SlideShare a Scribd company logo
1 of 31
Download to read offline
My Presentation Topic Name Is –
Rails Fastening
Name : Mohammad Khasrul Alam
ID No. : 003-18-23
Batch No. : CE-21
Department Of Civil Engineering
Southern University Bangladesh.
. Submitted To:
Hasina Iasmin
Assistant Professor
Southern University Bangladesh
Index
What we can learn from that presentation :
 Fixtures And Fastenings
 Rail Fixtures & Fastening Figure
 Types Of Fixtures & Fastening
 Fish Plates, Fish Plates Figures
 Requirements Of Fish Plates
 Bearing Plates, Bearing Plate Figure, Function Of Bearing Plate
 Advantages And Disadvantages Of Fixtures And Fastenings
 Spikes, Dog Spikes, Round Spikes, Screw Spikes, Elastic Spikes
 Requirements Of A Good Spike
 Bolts, Fish Bolts, Hook Bolts, Fang Bolts
 Keys, Wooden Keys, Metal Keys
 Anti-creepers
 Let's See How The Rail Ties And How To Make Different Parts Of It…
 End
FIXTURES AND FASTENINGS
Fixtures and fastenings are fittings requires
for joining of rails end to end and also for
fixing the rails to sleepers in a track.
RAIL FIXTURES & FASTENING FIGURE
TYPES OF FIXTURES & FASTENING
Rail fastening system is a means of fixing rails to sleepers.
Used to keep rails in proper position
Important fittings are:
 FISH PLATES
 SPIKES
 BOLTS
 KEYS
 PLATES
FISH PLATES
 Fish plates are used in rail joints to maintain the
continuity of the rails.
 Two types of fish plates are commonly used on
Indian Railways for joining F.F. and B.H. rails,
each fish plate is 457 mm long and provided with
four holes 32 mm at a spacing of 114 mm c/c.
 These are manufactured of steel and are so
designed that they fit in between the head and foot
of the rail.
FISH PLATES FIGURES
REQUIREMENTS OF FISH PLATES
 They should hold the adjoining ends of rails in
correct horizontal and vertical plane.
 They should allow free longitudinal movements of
rails due to temperature variation.
 They should be able to resist all types of wear.
 They should be able to bear the vertical and lateral
stresses which come at joints without any distortion.
 They should allow easy renewal and replacement of
rails in case of wear and damage
BEARING PLATES
 Bearing plates are cast iron or steel plates placed in
between the F.F rail and wooden sleepers of a railway track.
 F.F. rails if fixed directly on wooden sleepers sink in the
sleeper due to the heavy loads of trains and thus loosen the
spikes.
 To overcome this difficulty bearing plates are used under
F.F. rails to distribute the load over a wider area and bring
the intensity of pressure within limit.
 Bearing plates give the required 1 in 20 inward slope to the
rail directly and no adzing is required in the wooden
sleeper.
 These are fixed to sleepers by spikes.
BEARING PLATE FIGURE
FUNCTION OF BEARING PLATE
 To prevent sinking of rail in wooden sleeper
 To distribute the load uniformly
 To enable the spike to be held tight
 To prevent shifting of rail
 To eliminate adding of wooden sleeper
 To maintain gauge when bearing plate are used
 To achieve economy
ADVANTAGES
Following are the advantages of bearing plates:
(i) They distribute the loads to wider area and prevent sinking
of the rail to the sleeper.
(ii) They avoid adzing of sleepers.
(iii) They enable the spikes to remain tight and require less
maintenance.
(iv) Bearing plates prevent the widening of gauge on curves.
(v) Bearing plates increase the overall stability of the track.
(vi) They prevent the destruction of the sleeper due to rubbing
action of the rail.
DISADVANTAGES
Following are the disadvantages of bearing
plates:
(i) When the bearing plates become loose due to
settlement of ballast, moisture is likely to enter
between the sleepers and plates, causing sleepers to
wear.
(ii) When any spike is damaged and it is required to
be redriven at another place, all other spikes of the
bearing plates have to be removed, which will
reduce the holding power of the spikes.
SPIKES
Spikes are used to fix rails to wooden sleepers.
Spikes are of following types:
 Dog spikes
 Round spikes
 Screw spikes
 Elastic spik
DOG SPIKES
 Dog spikes are the cheaper type
of spikes which hold the rails at
correct gauge and can be easily
fixed and removed.
 These are commonly used for
holding F.F. rails.
 Four dog spikes are used per
sleeper, two on either side of the
rail.
 The disadvantage of dog spikes
is that these become loose under
the wave action caused by the
moving train.
ROUND SPIKES
 Round spikes are
used for fixing
chairs of B.H. rails
to wooden sleepers
and also for fixing
slide chairs of points
and crossings.
 These have either
cylindrical or
hemispherical head
and blunt end.
SCREW SPIKES
 Screw spikes are tapered
screws with V-threads.
 Their head is circular with
a square projection and
are used to fasten rails
with wooden sleepers.
 The holding power of these
spikes is more than double
to that of dog spikes and
can resist the lateral thrust
better than the dog spikes
ELASTIC SPIKES
 Elastic spikes are used
for fixing F.F. rails to
wooden sleepers.
 These give better grip
and result in reduction
of wear and tear of rail.
 The advantage of this
type of spike is that it
is not pulled up by the
wave action of the
moving train.
REQUIREMENTS OF A GOOD SPIKE
 It should be easy in fixing or removing
from the sleepers.
 It should hold the rails and bearing plates
in proper position.
 It should be cheap.
 It should require minimum maintenance.
 It should not come out of the sleepers
under vibrations.
BOLTS
Different types of
bolts used in
Indian Railway
are described
below:-
FISH BOLTS
HOOK BOLTS
FANG BOLTS
FISH BOLTS
 Fish bolts are used for connecting fish plates
with the rails.
 Four bolts are required for each pair of fish
plates.
 These bolts are inserted from outside the track
and bolted on the inside of the track.
 Fish bolts have to withstand shear due to
heavy transverse stresses, hence they are
manufactured of medium or high carbon steel.
 The length of fish bolt depends on the type of
fish plate used.
 For 44.70kg rail, the fish bolts of 25 mm dia
and 127.6 mm length are used.
 These bolts get loosened due to vibration of
moving train and hence these are to be
tightened time to time.
 Too much tightening of bolts is prohibited as
it prevents free expansion or contraction of
rails due to temperature vibrations.
HOOK BOLTS
 Hook bolts are also known as
dog bolts due to the shape of
their heads. These bolts are
used to fix sleepers which rest
directly on a girder.
 Two bolts per sleeper are
used.
 Dog bolts are of two types.
 (i) Sloping lips- for fixing
sleepers to plate girder spans.
 (ii) Straight lips- for fixing
sleepers to joist spans
FANG BOLTS
 Fang bolts are used for
fixing side chairs to
sleepers.
 These are alternative to
screw or round spikes.
 The fang bolts are found
to be more effective but
are not generally used,
because fixing and
removal of these bolts are
difficult.
KEYS
 These are small
tapered pieces of
timber or steel used to
fix rails to chairs on
metal sleepers.
 Keys are of two
types
 Wooden keys
 Metal keys
WOODEN KEYS
 Wooden keys are small
straight or tapered pieces
of timber.
 These are cheap and Easily
prepared.
 These are not strong and
become loose under
vibrations.
 These require frequent
maintenance.
 Wooden keys are not used
now-a days in
 Indian Railways.
METAL KEYS
 Metal keys are small
tapered or spring like
pieces of steel.
 These keys are much
more durable than
wooden keys.
 Metal keys are of
two types.
 Stuart`s key and
 Morgan key
ANTI-CREEPERS
 Anti-creepers are
used to prevent
creep in a railway
track.
 Different shapes
of anti-creepers
are available and
are fixed to the
foot of rail.
Let's see how the rail ties and how to
make different parts of it…
CONCLUSIONS
At present, scholars have proposed a variety of algorithms for the processing of 3D
visual measurement data, but they are not very versatile, the algorithms are highly
correlated with the characteristics of the measured objects, and the related
theoretical algorithms are not fully studied. In this context, this article uses the
increased third-dimensional data to obtain more information about the measured
object, reduce data deviation, improve measurement accuracy, and improve the
accuracy of the state evaluation of critical track components. Analysis and research
of 3D visual measurement data. We make full use of the two-dimensional intensity
and three-dimensional depth multi-source information obtained by the structured
light three-dimensional sensor, combine the advantages of the data, and propose
an automatic detection algorithm for fasteners and nuts (bolts) combined with
multi-source data. Firstly, the position of the fastener is located using the dynamic
template matching method from the two-dimensional intensity map, and then the
watershed algorithm is used to segment the nut and bolt objects in the
corresponding three-dimensional depth map. Finally, based on the location and
geometric prior information of the track facility, we designed a model for detecting
the tightness of rail fasteners. The experimental results show that the detection
method proposed in this paper can effectively detect the abnormal state of the
fastener being too loose or too tight, and the detection rate reaches more than 90%,
and the automatic detection of the fastener tightness is basically realized.
REFERENCES
 M. Altuntas, “Elevator Guide Rail Anchor Elements Experimental Stress Analysis”
MSc. Thesis, Istanbul Technical University, Turkey, 2012.
 S. Atay, “Experimental Stress Analysis of Complete Rail Fastening Systems” MSc.
Thesis, Istanbul Technical University, Turkey, 2013.
 S. Atay, E. Kayaoglu, A. Candas, C. E. Imrak, S. Targıt, Y.Z. Kocabal
“Determination of Loads Acting on Guide Rail Fixing under Certain Loading
Condition” ELEVCON 20th International Congress on Vertical Transportation
Technologies, pp.85-92 (2014).
 BS A 305, 1994. Bolt Testing Method, British Standard Institute, London.
 M. Altuntas, O. Salman, C. E. Imrak “Experimental stress analysis of elevator
guiding equipment”. Key Engineering Materials, Vol.572, pp. 177-180 (2014).
 M. Merz, “Practical stress behaviour of complete rail fastening systems”.
ELEVATION Vol. 68, p56-62 (2010).
 M. Merz, “Practical stress detection on rail anchors”. Hilti Corporation, ELEVCON
The 17th International Congress on Vertical Transportation Technologies,
Thessaloniki, 268-277 (2008).
Thank You
See you again any other class and
any other presentation.
End

More Related Content

What's hot

Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)RAMPRASAD KUMAWAT
 
Creep of Rails.pdf
Creep of Rails.pdfCreep of Rails.pdf
Creep of Rails.pdfTVijayaGowri
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)RAMPRASAD KUMAWAT
 
Rail Joints
Rail JointsRail Joints
Rail JointsSine19
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfTURUMELLAVIJAYAGOWRI
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)RAMPRASAD KUMAWAT
 
Station and Yards in Indian Railway
Station and Yards in Indian RailwayStation and Yards in Indian Railway
Station and Yards in Indian RailwayArbaz Kazi
 
About Bridge pier.
About Bridge pier.About Bridge pier.
About Bridge pier.Tajul Islam
 
Sleepers and Ballast
Sleepers and Ballast Sleepers and Ballast
Sleepers and Ballast T.Naga Anusha
 
5.track or permanent way and track stresses
5.track or permanent way and track stresses5.track or permanent way and track stresses
5.track or permanent way and track stressesMani Vel
 
Point and crossing of railway
Point and crossing of railwayPoint and crossing of railway
Point and crossing of railwayRAMPRASAD KUMAWAT
 
Fittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdfFittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdfTVijayaGowri
 
Rail gauges & rail sections Railway Engineering
Rail gauges & rail sections  Railway EngineeringRail gauges & rail sections  Railway Engineering
Rail gauges & rail sections Railway EngineeringLatif Hyder Wadho
 
Basic components and parts of bridge structures
Basic components and parts of bridge structuresBasic components and parts of bridge structures
Basic components and parts of bridge structuresMuhammad Qasim Jameel
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossingshiranrathva
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineeringPooja Lonare
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineeringHalcrow
 

What's hot (20)

Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
 
Bridge pier
Bridge pierBridge pier
Bridge pier
 
Classification of bridges
Classification of bridgesClassification of bridges
Classification of bridges
 
Creep of Rails.pdf
Creep of Rails.pdfCreep of Rails.pdf
Creep of Rails.pdf
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
 
Rail Joints
Rail JointsRail Joints
Rail Joints
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdf
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
 
Station and Yards in Indian Railway
Station and Yards in Indian RailwayStation and Yards in Indian Railway
Station and Yards in Indian Railway
 
About Bridge pier.
About Bridge pier.About Bridge pier.
About Bridge pier.
 
Sleepers and Ballast
Sleepers and Ballast Sleepers and Ballast
Sleepers and Ballast
 
5.track or permanent way and track stresses
5.track or permanent way and track stresses5.track or permanent way and track stresses
5.track or permanent way and track stresses
 
Point and crossing of railway
Point and crossing of railwayPoint and crossing of railway
Point and crossing of railway
 
Fittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdfFittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdf
 
Rail gauges & rail sections Railway Engineering
Rail gauges & rail sections  Railway EngineeringRail gauges & rail sections  Railway Engineering
Rail gauges & rail sections Railway Engineering
 
Basic components and parts of bridge structures
Basic components and parts of bridge structuresBasic components and parts of bridge structures
Basic components and parts of bridge structures
 
Railway Gauge
Railway GaugeRailway Gauge
Railway Gauge
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineering
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineering
 

Similar to Rails fastening.

railway failure and its type
railway failure and its typerailway failure and its type
railway failure and its typeYash Patel
 
Railway and highways, Airways material.pptx
Railway and highways, Airways material.pptxRailway and highways, Airways material.pptx
Railway and highways, Airways material.pptxRajuyadav437367
 
Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionBathla Tuition Centre
 
Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptxPlace and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptxCanberra Institute of technology
 
Railway Planning - Unit 1
Railway Planning - Unit 1Railway Planning - Unit 1
Railway Planning - Unit 1Arun G
 
ELEMENTS OF RAILWAY TRACKS.ppt
ELEMENTS OF RAILWAY TRACKS.pptELEMENTS OF RAILWAY TRACKS.ppt
ELEMENTS OF RAILWAY TRACKS.pptUmairAhmad155867
 
Chapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent wayChapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent waydhara dattani
 
COMBINATION ANCHORAGE TECHNIQUE / dental crown & bridge courses
COMBINATION ANCHORAGE TECHNIQUE / dental crown & bridge coursesCOMBINATION ANCHORAGE TECHNIQUE / dental crown & bridge courses
COMBINATION ANCHORAGE TECHNIQUE / dental crown & bridge coursesIndian dental academy
 
COMBINATION ANCHORAGE TECHNIQUE / dental crown & bridge courses
COMBINATION ANCHORAGE TECHNIQUE / dental crown & bridge coursesCOMBINATION ANCHORAGE TECHNIQUE / dental crown & bridge courses
COMBINATION ANCHORAGE TECHNIQUE / dental crown & bridge coursesIndian dental academy
 
Components of begg appliance /certified fixed orthodontic courses by Indian d...
Components of begg appliance /certified fixed orthodontic courses by Indian d...Components of begg appliance /certified fixed orthodontic courses by Indian d...
Components of begg appliance /certified fixed orthodontic courses by Indian d...Indian dental academy
 
Building construction 4- steel connection, Trusses, Joints, Foundations
Building construction 4- steel connection, Trusses, Joints, FoundationsBuilding construction 4- steel connection, Trusses, Joints, Foundations
Building construction 4- steel connection, Trusses, Joints, Foundationsaayush koolwal
 
SLEEPERS - RAILWAY ENGINEERING
SLEEPERS - RAILWAY ENGINEERINGSLEEPERS - RAILWAY ENGINEERING
SLEEPERS - RAILWAY ENGINEERINGKrishnendu Biswas
 
Lintech round rail_components_catalog
Lintech round rail_components_catalogLintech round rail_components_catalog
Lintech round rail_components_catalogElectromate
 

Similar to Rails fastening. (20)

railway failure and its type
railway failure and its typerailway failure and its type
railway failure and its type
 
brackets
bracketsbrackets
brackets
 
Railway and highways, Airways material.pptx
Railway and highways, Airways material.pptxRailway and highways, Airways material.pptx
Railway and highways, Airways material.pptx
 
Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic Introduction
 
Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptxPlace and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
 
Railway Planning - Unit 1
Railway Planning - Unit 1Railway Planning - Unit 1
Railway Planning - Unit 1
 
ELEMENTS OF RAILWAY TRACKS.ppt
ELEMENTS OF RAILWAY TRACKS.pptELEMENTS OF RAILWAY TRACKS.ppt
ELEMENTS OF RAILWAY TRACKS.ppt
 
Chapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent wayChapter 1 introductution to railway and permanent way
Chapter 1 introductution to railway and permanent way
 
COMBINATION ANCHORAGE TECHNIQUE / dental crown & bridge courses
COMBINATION ANCHORAGE TECHNIQUE / dental crown & bridge coursesCOMBINATION ANCHORAGE TECHNIQUE / dental crown & bridge courses
COMBINATION ANCHORAGE TECHNIQUE / dental crown & bridge courses
 
COMBINATION ANCHORAGE TECHNIQUE / dental crown & bridge courses
COMBINATION ANCHORAGE TECHNIQUE / dental crown & bridge coursesCOMBINATION ANCHORAGE TECHNIQUE / dental crown & bridge courses
COMBINATION ANCHORAGE TECHNIQUE / dental crown & bridge courses
 
Components of begg appliance /certified fixed orthodontic courses by Indian d...
Components of begg appliance /certified fixed orthodontic courses by Indian d...Components of begg appliance /certified fixed orthodontic courses by Indian d...
Components of begg appliance /certified fixed orthodontic courses by Indian d...
 
Building construction 4- steel connection, Trusses, Joints, Foundations
Building construction 4- steel connection, Trusses, Joints, FoundationsBuilding construction 4- steel connection, Trusses, Joints, Foundations
Building construction 4- steel connection, Trusses, Joints, Foundations
 
C a t presentation
C a t presentationC a t presentation
C a t presentation
 
Combination anchorage technique (2)
Combination anchorage technique (2)Combination anchorage technique (2)
Combination anchorage technique (2)
 
C a t presentation
C a t presentationC a t presentation
C a t presentation
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
SLEEPERS - RAILWAY ENGINEERING
SLEEPERS - RAILWAY ENGINEERINGSLEEPERS - RAILWAY ENGINEERING
SLEEPERS - RAILWAY ENGINEERING
 
Flat belt pulleys
Flat belt pulleysFlat belt pulleys
Flat belt pulleys
 
Lintech round rail_components_catalog
Lintech round rail_components_catalogLintech round rail_components_catalog
Lintech round rail_components_catalog
 
Orthodontic brackets
Orthodontic bracketsOrthodontic brackets
Orthodontic brackets
 

More from World Of Engineers Consultant.

More from World Of Engineers Consultant. (10)

Structural mechanics civil, class 02
Structural mechanics   civil, class 02Structural mechanics   civil, class 02
Structural mechanics civil, class 02
 
Structural mechanics civil, class 01
Structural mechanics   civil, class 01Structural mechanics   civil, class 01
Structural mechanics civil, class 01
 
Solve this problem on the solution of this ror ( rate of return ) problem
Solve this problem on the solution of this ror ( rate of return ) problemSolve this problem on the solution of this ror ( rate of return ) problem
Solve this problem on the solution of this ror ( rate of return ) problem
 
Solve this problem on the solution of this ror ( rate of return ) problem
Solve this problem on the solution of this ror ( rate of return ) problemSolve this problem on the solution of this ror ( rate of return ) problem
Solve this problem on the solution of this ror ( rate of return ) problem
 
Explain any tube system and structural configuration of a building having tha...
Explain any tube system and structural configuration of a building having tha...Explain any tube system and structural configuration of a building having tha...
Explain any tube system and structural configuration of a building having tha...
 
Explain any tube system and structural configuration of a building having tha...
Explain any tube system and structural configuration of a building having tha...Explain any tube system and structural configuration of a building having tha...
Explain any tube system and structural configuration of a building having tha...
 
Water logging
Water loggingWater logging
Water logging
 
Water logging
Water loggingWater logging
Water logging
 
Disposal method of industrial waste water.
Disposal method of industrial waste water.Disposal method of industrial waste water.
Disposal method of industrial waste water.
 
Disposal method of industrial waste water.
Disposal method of industrial waste water.Disposal method of industrial waste water.
Disposal method of industrial waste water.
 

Recently uploaded

6 ways Samsung’s Interactive Display powered by Android changes the classroom
6 ways Samsung’s Interactive Display powered by Android changes the classroom6 ways Samsung’s Interactive Display powered by Android changes the classroom
6 ways Samsung’s Interactive Display powered by Android changes the classroomSamsung Business USA
 
How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17Celine George
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxkarenfajardo43
 
An Overview of the Calendar App in Odoo 17 ERP
An Overview of the Calendar App in Odoo 17 ERPAn Overview of the Calendar App in Odoo 17 ERP
An Overview of the Calendar App in Odoo 17 ERPCeline George
 
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...Nguyen Thanh Tu Collection
 
DiskStorage_BasicFileStructuresandHashing.pdf
DiskStorage_BasicFileStructuresandHashing.pdfDiskStorage_BasicFileStructuresandHashing.pdf
DiskStorage_BasicFileStructuresandHashing.pdfChristalin Nelson
 
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFEPART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFEMISSRITIMABIOLOGYEXP
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
DBMSArchitecture_QueryProcessingandOptimization.pdf
DBMSArchitecture_QueryProcessingandOptimization.pdfDBMSArchitecture_QueryProcessingandOptimization.pdf
DBMSArchitecture_QueryProcessingandOptimization.pdfChristalin Nelson
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6Vanessa Camilleri
 
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...Osopher
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxSayali Powar
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research DiscourseAnita GoswamiGiri
 
4.9.24 Social Capital and Social Exclusion.pptx
4.9.24 Social Capital and Social Exclusion.pptx4.9.24 Social Capital and Social Exclusion.pptx
4.9.24 Social Capital and Social Exclusion.pptxmary850239
 
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDhatriParmar
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdfMr Bounab Samir
 

Recently uploaded (20)

6 ways Samsung’s Interactive Display powered by Android changes the classroom
6 ways Samsung’s Interactive Display powered by Android changes the classroom6 ways Samsung’s Interactive Display powered by Android changes the classroom
6 ways Samsung’s Interactive Display powered by Android changes the classroom
 
How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17How to Manage Buy 3 Get 1 Free in Odoo 17
How to Manage Buy 3 Get 1 Free in Odoo 17
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
 
An Overview of the Calendar App in Odoo 17 ERP
An Overview of the Calendar App in Odoo 17 ERPAn Overview of the Calendar App in Odoo 17 ERP
An Overview of the Calendar App in Odoo 17 ERP
 
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
 
DiskStorage_BasicFileStructuresandHashing.pdf
DiskStorage_BasicFileStructuresandHashing.pdfDiskStorage_BasicFileStructuresandHashing.pdf
DiskStorage_BasicFileStructuresandHashing.pdf
 
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFEPART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
DBMSArchitecture_QueryProcessingandOptimization.pdf
DBMSArchitecture_QueryProcessingandOptimization.pdfDBMSArchitecture_QueryProcessingandOptimization.pdf
DBMSArchitecture_QueryProcessingandOptimization.pdf
 
Introduction to Research ,Need for research, Need for design of Experiments, ...
Introduction to Research ,Need for research, Need for design of Experiments, ...Introduction to Research ,Need for research, Need for design of Experiments, ...
Introduction to Research ,Need for research, Need for design of Experiments, ...
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6
 
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
 
Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research Discourse
 
Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...
Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...
Plagiarism,forms,understand about plagiarism,avoid plagiarism,key significanc...
 
4.9.24 Social Capital and Social Exclusion.pptx
4.9.24 Social Capital and Social Exclusion.pptx4.9.24 Social Capital and Social Exclusion.pptx
4.9.24 Social Capital and Social Exclusion.pptx
 
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
 
prashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Professionprashanth updated resume 2024 for Teaching Profession
prashanth updated resume 2024 for Teaching Profession
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdf
 

Rails fastening.

  • 1. My Presentation Topic Name Is – Rails Fastening Name : Mohammad Khasrul Alam ID No. : 003-18-23 Batch No. : CE-21 Department Of Civil Engineering Southern University Bangladesh. . Submitted To: Hasina Iasmin Assistant Professor Southern University Bangladesh
  • 2. Index What we can learn from that presentation :  Fixtures And Fastenings  Rail Fixtures & Fastening Figure  Types Of Fixtures & Fastening  Fish Plates, Fish Plates Figures  Requirements Of Fish Plates  Bearing Plates, Bearing Plate Figure, Function Of Bearing Plate  Advantages And Disadvantages Of Fixtures And Fastenings  Spikes, Dog Spikes, Round Spikes, Screw Spikes, Elastic Spikes  Requirements Of A Good Spike  Bolts, Fish Bolts, Hook Bolts, Fang Bolts  Keys, Wooden Keys, Metal Keys  Anti-creepers  Let's See How The Rail Ties And How To Make Different Parts Of It…  End
  • 3. FIXTURES AND FASTENINGS Fixtures and fastenings are fittings requires for joining of rails end to end and also for fixing the rails to sleepers in a track.
  • 4. RAIL FIXTURES & FASTENING FIGURE
  • 5. TYPES OF FIXTURES & FASTENING Rail fastening system is a means of fixing rails to sleepers. Used to keep rails in proper position Important fittings are:  FISH PLATES  SPIKES  BOLTS  KEYS  PLATES
  • 6. FISH PLATES  Fish plates are used in rail joints to maintain the continuity of the rails.  Two types of fish plates are commonly used on Indian Railways for joining F.F. and B.H. rails, each fish plate is 457 mm long and provided with four holes 32 mm at a spacing of 114 mm c/c.  These are manufactured of steel and are so designed that they fit in between the head and foot of the rail.
  • 8. REQUIREMENTS OF FISH PLATES  They should hold the adjoining ends of rails in correct horizontal and vertical plane.  They should allow free longitudinal movements of rails due to temperature variation.  They should be able to resist all types of wear.  They should be able to bear the vertical and lateral stresses which come at joints without any distortion.  They should allow easy renewal and replacement of rails in case of wear and damage
  • 9. BEARING PLATES  Bearing plates are cast iron or steel plates placed in between the F.F rail and wooden sleepers of a railway track.  F.F. rails if fixed directly on wooden sleepers sink in the sleeper due to the heavy loads of trains and thus loosen the spikes.  To overcome this difficulty bearing plates are used under F.F. rails to distribute the load over a wider area and bring the intensity of pressure within limit.  Bearing plates give the required 1 in 20 inward slope to the rail directly and no adzing is required in the wooden sleeper.  These are fixed to sleepers by spikes.
  • 11. FUNCTION OF BEARING PLATE  To prevent sinking of rail in wooden sleeper  To distribute the load uniformly  To enable the spike to be held tight  To prevent shifting of rail  To eliminate adding of wooden sleeper  To maintain gauge when bearing plate are used  To achieve economy
  • 12. ADVANTAGES Following are the advantages of bearing plates: (i) They distribute the loads to wider area and prevent sinking of the rail to the sleeper. (ii) They avoid adzing of sleepers. (iii) They enable the spikes to remain tight and require less maintenance. (iv) Bearing plates prevent the widening of gauge on curves. (v) Bearing plates increase the overall stability of the track. (vi) They prevent the destruction of the sleeper due to rubbing action of the rail.
  • 13. DISADVANTAGES Following are the disadvantages of bearing plates: (i) When the bearing plates become loose due to settlement of ballast, moisture is likely to enter between the sleepers and plates, causing sleepers to wear. (ii) When any spike is damaged and it is required to be redriven at another place, all other spikes of the bearing plates have to be removed, which will reduce the holding power of the spikes.
  • 14. SPIKES Spikes are used to fix rails to wooden sleepers. Spikes are of following types:  Dog spikes  Round spikes  Screw spikes  Elastic spik
  • 15. DOG SPIKES  Dog spikes are the cheaper type of spikes which hold the rails at correct gauge and can be easily fixed and removed.  These are commonly used for holding F.F. rails.  Four dog spikes are used per sleeper, two on either side of the rail.  The disadvantage of dog spikes is that these become loose under the wave action caused by the moving train.
  • 16. ROUND SPIKES  Round spikes are used for fixing chairs of B.H. rails to wooden sleepers and also for fixing slide chairs of points and crossings.  These have either cylindrical or hemispherical head and blunt end.
  • 17. SCREW SPIKES  Screw spikes are tapered screws with V-threads.  Their head is circular with a square projection and are used to fasten rails with wooden sleepers.  The holding power of these spikes is more than double to that of dog spikes and can resist the lateral thrust better than the dog spikes
  • 18. ELASTIC SPIKES  Elastic spikes are used for fixing F.F. rails to wooden sleepers.  These give better grip and result in reduction of wear and tear of rail.  The advantage of this type of spike is that it is not pulled up by the wave action of the moving train.
  • 19. REQUIREMENTS OF A GOOD SPIKE  It should be easy in fixing or removing from the sleepers.  It should hold the rails and bearing plates in proper position.  It should be cheap.  It should require minimum maintenance.  It should not come out of the sleepers under vibrations.
  • 20. BOLTS Different types of bolts used in Indian Railway are described below:- FISH BOLTS HOOK BOLTS FANG BOLTS
  • 21. FISH BOLTS  Fish bolts are used for connecting fish plates with the rails.  Four bolts are required for each pair of fish plates.  These bolts are inserted from outside the track and bolted on the inside of the track.  Fish bolts have to withstand shear due to heavy transverse stresses, hence they are manufactured of medium or high carbon steel.  The length of fish bolt depends on the type of fish plate used.  For 44.70kg rail, the fish bolts of 25 mm dia and 127.6 mm length are used.  These bolts get loosened due to vibration of moving train and hence these are to be tightened time to time.  Too much tightening of bolts is prohibited as it prevents free expansion or contraction of rails due to temperature vibrations.
  • 22. HOOK BOLTS  Hook bolts are also known as dog bolts due to the shape of their heads. These bolts are used to fix sleepers which rest directly on a girder.  Two bolts per sleeper are used.  Dog bolts are of two types.  (i) Sloping lips- for fixing sleepers to plate girder spans.  (ii) Straight lips- for fixing sleepers to joist spans
  • 23. FANG BOLTS  Fang bolts are used for fixing side chairs to sleepers.  These are alternative to screw or round spikes.  The fang bolts are found to be more effective but are not generally used, because fixing and removal of these bolts are difficult.
  • 24. KEYS  These are small tapered pieces of timber or steel used to fix rails to chairs on metal sleepers.  Keys are of two types  Wooden keys  Metal keys
  • 25. WOODEN KEYS  Wooden keys are small straight or tapered pieces of timber.  These are cheap and Easily prepared.  These are not strong and become loose under vibrations.  These require frequent maintenance.  Wooden keys are not used now-a days in  Indian Railways.
  • 26. METAL KEYS  Metal keys are small tapered or spring like pieces of steel.  These keys are much more durable than wooden keys.  Metal keys are of two types.  Stuart`s key and  Morgan key
  • 27. ANTI-CREEPERS  Anti-creepers are used to prevent creep in a railway track.  Different shapes of anti-creepers are available and are fixed to the foot of rail.
  • 28. Let's see how the rail ties and how to make different parts of it…
  • 29. CONCLUSIONS At present, scholars have proposed a variety of algorithms for the processing of 3D visual measurement data, but they are not very versatile, the algorithms are highly correlated with the characteristics of the measured objects, and the related theoretical algorithms are not fully studied. In this context, this article uses the increased third-dimensional data to obtain more information about the measured object, reduce data deviation, improve measurement accuracy, and improve the accuracy of the state evaluation of critical track components. Analysis and research of 3D visual measurement data. We make full use of the two-dimensional intensity and three-dimensional depth multi-source information obtained by the structured light three-dimensional sensor, combine the advantages of the data, and propose an automatic detection algorithm for fasteners and nuts (bolts) combined with multi-source data. Firstly, the position of the fastener is located using the dynamic template matching method from the two-dimensional intensity map, and then the watershed algorithm is used to segment the nut and bolt objects in the corresponding three-dimensional depth map. Finally, based on the location and geometric prior information of the track facility, we designed a model for detecting the tightness of rail fasteners. The experimental results show that the detection method proposed in this paper can effectively detect the abnormal state of the fastener being too loose or too tight, and the detection rate reaches more than 90%, and the automatic detection of the fastener tightness is basically realized.
  • 30. REFERENCES  M. Altuntas, “Elevator Guide Rail Anchor Elements Experimental Stress Analysis” MSc. Thesis, Istanbul Technical University, Turkey, 2012.  S. Atay, “Experimental Stress Analysis of Complete Rail Fastening Systems” MSc. Thesis, Istanbul Technical University, Turkey, 2013.  S. Atay, E. Kayaoglu, A. Candas, C. E. Imrak, S. Targıt, Y.Z. Kocabal “Determination of Loads Acting on Guide Rail Fixing under Certain Loading Condition” ELEVCON 20th International Congress on Vertical Transportation Technologies, pp.85-92 (2014).  BS A 305, 1994. Bolt Testing Method, British Standard Institute, London.  M. Altuntas, O. Salman, C. E. Imrak “Experimental stress analysis of elevator guiding equipment”. Key Engineering Materials, Vol.572, pp. 177-180 (2014).  M. Merz, “Practical stress behaviour of complete rail fastening systems”. ELEVATION Vol. 68, p56-62 (2010).  M. Merz, “Practical stress detection on rail anchors”. Hilti Corporation, ELEVCON The 17th International Congress on Vertical Transportation Technologies, Thessaloniki, 268-277 (2008).
  • 31. Thank You See you again any other class and any other presentation. End