Measurement Of Efficiency
In Manufacturing Cycle Time
(How well do we manage waste ?)
Background
Manufacturing site was given an uphill task to improve overall cycle time
with a general goal of 2x theoretical cycle time.
Current practice
There is a common cycle time goal set for the site to achieve. Each
individual process along the flow will have it’s own goal to match
the common goal.
Advantage of this approach
This approach is good to track each process progress and contribution
towards the common goal.
Disadvantage of this approach
When there is slip up, every individual process will need to be dwell
in details and find the main process contributor to the slip up. From
there, actions taken to revert the situation. This approach will usually
end up with some processes will fail it’s goal marginally, but not enough
to explain the overall slips. Furthermore, time taken to dwell into each
process during presentation is lengthy.
Suggestion for a better approach
Find a measurement method to track cycle time performance and
process improvement at macro level which is easily understand by all
levels. This method should be able to separate entitlement or ideal time
from actual.
Expanding the process flow with time incurred :
Assembly EOLLoad Test Pack Ship
PTprinting
Queuetime
Allocationtime
Queuetime
Processtime
Inspectiontime(3rdopt)
Downtime
Allocationtime
Queuetime
Processtime
Downtime
Allocationtime
Queuetime
Processtime
Downtime
Holdlottime
Holdlottime
Holdlottime
Inspectiontime(Buyoff,IRreflow)
Allocationtime
Queuetime
Processtime
Downtime
Holdlottime
Processtime
Queuetime
Total cycle time
The typical macro process flow :
Theoretical/entitlement fixed time (value added)
Inspection time or must have to survive for quality reason (value added)
Mainly non value added or waste time that need improvement
Comments
The non value added and waste time is the main target for cycle time
improvement.
Proposed measurement or tracking method
Manufacturing cycle efficiency or MCE
= Value added time / Total cycle time
= (Theoretical process time + Inspection time) /
(Theoretical process time + Inspection time + Queue time +
allocation time + down time + Hold time + etc)
Ideal MCE should be 1.0 or 100% efficient.
The following 2 examples demonstrate based on 6.5 days theoretical/ideal
cycle time, even though we can achieve 2x = 13 days ( as set ), using
the above formulae will show how efficient is our process towards
the ideal cycle time.
Typical example 1 ( not efficient )
Assumptions :
A = Total process time from all processes = 5 days
B = Total inspection time from all processes = 1.5 days
C = Total queue time from all processes = 0.5 days
D = Total hold time from all processes = 3 days
E = Total down time from all processes = 0.5 days
F = Total allocation/execution time from all processes = 1.5 days
Manufacturing Cycle Efficiency (MCE)
= ( A + B) / ( A + B + C + D + E + F )
= ( 5 + 1.5) / (5 + 1.5 + 0.5 +3 + 0.5 + 1.5)
= 6.5 / 12
= 0.54
Conclusion : For the above example, we only able to achieve 54% of
entitlement or ideal cycle time. Although we can meet
2x goal, the efficiency is still low.
Typical example 2 ( 75% efficient )
Assumptions :
A = Total process time from all processes = 5 days
B = Total inspection time from all processes = 1.5 days
C = Total queue time from all processes = 0.5 days
D = Total hold time from all processes = 1 days
E = Total down time from all processes = 0.2 days
F = Total allocation/execution time from all processes = 0.5 days
Manufacturing Cycle Efficiency (MCE)
= ( A + B) / ( A + B + C + D + E + F )
= ( 5 + 1.5) / (5 + 1.5 + 0.5 +1 + 0.2 + 0.5)
= 6.5 / 8.7
= 0.75
Conclusion : For the above example, we are able to achieve 75% of
entitlement or ideal cycle time and meet the 2x goal
at the same time.
Suggestion for a start
Find out the current performance on MCE, set an internal goal to improve
50% from the ideal cycle time.
Example :
To date, our MCE = 50% efficiency
our Goal = 75% efficiency
If we really can achieved 75% efficiency, we have improved 25%. All these
will contribute to plant cycle time.
Takt Time
A meaningful measurement gauge
Takt Time = Total available time/Customer demand
Typical scenario 1 (More applicable)
Given customer demand of 1M/week, one week consist of
22 hr X 7 days X 60 mins = 9240 mins. (taking into account of efficiency)
Takt time per unit = 9240/1000000 = 0.00924 mins
What does this mean ?
It means we must produce one single unit out in every 0.00924 mins in
order to service the fixed customer demand per week. Lets say
average lot size is 12k, we need (12000 X 0.00924) = 110.88 mins =
1.848 hour to complete whole lot. Based on our simplify process from
start to end (refer to next page), our model process should looks and
perform in that manner.
Expand the process flow with time incurred :
Assembly EOLLoad Test Pack Ship
PTprinting
Queuetime
Allocationtime
Queuetime
Processtime
Inspectiontime(3rdopt)
Downtime
Allocationtime
Queuetime
Processtime
Downtime
Allocationtime
Queuetime
Processtime
Downtime
Holdlottime
Holdlottime
Holdlottime
Inspectiontime(Buyoff,IRreflow)
Allocationtime
Queuetime
Processtime
Downtime
Holdlottime
Processtime
Queuetime
Takt = 1.85 hr
The typical macro process flow :
Takt = 1.85 hr Takt = 1.85 hr
Takt = 1.85 hr Takt = 1.85 hr Takt = 1.85 hr
Continue next page ->
Each lot must be processed within 1.85 hour for each process step above
How does this work in actual situation ?
Since we have six processes , for the very first lot, it took 6x1.848 = 11.088 hr
to move from start until end. For every subsequent lots, if we can control
each process to take < takt time, we will achieve the goal of 1.848 hour to
ship each lot out. Total lot produced is (1000000/12000) = 83.33 lots.
This is equivalent to a total cycle time of
11.088 + 82.33(1.848) = 163.23 hours to process total of 83.33 lots
[1st
lot CT] + [(Total lot-1st
lot)TakT]
Converted to days, equivalent to 163.23/24 = 6.80days
WE CAN MEET CUSTOMER DEMAND FOR EVERY WEEK IF WE CAN
CONTROL TO PROCESS A LOT WITHIN THE CALCULATED Takt TIME.
Takt Time = Total available time/Customer demand
Typical scenario 2 (Less applicable)
Given a goal of 2.5 days cycle time and demand of 1kk/week, equivalent
to [(1kkx2.5)/7] = 357143 pieces per every 2.5 days. Assuming each lot
consists of 10k, equivalent to 35.7143 lots per every 2.5 days.
Takt time per lot = 2.5/35.7143 = 0.07 day = 1.68 hour
What does this mean ?
It means we must produce one single lot out in every 1.68 hour in order
not to jeopardize the total cycle time (2.5 days). Based on our simplify
process from start to end (refer to next page), our model process should
looks and perform in that manner.
Expand the process flow with time incurred :
Assembly EOLLoad Test Pack Ship
PTprinting
Queuetime
Allocationtime
Queuetime
Processtime
Inspectiontime(3rdopt)
Downtime
Allocationtime
Queuetime
Processtime
Downtime
Allocationtime
Queuetime
Processtime
Downtime
Holdlottime
Holdlottime
Holdlottime
Inspectiontime(Buyoff,IRreflow)
Allocationtime
Queuetime
Processtime
Downtime
Holdlottime
Processtime
Queuetime
Takt = 1.68 hr
The macro process flow :
Takt = 1.68 hr Takt = 1.68 hr
Takt = 1.68 hr Takt = 1.68 hr Takt = 1.68 hr
Continue next page ->
How does this work in actual situation ?
Since we have six processes , for the very first lot, it took 6x1.68 = 10.08 hr
to move from start until end. For every subsequent lots, if we can control
each process to take < takt time, we will achieve the goal of 1.68 hour to
ship each lot out. This is equivalent to a total cycle time of
10.08 + 34.713(1.68) = 68.40 hours to process total of 35.713 lots
Converted to days, equivalent to 68.40/24 = 2.85 days ( 0.3 days extra
for the very first lot processed)
Production Kanban
A visual control for Lean manufacturing
A
M/C 1 M/C 2 M/C 3
A B A BA B B B
2 bin before
process, B (white)
under processed
After
processed
Material handler
OperatorOperator Operator
Oper place card B
at Kanban board
(1)
MH get card B
and tag to
new lot (3)
A
A
B
Inventory from
upstream process
B
MH send
new lot to
m/c 1
(4)
Note :
• Sequence (1) to (4) happen
to m/c 2 and 3 as well if the
processes are stand alone.
If this is a full conveyor line,
only apply to M/C1.
• Kanban system ensure no
disruption to value added time,
reduce downtime and improve
productivity with Lean line.
Signal to
MH (2)
B
B
Initial stage
Lot Size
An easy task for early win engagement
if properly managed
Time
(min)
Start Step 1 Step 2 Step 3 Finish
(Step 4)
Start Step
1
Step
2
Step
3
Finish (Step 4)
1 a,b,c,d,e a,b,c,d,e
2 a
3 b a
4 c b a
5 a,b,c,d,e d c b a
6 e d c b
7 e d c
8 e d
9 e + (a,b,c,d)
10 a,b,c,d,e
11
12
13
14
15 a,b,c,d,e
16
17
18
19
20 a,b,c,d,e
Assumptions : Each alphabet contained 100 pcs, total 4 process steps, each step required 1 min to complete 100 pcs,
we only have one machine for each process.
If we build a big lot of 500 pcs, total time to complete whole process is 20 minutes.
In contrast, when we build in small lot size (100 pcs each), total time to complete whole process is only 9 minutes.

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

Scheduling ppt @ DOMS
Scheduling ppt @ DOMSScheduling ppt @ DOMS
Scheduling ppt @ DOMS
 
Scheduling
SchedulingScheduling
Scheduling
 
Ch17 scheduling
Ch17 schedulingCh17 scheduling
Ch17 scheduling
 
Scheduling
SchedulingScheduling
Scheduling
 
operations scheduling
operations schedulingoperations scheduling
operations scheduling
 
Scheduling
SchedulingScheduling
Scheduling
 
Scheduling
SchedulingScheduling
Scheduling
 
Job shop scheduling
Job shop schedulingJob shop scheduling
Job shop scheduling
 
Process analysis
Process analysisProcess analysis
Process analysis
 
Production planning and control 2019
Production planning and control 2019Production planning and control 2019
Production planning and control 2019
 
job scheduling
job schedulingjob scheduling
job scheduling
 
Job Shop Scheduling with Setup Times Release times and Deadlines
Job Shop Scheduling with Setup Times  Release times and DeadlinesJob Shop Scheduling with Setup Times  Release times and Deadlines
Job Shop Scheduling with Setup Times Release times and Deadlines
 
Work Center Scheduling
Work Center Scheduling Work Center Scheduling
Work Center Scheduling
 
TSV Mining: Variation Analysis in Mining Part 1 - Precision and Accuracy
TSV Mining: Variation Analysis in Mining Part 1 - Precision and AccuracyTSV Mining: Variation Analysis in Mining Part 1 - Precision and Accuracy
TSV Mining: Variation Analysis in Mining Part 1 - Precision and Accuracy
 
Sequencing problems in Operations Research
Sequencing problems in Operations ResearchSequencing problems in Operations Research
Sequencing problems in Operations Research
 
Takt Time, Cycle Time & Line Balancing
Takt Time, Cycle Time & Line BalancingTakt Time, Cycle Time & Line Balancing
Takt Time, Cycle Time & Line Balancing
 
C8 scheduling
C8 schedulingC8 scheduling
C8 scheduling
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
 
Mpc sequencing
Mpc   sequencingMpc   sequencing
Mpc sequencing
 
Scheduling
SchedulingScheduling
Scheduling
 

Semelhante a Litttle knowledge of lean concept helps

Ch5 process+analysis
Ch5 process+analysisCh5 process+analysis
Ch5 process+analysisvideoaakash15
 
ch5-processanalysis-131122013048-phpapp02 (1).pptx
ch5-processanalysis-131122013048-phpapp02 (1).pptxch5-processanalysis-131122013048-phpapp02 (1).pptx
ch5-processanalysis-131122013048-phpapp02 (1).pptxMukhtarMohamedAbdila
 
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdfRahbiMalek
 
Industrial Engineering Training
Industrial Engineering TrainingIndustrial Engineering Training
Industrial Engineering Trainingbabu947412
 
customer relation management presentation roadmap what is known and
customer relation management presentation roadmap  what is known andcustomer relation management presentation roadmap  what is known and
customer relation management presentation roadmap what is known andMohamadIbrahim86
 
OPS 571 HELP Inspiring Innovation--ops571help.com
OPS 571 HELP Inspiring Innovation--ops571help.comOPS 571 HELP Inspiring Innovation--ops571help.com
OPS 571 HELP Inspiring Innovation--ops571help.comclaric77
 
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaaSCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaainfinitepestcontrol
 
ملاحظات مهمة عن تعجيل المشاريع
ملاحظات مهمة عن تعجيل المشاريعملاحظات مهمة عن تعجيل المشاريع
ملاحظات مهمة عن تعجيل المشاريعDr. Mahmoud Al-Naimi
 
UOP OPS 571 Inspiring Innovation--uopops571.com
UOP OPS 571 Inspiring Innovation--uopops571.comUOP OPS 571 Inspiring Innovation--uopops571.com
UOP OPS 571 Inspiring Innovation--uopops571.comkopiko118
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materialspikuoec
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materialspikuoec
 
Which of the following is a focusing step of dr
Which of the following is a focusing step of drWhich of the following is a focusing step of dr
Which of the following is a focusing step of drramuaa129
 
Chapter 4 product layout - 1st (3)
Chapter 4  product layout - 1st (3)Chapter 4  product layout - 1st (3)
Chapter 4 product layout - 1st (3)Shadina Shah
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)MohammedLahssaini1
 
In designing a lean production facility layout, a designer should do which of...
In designing a lean production facility layout, a designer should do which of...In designing a lean production facility layout, a designer should do which of...
In designing a lean production facility layout, a designer should do which of...ramuaa127
 
Operations Research_18ME735_module 5 sequencing notes.pdf
Operations Research_18ME735_module 5 sequencing notes.pdfOperations Research_18ME735_module 5 sequencing notes.pdf
Operations Research_18ME735_module 5 sequencing notes.pdfRoopaDNDandally
 

Semelhante a Litttle knowledge of lean concept helps (20)

Ch5 process+analysis
Ch5 process+analysisCh5 process+analysis
Ch5 process+analysis
 
ch5-processanalysis-131122013048-phpapp02 (1).pptx
ch5-processanalysis-131122013048-phpapp02 (1).pptxch5-processanalysis-131122013048-phpapp02 (1).pptx
ch5-processanalysis-131122013048-phpapp02 (1).pptx
 
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
05-Chapter_5_Automated_Work_Cells_and_CIM_Systems_Final.pdf
 
Industrial Engineering Training
Industrial Engineering TrainingIndustrial Engineering Training
Industrial Engineering Training
 
customer relation management presentation roadmap what is known and
customer relation management presentation roadmap  what is known andcustomer relation management presentation roadmap  what is known and
customer relation management presentation roadmap what is known and
 
Line Balancing In Garments Industry
Line Balancing In Garments IndustryLine Balancing In Garments Industry
Line Balancing In Garments Industry
 
A line in apparel
A line in apparelA line in apparel
A line in apparel
 
OPS 571 HELP Inspiring Innovation--ops571help.com
OPS 571 HELP Inspiring Innovation--ops571help.comOPS 571 HELP Inspiring Innovation--ops571help.com
OPS 571 HELP Inspiring Innovation--ops571help.com
 
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaaSCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
 
ملاحظات مهمة عن تعجيل المشاريع
ملاحظات مهمة عن تعجيل المشاريعملاحظات مهمة عن تعجيل المشاريع
ملاحظات مهمة عن تعجيل المشاريع
 
5 Steps to implementing Lean
5  Steps to implementing Lean5  Steps to implementing Lean
5 Steps to implementing Lean
 
UOP OPS 571 Inspiring Innovation--uopops571.com
UOP OPS 571 Inspiring Innovation--uopops571.comUOP OPS 571 Inspiring Innovation--uopops571.com
UOP OPS 571 Inspiring Innovation--uopops571.com
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
Which of the following is a focusing step of dr
Which of the following is a focusing step of drWhich of the following is a focusing step of dr
Which of the following is a focusing step of dr
 
Line balancing
Line balancing Line balancing
Line balancing
 
Chapter 4 product layout - 1st (3)
Chapter 4  product layout - 1st (3)Chapter 4  product layout - 1st (3)
Chapter 4 product layout - 1st (3)
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)
 
In designing a lean production facility layout, a designer should do which of...
In designing a lean production facility layout, a designer should do which of...In designing a lean production facility layout, a designer should do which of...
In designing a lean production facility layout, a designer should do which of...
 
Operations Research_18ME735_module 5 sequencing notes.pdf
Operations Research_18ME735_module 5 sequencing notes.pdfOperations Research_18ME735_module 5 sequencing notes.pdf
Operations Research_18ME735_module 5 sequencing notes.pdf
 

Último

NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...
NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...
NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...Amil Baba Dawood bangali
 
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...Boston Institute of Analytics
 
Identifying Appropriate Test Statistics Involving Population Mean
Identifying Appropriate Test Statistics Involving Population MeanIdentifying Appropriate Test Statistics Involving Population Mean
Identifying Appropriate Test Statistics Involving Population MeanMYRABACSAFRA2
 
RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.natarajan8993
 
detection and classification of knee osteoarthritis.pptx
detection and classification of knee osteoarthritis.pptxdetection and classification of knee osteoarthritis.pptx
detection and classification of knee osteoarthritis.pptxAleenaJamil4
 
Easter Eggs From Star Wars and in cars 1 and 2
Easter Eggs From Star Wars and in cars 1 and 2Easter Eggs From Star Wars and in cars 1 and 2
Easter Eggs From Star Wars and in cars 1 and 217djon017
 
Data Factory in Microsoft Fabric (MsBIP #82)
Data Factory in Microsoft Fabric (MsBIP #82)Data Factory in Microsoft Fabric (MsBIP #82)
Data Factory in Microsoft Fabric (MsBIP #82)Cathrine Wilhelmsen
 
Predicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdfPredicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdfBoston Institute of Analytics
 
Student profile product demonstration on grades, ability, well-being and mind...
Student profile product demonstration on grades, ability, well-being and mind...Student profile product demonstration on grades, ability, well-being and mind...
Student profile product demonstration on grades, ability, well-being and mind...Seán Kennedy
 
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default  Presentation : Data Analysis Project PPTPredictive Analysis for Loan Default  Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPTBoston Institute of Analytics
 
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)jennyeacort
 
Thiophen Mechanism khhjjjjjjjhhhhhhhhhhh
Thiophen Mechanism khhjjjjjjjhhhhhhhhhhhThiophen Mechanism khhjjjjjjjhhhhhhhhhhh
Thiophen Mechanism khhjjjjjjjhhhhhhhhhhhYasamin16
 
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
Real-Time AI Streaming - AI Max Princeton
Real-Time AI  Streaming - AI Max PrincetonReal-Time AI  Streaming - AI Max Princeton
Real-Time AI Streaming - AI Max PrincetonTimothy Spann
 
INTERNSHIP ON PURBASHA COMPOSITE TEX LTD
INTERNSHIP ON PURBASHA COMPOSITE TEX LTDINTERNSHIP ON PURBASHA COMPOSITE TEX LTD
INTERNSHIP ON PURBASHA COMPOSITE TEX LTDRafezzaman
 
Semantic Shed - Squashing and Squeezing.pptx
Semantic Shed - Squashing and Squeezing.pptxSemantic Shed - Squashing and Squeezing.pptx
Semantic Shed - Squashing and Squeezing.pptxMike Bennett
 
Advanced Machine Learning for Business Professionals
Advanced Machine Learning for Business ProfessionalsAdvanced Machine Learning for Business Professionals
Advanced Machine Learning for Business ProfessionalsVICTOR MAESTRE RAMIREZ
 
Minimizing AI Hallucinations/Confabulations and the Path towards AGI with Exa...
Minimizing AI Hallucinations/Confabulations and the Path towards AGI with Exa...Minimizing AI Hallucinations/Confabulations and the Path towards AGI with Exa...
Minimizing AI Hallucinations/Confabulations and the Path towards AGI with Exa...Thomas Poetter
 
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024thyngster
 
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...limedy534
 

Último (20)

NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...
NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...
NO1 Certified Black Magic Specialist Expert Amil baba in Lahore Islamabad Raw...
 
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
 
Identifying Appropriate Test Statistics Involving Population Mean
Identifying Appropriate Test Statistics Involving Population MeanIdentifying Appropriate Test Statistics Involving Population Mean
Identifying Appropriate Test Statistics Involving Population Mean
 
RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.
 
detection and classification of knee osteoarthritis.pptx
detection and classification of knee osteoarthritis.pptxdetection and classification of knee osteoarthritis.pptx
detection and classification of knee osteoarthritis.pptx
 
Easter Eggs From Star Wars and in cars 1 and 2
Easter Eggs From Star Wars and in cars 1 and 2Easter Eggs From Star Wars and in cars 1 and 2
Easter Eggs From Star Wars and in cars 1 and 2
 
Data Factory in Microsoft Fabric (MsBIP #82)
Data Factory in Microsoft Fabric (MsBIP #82)Data Factory in Microsoft Fabric (MsBIP #82)
Data Factory in Microsoft Fabric (MsBIP #82)
 
Predicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdfPredicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdf
 
Student profile product demonstration on grades, ability, well-being and mind...
Student profile product demonstration on grades, ability, well-being and mind...Student profile product demonstration on grades, ability, well-being and mind...
Student profile product demonstration on grades, ability, well-being and mind...
 
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default  Presentation : Data Analysis Project PPTPredictive Analysis for Loan Default  Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPT
 
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
 
Thiophen Mechanism khhjjjjjjjhhhhhhhhhhh
Thiophen Mechanism khhjjjjjjjhhhhhhhhhhhThiophen Mechanism khhjjjjjjjhhhhhhhhhhh
Thiophen Mechanism khhjjjjjjjhhhhhhhhhhh
 
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
 
Real-Time AI Streaming - AI Max Princeton
Real-Time AI  Streaming - AI Max PrincetonReal-Time AI  Streaming - AI Max Princeton
Real-Time AI Streaming - AI Max Princeton
 
INTERNSHIP ON PURBASHA COMPOSITE TEX LTD
INTERNSHIP ON PURBASHA COMPOSITE TEX LTDINTERNSHIP ON PURBASHA COMPOSITE TEX LTD
INTERNSHIP ON PURBASHA COMPOSITE TEX LTD
 
Semantic Shed - Squashing and Squeezing.pptx
Semantic Shed - Squashing and Squeezing.pptxSemantic Shed - Squashing and Squeezing.pptx
Semantic Shed - Squashing and Squeezing.pptx
 
Advanced Machine Learning for Business Professionals
Advanced Machine Learning for Business ProfessionalsAdvanced Machine Learning for Business Professionals
Advanced Machine Learning for Business Professionals
 
Minimizing AI Hallucinations/Confabulations and the Path towards AGI with Exa...
Minimizing AI Hallucinations/Confabulations and the Path towards AGI with Exa...Minimizing AI Hallucinations/Confabulations and the Path towards AGI with Exa...
Minimizing AI Hallucinations/Confabulations and the Path towards AGI with Exa...
 
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
 
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
 

Litttle knowledge of lean concept helps

  • 1. Measurement Of Efficiency In Manufacturing Cycle Time (How well do we manage waste ?)
  • 2. Background Manufacturing site was given an uphill task to improve overall cycle time with a general goal of 2x theoretical cycle time. Current practice There is a common cycle time goal set for the site to achieve. Each individual process along the flow will have it’s own goal to match the common goal.
  • 3. Advantage of this approach This approach is good to track each process progress and contribution towards the common goal. Disadvantage of this approach When there is slip up, every individual process will need to be dwell in details and find the main process contributor to the slip up. From there, actions taken to revert the situation. This approach will usually end up with some processes will fail it’s goal marginally, but not enough to explain the overall slips. Furthermore, time taken to dwell into each process during presentation is lengthy. Suggestion for a better approach Find a measurement method to track cycle time performance and process improvement at macro level which is easily understand by all levels. This method should be able to separate entitlement or ideal time from actual.
  • 4. Expanding the process flow with time incurred : Assembly EOLLoad Test Pack Ship PTprinting Queuetime Allocationtime Queuetime Processtime Inspectiontime(3rdopt) Downtime Allocationtime Queuetime Processtime Downtime Allocationtime Queuetime Processtime Downtime Holdlottime Holdlottime Holdlottime Inspectiontime(Buyoff,IRreflow) Allocationtime Queuetime Processtime Downtime Holdlottime Processtime Queuetime Total cycle time The typical macro process flow : Theoretical/entitlement fixed time (value added) Inspection time or must have to survive for quality reason (value added) Mainly non value added or waste time that need improvement
  • 5. Comments The non value added and waste time is the main target for cycle time improvement. Proposed measurement or tracking method Manufacturing cycle efficiency or MCE = Value added time / Total cycle time = (Theoretical process time + Inspection time) / (Theoretical process time + Inspection time + Queue time + allocation time + down time + Hold time + etc) Ideal MCE should be 1.0 or 100% efficient. The following 2 examples demonstrate based on 6.5 days theoretical/ideal cycle time, even though we can achieve 2x = 13 days ( as set ), using the above formulae will show how efficient is our process towards the ideal cycle time.
  • 6. Typical example 1 ( not efficient ) Assumptions : A = Total process time from all processes = 5 days B = Total inspection time from all processes = 1.5 days C = Total queue time from all processes = 0.5 days D = Total hold time from all processes = 3 days E = Total down time from all processes = 0.5 days F = Total allocation/execution time from all processes = 1.5 days Manufacturing Cycle Efficiency (MCE) = ( A + B) / ( A + B + C + D + E + F ) = ( 5 + 1.5) / (5 + 1.5 + 0.5 +3 + 0.5 + 1.5) = 6.5 / 12 = 0.54 Conclusion : For the above example, we only able to achieve 54% of entitlement or ideal cycle time. Although we can meet 2x goal, the efficiency is still low.
  • 7. Typical example 2 ( 75% efficient ) Assumptions : A = Total process time from all processes = 5 days B = Total inspection time from all processes = 1.5 days C = Total queue time from all processes = 0.5 days D = Total hold time from all processes = 1 days E = Total down time from all processes = 0.2 days F = Total allocation/execution time from all processes = 0.5 days Manufacturing Cycle Efficiency (MCE) = ( A + B) / ( A + B + C + D + E + F ) = ( 5 + 1.5) / (5 + 1.5 + 0.5 +1 + 0.2 + 0.5) = 6.5 / 8.7 = 0.75 Conclusion : For the above example, we are able to achieve 75% of entitlement or ideal cycle time and meet the 2x goal at the same time.
  • 8. Suggestion for a start Find out the current performance on MCE, set an internal goal to improve 50% from the ideal cycle time. Example : To date, our MCE = 50% efficiency our Goal = 75% efficiency If we really can achieved 75% efficiency, we have improved 25%. All these will contribute to plant cycle time.
  • 9. Takt Time A meaningful measurement gauge
  • 10. Takt Time = Total available time/Customer demand Typical scenario 1 (More applicable) Given customer demand of 1M/week, one week consist of 22 hr X 7 days X 60 mins = 9240 mins. (taking into account of efficiency) Takt time per unit = 9240/1000000 = 0.00924 mins What does this mean ? It means we must produce one single unit out in every 0.00924 mins in order to service the fixed customer demand per week. Lets say average lot size is 12k, we need (12000 X 0.00924) = 110.88 mins = 1.848 hour to complete whole lot. Based on our simplify process from start to end (refer to next page), our model process should looks and perform in that manner.
  • 11. Expand the process flow with time incurred : Assembly EOLLoad Test Pack Ship PTprinting Queuetime Allocationtime Queuetime Processtime Inspectiontime(3rdopt) Downtime Allocationtime Queuetime Processtime Downtime Allocationtime Queuetime Processtime Downtime Holdlottime Holdlottime Holdlottime Inspectiontime(Buyoff,IRreflow) Allocationtime Queuetime Processtime Downtime Holdlottime Processtime Queuetime Takt = 1.85 hr The typical macro process flow : Takt = 1.85 hr Takt = 1.85 hr Takt = 1.85 hr Takt = 1.85 hr Takt = 1.85 hr Continue next page -> Each lot must be processed within 1.85 hour for each process step above
  • 12. How does this work in actual situation ? Since we have six processes , for the very first lot, it took 6x1.848 = 11.088 hr to move from start until end. For every subsequent lots, if we can control each process to take < takt time, we will achieve the goal of 1.848 hour to ship each lot out. Total lot produced is (1000000/12000) = 83.33 lots. This is equivalent to a total cycle time of 11.088 + 82.33(1.848) = 163.23 hours to process total of 83.33 lots [1st lot CT] + [(Total lot-1st lot)TakT] Converted to days, equivalent to 163.23/24 = 6.80days WE CAN MEET CUSTOMER DEMAND FOR EVERY WEEK IF WE CAN CONTROL TO PROCESS A LOT WITHIN THE CALCULATED Takt TIME.
  • 13. Takt Time = Total available time/Customer demand Typical scenario 2 (Less applicable) Given a goal of 2.5 days cycle time and demand of 1kk/week, equivalent to [(1kkx2.5)/7] = 357143 pieces per every 2.5 days. Assuming each lot consists of 10k, equivalent to 35.7143 lots per every 2.5 days. Takt time per lot = 2.5/35.7143 = 0.07 day = 1.68 hour What does this mean ? It means we must produce one single lot out in every 1.68 hour in order not to jeopardize the total cycle time (2.5 days). Based on our simplify process from start to end (refer to next page), our model process should looks and perform in that manner.
  • 14. Expand the process flow with time incurred : Assembly EOLLoad Test Pack Ship PTprinting Queuetime Allocationtime Queuetime Processtime Inspectiontime(3rdopt) Downtime Allocationtime Queuetime Processtime Downtime Allocationtime Queuetime Processtime Downtime Holdlottime Holdlottime Holdlottime Inspectiontime(Buyoff,IRreflow) Allocationtime Queuetime Processtime Downtime Holdlottime Processtime Queuetime Takt = 1.68 hr The macro process flow : Takt = 1.68 hr Takt = 1.68 hr Takt = 1.68 hr Takt = 1.68 hr Takt = 1.68 hr Continue next page ->
  • 15. How does this work in actual situation ? Since we have six processes , for the very first lot, it took 6x1.68 = 10.08 hr to move from start until end. For every subsequent lots, if we can control each process to take < takt time, we will achieve the goal of 1.68 hour to ship each lot out. This is equivalent to a total cycle time of 10.08 + 34.713(1.68) = 68.40 hours to process total of 35.713 lots Converted to days, equivalent to 68.40/24 = 2.85 days ( 0.3 days extra for the very first lot processed)
  • 16. Production Kanban A visual control for Lean manufacturing
  • 17. A M/C 1 M/C 2 M/C 3 A B A BA B B B 2 bin before process, B (white) under processed After processed Material handler OperatorOperator Operator Oper place card B at Kanban board (1) MH get card B and tag to new lot (3) A A B Inventory from upstream process B MH send new lot to m/c 1 (4) Note : • Sequence (1) to (4) happen to m/c 2 and 3 as well if the processes are stand alone. If this is a full conveyor line, only apply to M/C1. • Kanban system ensure no disruption to value added time, reduce downtime and improve productivity with Lean line. Signal to MH (2) B B Initial stage
  • 18. Lot Size An easy task for early win engagement if properly managed
  • 19. Time (min) Start Step 1 Step 2 Step 3 Finish (Step 4) Start Step 1 Step 2 Step 3 Finish (Step 4) 1 a,b,c,d,e a,b,c,d,e 2 a 3 b a 4 c b a 5 a,b,c,d,e d c b a 6 e d c b 7 e d c 8 e d 9 e + (a,b,c,d) 10 a,b,c,d,e 11 12 13 14 15 a,b,c,d,e 16 17 18 19 20 a,b,c,d,e Assumptions : Each alphabet contained 100 pcs, total 4 process steps, each step required 1 min to complete 100 pcs, we only have one machine for each process. If we build a big lot of 500 pcs, total time to complete whole process is 20 minutes. In contrast, when we build in small lot size (100 pcs each), total time to complete whole process is only 9 minutes.