All the consumers of the State Distribution licensee or PSPCL who intend to encourage solar energy and set up solar PV plants at available places on roof-tops of Individual households, industries, Government or Semi-Government or Local Body offices, commercial establishments, institutions, residential complexes shall be eligible with project capacity ranging from minimum 1 KWp upto 1MWp (AC side) with or without battery back-up support. Consumers may generate solar power for self consumption and may feed excess power into the grid to be adjusted.

NET METERING REQUIREMENTS IN PUNJAB
FOR GRID INTERACTIVE ROOFTOP SOLAR
PV POWER PLANTS
EnvironmentFirst Energy Services Pvt.
Ltd.
ELIGIBILITY
All the consumers of the State Distribution licensee or PSPCL
who intend to encourage solar energy and set up solar PV plants
at available places on roof-tops of Individual households,
industries, Government or Semi-Government or Local Body
offices, commercial establishments, institutions, residential
complexes shall be eligible with project capacity ranging from
minimum 1 KWp upto 1MWp (AC side) with or without
battery back-up support. Consumers may generate solar
power for self consumption and may feed excess power into
the grid to be adjusted
NET METERING
( 1) The distribution licensee shall allow non- discriminatory net-
metering arrangement on first-cum-first serve basis for both
self-owned and third party owned rooftop PV systems as long
as the total capacity (in MW) does not exceed the target capacity
determined.
(2) The distribution licensee shall accept the solar PV power for 25
years as per the useful life of the SPV system.
INSTALLED CAPACITY
The maximum capacity of the Roof Top Solar PV system, as
mentioned on AC side at the output of inverter based on
rated inverter capacity, shall not be more than 80% of the
Sanctioned Connected Load or Contract Demand (in KVA
converted to KW at normative Power Factor of 0.90) of
the consumer and the minimum capacity shall not be less
than 1 KW. Eligible Consumers shall assess their rooftop solar
PV plant capacity based on the shadow less clear roof top
area or vacant spaces, SCL or CD, actual annual energy
consumption pattern and the capacity of Distribution transformer.
APPLICABILITY OF RENEWABLE
ENERGY CERTIFICATES AND
RPO
Net-metering injection is not eligible for REC. The quantum of
electricity consumed by an eligible consumer, who is not defined as
an obligated entity from the rooftop solar system under net-metering
arrangement shall qualify as deemed Renewable Purchase Obligation
(RPO) for the distribution licensee.
Energy Meter(s) Detail
12
Serial
No.
Meter Description Accuracy Load of
Consumer
Voltage
Level
1 Single Phase 10-60 A,
whole current
Class-I upto 7 KW Single Phase
LT 230 V
2 3 Phase 10-60 A,
whole current
Class-I More than 7KW
& up to 25 KW
Three Phase
LT 400 V
3 LT AC 3-Phase 4-
Wires CT operated
static DLMC
compliant energy
meter
Class- 0.5s
or better
More than 25 KW
& up to 100 KW
Three Phase
LT 400 V
4 HT TPT Meter, DLMS
Compliant & AMR
Compatible
Class- 0.5s
or better
More than 100
KW
Three Phase
HT (11 KV)
Harmonics Standard
As per the standard of IEEE 519, the permissible individual harmonics level shall be less
than 3% (for both voltage and current harmonics) and Total Harmonics Distortion (THD) for both
voltage and current harmonics of the system shall be less than 5%.
13
Inverter Standards
Inverter should comply with IEC 61683/IS 61683 for efficiency and Measurements and
should comply IEC 60068-2 (1,2,14,30) / Equivalent BIS Standard for environmental testing.
Inverter should supervise the grid condition continuously and in the event of grid failure
(or) under voltage (or) over voltage, Solar System should be disconnected by the circuit Breaker
/ Auto switch provided in the inverter.
14
Technical and interconnection requirements
15
Parameter Reference Requirement
Overall conditions
of service
State Distribution/Supply Code State Distribution/Supply
Code
Overall Grid
Standards
Central Electricity Authority (Grid
Standard) Regulations 2010
Central Electricity Authority
(Grid Standard) Regulations
2010
Equipment BIS / IEC / IEEE BIS / IEC / IEEE
Meters Central Electricity authority (Installation
& operation of
meters) Regulation 2006 as
amended time to time
Central Electricity authority
(Installation & operation of
meters) Regulation 2006 as
amended time to time
Safety and supply Central Electricity
Authority(measures of safety
and electricity supply)
Regulations, 2010
Central Electricity
Authority(measures of safety
and electricity supply)
Regulations, 2010
Harmonic
Requirements
Harmonic Current IEEE 519
CEA (Technical Standards for
Connectivity of the Distributed
Generation
Resources) Regulations 2013
IEEE 519
CEA (Technical Standards for
Connectivity of the Distributed
Generation
Resources) Regulations 2013
Synchronization IEEE 519
CEA (Technical Standards for
Connectivity of the Distributed
Generation Resources) Regulations
2013
Photovoltaic system must be
equipped with a grid frequency
synchronization device. Every time
the generating station is
synchronized to the electricity
system. It shall not cause voltage
fluctuation greater than +/- 5% at
point of connection.
Voltage IEEE 519
CEA (Technical Standards for
Connectivity of the Distributed
Generation Resources) Regulations
2013
The voltage-operating window
should minimize nuisance
tripping and should be under
operating range of 80% to 110%
of the nominal connected
voltage. Beyond a clearing time
of 2 second, the photovoltaic
system must isolate itself from
the grid.
Flicker IEEE 519
CEA (Technical Standards for
Connectivity of the Distributed
Generation Resources) Regulations
2013
Operation of Photovoltaic
system should not cause
voltage flicker in excess of
the limits stated in IEC 61000
standards or other
equivalent Indian standards, if
any.
Note: The standards/specifications shall be subject to amendments/revisions from time to time
as duly notified by PEDA on its website.
16
Frequency IEEE 519
CEA (Technical Standards for
Connectivity of the Distributed
Generation Resources) Regulations
2013
When the Distribution system
frequency deviates outside the
specified conditions (50.5 Hz
on upper side and 47.5 Hz on
lower side), There should be over
and under frequency trip
functions with a clearing time of 0.2
seconds.
DC injection IEEE 519
CEA (Technical Standards for
Connectivity of the Distributed
Generation Resources) Regulations
2013
Photovoltaic system should
not inject DC power more than
0.5% of full rated output
at the interconnection point or
1% of rated inverter output current
into distribution system under any
operating conditions.
Power Factor IEEE 519
CEA (Technical Standards for
Connectivity of the Distributed
Generation Resources) Regulations
2013
While the output of the inverter is
greater than 50%, a lagging power
factor of greater than 0.9 should
operate.
Islanding and
Disconnection
IEEE 519
CEA (Technical Standards for
Connectivity of the Distributed
Generation Resources) Regulations
2013
The photovoltaic system in the
event of fault, voltage or frequency
variations must island/disconnect
itself within IEC standard on
stipulated period.
Overload and
Overheat
IEEE 519
CEA (Technical Standards for
Connectivity of the Distributed
Generation Resources) Regulations
2013
The inverter should have the facility
to automatically switch off in case of
overload or overheating and
should restart when normal
conditions are restored.
Paralleling Device IEEE 519
CEA (Technical Standards for
Connectivity of the Distributed
Generation Resources) Regulations
2013
Paralleling device of photovoltaic
system shall be capable of
withstanding 220% of the normal
voltage at the interconnection point.
10 days
Timelines to set-up Grid Interactive Roof-Top Solar Photovoltaic Power Plants
Application submitted
to designated officer
of PSPCL
30 days maximum
180 days maximum from LOA
10 days
17
Site verification, installation,
sealing & initial reading of energy
meter(s) by PSPCL
Set-up the plant and submit work
completion report alongwith SLD
to PSPCL
Letter of Approval
(LOA) by PSPCL
Meter Configuration options
The metering system for rooftop solar system, under net-metering arrangement, shall
be as elaborated below which should be applicable till such time the Central Electricity
Authority notifies the standards in this matter.
a) Two Meter Configuration without Storage
The metering protocol for ‘Grid connected rooftop solar PV system without storage’ and
location of solar meter
schematic below:-
and consumer meter shall be in accordance with the
The utility meter (Net-meter) has to be bi-directional meter to register both import grid
electricity amount as well as export solar electricity amount.
18
b) Two Meter Configuration with Storage
The metering protocol for ‘Grid connected rooftop solar PV system with storage’ and location of
Solar Meter (SM) and Utility Meter (UM) shall be in accordance with the schematic below:-
The utility meter (Net-meter) has to be bi-directional meter to register both import grid electricity
amount as well as export solar electricity amount
.
19
• 405 A, Prakrati Corporate, Y N Road,
Indore (INDIA) 452001
• +91-731 2970493, 6007860
Registered
Office
• SCO 48, 2nd Floor, Opposite
P.O., Sector-8, Panchkula (INDIA)
134109
• +91-172-4014288
Chandigarh
Office:
• A1-1603, Runwal Garden City,
Balkum, Thane (W), Mumbai (INDIA)
– 400607
Mumbai
Office:
Email ID: info@environmentfirst.in

Recomendados

List of solar technologies por
List of solar technologiesList of solar technologies
List of solar technologiesfirstgreen
1.1K visualizações22 slides
Solar Resource Assessment por
Solar Resource AssessmentSolar Resource Assessment
Solar Resource Assessmentfirstgreen
1.8K visualizações17 slides
Solar Power Plant System Sizing por
Solar Power Plant System SizingSolar Power Plant System Sizing
Solar Power Plant System Sizingfirstgreen
3.5K visualizações26 slides
10 kwp-solar-rooftop-system por
10 kwp-solar-rooftop-system10 kwp-solar-rooftop-system
10 kwp-solar-rooftop-systemExergy
22K visualizações7 slides
Photovoltaic Training - Session 3 - Plant Operation por
Photovoltaic Training - Session 3 - Plant OperationPhotovoltaic Training - Session 3 - Plant Operation
Photovoltaic Training - Session 3 - Plant OperationLeonardo ENERGY
4.2K visualizações43 slides
performance optimization of Solar pv plant through Micro inverter por
performance optimization of Solar pv plant through Micro inverterperformance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverterAshish Verma
2.9K visualizações25 slides

Mais conteúdo relacionado

Mais procurados

Inspecting Photovoltaic (PV) Systems for Code Compliance por
Inspecting Photovoltaic (PV) Systems for Code ComplianceInspecting Photovoltaic (PV) Systems for Code Compliance
Inspecting Photovoltaic (PV) Systems for Code ComplianceJLanka Technologies (Pvt) Limited
3.7K visualizações168 slides
Renewable Energy Conversion por
Renewable Energy ConversionRenewable Energy Conversion
Renewable Energy Conversionrob_1v
867 visualizações8 slides
Brian Patterson: Reinventing Building Power por
Brian Patterson: Reinventing Building PowerBrian Patterson: Reinventing Building Power
Brian Patterson: Reinventing Building PowerEnergyTech2015
609 visualizações55 slides
Pv solar plant components por
Pv solar plant componentsPv solar plant components
Pv solar plant componentsJay Ranvir
899 visualizações47 slides
Trusted Solar Panel Suppliers & Installation por
Trusted Solar Panel Suppliers & InstallationTrusted Solar Panel Suppliers & Installation
Trusted Solar Panel Suppliers & Installationanshparmar
11 visualizações12 slides
Specification grid tie_spv_plant por
Specification grid tie_spv_plantSpecification grid tie_spv_plant
Specification grid tie_spv_plantJay Ranvir
59 visualizações24 slides

Mais procurados(18)

Renewable Energy Conversion por rob_1v
Renewable Energy ConversionRenewable Energy Conversion
Renewable Energy Conversion
rob_1v867 visualizações
Brian Patterson: Reinventing Building Power por EnergyTech2015
Brian Patterson: Reinventing Building PowerBrian Patterson: Reinventing Building Power
Brian Patterson: Reinventing Building Power
EnergyTech2015609 visualizações
Pv solar plant components por Jay Ranvir
Pv solar plant componentsPv solar plant components
Pv solar plant components
Jay Ranvir899 visualizações
Trusted Solar Panel Suppliers & Installation por anshparmar
Trusted Solar Panel Suppliers & InstallationTrusted Solar Panel Suppliers & Installation
Trusted Solar Panel Suppliers & Installation
anshparmar11 visualizações
Specification grid tie_spv_plant por Jay Ranvir
Specification grid tie_spv_plantSpecification grid tie_spv_plant
Specification grid tie_spv_plant
Jay Ranvir59 visualizações
Younes Sina, Jonathan Rhyne ,Sabina Ude, Huidong Zang, Mary Waddle ,A report ... por Younes Sina
Younes Sina, Jonathan Rhyne ,Sabina Ude, Huidong Zang, Mary Waddle ,A report ...Younes Sina, Jonathan Rhyne ,Sabina Ude, Huidong Zang, Mary Waddle ,A report ...
Younes Sina, Jonathan Rhyne ,Sabina Ude, Huidong Zang, Mary Waddle ,A report ...
Younes Sina1.1K visualizações
Session 06 balance of system components por Chirag Jain
Session 06   balance of system componentsSession 06   balance of system components
Session 06 balance of system components
Chirag Jain352 visualizações
SOLAR DESIGN -PREMKUMAR-1 por Murugappa Group
SOLAR DESIGN -PREMKUMAR-1SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1
Murugappa Group7.5K visualizações
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami... por Headway Solar
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Guidelines for Grid-connected Small Scale (Rooftop) Solar PV Systems for Tami...
Headway Solar1.6K visualizações
NABCEP Exam Prep Review for PV Installation & Tech Sales  por solpowerpeople
NABCEP Exam Prep Review for PV Installation & Tech Sales NABCEP Exam Prep Review for PV Installation & Tech Sales 
NABCEP Exam Prep Review for PV Installation & Tech Sales 
solpowerpeople5K visualizações
Session 07 site assessment & planning por Chirag Jain
Session 07   site assessment & planningSession 07   site assessment & planning
Session 07 site assessment & planning
Chirag Jain287 visualizações
Session 03 solar pv rooftop technology overview por Chirag Jain
Session 03   solar pv rooftop technology overviewSession 03   solar pv rooftop technology overview
Session 03 solar pv rooftop technology overview
Chirag Jain306 visualizações
IRJET- Power Quality Assessment of Photovoltaic System por IRJET Journal
IRJET- Power Quality Assessment of Photovoltaic SystemIRJET- Power Quality Assessment of Photovoltaic System
IRJET- Power Quality Assessment of Photovoltaic System
IRJET Journal16 visualizações
Maximum Energy Case Studies - EUPVSEC por SolarEdge Technologies
Maximum Energy Case Studies - EUPVSECMaximum Energy Case Studies - EUPVSEC
Maximum Energy Case Studies - EUPVSEC
SolarEdge Technologies638 visualizações
SOLAR SOLUTIONS A STEP TOWARDS A GREENER FUTURE por urjarathi
SOLAR SOLUTIONS A STEP TOWARDS A GREENER FUTURESOLAR SOLUTIONS A STEP TOWARDS A GREENER FUTURE
SOLAR SOLUTIONS A STEP TOWARDS A GREENER FUTURE
urjarathi5 visualizações
Session 02 solar energy technologies por Chirag Jain
Session 02   solar energy technologiesSession 02   solar energy technologies
Session 02 solar energy technologies
Chirag Jain215 visualizações

Similar a Net metering requirements in punjab for grid interactive rooftop SPV Power Plant

Power Plant Controller-Putting the Power back into the hands of the Developer por
Power Plant Controller-Putting the Power back into the hands of the DeveloperPower Plant Controller-Putting the Power back into the hands of the Developer
Power Plant Controller-Putting the Power back into the hands of the DeveloperSgurrEnergy Pvt. Ltd.
11 visualizações6 slides
file-9.pptx por
file-9.pptxfile-9.pptx
file-9.pptxUdayMujumdar
3 visualizações22 slides
file-9.pptx por
file-9.pptxfile-9.pptx
file-9.pptxSheelKapar1
4 visualizações22 slides
Grid Connected Photovoltaic System with Energy Management Scheme por
Grid Connected Photovoltaic System with Energy Management SchemeGrid Connected Photovoltaic System with Energy Management Scheme
Grid Connected Photovoltaic System with Energy Management SchemeIRJET Journal
58 visualizações9 slides
IRJET- High-Efficiency Three-Level Stacked-Neutral-Point-Clamped Grid-Tie... por
IRJET-  	  High-Efficiency Three-Level Stacked-Neutral-Point-Clamped Grid-Tie...IRJET-  	  High-Efficiency Three-Level Stacked-Neutral-Point-Clamped Grid-Tie...
IRJET- High-Efficiency Three-Level Stacked-Neutral-Point-Clamped Grid-Tie...IRJET Journal
21 visualizações4 slides
Session 10 grid interconnections & commissioning test procedures por
Session 10   grid interconnections & commissioning test proceduresSession 10   grid interconnections & commissioning test procedures
Session 10 grid interconnections & commissioning test proceduresChirag Jain
625 visualizações25 slides

Similar a Net metering requirements in punjab for grid interactive rooftop SPV Power Plant(20)

Power Plant Controller-Putting the Power back into the hands of the Developer por SgurrEnergy Pvt. Ltd.
Power Plant Controller-Putting the Power back into the hands of the DeveloperPower Plant Controller-Putting the Power back into the hands of the Developer
Power Plant Controller-Putting the Power back into the hands of the Developer
SgurrEnergy Pvt. Ltd.11 visualizações
file-9.pptx por UdayMujumdar
file-9.pptxfile-9.pptx
file-9.pptx
UdayMujumdar3 visualizações
file-9.pptx por SheelKapar1
file-9.pptxfile-9.pptx
file-9.pptx
SheelKapar14 visualizações
Grid Connected Photovoltaic System with Energy Management Scheme por IRJET Journal
Grid Connected Photovoltaic System with Energy Management SchemeGrid Connected Photovoltaic System with Energy Management Scheme
Grid Connected Photovoltaic System with Energy Management Scheme
IRJET Journal58 visualizações
IRJET- High-Efficiency Three-Level Stacked-Neutral-Point-Clamped Grid-Tie... por IRJET Journal
IRJET-  	  High-Efficiency Three-Level Stacked-Neutral-Point-Clamped Grid-Tie...IRJET-  	  High-Efficiency Three-Level Stacked-Neutral-Point-Clamped Grid-Tie...
IRJET- High-Efficiency Three-Level Stacked-Neutral-Point-Clamped Grid-Tie...
IRJET Journal21 visualizações
Session 10 grid interconnections & commissioning test procedures por Chirag Jain
Session 10   grid interconnections & commissioning test proceduresSession 10   grid interconnections & commissioning test procedures
Session 10 grid interconnections & commissioning test procedures
Chirag Jain625 visualizações
Fault Ride-Through of DFIG Wind Turbine by DVR Using Synchronous Reference Fr... por theijes
Fault Ride-Through of DFIG Wind Turbine by DVR Using Synchronous Reference Fr...Fault Ride-Through of DFIG Wind Turbine by DVR Using Synchronous Reference Fr...
Fault Ride-Through of DFIG Wind Turbine by DVR Using Synchronous Reference Fr...
theijes241 visualizações
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion System por IRJET Journal
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion SystemIRJET- Low Volatge Ride through Solution for Wind Energy Conversion System
IRJET- Low Volatge Ride through Solution for Wind Energy Conversion System
IRJET Journal39 visualizações
IRPTF_Workshop_Presentations (1).pdf por PowerSystemDynamicsS
IRPTF_Workshop_Presentations (1).pdfIRPTF_Workshop_Presentations (1).pdf
IRPTF_Workshop_Presentations (1).pdf
PowerSystemDynamicsS74 visualizações
IRJET- Solar H8 Inverter to Reduce Leakage Currents in Grid Connected Applic... por IRJET Journal
IRJET-	 Solar H8 Inverter to Reduce Leakage Currents in Grid Connected Applic...IRJET-	 Solar H8 Inverter to Reduce Leakage Currents in Grid Connected Applic...
IRJET- Solar H8 Inverter to Reduce Leakage Currents in Grid Connected Applic...
IRJET Journal43 visualizações
A Review paper on Power Quality Improvement Techniques in a Grid Integrated S... por IRJET Journal
A Review paper on Power Quality Improvement Techniques in a Grid Integrated S...A Review paper on Power Quality Improvement Techniques in a Grid Integrated S...
A Review paper on Power Quality Improvement Techniques in a Grid Integrated S...
IRJET Journal6 visualizações
IRJET- Comparative Analysis of Different Converter Topologies Employed for Tr... por IRJET Journal
IRJET- Comparative Analysis of Different Converter Topologies Employed for Tr...IRJET- Comparative Analysis of Different Converter Topologies Employed for Tr...
IRJET- Comparative Analysis of Different Converter Topologies Employed for Tr...
IRJET Journal24 visualizações
IRJET - Power Quality Improvement using Statcom in PV Grid Connected System por IRJET Journal
IRJET - Power Quality Improvement using Statcom in PV Grid Connected SystemIRJET - Power Quality Improvement using Statcom in PV Grid Connected System
IRJET - Power Quality Improvement using Statcom in PV Grid Connected System
IRJET Journal16 visualizações
Requerimientos ERCOT para Recursos Renovables.pdf por ssuserf19e47
Requerimientos ERCOT para Recursos Renovables.pdfRequerimientos ERCOT para Recursos Renovables.pdf
Requerimientos ERCOT para Recursos Renovables.pdf
ssuserf19e4711 visualizações
IRJET- Design Simulation and Control of Utility Grid Connected Solar Photovol... por IRJET Journal
IRJET- Design Simulation and Control of Utility Grid Connected Solar Photovol...IRJET- Design Simulation and Control of Utility Grid Connected Solar Photovol...
IRJET- Design Simulation and Control of Utility Grid Connected Solar Photovol...
IRJET Journal39 visualizações
IRJET- Photovoltaic 10MW Power Plant Simulation & Design using Mathwork &... por IRJET Journal
IRJET-  	  Photovoltaic 10MW Power Plant Simulation & Design using Mathwork &...IRJET-  	  Photovoltaic 10MW Power Plant Simulation & Design using Mathwork &...
IRJET- Photovoltaic 10MW Power Plant Simulation & Design using Mathwork &...
IRJET Journal12 visualizações
IRJET- Frequency Control of Distributed Generators in Microgrid with ANFIS Co... por IRJET Journal
IRJET- Frequency Control of Distributed Generators in Microgrid with ANFIS Co...IRJET- Frequency Control of Distributed Generators in Microgrid with ANFIS Co...
IRJET- Frequency Control of Distributed Generators in Microgrid with ANFIS Co...
IRJET Journal29 visualizações
IRJET- Grid Integrated Single Phase PV with Shunt Active Filter based Control... por IRJET Journal
IRJET- Grid Integrated Single Phase PV with Shunt Active Filter based Control...IRJET- Grid Integrated Single Phase PV with Shunt Active Filter based Control...
IRJET- Grid Integrated Single Phase PV with Shunt Active Filter based Control...
IRJET Journal22 visualizações
Voltage Stability & Power Quality Assessment of Distributed Generation Based ... por ijsrd.com
Voltage Stability & Power Quality Assessment of Distributed Generation Based ...Voltage Stability & Power Quality Assessment of Distributed Generation Based ...
Voltage Stability & Power Quality Assessment of Distributed Generation Based ...
ijsrd.com902 visualizações
Performance Improvement of a Grid Connected Wind Farm System por IOSRJEEE
Performance Improvement of a Grid Connected Wind Farm SystemPerformance Improvement of a Grid Connected Wind Farm System
Performance Improvement of a Grid Connected Wind Farm System
IOSRJEEE52 visualizações

Mais de Harish Sharma

MNRE recomendations to States for the Solar Street Lighting Systems por
MNRE recomendations to States for the Solar Street Lighting SystemsMNRE recomendations to States for the Solar Street Lighting Systems
MNRE recomendations to States for the Solar Street Lighting SystemsHarish Sharma
222 visualizações1 slide
MNRE Clarification on the capacity with respect to inverter and eligibility o... por
MNRE Clarification on the capacity with respect to inverter and eligibility o...MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...Harish Sharma
484 visualizações1 slide
MNRE Guidelines for off-grid and grid connected Solar DC System por
MNRE Guidelines for off-grid and grid connected Solar DC SystemMNRE Guidelines for off-grid and grid connected Solar DC System
MNRE Guidelines for off-grid and grid connected Solar DC SystemHarish Sharma
712 visualizações2 slides
Future of solar Power Projects in India por
Future of solar Power Projects in IndiaFuture of solar Power Projects in India
Future of solar Power Projects in IndiaHarish Sharma
1.9K visualizações2 slides
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV por
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IVRfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IVHarish Sharma
1K visualizações95 slides
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch... por
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...Harish Sharma
944 visualizações94 slides

Mais de Harish Sharma(20)

MNRE recomendations to States for the Solar Street Lighting Systems por Harish Sharma
MNRE recomendations to States for the Solar Street Lighting SystemsMNRE recomendations to States for the Solar Street Lighting Systems
MNRE recomendations to States for the Solar Street Lighting Systems
Harish Sharma222 visualizações
MNRE Clarification on the capacity with respect to inverter and eligibility o... por Harish Sharma
MNRE Clarification on the capacity with respect to inverter and eligibility o...MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...
Harish Sharma484 visualizações
MNRE Guidelines for off-grid and grid connected Solar DC System por Harish Sharma
MNRE Guidelines for off-grid and grid connected Solar DC SystemMNRE Guidelines for off-grid and grid connected Solar DC System
MNRE Guidelines for off-grid and grid connected Solar DC System
Harish Sharma712 visualizações
Future of solar Power Projects in India por Harish Sharma
Future of solar Power Projects in IndiaFuture of solar Power Projects in India
Future of solar Power Projects in India
Harish Sharma1.9K visualizações
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV por Harish Sharma
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IVRfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
Harish Sharma1K visualizações
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch... por Harish Sharma
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
Harish Sharma944 visualizações
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III por Harish Sharma
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-IIIRfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
Harish Sharma631 visualizações
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH por Harish Sharma
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHRfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
Harish Sharma601 visualizações
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di... por Harish Sharma
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Harish Sharma1.5K visualizações
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH... por Harish Sharma
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
Harish Sharma1.8K visualizações
PPA draft for the development of solar power project in the state of Karnataka por Harish Sharma
PPA draft for the development of solar power project in the state of KarnatakaPPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of Karnataka
Harish Sharma710 visualizações
RfP for tariff based competitive bidding by KREDL for the installation of 240... por Harish Sharma
RfP for tariff based competitive bidding by KREDL for the installation of 240...RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...
Harish Sharma940 visualizações
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev... por Harish Sharma
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
Harish Sharma1.6K visualizações
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKA por Harish Sharma
RfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKARfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKA
Harish Sharma1.1K visualizações
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh. por Harish Sharma
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
Harish Sharma1.9K visualizações
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by... por Harish Sharma
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Harish Sharma1.1K visualizações
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab por Harish Sharma
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabScheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Harish Sharma1.3K visualizações
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte... por Harish Sharma
Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
Harish Sharma2.6K visualizações
Water Benefit Standard (WBS) por Harish Sharma
Water Benefit Standard (WBS) Water Benefit Standard (WBS)
Water Benefit Standard (WBS)
Harish Sharma2.3K visualizações
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne... por Harish Sharma
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Harish Sharma813 visualizações

Último

CHEMICAL KINETICS.pdf por
CHEMICAL KINETICS.pdfCHEMICAL KINETICS.pdf
CHEMICAL KINETICS.pdfAguedaGutirrez
8 visualizações337 slides
Design of machine elements-UNIT 3.pptx por
Design of machine elements-UNIT 3.pptxDesign of machine elements-UNIT 3.pptx
Design of machine elements-UNIT 3.pptxgopinathcreddy
29 visualizações31 slides
Investor Presentation por
Investor PresentationInvestor Presentation
Investor Presentationeser sevinç
23 visualizações26 slides
NEW SUPPLIERS SUPPLIES (copie).pdf por
NEW SUPPLIERS SUPPLIES (copie).pdfNEW SUPPLIERS SUPPLIES (copie).pdf
NEW SUPPLIERS SUPPLIES (copie).pdfgeorgesradjou
14 visualizações30 slides
Machine Element II Course outline.pdf por
Machine Element II Course outline.pdfMachine Element II Course outline.pdf
Machine Element II Course outline.pdfodatadese1
8 visualizações2 slides
_MAKRIADI-FOTEINI_diploma thesis.pptx por
_MAKRIADI-FOTEINI_diploma thesis.pptx_MAKRIADI-FOTEINI_diploma thesis.pptx
_MAKRIADI-FOTEINI_diploma thesis.pptxfotinimakriadi
7 visualizações32 slides

Último(20)

CHEMICAL KINETICS.pdf por AguedaGutirrez
CHEMICAL KINETICS.pdfCHEMICAL KINETICS.pdf
CHEMICAL KINETICS.pdf
AguedaGutirrez8 visualizações
Design of machine elements-UNIT 3.pptx por gopinathcreddy
Design of machine elements-UNIT 3.pptxDesign of machine elements-UNIT 3.pptx
Design of machine elements-UNIT 3.pptx
gopinathcreddy29 visualizações
Investor Presentation por eser sevinç
Investor PresentationInvestor Presentation
Investor Presentation
eser sevinç23 visualizações
NEW SUPPLIERS SUPPLIES (copie).pdf por georgesradjou
NEW SUPPLIERS SUPPLIES (copie).pdfNEW SUPPLIERS SUPPLIES (copie).pdf
NEW SUPPLIERS SUPPLIES (copie).pdf
georgesradjou14 visualizações
Machine Element II Course outline.pdf por odatadese1
Machine Element II Course outline.pdfMachine Element II Course outline.pdf
Machine Element II Course outline.pdf
odatadese18 visualizações
_MAKRIADI-FOTEINI_diploma thesis.pptx por fotinimakriadi
_MAKRIADI-FOTEINI_diploma thesis.pptx_MAKRIADI-FOTEINI_diploma thesis.pptx
_MAKRIADI-FOTEINI_diploma thesis.pptx
fotinimakriadi7 visualizações
SUMIT SQL PROJECT SUPERSTORE 1.pptx por Sumit Jadhav
SUMIT SQL PROJECT SUPERSTORE 1.pptxSUMIT SQL PROJECT SUPERSTORE 1.pptx
SUMIT SQL PROJECT SUPERSTORE 1.pptx
Sumit Jadhav 11 visualizações
Literature review and Case study on Commercial Complex in Nepal, Durbar mall,... por AakashShakya12
Literature review and Case study on Commercial Complex in Nepal, Durbar mall,...Literature review and Case study on Commercial Complex in Nepal, Durbar mall,...
Literature review and Case study on Commercial Complex in Nepal, Durbar mall,...
AakashShakya1263 visualizações
How I learned to stop worrying and love the dark silicon apocalypse.pdf por Tomasz Kowalczewski
How I learned to stop worrying and love the dark silicon apocalypse.pdfHow I learned to stop worrying and love the dark silicon apocalypse.pdf
How I learned to stop worrying and love the dark silicon apocalypse.pdf
Tomasz Kowalczewski26 visualizações
Activated sludge process .pdf por 8832RafiyaAltaf
Activated sludge process .pdfActivated sludge process .pdf
Activated sludge process .pdf
8832RafiyaAltaf8 visualizações
K8S Roadmap.pdf por MaryamTavakkoli2
K8S Roadmap.pdfK8S Roadmap.pdf
K8S Roadmap.pdf
MaryamTavakkoli26 visualizações
Object Oriented Programming with JAVA por Demian Antony D'Mello
Object Oriented Programming with JAVAObject Oriented Programming with JAVA
Object Oriented Programming with JAVA
Demian Antony D'Mello107 visualizações
Thermal aware task assignment for multicore processors using genetic algorithm por IJECEIAES
Thermal aware task assignment for multicore processors using genetic algorithm Thermal aware task assignment for multicore processors using genetic algorithm
Thermal aware task assignment for multicore processors using genetic algorithm
IJECEIAES31 visualizações
Multi-objective distributed generation integration in radial distribution sy... por IJECEIAES
Multi-objective distributed generation integration in radial  distribution sy...Multi-objective distributed generation integration in radial  distribution sy...
Multi-objective distributed generation integration in radial distribution sy...
IJECEIAES15 visualizações
fakenews_DBDA_Mar23.pptx por deepmitra8
fakenews_DBDA_Mar23.pptxfakenews_DBDA_Mar23.pptx
fakenews_DBDA_Mar23.pptx
deepmitra812 visualizações
Digital Watermarking Of Audio Signals.pptx por AyushJaiswal781174
Digital Watermarking Of Audio Signals.pptxDigital Watermarking Of Audio Signals.pptx
Digital Watermarking Of Audio Signals.pptx
AyushJaiswal7811748 visualizações
SEMI CONDUCTORS por pavaniaalla2005
SEMI CONDUCTORSSEMI CONDUCTORS
SEMI CONDUCTORS
pavaniaalla200520 visualizações
Informed search algorithms.pptx por Dr.Shweta
Informed search algorithms.pptxInformed search algorithms.pptx
Informed search algorithms.pptx
Dr.Shweta16 visualizações
DevOps-ITverse-2023-IIT-DU.pptx por Anowar Hossain
DevOps-ITverse-2023-IIT-DU.pptxDevOps-ITverse-2023-IIT-DU.pptx
DevOps-ITverse-2023-IIT-DU.pptx
Anowar Hossain8 visualizações

Net metering requirements in punjab for grid interactive rooftop SPV Power Plant

  • 1. NET METERING REQUIREMENTS IN PUNJAB FOR GRID INTERACTIVE ROOFTOP SOLAR PV POWER PLANTS EnvironmentFirst Energy Services Pvt. Ltd.
  • 2. ELIGIBILITY All the consumers of the State Distribution licensee or PSPCL who intend to encourage solar energy and set up solar PV plants at available places on roof-tops of Individual households, industries, Government or Semi-Government or Local Body offices, commercial establishments, institutions, residential complexes shall be eligible with project capacity ranging from minimum 1 KWp upto 1MWp (AC side) with or without battery back-up support. Consumers may generate solar power for self consumption and may feed excess power into the grid to be adjusted
  • 3. NET METERING ( 1) The distribution licensee shall allow non- discriminatory net- metering arrangement on first-cum-first serve basis for both self-owned and third party owned rooftop PV systems as long as the total capacity (in MW) does not exceed the target capacity determined. (2) The distribution licensee shall accept the solar PV power for 25 years as per the useful life of the SPV system.
  • 4. INSTALLED CAPACITY The maximum capacity of the Roof Top Solar PV system, as mentioned on AC side at the output of inverter based on rated inverter capacity, shall not be more than 80% of the Sanctioned Connected Load or Contract Demand (in KVA converted to KW at normative Power Factor of 0.90) of the consumer and the minimum capacity shall not be less than 1 KW. Eligible Consumers shall assess their rooftop solar PV plant capacity based on the shadow less clear roof top area or vacant spaces, SCL or CD, actual annual energy consumption pattern and the capacity of Distribution transformer.
  • 5. APPLICABILITY OF RENEWABLE ENERGY CERTIFICATES AND RPO Net-metering injection is not eligible for REC. The quantum of electricity consumed by an eligible consumer, who is not defined as an obligated entity from the rooftop solar system under net-metering arrangement shall qualify as deemed Renewable Purchase Obligation (RPO) for the distribution licensee.
  • 6. Energy Meter(s) Detail 12 Serial No. Meter Description Accuracy Load of Consumer Voltage Level 1 Single Phase 10-60 A, whole current Class-I upto 7 KW Single Phase LT 230 V 2 3 Phase 10-60 A, whole current Class-I More than 7KW & up to 25 KW Three Phase LT 400 V 3 LT AC 3-Phase 4- Wires CT operated static DLMC compliant energy meter Class- 0.5s or better More than 25 KW & up to 100 KW Three Phase LT 400 V 4 HT TPT Meter, DLMS Compliant & AMR Compatible Class- 0.5s or better More than 100 KW Three Phase HT (11 KV)
  • 7. Harmonics Standard As per the standard of IEEE 519, the permissible individual harmonics level shall be less than 3% (for both voltage and current harmonics) and Total Harmonics Distortion (THD) for both voltage and current harmonics of the system shall be less than 5%. 13
  • 8. Inverter Standards Inverter should comply with IEC 61683/IS 61683 for efficiency and Measurements and should comply IEC 60068-2 (1,2,14,30) / Equivalent BIS Standard for environmental testing. Inverter should supervise the grid condition continuously and in the event of grid failure (or) under voltage (or) over voltage, Solar System should be disconnected by the circuit Breaker / Auto switch provided in the inverter. 14
  • 9. Technical and interconnection requirements 15 Parameter Reference Requirement Overall conditions of service State Distribution/Supply Code State Distribution/Supply Code Overall Grid Standards Central Electricity Authority (Grid Standard) Regulations 2010 Central Electricity Authority (Grid Standard) Regulations 2010 Equipment BIS / IEC / IEEE BIS / IEC / IEEE Meters Central Electricity authority (Installation & operation of meters) Regulation 2006 as amended time to time Central Electricity authority (Installation & operation of meters) Regulation 2006 as amended time to time Safety and supply Central Electricity Authority(measures of safety and electricity supply) Regulations, 2010 Central Electricity Authority(measures of safety and electricity supply) Regulations, 2010 Harmonic Requirements Harmonic Current IEEE 519 CEA (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations 2013 IEEE 519 CEA (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations 2013 Synchronization IEEE 519 CEA (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations 2013 Photovoltaic system must be equipped with a grid frequency synchronization device. Every time the generating station is synchronized to the electricity system. It shall not cause voltage fluctuation greater than +/- 5% at point of connection. Voltage IEEE 519 CEA (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations 2013 The voltage-operating window should minimize nuisance tripping and should be under operating range of 80% to 110% of the nominal connected voltage. Beyond a clearing time of 2 second, the photovoltaic system must isolate itself from the grid. Flicker IEEE 519 CEA (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations 2013 Operation of Photovoltaic system should not cause voltage flicker in excess of the limits stated in IEC 61000 standards or other equivalent Indian standards, if any.
  • 10. Note: The standards/specifications shall be subject to amendments/revisions from time to time as duly notified by PEDA on its website. 16 Frequency IEEE 519 CEA (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations 2013 When the Distribution system frequency deviates outside the specified conditions (50.5 Hz on upper side and 47.5 Hz on lower side), There should be over and under frequency trip functions with a clearing time of 0.2 seconds. DC injection IEEE 519 CEA (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations 2013 Photovoltaic system should not inject DC power more than 0.5% of full rated output at the interconnection point or 1% of rated inverter output current into distribution system under any operating conditions. Power Factor IEEE 519 CEA (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations 2013 While the output of the inverter is greater than 50%, a lagging power factor of greater than 0.9 should operate. Islanding and Disconnection IEEE 519 CEA (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations 2013 The photovoltaic system in the event of fault, voltage or frequency variations must island/disconnect itself within IEC standard on stipulated period. Overload and Overheat IEEE 519 CEA (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations 2013 The inverter should have the facility to automatically switch off in case of overload or overheating and should restart when normal conditions are restored. Paralleling Device IEEE 519 CEA (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations 2013 Paralleling device of photovoltaic system shall be capable of withstanding 220% of the normal voltage at the interconnection point.
  • 11. 10 days Timelines to set-up Grid Interactive Roof-Top Solar Photovoltaic Power Plants Application submitted to designated officer of PSPCL 30 days maximum 180 days maximum from LOA 10 days 17 Site verification, installation, sealing & initial reading of energy meter(s) by PSPCL Set-up the plant and submit work completion report alongwith SLD to PSPCL Letter of Approval (LOA) by PSPCL
  • 12. Meter Configuration options The metering system for rooftop solar system, under net-metering arrangement, shall be as elaborated below which should be applicable till such time the Central Electricity Authority notifies the standards in this matter. a) Two Meter Configuration without Storage The metering protocol for ‘Grid connected rooftop solar PV system without storage’ and location of solar meter schematic below:- and consumer meter shall be in accordance with the The utility meter (Net-meter) has to be bi-directional meter to register both import grid electricity amount as well as export solar electricity amount. 18
  • 13. b) Two Meter Configuration with Storage The metering protocol for ‘Grid connected rooftop solar PV system with storage’ and location of Solar Meter (SM) and Utility Meter (UM) shall be in accordance with the schematic below:- The utility meter (Net-meter) has to be bi-directional meter to register both import grid electricity amount as well as export solar electricity amount . 19
  • 14. • 405 A, Prakrati Corporate, Y N Road, Indore (INDIA) 452001 • +91-731 2970493, 6007860 Registered Office • SCO 48, 2nd Floor, Opposite P.O., Sector-8, Panchkula (INDIA) 134109 • +91-172-4014288 Chandigarh Office: • A1-1603, Runwal Garden City, Balkum, Thane (W), Mumbai (INDIA) – 400607 Mumbai Office: Email ID: info@environmentfirst.in