PRIVATE AND NOT FOR PUBLICATION




     WEEKLY OPERATING NOTICE
                         Extracted from the following




       London North Eastern
          Route (South)
                                    AN D

                Anglia Routes
                                                           Week No.


     LNES / AR - GN ROUTES                                   43
                               Containing
                              SAFETY NOTICES
                      TEMPORARY SPEED RESTRICTIONS
                        ENGINEERING ARRANGEMENTS
                 SIGNALLING & PERMANENT WAY ALTERATIONS
                     GENERAL INSTRUCTIONS & NOTICES


               SATURDAY 22 JANUARY 2011
                           To
                FRIDAY 28 JANUARY 2011

            THIS NOTICE COVERS SELECTED LINES FROM THE
                    LONDON NORTH EASTERN REGION
AND SELECTED LINES FROM THE EAST ANGLIA REGION SECTIONAL APPENDICES
                         This document contains 47 pages
LINES COVERED BY THIS NOTICE

LONDON NORTH EASTERN (SOUTH) (LN)

LN 101 KING’S CROSS TO SHAFTHOLME JN
LN 105 MOORGATE TO FINSBURY PARK JN
LN 120 WOOD GREEN NORTH JN TO LANGLEY JN VIA HERTFORD
LN 125 HITCHIN CAMBRIDGE JN TO CAMBRIDGE

EAST ANGLIA ROUTES (EA)

EA 1161 BISHOPS STORTFORD TO ELY NORTH JN
EA 1162 ELY NORTH JN TO KINGS LYNN
EA 1230 ROYSTON TO SHEPRETH BRANCH JN




                First Capital Connect WON – Week 43     2
Safety Notices




First Capital Connect WON – Week 43   3
First Capital Connect WON – Week 43   4
First Capital Connect WON – Week 43   5
First Capital Connect WON – Week 43   6
First Capital Connect WON – Week 43   7
ITEM 4 CONTINUED




                   First Capital Connect WON – Week 43   8
First Capital Connect WON – Week 43   9
First Capital Connect WON – Week 43   10
First Capital Connect WON – Week 43   11
First Capital Connect WON – Week 43   12
First Capital Connect WON – Week 43   13
First Capital Connect WON – Week 43   14
First Capital Connect WON – Week 43   15
First Capital Connect WON – Week 43   16
First Capital Connect WON – Week 43   17
First Capital Connect WON – Week 43   18
First Capital Connect WON – Week 43   19
First Capital Connect WON – Week 43   20
First Capital Connect WON – Week 43   21
First Capital Connect WON – Week 43   22
First Capital Connect WON – Week 43   23
First Capital Connect WON – Week 43   24
First Capital Connect WON – Week 43   25
First Capital Connect WON – Week 43   26
First Capital Connect WON – Week 43   27
First Capital Connect WON – Week 43   28
First Capital Connect WON – Week 43   29
Item 144 – Repeated item – see item 42 LN125 (Hitchin Cambridge Jn – Cambridge)




                          First Capital Connect WON – Week 43                     30
NONE




                NONE




First Capital Connect WON – Week 43   31
TABLE DISPLAYED ON NEXT PAGE




First Capital Connect WON – Week 43   32
First Capital Connect WON – Week 43   33
TABLE DISPLAYED ON NEXT PAGE




First Capital Connect WON – Week 43   34
First Capital Connect WON – Week 43   35
TABLE DISPLAYED ON NEXT PAGE




First Capital Connect WON – Week 43   36
First Capital Connect WON – Week 43   37
First Capital Connect WON – Week 43   38
First Capital Connect WON – Week 43   39
First Capital Connect WON – Week 43   40
Signal      Location       Line       ELR     Signalbox      Date of     Events    Events      TPWS
                                                              latest      since       in      fitted at
                                                             SPAD         1985    current 5    signal
                                                                                   years

 K445       Hornsey      Down Slow    ECM1   Kings Cross    0/03/2009      3         2           Y
                           No 1                 PSB


 K446       Hornsey      Up Goods     ECM1   Kings Cross    0/07/2010      7         2           N



 K697       Hitchin      Down Slow    ECM1   Kings Cross    20/03/2009     7         2           Y
                                                PSB


 P84      Peterborough   South Up     ECM1   Peterborough   19/12/2007     8         2           N
                         Departure               PSB


 Stop      Letchworth     Arrival /   SBRO   Kings Cross    09/03/2010     4         2           N
Board 1                  Departure


 K833     Bowes Park       Down       HDB0   Kings Cross    05/12/2010     2         2           N
                          Hertford




                           First Capital Connect WON – Week 43                                       41
FIRST CAPITAL CONNECT ADDITIONAL NOTICES

                                        New 6 car stop board at Hertford North platform 3

A new 6 car stop board has been provided on platform 3 (Bay Platform) at Hertford North 16 metres away from the stop block.
Drivers of 6 car trains should use this stop point forthwith

19 September 2008

Steve Castle
Area Operations Manager
First Capital Connect
Kings Cross / Hitchin / Peterborough

                                                Royston Platform 1 Down direction.
A new 12 car stop board has been provided at the Cambridge end of the new platform extension.
The 3/4/6/8 stop car boards have been provided just beyond the station overbridge on the appropriate lamp post.


                                                   Royston Platform 1 Up direction
A new 12 car stop marker has been provided at the same position as the existing 6/8 car markers at the London end.

John Harradine
Safety Business Partner (Operations)

11 May 2009


                   New 12 car stop marker boards have been provided at the following stations;-
Stevenage Platform 1 & 2 at the London end.
Hitchin Platform 1 at the London end.
Huntingdon Platform 2 at the London end.
Cambridge Platform 1 at the London end.
Peterborough Platforms 2 & 3 at both ends of the platforms.
Peterborough Platform 4 & 5 at the country end.
Peterborough Down Fast line at the turn back point from P78 signal so as to align units with the walkways provided.

John Harradine
Safety Business Partner (Operations)

11 May 2009


                           New “S” Car Stopping Point - Hatfield Down Slow Line - Platform 3

With effect from 00:01 hours on Friday 16th January 2009, Drivers are advised that ALL formations of trains required to stop at
Hatfield Platform 3 must do so at the new “S” Car Stopping Point

A new “S” Car Board will be provided and will be placed “cess” side adjacent to the existing 8 Car Stopping Point.

Train dispatch will continue to be by use of the existing mirror provided at the 8 Car Point.

2 January 2009

Steve Castle
Area Operations Manager
First Capital Connect
King‟s Cross / Hitchin / Peterborough

                                                             Letchworth Stop Boards

With immediate effect Stop Boards 1 & 2 at Letchworth have been replaced with new reflectorised boards.

The position and meaning of these boards has not changed.


Richard Farish
Operations Standards Manager
20th September 2010



                                        First Capital Connect WON – Week 43                                                       42
FIRST CAPITAL CONNECT ADDITIONAL NOTICES

                                   Blocking the Line for the Purpose of Train Examination

There has been two occasions recently where train drivers and train maintenance staff have been involved in near misses with other trains
when undertaking an examination of a defective or failed train.

Luckily, on both occasions, no-one was injured or killed.

In both cases poor safety critical communications between driver and signaller were the underlying cause.

Train drivers and maintenance staff are reminded that if they are required to work outside their train, and cannot do so from a position of
safety, they must arrange a blockage of the adjacent line(s) from the controlling signaller.

When arranging a blockage with the signaller you must ensure that:-

     You are speaking to the correct signaller for that portion of line
     You identify yourself, your train headcode and where you are speaking from
     You identify specifically what line(s) you require blocked and for what purpose
     The signaller repeats back your request correctly
     You do not start work until the signaller has confirmed that train movements have been stopped on the line(s) requested and it is safe
     for you to go on or near the line.

Correct use of the safety critical communications protocols are a key element to staying safe. Stay professional – stay focussed –
stay alive.

Richard Farish
Operations Standards Manager

12th May 2009


                                   Headwall Telephones and Plungers - Northern City Line
Network Rail and its contractors Thales, will be replacing the Headwall Telephones and Plungers at the following locations from 13th June
until further notice.

•    Drayton Park
•    Highbury and Islington
•    Essex Road
•    Old Street
•    Moorgate

The new equipment is a direct replacement of ageing equipment and is being provided to improve safety and reliability.
There is no alteration to the way in which drivers operate the new equipment.

Richard Farish
Operations Standards Manager
First Capital Connect
Original notice date:    5th June 2009
Amended notice date:     28th August 2009


                           Relocation of 6 Car Stop Markers -Finsbury Park Platforms 3, 5 & 6

On the 23 August 2010 the 6 Car Stop Markers on platforms 3, 5 & 6 will be removed from their current location and repositioned adjacent to
the existing 8 Car Stop Markers. The position of the 3 & 4 Car Markers will remain unchanged. This will remove the current inconsistency of
having 3 stopping points on these platforms at this location. With the exception of platform 1 at Hatfield, this will bring it into line with current
stopping points at all other FCC GN route locations, where either 1 or 2 stopping points are provided, e.g. „S‟ Car marker or combined 8/6 Car
markers and combined 3/4 Car markers.

Drivers are reminded that it is their responsibility to check the length of the train that they are working, and to ensure that the chosen stopping
point is correct for that length of train. Where possible this information is provided on schedule cards, and Train Length reminders are
provided in the cab. In addition Train Length reminder cards can be ordered from your Driver Management Team and have been proven to be
of benefit.

Please ensure that you always use the relevant stopping points. Before releasing the doors it is good practice to double check for both the
length and on which side the doors are to be released.

Can you be sure you‟re a 3 or a 4? If you don‟t pause and wait, it might be too late, as you could be a 6 or an 8? And if you really want to look
after yourselves, remember you might also be 12!

Darren Standing
Operations Compliance Manager (Driving)



                                        First Capital Connect WON – Week 43                                                                      43
FIRST CAPITAL CONNECT ADDITIONAL NOTICES

                                           RAIL-HEAD ADHESION

Controlling the train

You must control the train to take account of:-

        The conditions, and
        Locations of known low rail-head adhesion as listed in the Sectional Appendix

Experiencing and reporting low rail-head conditions

You must tell the signaller immediately if you experience either of the following:-

Low rail adhesion            Likely to cause difficulties in stopping at a location NOT listed in the
                             Sectional Appendix

Exceptionally poor rail      Likely to cause more than anticipated difficulties in stopping at a location
adhesion                     listed in the Sectional Appendix

Controlled Test Stops

When the signaller tells you to make a controlled test stop, you must brake the train using the technique that you
would normally use for the weather and rail adhesion conditions at the location rather than that used for the
exceptional, rail-head adhesion conditions.

Immediately following the controlled test stop, you must tell the signaller:-

        The results of the test, and
        Whether the rail-head adhesion conditions should still be considered as exceptional

Serious Wheel Slip

You must tell the signaller the location where serious or prolonged wheel slip is experienced. However, if the
wheel slip is severe or you suspect damage to the rail, you must stop the train specially and tell the signaller
immediately.

Richard Farish
Operations Standards Manager
  th
15 October 2010




                                   Welwyn Garden City Platform 3 & 4


The 4 car stop marks on platform 3 (down slow) & platform 4 (down back) have been repositioned in rear of their
previous location. They are now affixed to the same post as the current 3 car stop marks giving a common
stopping point for both 3 & 4 car units.

Drivers must use this new stopping point as this allows enough room for a unit to arrive from the Carriage Sidings
and couple/attach in the platform to form an 8 car service if this is required.

Darren Standing
Operations Compliance Manager (Driving – GN)
Until Further Notice
 rd
3 December 2010



                               First Capital Connect WON – Week 43                                                 44
FIRST CAPITAL CONNECT ADDITIONAL NOTICES

                                                       Royston

When uncoupling units from a 12 car train, the 4 car unit must always be used to perform the uncoupling,
as it is possible for an 8 car to push a 4 car even with its emergency brakes applied

                                               Royston – Platform 1

       The following procedure must be followed for 12 car services to Cambridge that are required to split at
       Royston in the Up direction platform (platform 1), with the detached 4 car unit then proceeding all
       stations to Cambridge after the 8 car service has departed.

       This procedure is specific to Royston for down direction 12 car trains using the up direction
       platform.


       Driver of 12 car train arrives in Platform 1 and ensures that train is stopped at the “12” car mark. After
       releasing the train doors the Driver must use the P.A to announce the changes to the train formation. The
       Driver then applies full service brake (step 3) and shuts down cab removing key.
       Following face to face with Driver of 12 car, Detaching Driver proceeds to intermediate (Country end) cab
       of 4 car unit to be detached and mobilizes the cab.
       Once confirmation has been received from platform staff that it is safe for doors to be closed, the
       Detaching Driver makes PA announcement to passengers that doors will be closing, warns that train will
       be detaching and then closes the doors on the 4 car unit.
       Detaching Driver, after carrying out the necessary checks, completes the uncoupling process from the 4
       car unit.
       Detaching Driver enters rear cab of 8 car and sets tail lights, then informs the Driver who is to take the 8
       car train forwards, that uncoupling is complete via cab to cab communication before exiting cab.
       Driver of 8 car train sets up cab, and awaits dispatch from platform staff.
       Following departure of 8 car train, Driver of 4 car train sets up the cab and gets permission from signaller
       to draw train down to 4 car stopping point.
       Driver of 4 car train releases doors and awaits dispatch from platform staff.

                                          Royston – Platform 2

       The following procedure must be followed for 12 car services to Cambridge that are required to split at
       Royston in the Down direction platform (platform 2).

       Driver of 12 car train arrives in Platform 2 and ensures that train is stopped at the “12” car mark. After
       releasing the train doors the Driver must use the P.A to announce the changes to the train formation. The
       Driver then applies full service brake (step 3) and shuts down cab removing key.
       Following face to face with Driver of 12 car, Detaching Driver proceeds to intermediate (Country end) cab
       of 4 car unit to be detached and mobilizes the cab.
       Once confirmation has been received from platform staff that it is safe for doors to be closed, the
       Detaching Driver makes PA announcement to passengers that doors will be closing, warns that train will
       be detaching and then closes the doors on the 4 car unit.
       Detaching Driver, after carrying out the necessary checks, completes the uncoupling process from the 4
       car unit.
       Detaching Driver enters rear cab of 8 car and sets tail lights, then informs the Driver who is to take the 8
       car train forwards, that uncoupling is complete via cab to cab communication before exiting cab.
       Driver of 8 car train sets up cab, and awaits dispatch from platform staff.
       Following departure of 8 car train, Driver of 4 car train sets up the cab, releases doors and awaits
       dispatch from platform staff.

Darren Standing
Operations Compliance Manager (GN-Driving)
         th
Friday 10 December 2010

UNTIL FURTHER NOTICE
                             First Capital Connect WON – Week 43                                                45
FIRST CAPITAL CONNECT ADDITIONAL NOTICES

                                                        Ely Station North Level Crossing

Drivers are advised that following an incident at Exeter St David‟s last year a review of all level crossings has been undertaken to identify
similar locations on FCC routes.

The train involved in the incident was signalled into a permissive platform under the authority of a position light signal for the purpose of
attaching to another unit.

The railhead through the level crossing immediately prior to the station had become contaminated by discharge from a road vehicle which
resulted in the train sliding into the back of the stationary unit.

The only location that is similar on FCC routes, is Ely Station North Level Crossing, for trains travelling in the UP direction on:-



          Down Line – Platform 1
          Up Line – Platform 2
          Up Passenger Loop – Platform 3


Drivers are advised that if they are signalled into Ely Station in
the UP direction under the authority of a position light signal
then they must control the speed of the train on approach in
such a manner that if unexpected low railhead adhesion is
encountered on the level crossing then the train can still be
brought to a stand within the distance that can be seen to be
clear.




Richard Farish
Operations Standards Manager
First Capital Connect

24th December 2010

UNTIL FURTHER NOTICE




                                        First Capital Connect WON – Week 43                                                                     46
Extracted from
                                             Network Rail
                                   London North Eastern Route (South)
                                          East Anglia Routes
                                               Week 43

                                                                                         Jackie Townsend
                                                                                      Operations Director
                                                                                     First Capital Connect

                                                                             Telephone (Internal) 004 3872
                                                                        Telephone (External) 01234 275872


Issued at Bedford
Saturday, 15 January 2011

                            First Capital Connect WON – Week 43                                       47

More Related Content

Viewers also liked

Viewers also liked (8)

AVON Ukraine 5/2014 beta (Holodyk)
AVON Ukraine 5/2014 beta (Holodyk)AVON Ukraine 5/2014 beta (Holodyk)
AVON Ukraine 5/2014 beta (Holodyk)
 
Postofficesmallsavingsscheme
PostofficesmallsavingsschemePostofficesmallsavingsscheme
Postofficesmallsavingsscheme
 
Evaluation-Q2
Evaluation-Q2Evaluation-Q2
Evaluation-Q2
 
Placas terrestres
Placas terrestresPlacas terrestres
Placas terrestres
 
Zodiaco
ZodiacoZodiaco
Zodiaco
 
Xy Inter Act Nexus Toolkit
Xy Inter Act Nexus ToolkitXy Inter Act Nexus Toolkit
Xy Inter Act Nexus Toolkit
 
Historia del internet
Historia del internetHistoria del internet
Historia del internet
 
Simple Present
Simple PresentSimple Present
Simple Present
 

Similar to Fccgnea1043

North doncaster chord environmental statement
North doncaster chord environmental statementNorth doncaster chord environmental statement
North doncaster chord environmental statementdoncasterrail
 
C0396824_REV_B_As_Issued
C0396824_REV_B_As_IssuedC0396824_REV_B_As_Issued
C0396824_REV_B_As_IssuedTrent Farrell
 
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...SUBHAMOY SINGHA ROY
 
Curriculum_Vitae_Kevin April 15 (2)
Curriculum_Vitae_Kevin April 15 (2)Curriculum_Vitae_Kevin April 15 (2)
Curriculum_Vitae_Kevin April 15 (2)Kevin Westerman
 
North Doncaster Rail Chord Decision by Secretary of State
North Doncaster Rail Chord Decision by Secretary of StateNorth Doncaster Rail Chord Decision by Secretary of State
North Doncaster Rail Chord Decision by Secretary of Statedoncasterrail
 
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2syed abdul wahab
 
The Janet architecture and new Janet access infrastructure
The Janet architecture and new Janet access infrastructureThe Janet architecture and new Janet access infrastructure
The Janet architecture and new Janet access infrastructureJisc
 
Haram complementary projects temporary feeding proposals
Haram complementary projects temporary feeding proposalsHaram complementary projects temporary feeding proposals
Haram complementary projects temporary feeding proposalsMohamed Azzam
 

Similar to Fccgnea1043 (10)

Fcclnesso1043
Fcclnesso1043Fcclnesso1043
Fcclnesso1043
 
North doncaster chord environmental statement
North doncaster chord environmental statementNorth doncaster chord environmental statement
North doncaster chord environmental statement
 
C0396824_REV_B_As_Issued
C0396824_REV_B_As_IssuedC0396824_REV_B_As_Issued
C0396824_REV_B_As_Issued
 
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
 
Curriculum_Vitae_Kevin April 15 (2)
Curriculum_Vitae_Kevin April 15 (2)Curriculum_Vitae_Kevin April 15 (2)
Curriculum_Vitae_Kevin April 15 (2)
 
North Doncaster Rail Chord Decision by Secretary of State
North Doncaster Rail Chord Decision by Secretary of StateNorth Doncaster Rail Chord Decision by Secretary of State
North Doncaster Rail Chord Decision by Secretary of State
 
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
 
The Janet architecture and new Janet access infrastructure
The Janet architecture and new Janet access infrastructureThe Janet architecture and new Janet access infrastructure
The Janet architecture and new Janet access infrastructure
 
Haram complementary projects temporary feeding proposals
Haram complementary projects temporary feeding proposalsHaram complementary projects temporary feeding proposals
Haram complementary projects temporary feeding proposals
 
EIT_Presentation
EIT_PresentationEIT_Presentation
EIT_Presentation
 

Recently uploaded

Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxNikitaBankoti2
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfChris Hunter
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 

Recently uploaded (20)

Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 

Fccgnea1043

  • 1. PRIVATE AND NOT FOR PUBLICATION WEEKLY OPERATING NOTICE Extracted from the following London North Eastern Route (South) AN D Anglia Routes Week No. LNES / AR - GN ROUTES 43 Containing SAFETY NOTICES TEMPORARY SPEED RESTRICTIONS ENGINEERING ARRANGEMENTS SIGNALLING & PERMANENT WAY ALTERATIONS GENERAL INSTRUCTIONS & NOTICES SATURDAY 22 JANUARY 2011 To FRIDAY 28 JANUARY 2011 THIS NOTICE COVERS SELECTED LINES FROM THE LONDON NORTH EASTERN REGION AND SELECTED LINES FROM THE EAST ANGLIA REGION SECTIONAL APPENDICES This document contains 47 pages
  • 2. LINES COVERED BY THIS NOTICE LONDON NORTH EASTERN (SOUTH) (LN) LN 101 KING’S CROSS TO SHAFTHOLME JN LN 105 MOORGATE TO FINSBURY PARK JN LN 120 WOOD GREEN NORTH JN TO LANGLEY JN VIA HERTFORD LN 125 HITCHIN CAMBRIDGE JN TO CAMBRIDGE EAST ANGLIA ROUTES (EA) EA 1161 BISHOPS STORTFORD TO ELY NORTH JN EA 1162 ELY NORTH JN TO KINGS LYNN EA 1230 ROYSTON TO SHEPRETH BRANCH JN First Capital Connect WON – Week 43 2
  • 3. Safety Notices First Capital Connect WON – Week 43 3
  • 4. First Capital Connect WON – Week 43 4
  • 5. First Capital Connect WON – Week 43 5
  • 6. First Capital Connect WON – Week 43 6
  • 7. First Capital Connect WON – Week 43 7
  • 8. ITEM 4 CONTINUED First Capital Connect WON – Week 43 8
  • 9. First Capital Connect WON – Week 43 9
  • 10. First Capital Connect WON – Week 43 10
  • 11. First Capital Connect WON – Week 43 11
  • 12. First Capital Connect WON – Week 43 12
  • 13. First Capital Connect WON – Week 43 13
  • 14. First Capital Connect WON – Week 43 14
  • 15. First Capital Connect WON – Week 43 15
  • 16. First Capital Connect WON – Week 43 16
  • 17. First Capital Connect WON – Week 43 17
  • 18. First Capital Connect WON – Week 43 18
  • 19. First Capital Connect WON – Week 43 19
  • 20. First Capital Connect WON – Week 43 20
  • 21. First Capital Connect WON – Week 43 21
  • 22. First Capital Connect WON – Week 43 22
  • 23. First Capital Connect WON – Week 43 23
  • 24. First Capital Connect WON – Week 43 24
  • 25. First Capital Connect WON – Week 43 25
  • 26. First Capital Connect WON – Week 43 26
  • 27. First Capital Connect WON – Week 43 27
  • 28. First Capital Connect WON – Week 43 28
  • 29. First Capital Connect WON – Week 43 29
  • 30. Item 144 – Repeated item – see item 42 LN125 (Hitchin Cambridge Jn – Cambridge) First Capital Connect WON – Week 43 30
  • 31. NONE NONE First Capital Connect WON – Week 43 31
  • 32. TABLE DISPLAYED ON NEXT PAGE First Capital Connect WON – Week 43 32
  • 33. First Capital Connect WON – Week 43 33
  • 34. TABLE DISPLAYED ON NEXT PAGE First Capital Connect WON – Week 43 34
  • 35. First Capital Connect WON – Week 43 35
  • 36. TABLE DISPLAYED ON NEXT PAGE First Capital Connect WON – Week 43 36
  • 37. First Capital Connect WON – Week 43 37
  • 38. First Capital Connect WON – Week 43 38
  • 39. First Capital Connect WON – Week 43 39
  • 40. First Capital Connect WON – Week 43 40
  • 41. Signal Location Line ELR Signalbox Date of Events Events TPWS latest since in fitted at SPAD 1985 current 5 signal years K445 Hornsey Down Slow ECM1 Kings Cross 0/03/2009 3 2 Y No 1 PSB K446 Hornsey Up Goods ECM1 Kings Cross 0/07/2010 7 2 N K697 Hitchin Down Slow ECM1 Kings Cross 20/03/2009 7 2 Y PSB P84 Peterborough South Up ECM1 Peterborough 19/12/2007 8 2 N Departure PSB Stop Letchworth Arrival / SBRO Kings Cross 09/03/2010 4 2 N Board 1 Departure K833 Bowes Park Down HDB0 Kings Cross 05/12/2010 2 2 N Hertford First Capital Connect WON – Week 43 41
  • 42. FIRST CAPITAL CONNECT ADDITIONAL NOTICES New 6 car stop board at Hertford North platform 3 A new 6 car stop board has been provided on platform 3 (Bay Platform) at Hertford North 16 metres away from the stop block. Drivers of 6 car trains should use this stop point forthwith 19 September 2008 Steve Castle Area Operations Manager First Capital Connect Kings Cross / Hitchin / Peterborough Royston Platform 1 Down direction. A new 12 car stop board has been provided at the Cambridge end of the new platform extension. The 3/4/6/8 stop car boards have been provided just beyond the station overbridge on the appropriate lamp post. Royston Platform 1 Up direction A new 12 car stop marker has been provided at the same position as the existing 6/8 car markers at the London end. John Harradine Safety Business Partner (Operations) 11 May 2009 New 12 car stop marker boards have been provided at the following stations;- Stevenage Platform 1 & 2 at the London end. Hitchin Platform 1 at the London end. Huntingdon Platform 2 at the London end. Cambridge Platform 1 at the London end. Peterborough Platforms 2 & 3 at both ends of the platforms. Peterborough Platform 4 & 5 at the country end. Peterborough Down Fast line at the turn back point from P78 signal so as to align units with the walkways provided. John Harradine Safety Business Partner (Operations) 11 May 2009 New “S” Car Stopping Point - Hatfield Down Slow Line - Platform 3 With effect from 00:01 hours on Friday 16th January 2009, Drivers are advised that ALL formations of trains required to stop at Hatfield Platform 3 must do so at the new “S” Car Stopping Point A new “S” Car Board will be provided and will be placed “cess” side adjacent to the existing 8 Car Stopping Point. Train dispatch will continue to be by use of the existing mirror provided at the 8 Car Point. 2 January 2009 Steve Castle Area Operations Manager First Capital Connect King‟s Cross / Hitchin / Peterborough Letchworth Stop Boards With immediate effect Stop Boards 1 & 2 at Letchworth have been replaced with new reflectorised boards. The position and meaning of these boards has not changed. Richard Farish Operations Standards Manager 20th September 2010 First Capital Connect WON – Week 43 42
  • 43. FIRST CAPITAL CONNECT ADDITIONAL NOTICES Blocking the Line for the Purpose of Train Examination There has been two occasions recently where train drivers and train maintenance staff have been involved in near misses with other trains when undertaking an examination of a defective or failed train. Luckily, on both occasions, no-one was injured or killed. In both cases poor safety critical communications between driver and signaller were the underlying cause. Train drivers and maintenance staff are reminded that if they are required to work outside their train, and cannot do so from a position of safety, they must arrange a blockage of the adjacent line(s) from the controlling signaller. When arranging a blockage with the signaller you must ensure that:- You are speaking to the correct signaller for that portion of line You identify yourself, your train headcode and where you are speaking from You identify specifically what line(s) you require blocked and for what purpose The signaller repeats back your request correctly You do not start work until the signaller has confirmed that train movements have been stopped on the line(s) requested and it is safe for you to go on or near the line. Correct use of the safety critical communications protocols are a key element to staying safe. Stay professional – stay focussed – stay alive. Richard Farish Operations Standards Manager 12th May 2009 Headwall Telephones and Plungers - Northern City Line Network Rail and its contractors Thales, will be replacing the Headwall Telephones and Plungers at the following locations from 13th June until further notice. • Drayton Park • Highbury and Islington • Essex Road • Old Street • Moorgate The new equipment is a direct replacement of ageing equipment and is being provided to improve safety and reliability. There is no alteration to the way in which drivers operate the new equipment. Richard Farish Operations Standards Manager First Capital Connect Original notice date: 5th June 2009 Amended notice date: 28th August 2009 Relocation of 6 Car Stop Markers -Finsbury Park Platforms 3, 5 & 6 On the 23 August 2010 the 6 Car Stop Markers on platforms 3, 5 & 6 will be removed from their current location and repositioned adjacent to the existing 8 Car Stop Markers. The position of the 3 & 4 Car Markers will remain unchanged. This will remove the current inconsistency of having 3 stopping points on these platforms at this location. With the exception of platform 1 at Hatfield, this will bring it into line with current stopping points at all other FCC GN route locations, where either 1 or 2 stopping points are provided, e.g. „S‟ Car marker or combined 8/6 Car markers and combined 3/4 Car markers. Drivers are reminded that it is their responsibility to check the length of the train that they are working, and to ensure that the chosen stopping point is correct for that length of train. Where possible this information is provided on schedule cards, and Train Length reminders are provided in the cab. In addition Train Length reminder cards can be ordered from your Driver Management Team and have been proven to be of benefit. Please ensure that you always use the relevant stopping points. Before releasing the doors it is good practice to double check for both the length and on which side the doors are to be released. Can you be sure you‟re a 3 or a 4? If you don‟t pause and wait, it might be too late, as you could be a 6 or an 8? And if you really want to look after yourselves, remember you might also be 12! Darren Standing Operations Compliance Manager (Driving) First Capital Connect WON – Week 43 43
  • 44. FIRST CAPITAL CONNECT ADDITIONAL NOTICES RAIL-HEAD ADHESION Controlling the train You must control the train to take account of:- The conditions, and Locations of known low rail-head adhesion as listed in the Sectional Appendix Experiencing and reporting low rail-head conditions You must tell the signaller immediately if you experience either of the following:- Low rail adhesion Likely to cause difficulties in stopping at a location NOT listed in the Sectional Appendix Exceptionally poor rail Likely to cause more than anticipated difficulties in stopping at a location adhesion listed in the Sectional Appendix Controlled Test Stops When the signaller tells you to make a controlled test stop, you must brake the train using the technique that you would normally use for the weather and rail adhesion conditions at the location rather than that used for the exceptional, rail-head adhesion conditions. Immediately following the controlled test stop, you must tell the signaller:- The results of the test, and Whether the rail-head adhesion conditions should still be considered as exceptional Serious Wheel Slip You must tell the signaller the location where serious or prolonged wheel slip is experienced. However, if the wheel slip is severe or you suspect damage to the rail, you must stop the train specially and tell the signaller immediately. Richard Farish Operations Standards Manager th 15 October 2010 Welwyn Garden City Platform 3 & 4 The 4 car stop marks on platform 3 (down slow) & platform 4 (down back) have been repositioned in rear of their previous location. They are now affixed to the same post as the current 3 car stop marks giving a common stopping point for both 3 & 4 car units. Drivers must use this new stopping point as this allows enough room for a unit to arrive from the Carriage Sidings and couple/attach in the platform to form an 8 car service if this is required. Darren Standing Operations Compliance Manager (Driving – GN) Until Further Notice rd 3 December 2010 First Capital Connect WON – Week 43 44
  • 45. FIRST CAPITAL CONNECT ADDITIONAL NOTICES Royston When uncoupling units from a 12 car train, the 4 car unit must always be used to perform the uncoupling, as it is possible for an 8 car to push a 4 car even with its emergency brakes applied Royston – Platform 1 The following procedure must be followed for 12 car services to Cambridge that are required to split at Royston in the Up direction platform (platform 1), with the detached 4 car unit then proceeding all stations to Cambridge after the 8 car service has departed. This procedure is specific to Royston for down direction 12 car trains using the up direction platform. Driver of 12 car train arrives in Platform 1 and ensures that train is stopped at the “12” car mark. After releasing the train doors the Driver must use the P.A to announce the changes to the train formation. The Driver then applies full service brake (step 3) and shuts down cab removing key. Following face to face with Driver of 12 car, Detaching Driver proceeds to intermediate (Country end) cab of 4 car unit to be detached and mobilizes the cab. Once confirmation has been received from platform staff that it is safe for doors to be closed, the Detaching Driver makes PA announcement to passengers that doors will be closing, warns that train will be detaching and then closes the doors on the 4 car unit. Detaching Driver, after carrying out the necessary checks, completes the uncoupling process from the 4 car unit. Detaching Driver enters rear cab of 8 car and sets tail lights, then informs the Driver who is to take the 8 car train forwards, that uncoupling is complete via cab to cab communication before exiting cab. Driver of 8 car train sets up cab, and awaits dispatch from platform staff. Following departure of 8 car train, Driver of 4 car train sets up the cab and gets permission from signaller to draw train down to 4 car stopping point. Driver of 4 car train releases doors and awaits dispatch from platform staff. Royston – Platform 2 The following procedure must be followed for 12 car services to Cambridge that are required to split at Royston in the Down direction platform (platform 2). Driver of 12 car train arrives in Platform 2 and ensures that train is stopped at the “12” car mark. After releasing the train doors the Driver must use the P.A to announce the changes to the train formation. The Driver then applies full service brake (step 3) and shuts down cab removing key. Following face to face with Driver of 12 car, Detaching Driver proceeds to intermediate (Country end) cab of 4 car unit to be detached and mobilizes the cab. Once confirmation has been received from platform staff that it is safe for doors to be closed, the Detaching Driver makes PA announcement to passengers that doors will be closing, warns that train will be detaching and then closes the doors on the 4 car unit. Detaching Driver, after carrying out the necessary checks, completes the uncoupling process from the 4 car unit. Detaching Driver enters rear cab of 8 car and sets tail lights, then informs the Driver who is to take the 8 car train forwards, that uncoupling is complete via cab to cab communication before exiting cab. Driver of 8 car train sets up cab, and awaits dispatch from platform staff. Following departure of 8 car train, Driver of 4 car train sets up the cab, releases doors and awaits dispatch from platform staff. Darren Standing Operations Compliance Manager (GN-Driving) th Friday 10 December 2010 UNTIL FURTHER NOTICE First Capital Connect WON – Week 43 45
  • 46. FIRST CAPITAL CONNECT ADDITIONAL NOTICES Ely Station North Level Crossing Drivers are advised that following an incident at Exeter St David‟s last year a review of all level crossings has been undertaken to identify similar locations on FCC routes. The train involved in the incident was signalled into a permissive platform under the authority of a position light signal for the purpose of attaching to another unit. The railhead through the level crossing immediately prior to the station had become contaminated by discharge from a road vehicle which resulted in the train sliding into the back of the stationary unit. The only location that is similar on FCC routes, is Ely Station North Level Crossing, for trains travelling in the UP direction on:- Down Line – Platform 1 Up Line – Platform 2 Up Passenger Loop – Platform 3 Drivers are advised that if they are signalled into Ely Station in the UP direction under the authority of a position light signal then they must control the speed of the train on approach in such a manner that if unexpected low railhead adhesion is encountered on the level crossing then the train can still be brought to a stand within the distance that can be seen to be clear. Richard Farish Operations Standards Manager First Capital Connect 24th December 2010 UNTIL FURTHER NOTICE First Capital Connect WON – Week 43 46
  • 47. Extracted from Network Rail London North Eastern Route (South) East Anglia Routes Week 43 Jackie Townsend Operations Director First Capital Connect Telephone (Internal) 004 3872 Telephone (External) 01234 275872 Issued at Bedford Saturday, 15 January 2011 First Capital Connect WON – Week 43 47