of GLOSOLAN actions - Ms. Lucrezia Caon (GSP Secretar...Item 13: Implementation of GLOSOLAN actions - Ms. Lucrezia Caon (GSP Secretar...
Item 13: Implementation of GLOSOLAN actions - Ms. Lucrezia Caon (GSP Secretar...FAO
 
Item 4. Global Soil Laboratory Network updates
Item 4. Global Soil Laboratory Network updatesItem 4. Global Soil Laboratory Network updates
Item 4. Global Soil Laboratory Network updatesSoils FAO-GSP
 
INFA launch meeting - Item 3 - Introduction to the Global Soil Laboratory Net...
INFA launch meeting - Item 3 - Introduction to the Global Soil Laboratory Net...INFA launch meeting - Item 3 - Introduction to the Global Soil Laboratory Net...
INFA launch meeting - Item 3 - Introduction to the Global Soil Laboratory Net...Soils FAO-GSP
 
ITEM 14. GSP – The Global Soil Laboratory Network (GLOSOLAN) - Lucrezia Caon
ITEM 14. GSP – The Global Soil Laboratory Network (GLOSOLAN) - Lucrezia CaonITEM 14. GSP – The Global Soil Laboratory Network (GLOSOLAN) - Lucrezia Caon
ITEM 14. GSP – The Global Soil Laboratory Network (GLOSOLAN) - Lucrezia CaonFAO
 
Regional Soil Laboratory Networks (RESOLAN)
Regional Soil Laboratory Networks (RESOLAN)Regional Soil Laboratory Networks (RESOLAN)
Regional Soil Laboratory Networks (RESOLAN)ExternalEvents
 
Item 11. Plenary Discussion and Decision Making
Item 11. Plenary Discussion and Decision MakingItem 11. Plenary Discussion and Decision Making
Item 11. Plenary Discussion and Decision MakingFAO
 
Item 19. Endorsement of the GLOSOLAN SOPs 2019-2020 and discussion on the SOP...
Item 19. Endorsement of the GLOSOLAN SOPs 2019-2020 and discussion on the SOP...Item 19. Endorsement of the GLOSOLAN SOPs 2019-2020 and discussion on the SOP...
Item 19. Endorsement of the GLOSOLAN SOPs 2019-2020 and discussion on the SOP...Soils FAO-GSP
 
Item 1. Global Soil Laboratory Network updates
Item 1. Global Soil Laboratory Network updatesItem 1. Global Soil Laboratory Network updates
Item 1. Global Soil Laboratory Network updatesSoils FAO-GSP
 
GSP Pillar 5
GSP Pillar 5GSP Pillar 5
GSP Pillar 5FAO
 
Item 2. National updates on soil - Iraq
Item 2. National updates on soil - IraqItem 2. National updates on soil - Iraq
Item 2. National updates on soil - IraqSoils FAO-GSP
 
RESOLAN: GLOSOLAN in the Regional Soil Partnerships
RESOLAN: GLOSOLAN in the Regional Soil PartnershipsRESOLAN: GLOSOLAN in the Regional Soil Partnerships
RESOLAN: GLOSOLAN in the Regional Soil PartnershipsExternalEvents
 

Semelhante a GLOSOLAN (20)

Item 6
Item 6Item 6
Item 6
 
Item 1 glosolan 2018 2019
Item 1 glosolan 2018 2019Item 1 glosolan 2018 2019
Item 1 glosolan 2018 2019
 
Item 23: Report on GLOSOLAN
Item 23: Report on GLOSOLANItem 23: Report on GLOSOLAN
Item 23: Report on GLOSOLAN
 
Global Soil Laboratory Network (GLOSOLAN)
Global Soil Laboratory Network (GLOSOLAN)Global Soil Laboratory Network (GLOSOLAN)
Global Soil Laboratory Network (GLOSOLAN)
 
lobal Soil Laboratory Network (GLOSOLAN)
lobal Soil Laboratory Network (GLOSOLAN)lobal Soil Laboratory Network (GLOSOLAN)
lobal Soil Laboratory Network (GLOSOLAN)
 
4th SEALNET meeting, item 3
4th SEALNET meeting, item 34th SEALNET meeting, item 3
4th SEALNET meeting, item 3
 
Item 1: Introduction to GLOSOLAN
Item 1: Introduction to GLOSOLANItem 1: Introduction to GLOSOLAN
Item 1: Introduction to GLOSOLAN
 
1st NENALAB Meeting_Item 1: Introduction to the Global Soil Laboratory Networ...
1st NENALAB Meeting_Item 1: Introduction to the Global Soil Laboratory Networ...1st NENALAB Meeting_Item 1: Introduction to the Global Soil Laboratory Networ...
1st NENALAB Meeting_Item 1: Introduction to the Global Soil Laboratory Networ...
 
GLOSOLAN - Mission, status and way forward
GLOSOLAN - Mission, status and way forwardGLOSOLAN - Mission, status and way forward
GLOSOLAN - Mission, status and way forward
 
Item 13: Implementation of GLOSOLAN actions - Ms. Lucrezia Caon (GSP Secretar...
Item 13: Implementation of GLOSOLAN actions - Ms. Lucrezia Caon (GSP Secretar...Item 13: Implementation of GLOSOLAN actions - Ms. Lucrezia Caon (GSP Secretar...
Item 13: Implementation of GLOSOLAN actions - Ms. Lucrezia Caon (GSP Secretar...
 
Item 4. Global Soil Laboratory Network updates
Item 4. Global Soil Laboratory Network updatesItem 4. Global Soil Laboratory Network updates
Item 4. Global Soil Laboratory Network updates
 
INFA launch meeting - Item 3 - Introduction to the Global Soil Laboratory Net...
INFA launch meeting - Item 3 - Introduction to the Global Soil Laboratory Net...INFA launch meeting - Item 3 - Introduction to the Global Soil Laboratory Net...
INFA launch meeting - Item 3 - Introduction to the Global Soil Laboratory Net...
 
ITEM 14. GSP – The Global Soil Laboratory Network (GLOSOLAN) - Lucrezia Caon
ITEM 14. GSP – The Global Soil Laboratory Network (GLOSOLAN) - Lucrezia CaonITEM 14. GSP – The Global Soil Laboratory Network (GLOSOLAN) - Lucrezia Caon
ITEM 14. GSP – The Global Soil Laboratory Network (GLOSOLAN) - Lucrezia Caon
 
Regional Soil Laboratory Networks (RESOLAN)
Regional Soil Laboratory Networks (RESOLAN)Regional Soil Laboratory Networks (RESOLAN)
Regional Soil Laboratory Networks (RESOLAN)
 
Item 11. Plenary Discussion and Decision Making
Item 11. Plenary Discussion and Decision MakingItem 11. Plenary Discussion and Decision Making
Item 11. Plenary Discussion and Decision Making
 
Item 19. Endorsement of the GLOSOLAN SOPs 2019-2020 and discussion on the SOP...
Item 19. Endorsement of the GLOSOLAN SOPs 2019-2020 and discussion on the SOP...Item 19. Endorsement of the GLOSOLAN SOPs 2019-2020 and discussion on the SOP...
Item 19. Endorsement of the GLOSOLAN SOPs 2019-2020 and discussion on the SOP...
 
Item 1. Global Soil Laboratory Network updates
Item 1. Global Soil Laboratory Network updatesItem 1. Global Soil Laboratory Network updates
Item 1. Global Soil Laboratory Network updates
 
GSP Pillar 5
GSP Pillar 5GSP Pillar 5
GSP Pillar 5
 
Item 2. National updates on soil - Iraq
Item 2. National updates on soil - IraqItem 2. National updates on soil - Iraq
Item 2. National updates on soil - Iraq
 
RESOLAN: GLOSOLAN in the Regional Soil Partnerships
RESOLAN: GLOSOLAN in the Regional Soil PartnershipsRESOLAN: GLOSOLAN in the Regional Soil Partnerships
RESOLAN: GLOSOLAN in the Regional Soil Partnerships
 

Mais de Stankovic G

Fert code infa project presentation for 5th af-sp meeting
Fert code infa  project presentation for 5th af-sp meetingFert code infa  project presentation for 5th af-sp meeting
Fert code infa project presentation for 5th af-sp meetingStankovic G
 
Mauritius_5th AfSP
Mauritius_5th AfSPMauritius_5th AfSP
Mauritius_5th AfSPStankovic G
 
Sao Tome and Principe_5th AfSP
Sao Tome and Principe_5th AfSPSao Tome and Principe_5th AfSP
Sao Tome and Principe_5th AfSPStankovic G
 
Burkina Faso_5th AfSP
Burkina Faso_5th AfSPBurkina Faso_5th AfSP
Burkina Faso_5th AfSPStankovic G
 
Lesotho_5th AfSP
Lesotho_5th AfSPLesotho_5th AfSP
Lesotho_5th AfSPStankovic G
 
South Africa _5th AfSP meeting
South Africa _5th AfSP meetingSouth Africa _5th AfSP meeting
South Africa _5th AfSP meetingStankovic G
 
Item 1. GSP developments of regional interest
Item 1. GSP developments of regional interestItem 1. GSP developments of regional interest
Item 1. GSP developments of regional interestStankovic G
 
Funded projects and new project proposal
Funded projects and new project proposalFunded projects and new project proposal
Funded projects and new project proposalStankovic G
 
Item 3. Pillar 5
Item 3. Pillar 5Item 3. Pillar 5
Item 3. Pillar 5Stankovic G
 
Item 3. Pillar 3
Item 3. Pillar 3Item 3. Pillar 3
Item 3. Pillar 3Stankovic G
 
Item 3. Pillar 2 - Global Soil Doctors Programme
Item 3. Pillar 2 - Global Soil Doctors ProgrammeItem 3. Pillar 2 - Global Soil Doctors Programme
Item 3. Pillar 2 - Global Soil Doctors ProgrammeStankovic G
 
Item 2. National updates on soil: Viet Nam
Item 2. National updates on soil: Viet NamItem 2. National updates on soil: Viet Nam
Item 2. National updates on soil: Viet NamStankovic G
 
Item 2. National updates on soil: Sri Lanka
Item 2. National updates on soil: Sri LankaItem 2. National updates on soil: Sri Lanka
Item 2. National updates on soil: Sri LankaStankovic G
 
Item 2. National updates on soil: Philippines
Item 2. National updates on soil: PhilippinesItem 2. National updates on soil: Philippines
Item 2. National updates on soil: PhilippinesStankovic G
 
Item 2. National updates on soil: Pakistan
Item 2. National updates on soil: PakistanItem 2. National updates on soil: Pakistan
Item 2. National updates on soil: PakistanStankovic G
 
Item 2. National updates on soil: Nepal
Item 2. National updates on soil: NepalItem 2. National updates on soil: Nepal
Item 2. National updates on soil: NepalStankovic G
 
Item 2. National updates on soil: Cambodia
Item 2. National updates on soil: CambodiaItem 2. National updates on soil: Cambodia
Item 2. National updates on soil: CambodiaStankovic G
 
Item 2. National updates on soil: Bangladesh
Item 2. National updates on soil: BangladeshItem 2. National updates on soil: Bangladesh
Item 2. National updates on soil: BangladeshStankovic G
 
Item 2. National updates on soil: Japan
Item 2. National updates on soil: JapanItem 2. National updates on soil: Japan
Item 2. National updates on soil: JapanStankovic G
 

Mais de Stankovic G (20)

Fert code infa project presentation for 5th af-sp meeting
Fert code infa  project presentation for 5th af-sp meetingFert code infa  project presentation for 5th af-sp meeting
Fert code infa project presentation for 5th af-sp meeting
 
Mauritius_5th AfSP
Mauritius_5th AfSPMauritius_5th AfSP
Mauritius_5th AfSP
 
Sao Tome and Principe_5th AfSP
Sao Tome and Principe_5th AfSPSao Tome and Principe_5th AfSP
Sao Tome and Principe_5th AfSP
 
Burkina Faso_5th AfSP
Burkina Faso_5th AfSPBurkina Faso_5th AfSP
Burkina Faso_5th AfSP
 
Lesotho_5th AfSP
Lesotho_5th AfSPLesotho_5th AfSP
Lesotho_5th AfSP
 
Kenya_5th AfSP
Kenya_5th AfSPKenya_5th AfSP
Kenya_5th AfSP
 
South Africa _5th AfSP meeting
South Africa _5th AfSP meetingSouth Africa _5th AfSP meeting
South Africa _5th AfSP meeting
 
Item 1. GSP developments of regional interest
Item 1. GSP developments of regional interestItem 1. GSP developments of regional interest
Item 1. GSP developments of regional interest
 
Funded projects and new project proposal
Funded projects and new project proposalFunded projects and new project proposal
Funded projects and new project proposal
 
Item 3. Pillar 5
Item 3. Pillar 5Item 3. Pillar 5
Item 3. Pillar 5
 
Item 3. Pillar 3
Item 3. Pillar 3Item 3. Pillar 3
Item 3. Pillar 3
 
Item 3. Pillar 2 - Global Soil Doctors Programme
Item 3. Pillar 2 - Global Soil Doctors ProgrammeItem 3. Pillar 2 - Global Soil Doctors Programme
Item 3. Pillar 2 - Global Soil Doctors Programme
 
Item 2. National updates on soil: Viet Nam
Item 2. National updates on soil: Viet NamItem 2. National updates on soil: Viet Nam
Item 2. National updates on soil: Viet Nam
 
Item 2. National updates on soil: Sri Lanka
Item 2. National updates on soil: Sri LankaItem 2. National updates on soil: Sri Lanka
Item 2. National updates on soil: Sri Lanka
 
Item 2. National updates on soil: Philippines
Item 2. National updates on soil: PhilippinesItem 2. National updates on soil: Philippines
Item 2. National updates on soil: Philippines
 
Item 2. National updates on soil: Pakistan
Item 2. National updates on soil: PakistanItem 2. National updates on soil: Pakistan
Item 2. National updates on soil: Pakistan
 
Item 2. National updates on soil: Nepal
Item 2. National updates on soil: NepalItem 2. National updates on soil: Nepal
Item 2. National updates on soil: Nepal
 
Item 2. National updates on soil: Cambodia
Item 2. National updates on soil: CambodiaItem 2. National updates on soil: Cambodia
Item 2. National updates on soil: Cambodia
 
Item 2. National updates on soil: Bangladesh
Item 2. National updates on soil: BangladeshItem 2. National updates on soil: Bangladesh
Item 2. National updates on soil: Bangladesh
 
Item 2. National updates on soil: Japan
Item 2. National updates on soil: JapanItem 2. National updates on soil: Japan
Item 2. National updates on soil: Japan
 

Último

Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Millenials and Fillennials (Ethical Challenge and Responses).pptx
Millenials and Fillennials (Ethical Challenge and Responses).pptxMillenials and Fillennials (Ethical Challenge and Responses).pptx
Millenials and Fillennials (Ethical Challenge and Responses).pptxJanEmmanBrigoli
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataBabyAnnMotar
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Dust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEDust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEaurabinda banchhor
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...JojoEDelaCruz
 

Último (20)

INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Millenials and Fillennials (Ethical Challenge and Responses).pptx
Millenials and Fillennials (Ethical Challenge and Responses).pptxMillenials and Fillennials (Ethical Challenge and Responses).pptx
Millenials and Fillennials (Ethical Challenge and Responses).pptx
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped data
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Dust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEDust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSE
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
 

GLOSOLAN

  • 1.
  • 2. Ms. Lucrezia Caon GSP Secretariat, FAO
  • 3. “Brief” update…what happened in GLOSOLAN since October 2018?
  • 4. 2nd GLOSOLAN meeting 28-30 November 2018 FAO HQ, Rome
  • 5. 1. Review of the purpose, objectives, impacts and indicators of performance of the network • The purpose of GLOSOLAN is to improve the quality of soil laboratory data to support decision making at field and policy levels, in support of the overarching goals of eradicating hunger by achieving food security and improving nutrition, and ensuring environmental quality. In this context, the work of GLOSOLAN is connected to the GSP Pillars of Action.
  • 6. 1. Review of the purpose, objectives, impacts and indicators of performance of the network • To strengthen the performance of laboratories through use of standardized methods and protocols. • To harmonize soil analysis methods so that soil information would be comparable and interpretable across laboratories, countries and regions. • To provide a certification for technical competencies in laboratory analysis.
  • 7. 1. Review of the purpose, objectives, impacts and indicators of performance of the network • To support decision making at field and policy levels; • To support countries in reporting on the Sustainable Development Goals and on other international commitments; • To contribute to the development of international standards and indicators; • To contribute to the establishment of the Global Soil Information System (GLOSIS); • To contribute to the development of harmonized methods for the assessment and monitoring of degraded lands and/or lands affected by climate change and other threats, as identified in the Status of the World Soil Resources report; • To improve the connection between soil chemistry, physics and biology; • To contribute to and improve soil classification and description; • To assist companies manufacturing laboratory equipment in improving their products; • To expand the opportunities for technical and scientific cooperation; • To strengthen the capability of extension services; • To identify research needs; and • To increase investments in research
  • 8. 2. Development of the GLOSOLAN work plan 2018- 2019 Activity Responsible party Deadline Establishing the GLOSOLAN Technical Working Group GSP Secretariat NA Developing/compiling GLOSOLAN terminology GLOSOLAN Technical Working Group 15 April (for presentation at 7th GSP Plenary Assembly) Revising the GSP Soil Data Policy GLOSOLAN Technical Working Group GSP Secretariat 15 April (for presentation at 7th GSP Plenary Assembly) Developing the template for reporting and publishing GLOSOLAN SOPs GLOSOLAN Technical Working Group GSP Secretariat 3rd GLOSOLAN meeting (for presentation)
  • 9. 2. Development of the GLOSOLAN work plan 2018- 2019 Activity Responsible party Deadline Developing the GLOSOLAN SOPs for sample pre-treatment, inorganic C (CaCO3 equivalent), OC Walkley-Black and OC dry combustion and writing the related volumes in the Best Practice Manual GLOSOLAN Technical Working Group GSP Secretariat RESOLANs 3rd GLOSOLAN meeting (for presentation)
  • 10. 2. Standard Operating Procedures Identification of top priority soil parameters to work on and SOPs to develop Soil parameter #SOP Note Sample preparation 1 Moisture content 1 Organic C 2 Walkley-Black (not in USA) Dry-combustion Inorganic C 1 CaCO3 equivalent Bulk density 1 Texture and coarse fraction 2 Pipette method Hydrometer pH in water, CaCl2 and KCl 1 TBC (SOP survey) Electrical conductivity (EC) 2 Saturated paste TBC (SOP survey) Total nitrogen 2 Kjeldahl Combustion
  • 11. 2. Standard Operating Procedures Identification of top priority soil parameters to work on and SOPs to develop Soil parameter #SOP Note Available phosphorus 3 Olsen Bray I/II Mehlich III Ammonium lactate CEC and exchangeable cations 2 or more Ammonium acetate/chloride (2) Cobalt Hexamine and BaCl2 TBC (SOP survey) Total trace and major elements 1 Total digestion method (aqua regia + HF) Quasi-total trace and major elements 1 Partial digestion method (aqua regia) Extractable micronutrients (Zn, Fe, Mn, Cu, B) 3 DTPA EDTA Mehlich III
  • 12. 2. Standard Operating Procedures Identification of top priority soil parameters to work on and SOPs to develop Soil parameter #SOP Note Extractable micronutrients (B) 1 Hot water/CaCl2 Chloride 1 Mohr method Sulfur 1 Barium chloride
  • 13. 2. Standard Operating Procedures Development of the work plan to develop GLOSOLAN’s SOPs SOPs (on average 3 per year) 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 sample pre-treatment inorganic C (CaCO3 equivalent) OC Walkley-Black OC dry combustion moisture content electrical conductivity (saturated paste + 1 depending on countries’ survey inputs) pH in water, CaCl2 and KCl texture and coarse fraction (pipette method and hydrometer) bulk density total nitrogen Kjeldahl total nitrogen combustion available P Olsen and Bray I/II available P Mehlich III and ammonium lactate CEC and exchangeable cations by ammonium acetate CEC and exchangeable cations by chloride plus survey in the regions total trace and major elements by total digestion method
  • 14. 2. Development of the GLOSOLAN work plan 2018- 2019 Activity Responsible party Deadline Launching RESOLAN Europe- Eurasia, Pacific, NENA and Africa GSP Secretariat Before 3rd GLOSOLAN meeting Launch of RESOLAN-Africa: 21-24 May 2019 Launch of RESOLAN- Europe&Eurasia: 30 September- 4 October 2019 Launch of RESOLAN-NENA: June 2019 [postponed] Launch of RESOLAN-Pacific: July 2019 [TBC]
  • 15. 2. Development of the GLOSOLAN work plan 2018- 2019 Activity Responsible party Deadline Identifying regional pools of experts to: - Supervise the implementation of GLOSOLAN SOPs and GLP - Provide specific training as appropriate GSP Secretariat and RESOLANs NA Done at the time the GLOSOLAN Technical Working Group was established. Each member to complete a survey. This would ensure that experts are put to work on the topic they are confident the most and are asked to do what they can actually contribute to (writing, reviewing, training, etc.)
  • 16. 2. Development of the GLOSOLAN work plan 2018- 2019 Activity Responsible party Deadline Surveying laboratories that work on spectroscopy and establishing a dedicated working group to develop SOPs on NIR and MIR GSP Secretariat February 2019 for establishment of working group 3rd GLOSOLAN meeting for presentation of progress on SOPs for NIR and MIR We established the working group but things are slow moving, the topic is quite complex
  • 17. 2. Development of the GLOSOLAN work plan 2018- 2019 Activity Responsible party Deadline Developing criteria for laboratories who want to join the global PT and criteria for samples to use in the PT GLOSOLAN Technical Working Group GSP Secretariat February 2019 • For laboratories to join the PT: “Laboratory qualification to participate in GLOSOLAN’s Proficiency Testing Programme”
  • 18. 2. Development of the GLOSOLAN work plan 2018- 2019 Activity Responsible party Deadline Launching the first global PT GSP Secretariat May 2019 Writing a technical document on the preparation of samples to use in PT GLOSOLAN Technical Working Group GSP Secretariat 15 April (for presentation at 7th GSP Plenary Assembly) Samples are about to be sent out. The PT will interest: - All National Reference Laboratories in Latin America and Asia - Laboratories joining the First RESOLAN-Africa meeting - Selected laboratories in Europe, Eurasia, NENA, Pacific and North America For laboratories to produce their own control samples: “Producing a sample for the GLOSOLAN PT Scheme”
  • 19. 2. Development of the GLOSOLAN work plan 2018- 2019 Activity Responsible party Deadline Writing a resolution for the international exchange of soil samples for research purposes under GLOSOLAN GLOSOLAN Technical Working Group GSP Secretariat 15 April (for presentation at 7th GSP Plenary Assembly) Initiating the work on harmonization ASPAC WEPAL Other GSP Secretariat 3rd GLOSOLAN meeting (for presentation)
  • 20. Harmonization strategy 1. Harmonization of data obtained using different GLOSOLAN SOPs PROPOSAL ENDORSED (Rich, USDA, USA) Implementation Strategy: - Soil parameter to harmonize at first: soil organic carbon. - Data to harmonize: SOC data obtained using the Walkley-Black and the dry combustion methods (reference to the GLOSOLAN work plan) - Transfer functions will be developed on historical databases at first and thereafter improved as needed. - Data need: SOC data from soil samples analyzed using both the Walkley-Black and the dry combustion methods
  • 21. Harmonization strategy 1. Harmonization of data obtained using different GLOSOLAN SOPs PROPOSAL ENDORSED (Rich, USDA, USA) Implementation Strategy: - USDA will make available their historical databases. Other partners complying with the above mentioned requirements will be invited to share their databases and the SOPs for the methods used. Data can be anonymized before submission. The provision of geo-located data is optional. The USDA volunteered to run the statistical analysis and develop the transfer functions. In order to facilitate data entry, a form for data submission will be sent to partners sharing their databases. Form to be prepared by the USDA and sent by the GSP Secretariat - In order to assist in the process, the GSP will do a literature review on the comparison of methods on SOC determination. Results will be presented at the 3rd GLOSOLAN meeting
  • 22. Harmonization strategy 2. Harmonization of data obtained using GLOSOLAN SOPs and ISO standards PROPOSAL ABOLISHED Not needed 3. Harmonization of data obtained using national methods and GLOSOLAN SOPs PROPOSAL ENDORSED (Louise, BGS UK to support) Survey those laboratories that cannot use GLOSOLAN SOPs. Eventually organize trainings on the development of transfer functions. 4. Harmonization of historical databases – DISCUSSION POST-PONED Waiting for results from point 1. It is going to be very difficult.
  • 23. 3. Best Practice Manual Definition of its structure and content Manual 1: Site characterization, sampling and sample pre-treatment Manual 2: Soil chemical analysis Manual 3: Soil physical analysis Manual 4: Soil biological analysis Manual 5: Data quality, management and validation Manual 6: Harmonization and correlation factors Manual 7: Data processing: soil functions, classification and statistics Manual 8: Soil contaminants Manual 9: Standards or maximum allowed levels of nutrients – interpretation and recommendations Manual 10: Security in the laboratory Manual 11: Good Laboratory Practices
  • 24. 3. Best Practice Manual Definition of its structure and content Manual 1: Site characterization, sampling and sample pre-treatment Volume 1.1 How to collect a soil sample for soil nutrient assessment: site selection and sampling Information on equipment, sample transport and storage, and moisture conditions should be included. The writing of Volume 1.1 was assigned to Pillar 4. Volume 1.2 Generic characterization of sites and samples The writing of Volume 1.2 was assigned to Pillar 4. Volume 1.3 Soil sample pre-treatment Manual 2: Soil chemical analysis SOPs developed by GLOSOLAN will be presented in here. For each method, information on its relevance/use, principle of measurement, apparatus, reagents, procedure, calculations, report and reference should be provided. Volume 2.1 Organic carbon Volume 2.2 pH Volume 2.3 Available phosphorous Volume 2.4 Available potassium Volume 2.5 Total nitrogen Volume 2.6 Exchangeable cations and CEC Volume 2.7 …
  • 25. 4. Other decisions Accreditation It was the decision of GLOSOLAN to leave the issue of accreditation to the countries, for now. In this regard, GLOSOLAN will focus on providing method- specific certifications based on proficiency testing. GLOSOLAN may provide its own accreditation only once a good certification system is developed and operational. Certificates A list of certificates and letters to provide to laboratories and members of the working group in different occasions was prepared Capacity building and individual laboratory’s training Will start as soon as possible
  • 26. 4. Other decisions Interpretation of overall laboratory results It was the decision of GLOSOLAN that a definition for “interpretation” should be provided and included in the GLOSOLAN terminology. In the future, GLOSOLAN will revise and harmonize available guidelines on the interpretation of laboratory data results for the best use and management of soil resources. In this regard, GLOSOLAN will cooperate with the Global Soil Information System (GLOSIS). Provision of recommendations It was the decision of GLOSOLAN to cooperate with GSP Pillar 1 on the laboratories’ provision of recommendations to land users and farmers. Recommendations should lead to the implementation of the Voluntary Guidelines for Sustainable Soil Management and the sustainable use of fertilizers.