1. 3"
32 =1'-0"
PROJECT TITLE
SCALE DATE
DRG: NO.
S-01
ELECTRIC VEHICLE CHARGING
STATION FOR 4 LOTS
FOOTING & COLUMN ,
GROUND BEAM PLAN
REVISION
MINISTRY OF CONSTRUCTION
A.D
DATE
SIGN
DEPARTMENT OF BUILDING S.O D.D
DIRECTOR
D.E
DRN: BY
DESIGN, Q.S & RESEARCH SECTION
A
1
FOOTING & COLUMN PLAN
20'-0" 20'-0"
40'-0"
28 Days Concrete Cube Strength = 3200 psi
Steel Yield Strength = 50000 psi
Allowable Soil Bearing Capacity = 0.75 ton/sqft
Note:
See together with Architectural Drawing.
31.3.2023
2
3
4
5
6
B C
3'-0"
11'-3"
1'-0"3'-9"
4'-0"
23'-0"
F1
C1
F1
C1
F1
C1
A
1
GROUND BEAM PLAN
20'-0" 20'-0"
40'-0"
2
3
4
5
6
B C
3'-0"
11'-3"
1'-0"3'-9"
4'-0"
23'-0"
GB1 GB1
2. DATE PROJECT TITLE
SCALE DATE
DRG: NO.
S-02
REVISION
MINISTRY OF CONSTRUCTION
A.D
SIGN
DEPARTMENT OF BUILDING
DIRECTOR
S.O D.D D.E
DRN: BY
DESIGN, Q.S & RESEARCH SECTION 3"
8 =1'-0"
FOOTING ,COLUMN & GROUND
BEAM SCHEDULES
REMARK
L
FOOTING SCHEDULE
TYPE
REINFORCEMENT
LONG STEEL
SIZE
B T SHORT STEEL
DEPTH
- Clear Cover = 2" ( at bottom ) , 3" ( at side )
31.3.2023
F1 4'-0" 12" 4'-0" ( BELOW N.G.L ) ISOLATED
16-16mmØ
8'-0" 7-16mmØ
COLUMN SCHEDULE
TYPE
LEVEL
FOOTING
TO
PLINTH
- Clear Cover = 1 -
1"
2
C1
Y
X
28 Days Concrete Cube Strength = 3200 psi
Steel Yield Strength = 50000 psi
Allowable Soil Bearing Capacity = 0.75 ton/sqft
ELECTRIC VEHICLE CHARGING STATION
FOR 4 LOTS
SIZE
GROUND BEAM SCHEDULE
TYPE LEFT END SUPPORT
TOP BOTTOM TOP
RIGHT END SUPPORT
MAIN REINFORCEMENT
BOTTOM
MID SPAN
TOP BOTTOM
STIRRUPS
REMARK
CLEAR COVER = 1.5"
END SUPPORT MID SPAN
TORSION
MID
GB1 16" x 16" 3 - 16mmØ 3 - 16mmØ 3 - 16mmØ 3 - 16mmØ 3 - 16mmØ 3 - 16mmØ 2 - 16mmØ 10mmØ @ 3"c/c GROUND BEAM
(2h)
10mmØ @ 5"c/c
20"
30"
(20" x 30")
20 - 16mmØ, main
( 1.5" CLEAR COVER )
6-10mmØ @ 4"c/c, tie
3. 3"
16 =1'-0"
PROJECT TITLE
SCALE DATE
DRG: NO.
S-03
31.3.2023
ELECTRIC VEHICLE CHARGING
STATION FOR 4 LOTS
ROOF BEAM PLAN
REVISION
MINISTRY OF CONSTRUCTION
A.D
DATE
SIGN
DEPARTMENT OF BUILDING S.O D.D
DIRECTOR
D.E
DRN: BY
DESIGN, Q.S & RESEARCH SECTION
A
1
ROOF BEAM PLAN
2
3
5
6
B C
5
2
5 5 5 5 5 5 5
1
1
2
2
3
3
3
5 5 5 5 5 5 5 5
5 5 5 5 5 5 5 5
5 5 5 5 5 5 5 5
5 5 5 5 5 5 5 5
5 5 5 5 5 5 5 5
3
3
3
3
3
3
3
3
3
3
3
3
1
1
3
3
3
Member 2 = 168.3 x 6 mm (24 kg/m) Round G.I Pipe
Member 1 = 180 x180 x4 mm (21.8 kg/m) Square G.I Pipe
Member 3 = 100 x 100 x 3 mm (8.99 kg/m) Square G.I Pipe
100x50x12x1.8 mm Lipped Channel Purlin @ 3'-0" cc
Member 5 = 65 x 65 x 3 mm (5.97 kg/m) Square G.I Pipe
Minimum Steel Yield Stress , Fy = 36000 psi
Minimum Steel Tensile Strength , Fu = 58000 psi
4
3'-0"
11'-3"
1'-0"
3'-9"
4'-0"
23'-0"
20'-0" 20'-0"
40'-0"
4. PROJECT TITLE
SCALE DATE
DRG: NO.
S-04
SECTION
28 Days Concrete Cube Strength = 3200 psi
Steel Yield Strength = 50000 psi
REVISION
MINISTRY OF CONSTRUCTION
A.D
DATE
SIGN
DEPARTMENT OF BUILDING S.O D.D
DIRECTOR
D.E
DRN: BY
DESIGN, Q.S & RESEARCH SECTION 3"
8 =1'-0"
ELECTRIC VEHICLE CHARGING STATION
FOR 4 LOTS
SECTION
Minimum Steel Yield Stress , Fy = 36000 psi
Minimum Steel Tensile Strength , Fu = 58000 psi
31.3.2023
3" 3"
8'-0"
9" Thk: Well Compacted Hardcore
with Sand Blending
3" Thk: ( 1 : 3 : 6 ) Lean Concrete
1'-0"
3'-0"
6"
1 2 3 4 5 6
6-10mmØ @ 4"c/c, tie
20 - 16mmØ, main
16 - 16mmØ
7 - 16mmØ
0'-0" GROUND LEVEL
Member 1 = 180 x180 x4 mm (21.8 kg/m) Square G.I Pipe
Member 2 = 168.3 x 6 mm (24 kg/m) Round G.I Pipe
23'-0"
3'-0" 11'-3" 1'-0" 3'-9" 4'-0"
8'-0"
12'-0"
GB
Member 6 = 48.3 x 2 mm (2.28 kg/m) Round G.I Pipe
Member 4 = 76.1 x 3 mm (5.41 kg/m) Round G.I Pipe
2
2
2
2
6
6
6
6
4
4
4
4
1
1
5. PROJECT TITLE
SCALE DATE
DRG: NO.
S-05
31.3.2023
REVISION
MINISTRY OF CONSTRUCTION
A.D
DATE
SIGN
DEPARTMENT OF BUILDING S.O D.D
DIRECTOR
D.E
DRN: BY
DESIGN, Q.S & RESEARCH SECTION 1" =1'-0"
BASE PLATE DETAIL
Steel Yield Strength = 36000 psi
Bolts & Nuts = A36
Steel Tensile Strength = 58000 psi
1'-8"
2'-6"
21
4"
71
4"
71
4"
71
4"
21
4"
13
4" 13
4"
1'-8"
3"
2"
5"
5"
2"
3"
1'-0"
13
4"
13
4"
168.3X6mm Round Pipe x 24 kg/m
10 - 3/4"Ø A36 Anchor Bolts
5/16"thk: E70xx Fillet Welding
5/16
5/16
5/8" thk; Base Plate
C20x30 R.C Column
20"
Embedded
in
Concrete
A A
Section A - A
CONNECTION DETAIL FOR BASE PLATE
ELECTRIC VEHICLE CHARGING STATION
FOR 4 LOTS