Integrated hydrogeological and
environmental restoration of landslides
affecting a large asbestos mine dry tailings
dump
Franco Oboni, Riskope International, Vancouver, Canada

Cesar Oboni, Riskope International, Vancouver, Canada

Claudio Angelino, Polithema srl, Turin, Italy

Bartolomeo Visconti, Polithema srl, Turin, Italy
Width 800 m
Height 200 – 250 m
Estimated Volume 50-60 Mm3
Slope 35 – 45 degrees
The site was recognized as one of the most serious environmental
issues of Italy.

-deep seated
instabilities
-erosion gullies
-mud slides
etc...
Leading to the
evacuation of
houses located
at the toe, on
the opposite
side of the
valley.
Two communities with about 10,000 inhabitants were
under the influence of the dust plumes.

An international contest was organized by the “owner”
of the project, i.e. an agency named RSA.

Our team recognized two main objectives had to be
met:
a) limiting the volume of earth movements and
b) reducing the overall costs of the restoration to
match stringent financial limitations imposed
by RSA’s budget.
The restoration project had to consider numerous other global and sometimes
competing objectives:

- Minimize dusting.
- Limit air pollution.
- Control the geotechnical stability of a large area.
- Control the area water runoff guiding collected water across steep cross slopes.
- Give strong and immediate support to new vegetation on sterile soils.
- Limit the use of concrete/steel or any other artificial material given the sensitive
location of the site at the footsteps of the Alps, in a visible, densely inhabited area.
The Team recognized that:
Designs based on codes or recommendations may
differ quite significantly from designs based on Risk
Based Decision Making (RBDM).

Differences may go as deep as choosing a different
material hauling system, a different drainage pattern
etc.

Alternatives which are perfectly code-compliant and
require the same investments and maintenance may
expose the owner to totally different levels of risk all
along their expected life.
EXAMPLE: using an
aerial tramway to
haul waste material,
rather than trucks.

It is important to
recognize that
alternatives' risks
may have very
different time frames,
which is taken into
account by CDA/ESM
The 4.5 km of dirt tracks between the top and the toe of the
slope were a potential source of dusting and large carbon
footprint, given the need for a fleet of small tonnage trucks.

Thus, hauling trucks were
ultimately discarded because
of environmental risks:
-pollution from exhausts,
-fibres dispersion from the
excavated material
-need to upgrade the existing
tracks
-extra costs for ancillary
temporary structures).
Slope stability control procedures:
- Unloading of the crest of the dump slope by digging
three, 10 m wide benches and by storing the resulting
material at the valley bottom in an 8 m high fill.

-Cutting a series of eight, 2.5 m wide, “path-ways
berms” across the slope, each about
600 m long.
Runoff control procedure:

Deep gullies, had formed in the upper part of the slope.


- Overall runoff control
through a network of small
“horizontal” wooden channels,
50 to 100 cm wide.
- Transfer of the collected
water towards the toe of the
slope using four main “vertical”
channels located along the
slopes
Re-vegetation
The reforestation/re-vegetation of the area was a
major challenge within the project due to the
scarcity of nutrient materials in the sterile soil of
the dump.

Good re-vegetation was a significant project
objective and critical to overall dump stability.
The reforestation process was intensely monitored and scrutinized. By the end of the
works, the first trees and shrubs, hydroseeding had already undergone 3 or 4
vegetative seasons and allowed a “real time” control of the success of the operation. In
total the re-vegetation effort included: 450,000 m2 of hydro-seeding, 15,000 shrubs,
7,300 trees and 267,000 live cuttings.
Risk Based Decision Making (RBDM) procedures at every
step of the design process were used to develop the
best engineering design in terms of technical results and
budget limitations.
The integration of geotechnique, hydraulics, pedology and risk management within
the designers’ multidisciplinary group led to a well-balanced and environmentally
sustainable project allowing the gradual recovery through natural processes of an
otherwise highly compromised area.
Integrated hydrogeological and
 environmental restoration of landslides
 affecting a large asbestos mine dry tailings
 dump
 Franco Oboni, Riskope International, Vancouver, Canada

 Cesar Oboni, Riskope International, Vancouver, Canada

 Claudio Angelino, Polithema srl, Turin, Italy

 Bartolomeo Visconti, Polithema srl, Turin, Italy


10/11/11                                                  1
Width 800 m
           Height 200 – 250 m
           Estimated Volume 50-60 Mm3
           Slope 35 – 45 degrees




10/11/11            2
The site was recognized as one of the most serious environmental
issues of Italy.

-deep seated
instabilities
-erosion gullies
-mud slides
etc...
Leading to the
evacuation of
houses located
at the toe, on
the opposite
side of the
valley.

  10/11/11                                       3
Two communities with about 10,000 inhabitants were
under the influence of the dust plumes.

An international contest was organized by the “owner”
of the project, i.e. an agency named RSA.

Our team recognized two main objectives had to be
met:
a) limiting the volume of earth movements and
b) reducing the overall costs of the restoration to
match stringent financial limitations imposed
by RSA’s budget.


 10/11/11                               4
The restoration project had to consider numerous other global and sometimes
competing objectives:

- Minimize dusting.
- Limit air pollution.
- Control the geotechnical stability of a large area.
- Control the area water runoff guiding collected water across steep cross slopes.
- Give strong and immediate support to new vegetation on sterile soils.
- Limit the use of concrete/steel or any other artificial material given the sensitive
location of the site at the footsteps of the Alps, in a visible, densely inhabited area.




    10/11/11                                                        5
The Team recognized that:
Designs based on codes or recommendations may
differ quite significantly from designs based on Risk
Based Decision Making (RBDM).

Differences may go as deep as choosing a different
material hauling system, a different drainage pattern
etc.

Alternatives which are perfectly code-compliant and
require the same investments and maintenance may
expose the owner to totally different levels of risk all
along their expected life.

 10/11/11                                  6
EXAMPLE: using an
aerial tramway to
haul waste material,
rather than trucks.

It is important to
recognize that
alternatives' risks
may have very
different time frames,
which is taken into
account by CDA/ESM


  10/11/11               7
The 4.5 km of dirt tracks between the top and the toe of the
slope were a potential source of dusting and large carbon
footprint, given the need for a fleet of small tonnage trucks.

Thus, hauling trucks were
ultimately discarded because
of environmental risks:
-pollution from exhausts,
-fibres dispersion from the
excavated material
-need to upgrade the existing
tracks
-extra costs for ancillary
temporary structures).


  10/11/11                                      8
Slope stability control procedures:
- Unloading of the crest of the dump slope by digging
three, 10 m wide benches and by storing the resulting
material at the valley bottom in an 8 m high fill.

-Cutting a series of eight, 2.5 m wide, “path-ways
berms” across the slope, each about
600 m long.




 10/11/11                               9
Runoff control procedure:

Deep gullies, had formed in the upper part of the slope.


- Overall runoff control
through a network of small
“horizontal” wooden channels,
50 to 100 cm wide.
- Transfer of the collected
water towards the toe of the
slope using four main “vertical”
channels located along the
slopes



  10/11/11                                     10
10/11/11   11
10/11/11   12
Re-vegetation
The reforestation/re-vegetation of the area was a
major challenge within the project due to the
scarcity of nutrient materials in the sterile soil of
the dump.

Good re-vegetation was a significant project
objective and critical to overall dump stability.




   10/11/11                                             13
The reforestation process was intensely monitored and scrutinized. By the end of the
works, the first trees and shrubs, hydroseeding had already undergone 3 or 4
vegetative seasons and allowed a “real time” control of the success of the operation. In
total the re-vegetation effort included: 450,000 m2 of hydro-seeding, 15,000 shrubs,
7,300 trees and 267,000 live cuttings.




   10/11/11                                                     14
Risk Based Decision Making (RBDM) procedures at every
           step of the design process were used to develop the
           best engineering design in terms of technical results and
           budget limitations.




10/11/11                                     15
The integration of geotechnique, hydraulics, pedology and risk management within
the designers’ multidisciplinary group led to a well-balanced and environmentally
sustainable project allowing the gradual recovery through natural processes of an
otherwise highly compromised area.




  10/11/11                                                   16

Mais conteúdo relacionado

Mais procurados

Contolling Costs And Risks In Construction Of The Trans Alaska Oil Pipeline
Contolling Costs And Risks In Construction Of The Trans Alaska Oil PipelineContolling Costs And Risks In Construction Of The Trans Alaska Oil Pipeline
Contolling Costs And Risks In Construction Of The Trans Alaska Oil PipelineWayne Holley
 
Design of small dams
Design of small damsDesign of small dams
Design of small damsmytat3
 
Bjorn Johann Bjornsson_2014CV
Bjorn Johann Bjornsson_2014CVBjorn Johann Bjornsson_2014CV
Bjorn Johann Bjornsson_2014CVBjorn Bjornsson
 
Gas Drilling Water Quality and Private Drinking Supplies
Gas Drilling Water Quality and Private Drinking SuppliesGas Drilling Water Quality and Private Drinking Supplies
Gas Drilling Water Quality and Private Drinking SuppliesBruce Dickson
 
Water Supply Compilation of Reports
Water Supply Compilation of ReportsWater Supply Compilation of Reports
Water Supply Compilation of ReportsJahh Lavz
 
N11 Gorey By Pass Scheme
N11 Gorey By Pass SchemeN11 Gorey By Pass Scheme
N11 Gorey By Pass SchemeTony O Neill
 
Natural gas storage in the united states
Natural gas storage in the united states Natural gas storage in the united states
Natural gas storage in the united states BANABAS DOGAH
 
Capstone Midterm
Capstone MidtermCapstone Midterm
Capstone Midtermdchewni
 
Organic Soil and Water Management at the Arlington Agricultural Research Station
Organic Soil and Water Management at the Arlington Agricultural Research StationOrganic Soil and Water Management at the Arlington Agricultural Research Station
Organic Soil and Water Management at the Arlington Agricultural Research StationUniversity of Wisconsin-Madison
 
(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...
(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...
(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...Michal Krzeminski
 
Independent Review of Hydrological Issues: Deloro Mine Site
Independent Review of Hydrological Issues: Deloro Mine SiteIndependent Review of Hydrological Issues: Deloro Mine Site
Independent Review of Hydrological Issues: Deloro Mine SiteLOWaterkeeper
 
Swim Drink Fish Canada submission for relicensing written hearing for the Del...
Swim Drink Fish Canada submission for relicensing written hearing for the Del...Swim Drink Fish Canada submission for relicensing written hearing for the Del...
Swim Drink Fish Canada submission for relicensing written hearing for the Del...LOWaterkeeper
 

Mais procurados (18)

Contolling Costs And Risks In Construction Of The Trans Alaska Oil Pipeline
Contolling Costs And Risks In Construction Of The Trans Alaska Oil PipelineContolling Costs And Risks In Construction Of The Trans Alaska Oil Pipeline
Contolling Costs And Risks In Construction Of The Trans Alaska Oil Pipeline
 
Design of small dams
Design of small damsDesign of small dams
Design of small dams
 
Green infrastructure as a foundation for climate resilience and sustainabilit...
Green infrastructure as a foundation for climate resilience and sustainabilit...Green infrastructure as a foundation for climate resilience and sustainabilit...
Green infrastructure as a foundation for climate resilience and sustainabilit...
 
Bjorn Johann Bjornsson_2014CV
Bjorn Johann Bjornsson_2014CVBjorn Johann Bjornsson_2014CV
Bjorn Johann Bjornsson_2014CV
 
Pecker aci2003
Pecker aci2003Pecker aci2003
Pecker aci2003
 
2013 Naval E Journal
2013 Naval E Journal2013 Naval E Journal
2013 Naval E Journal
 
Gas Drilling Water Quality and Private Drinking Supplies
Gas Drilling Water Quality and Private Drinking SuppliesGas Drilling Water Quality and Private Drinking Supplies
Gas Drilling Water Quality and Private Drinking Supplies
 
Water Supply Compilation of Reports
Water Supply Compilation of ReportsWater Supply Compilation of Reports
Water Supply Compilation of Reports
 
Dam engineering i 1
Dam engineering i 1Dam engineering i 1
Dam engineering i 1
 
N11 Gorey By Pass Scheme
N11 Gorey By Pass SchemeN11 Gorey By Pass Scheme
N11 Gorey By Pass Scheme
 
Natural gas storage in the united states
Natural gas storage in the united states Natural gas storage in the united states
Natural gas storage in the united states
 
Capstone Midterm
Capstone MidtermCapstone Midterm
Capstone Midterm
 
Organic Soil and Water Management at the Arlington Agricultural Research Station
Organic Soil and Water Management at the Arlington Agricultural Research StationOrganic Soil and Water Management at the Arlington Agricultural Research Station
Organic Soil and Water Management at the Arlington Agricultural Research Station
 
(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...
(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...
(2012) - Fok N, Vincent P, Qiu T, Krzeminski M - A Case Study of Ground Impro...
 
Independent Review of Hydrological Issues: Deloro Mine Site
Independent Review of Hydrological Issues: Deloro Mine SiteIndependent Review of Hydrological Issues: Deloro Mine Site
Independent Review of Hydrological Issues: Deloro Mine Site
 
Presentation 3: Impact Assessment Findings
Presentation 3: Impact Assessment FindingsPresentation 3: Impact Assessment Findings
Presentation 3: Impact Assessment Findings
 
Stormwater Magazine
Stormwater MagazineStormwater Magazine
Stormwater Magazine
 
Swim Drink Fish Canada submission for relicensing written hearing for the Del...
Swim Drink Fish Canada submission for relicensing written hearing for the Del...Swim Drink Fish Canada submission for relicensing written hearing for the Del...
Swim Drink Fish Canada submission for relicensing written hearing for the Del...
 

Destaque

English Translation Of Go Forward Plan, Harvard Bus Review
English Translation Of Go Forward Plan, Harvard Bus ReviewEnglish Translation Of Go Forward Plan, Harvard Bus Review
English Translation Of Go Forward Plan, Harvard Bus ReviewThomas Nastas
 
Webinar: Measuring Online Brand Loyalty and Benchmarking websites: Cartier, G...
Webinar: Measuring Online Brand Loyalty and Benchmarking websites: Cartier, G...Webinar: Measuring Online Brand Loyalty and Benchmarking websites: Cartier, G...
Webinar: Measuring Online Brand Loyalty and Benchmarking websites: Cartier, G...UserZoom
 
Intro to Twitter for Companies
Intro to Twitter for CompaniesIntro to Twitter for Companies
Intro to Twitter for CompaniesNoesium Consulting
 
PresentacióN1
PresentacióN1PresentacióN1
PresentacióN1Alex_27
 
(Online) Censorship in Southeast Asia | #rp15
(Online) Censorship in Southeast Asia | #rp15(Online) Censorship in Southeast Asia | #rp15
(Online) Censorship in Southeast Asia | #rp15Sascha Funk
 
Mobile UX Research: Travel Consumer Preferences for Mobile and Tablet
Mobile UX Research: Travel Consumer Preferences for Mobile and TabletMobile UX Research: Travel Consumer Preferences for Mobile and Tablet
Mobile UX Research: Travel Consumer Preferences for Mobile and TabletUserZoom
 
GeekMeet Iasi Intro
GeekMeet Iasi IntroGeekMeet Iasi Intro
GeekMeet Iasi IntroGeekMeet
 
study on indian teens
study on indian teensstudy on indian teens
study on indian teensAnoop Menon
 
RISI Latin American Conference, Eden Roc Hotel, Miami, Nov. 20, 2013
RISI Latin American Conference, Eden Roc Hotel, Miami, Nov. 20, 2013RISI Latin American Conference, Eden Roc Hotel, Miami, Nov. 20, 2013
RISI Latin American Conference, Eden Roc Hotel, Miami, Nov. 20, 2013SteveScheibe
 
Uz big design talk may10
Uz big design talk may10Uz big design talk may10
Uz big design talk may10UserZoom
 
The Economics of Grid-Connected Hybrid Distributed Generation
The Economics of Grid-Connected Hybrid Distributed GenerationThe Economics of Grid-Connected Hybrid Distributed Generation
The Economics of Grid-Connected Hybrid Distributed GenerationIain Sanders
 
You say you want a revolution
You say you want a revolutionYou say you want a revolution
You say you want a revolutionJason Dunstone
 

Destaque (20)

English Translation Of Go Forward Plan, Harvard Bus Review
English Translation Of Go Forward Plan, Harvard Bus ReviewEnglish Translation Of Go Forward Plan, Harvard Bus Review
English Translation Of Go Forward Plan, Harvard Bus Review
 
Webinar: Measuring Online Brand Loyalty and Benchmarking websites: Cartier, G...
Webinar: Measuring Online Brand Loyalty and Benchmarking websites: Cartier, G...Webinar: Measuring Online Brand Loyalty and Benchmarking websites: Cartier, G...
Webinar: Measuring Online Brand Loyalty and Benchmarking websites: Cartier, G...
 
Intro to Twitter for Companies
Intro to Twitter for CompaniesIntro to Twitter for Companies
Intro to Twitter for Companies
 
PresentacióN1
PresentacióN1PresentacióN1
PresentacióN1
 
CloudCoffee
CloudCoffeeCloudCoffee
CloudCoffee
 
Make Love Not War
Make Love Not WarMake Love Not War
Make Love Not War
 
(Online) Censorship in Southeast Asia | #rp15
(Online) Censorship in Southeast Asia | #rp15(Online) Censorship in Southeast Asia | #rp15
(Online) Censorship in Southeast Asia | #rp15
 
Mobile UX Research: Travel Consumer Preferences for Mobile and Tablet
Mobile UX Research: Travel Consumer Preferences for Mobile and TabletMobile UX Research: Travel Consumer Preferences for Mobile and Tablet
Mobile UX Research: Travel Consumer Preferences for Mobile and Tablet
 
Northstar So
Northstar SoNorthstar So
Northstar So
 
GeekMeet Iasi Intro
GeekMeet Iasi IntroGeekMeet Iasi Intro
GeekMeet Iasi Intro
 
Para ver y bajar los ppt
Para ver y bajar los pptPara ver y bajar los ppt
Para ver y bajar los ppt
 
study on indian teens
study on indian teensstudy on indian teens
study on indian teens
 
RISI Latin American Conference, Eden Roc Hotel, Miami, Nov. 20, 2013
RISI Latin American Conference, Eden Roc Hotel, Miami, Nov. 20, 2013RISI Latin American Conference, Eden Roc Hotel, Miami, Nov. 20, 2013
RISI Latin American Conference, Eden Roc Hotel, Miami, Nov. 20, 2013
 
Uz big design talk may10
Uz big design talk may10Uz big design talk may10
Uz big design talk may10
 
The Economics of Grid-Connected Hybrid Distributed Generation
The Economics of Grid-Connected Hybrid Distributed GenerationThe Economics of Grid-Connected Hybrid Distributed Generation
The Economics of Grid-Connected Hybrid Distributed Generation
 
Drenajes en cirugia biliopancreatica
Drenajes en cirugia biliopancreaticaDrenajes en cirugia biliopancreatica
Drenajes en cirugia biliopancreatica
 
The Beatles Parte II
The Beatles Parte IIThe Beatles Parte II
The Beatles Parte II
 
You say you want a revolution
You say you want a revolutionYou say you want a revolution
You say you want a revolution
 
Irudiak
IrudiakIrudiak
Irudiak
 
Detskaya Rabota2
Detskaya Rabota2Detskaya Rabota2
Detskaya Rabota2
 

Semelhante a Balangero asbestos mine dumps restoration a few years after, in the aftermath of quinn storm and rolf medicane events

Flood alleviationbrief170214
Flood alleviationbrief170214Flood alleviationbrief170214
Flood alleviationbrief170214Naoise
 
Groundwater remediation project
Groundwater remediation projectGroundwater remediation project
Groundwater remediation projectTurlough Guerin
 
Constructed wetlands for costeffective and energy-efficient remediation of pl...
Constructed wetlands for costeffective and energy-efficient remediation of pl...Constructed wetlands for costeffective and energy-efficient remediation of pl...
Constructed wetlands for costeffective and energy-efficient remediation of pl...Frank Pels
 
Geo textile by md rakib hasan
Geo textile by md rakib hasanGeo textile by md rakib hasan
Geo textile by md rakib hasanMdRakibHasan27
 
DSD-INT 2023 RESTCOAST ecotope quantification using D-Eco Impact - Caillibotte
DSD-INT 2023 RESTCOAST ecotope quantification using D-Eco Impact - CaillibotteDSD-INT 2023 RESTCOAST ecotope quantification using D-Eco Impact - Caillibotte
DSD-INT 2023 RESTCOAST ecotope quantification using D-Eco Impact - CaillibotteDeltares
 
Enhancing Rainwater Harvesting through Pervious Pavement System Based on the ...
Enhancing Rainwater Harvesting through Pervious Pavement System Based on the ...Enhancing Rainwater Harvesting through Pervious Pavement System Based on the ...
Enhancing Rainwater Harvesting through Pervious Pavement System Based on the ...civejjour
 
Mine propcessdisposal
Mine propcessdisposalMine propcessdisposal
Mine propcessdisposalDC Graphics
 
Alternative systems for coastal protection
Alternative systems for coastal protectionAlternative systems for coastal protection
Alternative systems for coastal protectionEdgar Bernabe
 
UNCONVENTIONAL GAS- DRILLING FOOTPRINT REDUCTION CHALLENGE
UNCONVENTIONAL GAS- DRILLING FOOTPRINT REDUCTION CHALLENGE UNCONVENTIONAL GAS- DRILLING FOOTPRINT REDUCTION CHALLENGE
UNCONVENTIONAL GAS- DRILLING FOOTPRINT REDUCTION CHALLENGE Akhil Prabhakar
 
Environmental Stabilization & Brownfield Redevelopment
Environmental Stabilization & Brownfield RedevelopmentEnvironmental Stabilization & Brownfield Redevelopment
Environmental Stabilization & Brownfield RedevelopmentDavid Bausmith
 
151111 Abstract - DB Sediments - 6th Arab-German Energy Forum
151111 Abstract - DB Sediments - 6th Arab-German Energy Forum151111 Abstract - DB Sediments - 6th Arab-German Energy Forum
151111 Abstract - DB Sediments - 6th Arab-German Energy ForumDietrich Bartelt
 
Melbourne Channel Deepening
Melbourne Channel DeepeningMelbourne Channel Deepening
Melbourne Channel DeepeningSikko Krol
 

Semelhante a Balangero asbestos mine dumps restoration a few years after, in the aftermath of quinn storm and rolf medicane events (20)

Flood alleviationbrief170214
Flood alleviationbrief170214Flood alleviationbrief170214
Flood alleviationbrief170214
 
Groundwater remediation project
Groundwater remediation projectGroundwater remediation project
Groundwater remediation project
 
Constructed wetlands for costeffective and energy-efficient remediation of pl...
Constructed wetlands for costeffective and energy-efficient remediation of pl...Constructed wetlands for costeffective and energy-efficient remediation of pl...
Constructed wetlands for costeffective and energy-efficient remediation of pl...
 
10. geo textile (lecture-10, 11)
10. geo textile (lecture-10, 11)10. geo textile (lecture-10, 11)
10. geo textile (lecture-10, 11)
 
Shimna Flood Alleviation Scheme webinar
Shimna Flood Alleviation Scheme webinarShimna Flood Alleviation Scheme webinar
Shimna Flood Alleviation Scheme webinar
 
Geo textile by md rakib hasan
Geo textile by md rakib hasanGeo textile by md rakib hasan
Geo textile by md rakib hasan
 
DSD-INT 2023 RESTCOAST ecotope quantification using D-Eco Impact - Caillibotte
DSD-INT 2023 RESTCOAST ecotope quantification using D-Eco Impact - CaillibotteDSD-INT 2023 RESTCOAST ecotope quantification using D-Eco Impact - Caillibotte
DSD-INT 2023 RESTCOAST ecotope quantification using D-Eco Impact - Caillibotte
 
Enhancing Rainwater Harvesting through Pervious Pavement System Based on the ...
Enhancing Rainwater Harvesting through Pervious Pavement System Based on the ...Enhancing Rainwater Harvesting through Pervious Pavement System Based on the ...
Enhancing Rainwater Harvesting through Pervious Pavement System Based on the ...
 
Mine propcessdisposal
Mine propcessdisposalMine propcessdisposal
Mine propcessdisposal
 
IJISET_V2_I9_78
IJISET_V2_I9_78IJISET_V2_I9_78
IJISET_V2_I9_78
 
Alternative systems for coastal protection
Alternative systems for coastal protectionAlternative systems for coastal protection
Alternative systems for coastal protection
 
World Environment Day 2013: 'RSPB Wallasea Island Coast Project', Chris Tyas
World Environment Day 2013: 'RSPB Wallasea Island Coast Project', Chris Tyas World Environment Day 2013: 'RSPB Wallasea Island Coast Project', Chris Tyas
World Environment Day 2013: 'RSPB Wallasea Island Coast Project', Chris Tyas
 
Libya & TERRA ROSSA
Libya & TERRA ROSSALibya & TERRA ROSSA
Libya & TERRA ROSSA
 
UNCONVENTIONAL GAS- DRILLING FOOTPRINT REDUCTION CHALLENGE
UNCONVENTIONAL GAS- DRILLING FOOTPRINT REDUCTION CHALLENGE UNCONVENTIONAL GAS- DRILLING FOOTPRINT REDUCTION CHALLENGE
UNCONVENTIONAL GAS- DRILLING FOOTPRINT REDUCTION CHALLENGE
 
Environmental Stabilization & Brownfield Redevelopment
Environmental Stabilization & Brownfield RedevelopmentEnvironmental Stabilization & Brownfield Redevelopment
Environmental Stabilization & Brownfield Redevelopment
 
A012470128
A012470128A012470128
A012470128
 
151111 Abstract - DB Sediments - 6th Arab-German Energy Forum
151111 Abstract - DB Sediments - 6th Arab-German Energy Forum151111 Abstract - DB Sediments - 6th Arab-German Energy Forum
151111 Abstract - DB Sediments - 6th Arab-German Energy Forum
 
On the road
On the roadOn the road
On the road
 
Melbourne Channel Deepening
Melbourne Channel DeepeningMelbourne Channel Deepening
Melbourne Channel Deepening
 
Sanipor
SaniporSanipor
Sanipor
 

Mais de Oboni Riskope Associates Inc.

Riskope 5 days course on Risk and Crisis Management for top managers and key ...
Riskope 5 days course on Risk and Crisis Management for top managers and key ...Riskope 5 days course on Risk and Crisis Management for top managers and key ...
Riskope 5 days course on Risk and Crisis Management for top managers and key ...Oboni Riskope Associates Inc.
 
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, Colombia
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, ColombiaOboni Riskope Conference on Risk Based Decision Making in Bogotà, Colombia
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, ColombiaOboni Riskope Associates Inc.
 
Rims Metal and Mining Session talk by F+C Oboni, Riskope
Rims Metal and Mining Session talk by F+C Oboni, RiskopeRims Metal and Mining Session talk by F+C Oboni, Riskope
Rims Metal and Mining Session talk by F+C Oboni, RiskopeOboni Riskope Associates Inc.
 

Mais de Oboni Riskope Associates Inc. (20)

Riskope new web site announcement
Riskope new web site announcementRiskope new web site announcement
Riskope new web site announcement
 
Rational Risk and Crisis Management Course
Rational Risk and Crisis Management CourseRational Risk and Crisis Management Course
Rational Risk and Crisis Management Course
 
Cim2013 oboni oboni_zabolotoniuk
Cim2013 oboni oboni_zabolotoniukCim2013 oboni oboni_zabolotoniuk
Cim2013 oboni oboni_zabolotoniuk
 
Riskope 5 days course on Risk and Crisis Management for top managers and key ...
Riskope 5 days course on Risk and Crisis Management for top managers and key ...Riskope 5 days course on Risk and Crisis Management for top managers and key ...
Riskope 5 days course on Risk and Crisis Management for top managers and key ...
 
Riskope for christmas 2012
Riskope for christmas 2012Riskope for christmas 2012
Riskope for christmas 2012
 
Ore cockpit castellano
Ore cockpit castellanoOre cockpit castellano
Ore cockpit castellano
 
Mining 012 riskope is it true that pi_gs
Mining 012 riskope  is it true that pi_gsMining 012 riskope  is it true that pi_gs
Mining 012 riskope is it true that pi_gs
 
Bogota 02 10-011 Risk Management Mining Summit
Bogota 02 10-011 Risk Management Mining SummitBogota 02 10-011 Risk Management Mining Summit
Bogota 02 10-011 Risk Management Mining Summit
 
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, Colombia
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, ColombiaOboni Riskope Conference on Risk Based Decision Making in Bogotà, Colombia
Oboni Riskope Conference on Risk Based Decision Making in Bogotà, Colombia
 
Review ICS Guidelines
Review ICS GuidelinesReview ICS Guidelines
Review ICS Guidelines
 
Cassass presentation WLF2 Rome
Cassass presentation WLF2 RomeCassass presentation WLF2 Rome
Cassass presentation WLF2 Rome
 
Road Safety- Sicurezza Stradale
Road Safety- Sicurezza StradaleRoad Safety- Sicurezza Stradale
Road Safety- Sicurezza Stradale
 
Tolerability and Decision Making Discussion
Tolerability and Decision Making DiscussionTolerability and Decision Making Discussion
Tolerability and Decision Making Discussion
 
Rims Metal and Mining Session talk by F+C Oboni, Riskope
Rims Metal and Mining Session talk by F+C Oboni, RiskopeRims Metal and Mining Session talk by F+C Oboni, Riskope
Rims Metal and Mining Session talk by F+C Oboni, Riskope
 
Rims Metals and Mining Session
Rims Metals and Mining Session Rims Metals and Mining Session
Rims Metals and Mining Session
 
Force Majeure: a Time Bomb
Force Majeure: a Time BombForce Majeure: a Time Bomb
Force Majeure: a Time Bomb
 
Oboni02 castellano
Oboni02 castellanoOboni02 castellano
Oboni02 castellano
 
Oboni01 castellano
Oboni01 castellanoOboni01 castellano
Oboni01 castellano
 
Cda esm waste oil disposal application part 2
Cda esm waste oil disposal application part 2Cda esm waste oil disposal application part 2
Cda esm waste oil disposal application part 2
 
Force Majeure Clause in Contracts
Force Majeure Clause in ContractsForce Majeure Clause in Contracts
Force Majeure Clause in Contracts
 

Último

ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...JojoEDelaCruz
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsManeerUddin
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxMusic 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxleah joy valeriano
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 

Último (20)

ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture hons
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxMusic 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 

Balangero asbestos mine dumps restoration a few years after, in the aftermath of quinn storm and rolf medicane events

  • 1. Integrated hydrogeological and environmental restoration of landslides affecting a large asbestos mine dry tailings dump Franco Oboni, Riskope International, Vancouver, Canada Cesar Oboni, Riskope International, Vancouver, Canada Claudio Angelino, Polithema srl, Turin, Italy Bartolomeo Visconti, Polithema srl, Turin, Italy
  • 2. Width 800 m Height 200 – 250 m Estimated Volume 50-60 Mm3 Slope 35 – 45 degrees
  • 3. The site was recognized as one of the most serious environmental issues of Italy. -deep seated instabilities -erosion gullies -mud slides etc... Leading to the evacuation of houses located at the toe, on the opposite side of the valley.
  • 4. Two communities with about 10,000 inhabitants were under the influence of the dust plumes. An international contest was organized by the “owner” of the project, i.e. an agency named RSA. Our team recognized two main objectives had to be met: a) limiting the volume of earth movements and b) reducing the overall costs of the restoration to match stringent financial limitations imposed by RSA’s budget.
  • 5. The restoration project had to consider numerous other global and sometimes competing objectives: - Minimize dusting. - Limit air pollution. - Control the geotechnical stability of a large area. - Control the area water runoff guiding collected water across steep cross slopes. - Give strong and immediate support to new vegetation on sterile soils. - Limit the use of concrete/steel or any other artificial material given the sensitive location of the site at the footsteps of the Alps, in a visible, densely inhabited area.
  • 6. The Team recognized that: Designs based on codes or recommendations may differ quite significantly from designs based on Risk Based Decision Making (RBDM). Differences may go as deep as choosing a different material hauling system, a different drainage pattern etc. Alternatives which are perfectly code-compliant and require the same investments and maintenance may expose the owner to totally different levels of risk all along their expected life.
  • 7. EXAMPLE: using an aerial tramway to haul waste material, rather than trucks. It is important to recognize that alternatives' risks may have very different time frames, which is taken into account by CDA/ESM
  • 8. The 4.5 km of dirt tracks between the top and the toe of the slope were a potential source of dusting and large carbon footprint, given the need for a fleet of small tonnage trucks. Thus, hauling trucks were ultimately discarded because of environmental risks: -pollution from exhausts, -fibres dispersion from the excavated material -need to upgrade the existing tracks -extra costs for ancillary temporary structures).
  • 9. Slope stability control procedures: - Unloading of the crest of the dump slope by digging three, 10 m wide benches and by storing the resulting material at the valley bottom in an 8 m high fill. -Cutting a series of eight, 2.5 m wide, “path-ways berms” across the slope, each about 600 m long.
  • 10. Runoff control procedure: Deep gullies, had formed in the upper part of the slope. - Overall runoff control through a network of small “horizontal” wooden channels, 50 to 100 cm wide. - Transfer of the collected water towards the toe of the slope using four main “vertical” channels located along the slopes
  • 11.
  • 12.
  • 13. Re-vegetation The reforestation/re-vegetation of the area was a major challenge within the project due to the scarcity of nutrient materials in the sterile soil of the dump. Good re-vegetation was a significant project objective and critical to overall dump stability.
  • 14. The reforestation process was intensely monitored and scrutinized. By the end of the works, the first trees and shrubs, hydroseeding had already undergone 3 or 4 vegetative seasons and allowed a “real time” control of the success of the operation. In total the re-vegetation effort included: 450,000 m2 of hydro-seeding, 15,000 shrubs, 7,300 trees and 267,000 live cuttings.
  • 15. Risk Based Decision Making (RBDM) procedures at every step of the design process were used to develop the best engineering design in terms of technical results and budget limitations.
  • 16. The integration of geotechnique, hydraulics, pedology and risk management within the designers’ multidisciplinary group led to a well-balanced and environmentally sustainable project allowing the gradual recovery through natural processes of an otherwise highly compromised area.
  • 17. Integrated hydrogeological and environmental restoration of landslides affecting a large asbestos mine dry tailings dump Franco Oboni, Riskope International, Vancouver, Canada Cesar Oboni, Riskope International, Vancouver, Canada Claudio Angelino, Polithema srl, Turin, Italy Bartolomeo Visconti, Polithema srl, Turin, Italy 10/11/11 1
  • 18. Width 800 m Height 200 – 250 m Estimated Volume 50-60 Mm3 Slope 35 – 45 degrees 10/11/11 2
  • 19. The site was recognized as one of the most serious environmental issues of Italy. -deep seated instabilities -erosion gullies -mud slides etc... Leading to the evacuation of houses located at the toe, on the opposite side of the valley. 10/11/11 3
  • 20. Two communities with about 10,000 inhabitants were under the influence of the dust plumes. An international contest was organized by the “owner” of the project, i.e. an agency named RSA. Our team recognized two main objectives had to be met: a) limiting the volume of earth movements and b) reducing the overall costs of the restoration to match stringent financial limitations imposed by RSA’s budget. 10/11/11 4
  • 21. The restoration project had to consider numerous other global and sometimes competing objectives: - Minimize dusting. - Limit air pollution. - Control the geotechnical stability of a large area. - Control the area water runoff guiding collected water across steep cross slopes. - Give strong and immediate support to new vegetation on sterile soils. - Limit the use of concrete/steel or any other artificial material given the sensitive location of the site at the footsteps of the Alps, in a visible, densely inhabited area. 10/11/11 5
  • 22. The Team recognized that: Designs based on codes or recommendations may differ quite significantly from designs based on Risk Based Decision Making (RBDM). Differences may go as deep as choosing a different material hauling system, a different drainage pattern etc. Alternatives which are perfectly code-compliant and require the same investments and maintenance may expose the owner to totally different levels of risk all along their expected life. 10/11/11 6
  • 23. EXAMPLE: using an aerial tramway to haul waste material, rather than trucks. It is important to recognize that alternatives' risks may have very different time frames, which is taken into account by CDA/ESM 10/11/11 7
  • 24. The 4.5 km of dirt tracks between the top and the toe of the slope were a potential source of dusting and large carbon footprint, given the need for a fleet of small tonnage trucks. Thus, hauling trucks were ultimately discarded because of environmental risks: -pollution from exhausts, -fibres dispersion from the excavated material -need to upgrade the existing tracks -extra costs for ancillary temporary structures). 10/11/11 8
  • 25. Slope stability control procedures: - Unloading of the crest of the dump slope by digging three, 10 m wide benches and by storing the resulting material at the valley bottom in an 8 m high fill. -Cutting a series of eight, 2.5 m wide, “path-ways berms” across the slope, each about 600 m long. 10/11/11 9
  • 26. Runoff control procedure: Deep gullies, had formed in the upper part of the slope. - Overall runoff control through a network of small “horizontal” wooden channels, 50 to 100 cm wide. - Transfer of the collected water towards the toe of the slope using four main “vertical” channels located along the slopes 10/11/11 10
  • 27. 10/11/11 11
  • 28. 10/11/11 12
  • 29. Re-vegetation The reforestation/re-vegetation of the area was a major challenge within the project due to the scarcity of nutrient materials in the sterile soil of the dump. Good re-vegetation was a significant project objective and critical to overall dump stability. 10/11/11 13
  • 30. The reforestation process was intensely monitored and scrutinized. By the end of the works, the first trees and shrubs, hydroseeding had already undergone 3 or 4 vegetative seasons and allowed a “real time” control of the success of the operation. In total the re-vegetation effort included: 450,000 m2 of hydro-seeding, 15,000 shrubs, 7,300 trees and 267,000 live cuttings. 10/11/11 14
  • 31. Risk Based Decision Making (RBDM) procedures at every step of the design process were used to develop the best engineering design in terms of technical results and budget limitations. 10/11/11 15
  • 32. The integration of geotechnique, hydraulics, pedology and risk management within the designers’ multidisciplinary group led to a well-balanced and environmentally sustainable project allowing the gradual recovery through natural processes of an otherwise highly compromised area. 10/11/11 16