SlideShare a Scribd company logo
1 of 64
Drilling technics
and technology
2018
Agenda:
• Rig Types
• Rig Components
• Drilling personnel
• Drill String Components
Movable by Trucks as parts
or a Piece
- Variable Sizes and
Capacities
Rig Types:
• Onshore Rig
• Offshore Rig
Land Rig:
Offshore rigs:
Jack-Up
Semi-
Submersib
le
Drill Ship Platform
Jack-up rig:
- 600ft (183m) depth of
Water
- Movable by Boats
- stand on 3 or more Legs
& Hull
- Jacked up and down to
allow Settling or
Movement
1ft = 0.3048 m
Semi-Submersible
rig:
-600-4000ft (183-1219m)
depth of Water
- Movable by Floating &
Towing by Boats, Fixed by
Chains & Anchor
- composed of 4-6 Legs
supported by Pontoons
- Known as THE
ELEPHANT
Drill Ship:
- Deep Marine
- Offer greater Mobility
but not well fixed like
others thru Drilling
- Fixed by Anchors
Platform:
- 9000ft (2743m) Depth of
Water
- Drilling, Production and
Storage
- Built of Steel and
Concrete
- drill several wells in the
same time
Rig Components:
Rig Components:
Hoisting
System
Rotational
system
Circulation
System
BOP
Power
System
1- Hoisting System:
1- Hoisting System:
1- Hoisting System:
Rotary table Travelling block & hook
1- Hoisting System:
Deadline anchor
Drawworks
Swivel
Equipment required for handling:
1- Slips: devices to hold the weight of drill string when it
isn’t supported by the hook
Equipment required for
handling:
3- Elevators: hung from the hook
by links and are used for latching
around the drill pipe to lift it.
2- Links: hold the Elevators
Equipment required for handling:
5- Spinning Wrench: used for rapidly
spinning out or spinning in the drill pipe
when breaking out or making up the pipe.
4- Tongs: used in make up or break out
manually connection between two stands
2- Circulation System:
Active Tanks Pumps
Swivel
Stand Pipe
Drill String
Rotary Hose
gooseneck
Suction
annulus
Flow Line
Shale Shaker
Sand Trap
Waste pool
Possum Belly
Centrifuge Desilter Desander
Bellnipple
2- Circulation System:
Tanks:
1- Active ( Suction ): connected directly to Pumps.
2- Trip: small tank connected to hole while tripping.
4- sand trap: directly under shale shaker receiving filtrated pure mud.
Pumps:
2 types
- Duplex: double acting – old fashion
- Triplex: single acting with 3 pistons
Stand Pipe: steel pipe mounted vertically on rig floor, allows mud to
move from the mud lines coming out from the mud pump to the
rotary hose.
rotary hose: rubber hose connecting between standpipe and a
gooseneck in the swivel.
Swivel: hanged from the hook, allow passage of mud to string,
allow rotation of string while it is fixed and help in carrying
weight of string
Annulus: space
between drill string
and the hole
Drill bit
Flow Line: pipe connecting hole to mud pits through possum
belly
Possum Belly: very small tank, receive mud from flow line and
pour onto shale shaker, where degasser is placed
Shale shaker: vibrating screen used to separate mud fluid from
cuttings
Desander & Desilter: device that used to remove particles from the mud
that haven’t removed by shale shaker by centrifugal force
Desander Desilter
30
Centrifuge: device used to clear mud from small particles
1 2
1- Rig’s Degasser: a device that removes the gas from the mud before it is re-
circulated down the hole, installed upon tank getting mud from it release gases
then pour it back.
2- Mixing hopper: Powdered chemicals and solids needed by the mud are
added using the mixing hopper.
3- Waste pool: large hole where waste and cuttings are dumped
3- Rotational System:
a- Kelly System:
- Old fashion
- Mechanism: rotary table turns by action of its own motor cause
rotation of master bushing that turns Kelly bushing which turns
Kelly which cause rotation of drill string.
- Due to kelly length (12 m) only one joint could be added
(max. 2 joints / connection)
- String cannot be rotated while being lifted.
-Kelly: the topmost joint in the drill string and is 40-45 feet in
length, It is commonly square or hexagonal.
- Outside swivel
3- Rotational System:
3- Rotational System:
Kelly
Drive bushing
Master bushing
Rotary table
Drive bushing=kelly bushing
3- Rotational System:
a- Kelly System:
- Old fashion
- Mechanism: rotary table turns by action of its own motor cause
rotation of master bushing that turns Kelly bushing which turns
Kelly which cause rotation of drill string.
- Due to kelly length (12 m) only one joint could be added ( max.
2 joints / connection)
- String cannot be rotated while being lifted.
-Kelly: the topmost joint in the drill string and is 40-45 feet in
length, It is commonly square or hexagonal.
- Outside swivel
3- Rotational System:
Rotary table
Kelly
Kelly bushing
3- Rotational System:
b- Top Drive System (TDS):
- Allow fewer connections
where it connect stand by stand
(30 m) in one connection
- Contain its own swivel
assembly
- Allow rotation while
lifting ( back reaming )
4- Blow Out Preventer System (BOP):
Consists of:
Annular Preventer: rubber sealing element which, when pressure is applied,
closes around the drill pipe or Kelly (close the annulus) or even can close the
open hole.
the annular preventer can be made to close on any size or type of drill pipe,
rated for surface pressure up to 5000 psi
Ram Preventers rated for pressure up to 15000 psi, only seal around a specific
pipe size
Pipe Rams: These have a rubber face molded to fit around a certain size of drill
pipe, cannot close an open hole.
Blind Rams: These are hydraulic rams which will close and completely close
off the borehole, can close an open hole.
Shear Rams: have specially designed cutting structures, which when closed on
drill pipe, will cut through the drill pipe and completely close off the borehole.
- The Hydraulic Press. Used to close BOP is generated from the Accumulators
that contain high press Nitrogen, in case of emergency BOP could closed
manually but only in Land rigs & Jack Up
1psi=0,068atm
4- Blow Out Preventer System (BOP):
4- Blow Out Preventer System (BOP):
4- Blow Out Preventer System (BOP):
4- Blow Out Preventer System (BOP):
Accumulator
BOP control panel
Well control:
- Kick: an entry of other formation fluid into the wellbore ( influx of Fm.
Fluid into hole )
- Blow out: uncontrolled flow of formation fluid ( uncontrolled kick )
In case of kick occurring:
1- close the well by one of BOP rams
2- the mud saturated with gases in the hole must be circulated out the hole
- Choke Manifold: a series of valves, gauges and lines that controls the
rate of flow from the well when the blowout preventers are closed, When
the well is shut in, mud circulated through the choke manifold, The flow
is diverted from the flow line or choke manifold to the mud-gas separator.
The separator releases the gas that is then carried by the vent line at the
top to a remote flare.
- Mud Gas Separator: separates the flammable gas from the mud so that
the gas can be
flared off at a safe distance from the rig.
-- Drilling Spool: choke line and kill line is connected to it.
-- Kill Line: line used in case of killing the well by adding high viscous
mud to settle gases down.
Mud Gas
Separator
Choke
manifold
Personnel: Drilling Crew
Company Man: representative of
Exploration Company, managing rig
Operations according to Company
Program
Well Site Geologist: representative of
Exploration Company defining Formation
Tops, Casing Points and supervise Wire
Line Logging, Coring, MWD, Mud Logging
describing Cuttings...etc.
Mud Engineer: service Engineer responsible
for make and assure qualifications of Mud
Prosperities as required along the Hole
according to Mud Plan.
Mud Logger: Service Engineer responsible
for supervisory of all drilling parameters
and record Gas Readings
MWD/LWD: Service Engineer responsible for
record Tool(Gamma, Neutron..etc.), angle
& Azimuth Reading along the Hole.
DD: Service Engineer responsible for Deviated
Drilling Directions and perform these
directions according to Directional Plan
Tool Pusher: the man in charge of the rig
and overall drilling operations.
Driller: in charge of Drilling, perform
Drilling Machinery.
Assistant Driller: in charge of Drilling in
absence of Driller & measure Pipes
Lengths in use.
Derrick-man: in case of absence of ass.
Driller he is in charge, he works on the
Monkey Board handling Stands during
Tripping.
Mud Tester: responsible for mixing and
adding mud
Floor-man: (roughneck)is responsible for
handling the drill pipe during connections
or trips.
Roustabout: handle the equipment and
supplies that are constantly being supplied
to the rig.
Crane Operator // Mechanic // Electrician
Drill String Components:
1- Bit 5- Jar
2- Drill Collar 6- Stabilizer
3- Heavy Weight Drill Pipes 7- Bit Sub
4- Drill Pipes 8- Mud Motor or Turbines
Drill Pipes (DP):
- Each length of drill pipe is approximately 30 to 31 feet long.
- A single drill pipe is called a joint, Each end of the joint is threaded, Box (a) and Pin(b).
- Every Three Connected Joints called Stand.
Bottom Hole Assembly (BHA):
- The entire drill string less the drill pipe.
- The functions of the BHA are:
- Protect the drill pipe from excessive bending and torsional loads
- Control the direction and inclination in directional holes
- Place weight on the drill bit
a b
Drill Collars
- heavy, thick-walled joints of pipe used just above the bit in the drilling string.
- They are approximately 30 feet long and heavier than drill pipes. The outside
diameter is larger than that of the DP
Drill collars are used to;
- Act as a pendulum to keep the hole straight.
- Maintain rigidity and keep the drill string in tension
- they may be Rounded or spiralled
- Spiral provide a passage for mud to exit so reduce
Probability of differential sticking.
Heavy Weight Drill Pipes (HWDP):
- They are drill pipes with a body weight that is 2-3 times greater than standard drill
pipe.
- Same OD of DP but smaller ID than DP
- Place weight on the drill bit.
- May be rounded or spiral too.
52
X X
- Stabilizers and Subs:
- The crossover sub is used to link different sizes and types of pipe.
- The shock sub is run behind the bit, absorb the impact of the bit bouncing on
hard formations.
- The stabilizer is a sub with “blades”. It has two functions:
- To keep the drill collars centered in the hole
- Maintain a full gauge hole
- The reamer is a sub that is run between the bit and drill collars to provide gauge hole while drilling in
hard formations.
- The bit sub is a short sub with a box on both ends. This allows the bit to be joined to the drill string.
- Hole Openers and under-reamers are tools that are run immediately above a bit to enlarge the hole
size.
where, Under-reamer arms opened by Mud Press. But Hole Opener Arms are Used Opened
- Bits:
4 Main Types;
a.Drag Bits
b.Roller cone or rock Bits
c.Diamond Bits
d.Polycrystalline diamond compact (PDC) Bits
e.Coring Bit
a.
b.
c.
54
55
Under-reamerHole Opener Reamer
- Positive displacement mud motor (PDM):
Spiral shaped steel rotor inside rounded rubber stator, used mainly in
directional drilling where it allows rotation of the bit with oriented
drill string in certain direction by help of bent sub.
- Turbine:
Consists of several stages, each made up of bladed rotors and
cylindrical stator
- Jar:
Involved in BHA, used in case of stuck to free the string by doing
kinetic action upward
- MWD Tool:
Used sometimes in case of azimuth measurements, rock petrophysical
properties are needed.
57
58
ic
59
Kinetic Energy (Energy in Motion)
Converts to Impacts Force
Drilling Jar
Operation
Translation of the terms used in the presentation into Azerbaijani
Glossary - Lüğət
61
Drag bit Pərli balta
Drawworks Bucurqad
Drill bit Qazıma baltası
Drill Collar (DC)
Ağırlaşdırılmış qazma
borusu
Drill Pipe (DP) Qazma borusu
Drill ship Qazıma gəmisi
Drill spool Qazıma makarası
Drill string Qazıma kəməri
Driller Qazmaçı
Drilling crew Qazıma briqadası
Drilling direction Qazıma istiqaməti
Drilling line Tal kanatı
Drilling mud or drilling Qazıma məhlulu, gilli
Drilling rig or rig Qazıma qurğusu
Drive bushing Kvadrat içliyi
Electrician Elektrik
Elevator Elevator (Qaldırcı)
Energy system Enerji sistemi
Fast line Kanatın hərəkətli ucu
Floor-man/ roustabout Fəhlə
Flow line Atqı xətti
Fluid Məhlul
Gooseneck “Qaz boğazı”
Heavy Weight Drill Pipe (HWDP)
Ağır Qazma Borusu
(AQB)
Hoisting system Qaldırıcı sistem
Hole Quyu lüləsi
Hole Opener Lülə açan
Hook Qarmaq
Inclination angle Zenit bucağı
Active tanks Aktiv tanklar
Annular preventer Həlqəvi preventor
Annulus Həlqəvi fəza
Assistant driller Qazmaçı köməkçisi
Azimuth İstiqamət
Bit sub Balta keçiricisi
Blind rams Kar plaşkalar
Blow Out Partlayış
Blow Out Preventer (BOP) Preventor
Bottom Hole Assembly
(BHA)
Qazma Kəmərinin Aşağı
Hissəsi (QKAH)
Brake lever Əyləc
Casing head Qoruyucu kəmər başlığı
Centrifuge Sentrifuqa
Choke line Ştuser xətti
Circulation system Sirkulyasiya sistemi
Company Man Şirkət nümayəndəsi
Conductor Konduktor (kəməri)
Core
Laydan götürülən süxur
nümunəsi
Coring bit Sütuncuqlu balta
Crane operator Kran operatoru
Crossover (XO) Diametr keçiricisi
Crown or crown block Kronblok(tərpənməzdir)
Dead line Kanatın hərəkətsiz ucu
Deadline anchor Lövbər
Derrick-man Yuxarı fəhlə
Desander Qum təmizləyici
Desilter Gil təmizləyici
Diamond bit Almaz balta
Dog house “İt damı”
62
Jack-up rig
Özüqalxan üzən qazıma
qurğusu
Jar/ Drilling jar Yas (яс)
Kelly Kvadrat (boru)
Kelly bushing Kvadrat içliyi
Kick Təzahür (neft/qaz/su)
Kill line Boğma xətti
Links Ştroplar
Logging While Drilling
(LWD)
Qazıma Zamanı Karotaj
(QZK)
Mast Qüllə
Master bushing Əsas içlik
Measuring While Drilling
(MWD)
Qazıma Zamanı Ölçmə
(QZÖ)
Mechanic Mexanik
Monkey board Verxovoy balkonu
Mud engineer Qazıma məhlulu mühəndisi
Mud logger
Qazıma məhlulu karotaj
mühəndisi
Mud tester Qazma məhlulunu yoxlayan
Personnel İşçi heyəti
Pipe rams Boru plaşkaları
Platform Platforma
Polycrystalline Diamond
Compact(PDC) bit Polikristallik Almaz balta
Positive Displacement Mud
Motor (PDM) Quyudibi qazma məhlulu motoru
Possum belly Ötürücü çən
Pump Nasos
Ram preventer Plaşkalı preventor
Reamer Genişləndirici
Roller cone bit/rock bit Şaroşkalı balta
Rotary hose Qazıma şlanqı
Rotary table Rotor stolu
Rotational system Fırladıcı sitem
Sand trap Qum tələsi
Semi-submersible rig
Yarımdalma üzən qazıma
qurğusu
Shale shaker Titrəyən ələk (rusca: vibrasita)
Shear rams Kəsici plaşkalar
Shock sub Amortizasiya keçiricisi
Slip Pazlı tutucu (Klin)
Spinning wrench Avtomat qazıma açarı
Stabiliser (Stab) Stabilizator
Stand of drill pipe Şamdan (rusca: Podsveçnik)
Stand pipe Dik boru
Sub Keçirici
Substructure Özül
Suction Sorma
Swivel Fırlanğıc
Tongs
Universal maşın açar ı (rusca: УМК
– UMK)
Tool pusher Baş qazıma ustası
Travelling block Tal bloku (tərpənəndir)
Turbine Turbin
Under-reamer Açılan genişləndirici
V-door Boruları qaldırmaq üçün körpü
Waste pool Tullantı hovuzu
Well control Quyuya nəzarət
Well site geologist Sahə geoloqu
team
Tarana Nasibli
Azerbaijan National Academy of Science
Research Engineer
63
Farida Ismayılova
BP
Drilling Geohazards Specialist
Our goals:
• Increasing materials in Azerbaijani
• Helping overcome English language
barrier
Follow “Engineers Change” accounts on Facebook,
Slideshare, Youtube or LinkedIn.
Drilling - Qazma English

More Related Content

What's hot

What's hot (20)

2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operations
 
Casing design
Casing designCasing design
Casing design
 
Drilling Problems.pdf
Drilling Problems.pdfDrilling Problems.pdf
Drilling Problems.pdf
 
Well Control
Well ControlWell Control
Well Control
 
Drilling - Qazma English
Drilling - Qazma EnglishDrilling - Qazma English
Drilling - Qazma English
 
Rig Operations & Equipment
Rig Operations & EquipmentRig Operations & Equipment
Rig Operations & Equipment
 
Well control intro presentation
Well control intro presentationWell control intro presentation
Well control intro presentation
 
Tubing string
Tubing stringTubing string
Tubing string
 
Drilling rigs and operations
Drilling rigs and operationsDrilling rigs and operations
Drilling rigs and operations
 
drilling operation
drilling operationdrilling operation
drilling operation
 
well control (1)
 well control (1) well control (1)
well control (1)
 
Drilling engineering zaidi
Drilling engineering zaidiDrilling engineering zaidi
Drilling engineering zaidi
 
RIG COMPONENTS - Definitions
RIG COMPONENTS - DefinitionsRIG COMPONENTS - Definitions
RIG COMPONENTS - Definitions
 
Problems during Drilling a Well
Problems during Drilling a WellProblems during Drilling a Well
Problems during Drilling a Well
 
Rotary drilling rig (onshore)
Rotary drilling rig (onshore)Rotary drilling rig (onshore)
Rotary drilling rig (onshore)
 
Rotary System
Rotary SystemRotary System
Rotary System
 
Drilling Mannual
Drilling MannualDrilling Mannual
Drilling Mannual
 
Drilling Operations
Drilling OperationsDrilling Operations
Drilling Operations
 
Rotary drilling rig systems overview
Rotary drilling rig  systems overview Rotary drilling rig  systems overview
Rotary drilling rig systems overview
 

Similar to Drilling - Qazma English

1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
ahmdrabymnswr
 
Comprehensive report on Tunneling @ Abu Hamour Project_Qatar
Comprehensive report on Tunneling @ Abu Hamour Project_QatarComprehensive report on Tunneling @ Abu Hamour Project_Qatar
Comprehensive report on Tunneling @ Abu Hamour Project_Qatar
Pallav Sharma
 
oil & gas drilling preliminaries
oil & gas drilling preliminariesoil & gas drilling preliminaries
oil & gas drilling preliminaries
Kartikeya Pandey
 

Similar to Drilling - Qazma English (20)

01_Rig Components & Personel.pdf
01_Rig Components & Personel.pdf01_Rig Components & Personel.pdf
01_Rig Components & Personel.pdf
 
Graduation Drilling Technology .pptx
Graduation  Drilling Technology .pptxGraduation  Drilling Technology .pptx
Graduation Drilling Technology .pptx
 
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh RajputDrilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
 
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
1.pptxjdhjdjdjdjdjdjjdjfbcbjdkjdhdjdjhdjdjdjd
 
Drilling and producing well
Drilling and  producing wellDrilling and  producing well
Drilling and producing well
 
Application of Horizontal Directional Drilling Machine in India and worldwide
Application of Horizontal Directional Drilling Machine in India and worldwideApplication of Horizontal Directional Drilling Machine in India and worldwide
Application of Horizontal Directional Drilling Machine in India and worldwide
 
Technical Features of Apollo HDD Machines In India and Worldwide
Technical Features of Apollo HDD Machines In India and WorldwideTechnical Features of Apollo HDD Machines In India and Worldwide
Technical Features of Apollo HDD Machines In India and Worldwide
 
176589.pptx.ppt
176589.pptx.ppt176589.pptx.ppt
176589.pptx.ppt
 
rotary drilling.pptx
rotary drilling.pptxrotary drilling.pptx
rotary drilling.pptx
 
Conventional shaft sinking by manual means
Conventional shaft sinking by manual meansConventional shaft sinking by manual means
Conventional shaft sinking by manual means
 
Rig Equipment Maintenance & Inspection.ppt
Rig Equipment Maintenance  & Inspection.pptRig Equipment Maintenance  & Inspection.ppt
Rig Equipment Maintenance & Inspection.ppt
 
Rig Equipment Maintenance & Inspection.ppt
Rig Equipment Maintenance  & Inspection.pptRig Equipment Maintenance  & Inspection.ppt
Rig Equipment Maintenance & Inspection.ppt
 
Drill String & Bottom Hole Assembly Design
Drill String & Bottom Hole Assembly DesignDrill String & Bottom Hole Assembly Design
Drill String & Bottom Hole Assembly Design
 
Trenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe InstallationsTrenchless Technologies for New Pipe Installations
Trenchless Technologies for New Pipe Installations
 
Presentation on Highwall Mining
Presentation on Highwall MiningPresentation on Highwall Mining
Presentation on Highwall Mining
 
7'' liner running and cementing
7'' liner running and cementing7'' liner running and cementing
7'' liner running and cementing
 
Comprehensive report on Tunneling @ Abu Hamour Project_Qatar
Comprehensive report on Tunneling @ Abu Hamour Project_QatarComprehensive report on Tunneling @ Abu Hamour Project_Qatar
Comprehensive report on Tunneling @ Abu Hamour Project_Qatar
 
oil & gas drilling preliminaries
oil & gas drilling preliminariesoil & gas drilling preliminaries
oil & gas drilling preliminaries
 
Drilling rig components ( illustrated glossary )
Drilling rig components ( illustrated glossary )Drilling rig components ( illustrated glossary )
Drilling rig components ( illustrated glossary )
 
Well intervention
Well  interventionWell  intervention
Well intervention
 

Recently uploaded

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 

Drilling - Qazma English

  • 2. Agenda: • Rig Types • Rig Components • Drilling personnel • Drill String Components
  • 3. Movable by Trucks as parts or a Piece - Variable Sizes and Capacities Rig Types: • Onshore Rig • Offshore Rig Land Rig:
  • 5. Jack-up rig: - 600ft (183m) depth of Water - Movable by Boats - stand on 3 or more Legs & Hull - Jacked up and down to allow Settling or Movement 1ft = 0.3048 m
  • 6. Semi-Submersible rig: -600-4000ft (183-1219m) depth of Water - Movable by Floating & Towing by Boats, Fixed by Chains & Anchor - composed of 4-6 Legs supported by Pontoons - Known as THE ELEPHANT
  • 7. Drill Ship: - Deep Marine - Offer greater Mobility but not well fixed like others thru Drilling - Fixed by Anchors
  • 8. Platform: - 9000ft (2743m) Depth of Water - Drilling, Production and Storage - Built of Steel and Concrete - drill several wells in the same time
  • 13. 1- Hoisting System: Rotary table Travelling block & hook
  • 14. 1- Hoisting System: Deadline anchor Drawworks Swivel
  • 15. Equipment required for handling: 1- Slips: devices to hold the weight of drill string when it isn’t supported by the hook
  • 16. Equipment required for handling: 3- Elevators: hung from the hook by links and are used for latching around the drill pipe to lift it. 2- Links: hold the Elevators
  • 17. Equipment required for handling: 5- Spinning Wrench: used for rapidly spinning out or spinning in the drill pipe when breaking out or making up the pipe. 4- Tongs: used in make up or break out manually connection between two stands
  • 18. 2- Circulation System: Active Tanks Pumps Swivel Stand Pipe Drill String Rotary Hose gooseneck Suction annulus Flow Line Shale Shaker Sand Trap Waste pool Possum Belly Centrifuge Desilter Desander Bellnipple
  • 20. Tanks: 1- Active ( Suction ): connected directly to Pumps. 2- Trip: small tank connected to hole while tripping. 4- sand trap: directly under shale shaker receiving filtrated pure mud.
  • 21. Pumps: 2 types - Duplex: double acting – old fashion - Triplex: single acting with 3 pistons
  • 22. Stand Pipe: steel pipe mounted vertically on rig floor, allows mud to move from the mud lines coming out from the mud pump to the rotary hose.
  • 23. rotary hose: rubber hose connecting between standpipe and a gooseneck in the swivel.
  • 24. Swivel: hanged from the hook, allow passage of mud to string, allow rotation of string while it is fixed and help in carrying weight of string
  • 25. Annulus: space between drill string and the hole Drill bit
  • 26. Flow Line: pipe connecting hole to mud pits through possum belly
  • 27. Possum Belly: very small tank, receive mud from flow line and pour onto shale shaker, where degasser is placed
  • 28. Shale shaker: vibrating screen used to separate mud fluid from cuttings
  • 29. Desander & Desilter: device that used to remove particles from the mud that haven’t removed by shale shaker by centrifugal force Desander Desilter
  • 30. 30
  • 31. Centrifuge: device used to clear mud from small particles
  • 32. 1 2 1- Rig’s Degasser: a device that removes the gas from the mud before it is re- circulated down the hole, installed upon tank getting mud from it release gases then pour it back. 2- Mixing hopper: Powdered chemicals and solids needed by the mud are added using the mixing hopper. 3- Waste pool: large hole where waste and cuttings are dumped
  • 33. 3- Rotational System: a- Kelly System: - Old fashion - Mechanism: rotary table turns by action of its own motor cause rotation of master bushing that turns Kelly bushing which turns Kelly which cause rotation of drill string. - Due to kelly length (12 m) only one joint could be added (max. 2 joints / connection) - String cannot be rotated while being lifted. -Kelly: the topmost joint in the drill string and is 40-45 feet in length, It is commonly square or hexagonal. - Outside swivel
  • 35. 3- Rotational System: Kelly Drive bushing Master bushing Rotary table Drive bushing=kelly bushing
  • 36. 3- Rotational System: a- Kelly System: - Old fashion - Mechanism: rotary table turns by action of its own motor cause rotation of master bushing that turns Kelly bushing which turns Kelly which cause rotation of drill string. - Due to kelly length (12 m) only one joint could be added ( max. 2 joints / connection) - String cannot be rotated while being lifted. -Kelly: the topmost joint in the drill string and is 40-45 feet in length, It is commonly square or hexagonal. - Outside swivel
  • 37. 3- Rotational System: Rotary table Kelly Kelly bushing
  • 38. 3- Rotational System: b- Top Drive System (TDS): - Allow fewer connections where it connect stand by stand (30 m) in one connection - Contain its own swivel assembly - Allow rotation while lifting ( back reaming )
  • 39. 4- Blow Out Preventer System (BOP): Consists of: Annular Preventer: rubber sealing element which, when pressure is applied, closes around the drill pipe or Kelly (close the annulus) or even can close the open hole. the annular preventer can be made to close on any size or type of drill pipe, rated for surface pressure up to 5000 psi Ram Preventers rated for pressure up to 15000 psi, only seal around a specific pipe size Pipe Rams: These have a rubber face molded to fit around a certain size of drill pipe, cannot close an open hole. Blind Rams: These are hydraulic rams which will close and completely close off the borehole, can close an open hole. Shear Rams: have specially designed cutting structures, which when closed on drill pipe, will cut through the drill pipe and completely close off the borehole. - The Hydraulic Press. Used to close BOP is generated from the Accumulators that contain high press Nitrogen, in case of emergency BOP could closed manually but only in Land rigs & Jack Up 1psi=0,068atm
  • 40. 4- Blow Out Preventer System (BOP):
  • 41. 4- Blow Out Preventer System (BOP):
  • 42. 4- Blow Out Preventer System (BOP):
  • 43. 4- Blow Out Preventer System (BOP): Accumulator BOP control panel
  • 44. Well control: - Kick: an entry of other formation fluid into the wellbore ( influx of Fm. Fluid into hole ) - Blow out: uncontrolled flow of formation fluid ( uncontrolled kick ) In case of kick occurring: 1- close the well by one of BOP rams 2- the mud saturated with gases in the hole must be circulated out the hole - Choke Manifold: a series of valves, gauges and lines that controls the rate of flow from the well when the blowout preventers are closed, When the well is shut in, mud circulated through the choke manifold, The flow is diverted from the flow line or choke manifold to the mud-gas separator. The separator releases the gas that is then carried by the vent line at the top to a remote flare. - Mud Gas Separator: separates the flammable gas from the mud so that the gas can be flared off at a safe distance from the rig. -- Drilling Spool: choke line and kill line is connected to it. -- Kill Line: line used in case of killing the well by adding high viscous mud to settle gases down.
  • 46. Personnel: Drilling Crew Company Man: representative of Exploration Company, managing rig Operations according to Company Program Well Site Geologist: representative of Exploration Company defining Formation Tops, Casing Points and supervise Wire Line Logging, Coring, MWD, Mud Logging describing Cuttings...etc. Mud Engineer: service Engineer responsible for make and assure qualifications of Mud Prosperities as required along the Hole according to Mud Plan. Mud Logger: Service Engineer responsible for supervisory of all drilling parameters and record Gas Readings MWD/LWD: Service Engineer responsible for record Tool(Gamma, Neutron..etc.), angle & Azimuth Reading along the Hole. DD: Service Engineer responsible for Deviated Drilling Directions and perform these directions according to Directional Plan Tool Pusher: the man in charge of the rig and overall drilling operations. Driller: in charge of Drilling, perform Drilling Machinery. Assistant Driller: in charge of Drilling in absence of Driller & measure Pipes Lengths in use. Derrick-man: in case of absence of ass. Driller he is in charge, he works on the Monkey Board handling Stands during Tripping. Mud Tester: responsible for mixing and adding mud Floor-man: (roughneck)is responsible for handling the drill pipe during connections or trips. Roustabout: handle the equipment and supplies that are constantly being supplied to the rig. Crane Operator // Mechanic // Electrician
  • 47.
  • 48. Drill String Components: 1- Bit 5- Jar 2- Drill Collar 6- Stabilizer 3- Heavy Weight Drill Pipes 7- Bit Sub 4- Drill Pipes 8- Mud Motor or Turbines Drill Pipes (DP): - Each length of drill pipe is approximately 30 to 31 feet long. - A single drill pipe is called a joint, Each end of the joint is threaded, Box (a) and Pin(b). - Every Three Connected Joints called Stand. Bottom Hole Assembly (BHA): - The entire drill string less the drill pipe. - The functions of the BHA are: - Protect the drill pipe from excessive bending and torsional loads - Control the direction and inclination in directional holes - Place weight on the drill bit a b
  • 49.
  • 50. Drill Collars - heavy, thick-walled joints of pipe used just above the bit in the drilling string. - They are approximately 30 feet long and heavier than drill pipes. The outside diameter is larger than that of the DP Drill collars are used to; - Act as a pendulum to keep the hole straight. - Maintain rigidity and keep the drill string in tension - they may be Rounded or spiralled - Spiral provide a passage for mud to exit so reduce Probability of differential sticking. Heavy Weight Drill Pipes (HWDP): - They are drill pipes with a body weight that is 2-3 times greater than standard drill pipe. - Same OD of DP but smaller ID than DP - Place weight on the drill bit. - May be rounded or spiral too.
  • 51.
  • 53. - Stabilizers and Subs: - The crossover sub is used to link different sizes and types of pipe. - The shock sub is run behind the bit, absorb the impact of the bit bouncing on hard formations. - The stabilizer is a sub with “blades”. It has two functions: - To keep the drill collars centered in the hole - Maintain a full gauge hole - The reamer is a sub that is run between the bit and drill collars to provide gauge hole while drilling in hard formations. - The bit sub is a short sub with a box on both ends. This allows the bit to be joined to the drill string. - Hole Openers and under-reamers are tools that are run immediately above a bit to enlarge the hole size. where, Under-reamer arms opened by Mud Press. But Hole Opener Arms are Used Opened - Bits: 4 Main Types; a.Drag Bits b.Roller cone or rock Bits c.Diamond Bits d.Polycrystalline diamond compact (PDC) Bits e.Coring Bit a. b. c.
  • 54. 54
  • 56. - Positive displacement mud motor (PDM): Spiral shaped steel rotor inside rounded rubber stator, used mainly in directional drilling where it allows rotation of the bit with oriented drill string in certain direction by help of bent sub. - Turbine: Consists of several stages, each made up of bladed rotors and cylindrical stator - Jar: Involved in BHA, used in case of stuck to free the string by doing kinetic action upward - MWD Tool: Used sometimes in case of azimuth measurements, rock petrophysical properties are needed.
  • 57. 57
  • 58. 58 ic
  • 59. 59 Kinetic Energy (Energy in Motion) Converts to Impacts Force Drilling Jar Operation
  • 60. Translation of the terms used in the presentation into Azerbaijani Glossary - Lüğət
  • 61. 61 Drag bit Pərli balta Drawworks Bucurqad Drill bit Qazıma baltası Drill Collar (DC) Ağırlaşdırılmış qazma borusu Drill Pipe (DP) Qazma borusu Drill ship Qazıma gəmisi Drill spool Qazıma makarası Drill string Qazıma kəməri Driller Qazmaçı Drilling crew Qazıma briqadası Drilling direction Qazıma istiqaməti Drilling line Tal kanatı Drilling mud or drilling Qazıma məhlulu, gilli Drilling rig or rig Qazıma qurğusu Drive bushing Kvadrat içliyi Electrician Elektrik Elevator Elevator (Qaldırcı) Energy system Enerji sistemi Fast line Kanatın hərəkətli ucu Floor-man/ roustabout Fəhlə Flow line Atqı xətti Fluid Məhlul Gooseneck “Qaz boğazı” Heavy Weight Drill Pipe (HWDP) Ağır Qazma Borusu (AQB) Hoisting system Qaldırıcı sistem Hole Quyu lüləsi Hole Opener Lülə açan Hook Qarmaq Inclination angle Zenit bucağı Active tanks Aktiv tanklar Annular preventer Həlqəvi preventor Annulus Həlqəvi fəza Assistant driller Qazmaçı köməkçisi Azimuth İstiqamət Bit sub Balta keçiricisi Blind rams Kar plaşkalar Blow Out Partlayış Blow Out Preventer (BOP) Preventor Bottom Hole Assembly (BHA) Qazma Kəmərinin Aşağı Hissəsi (QKAH) Brake lever Əyləc Casing head Qoruyucu kəmər başlığı Centrifuge Sentrifuqa Choke line Ştuser xətti Circulation system Sirkulyasiya sistemi Company Man Şirkət nümayəndəsi Conductor Konduktor (kəməri) Core Laydan götürülən süxur nümunəsi Coring bit Sütuncuqlu balta Crane operator Kran operatoru Crossover (XO) Diametr keçiricisi Crown or crown block Kronblok(tərpənməzdir) Dead line Kanatın hərəkətsiz ucu Deadline anchor Lövbər Derrick-man Yuxarı fəhlə Desander Qum təmizləyici Desilter Gil təmizləyici Diamond bit Almaz balta Dog house “İt damı”
  • 62. 62 Jack-up rig Özüqalxan üzən qazıma qurğusu Jar/ Drilling jar Yas (яс) Kelly Kvadrat (boru) Kelly bushing Kvadrat içliyi Kick Təzahür (neft/qaz/su) Kill line Boğma xətti Links Ştroplar Logging While Drilling (LWD) Qazıma Zamanı Karotaj (QZK) Mast Qüllə Master bushing Əsas içlik Measuring While Drilling (MWD) Qazıma Zamanı Ölçmə (QZÖ) Mechanic Mexanik Monkey board Verxovoy balkonu Mud engineer Qazıma məhlulu mühəndisi Mud logger Qazıma məhlulu karotaj mühəndisi Mud tester Qazma məhlulunu yoxlayan Personnel İşçi heyəti Pipe rams Boru plaşkaları Platform Platforma Polycrystalline Diamond Compact(PDC) bit Polikristallik Almaz balta Positive Displacement Mud Motor (PDM) Quyudibi qazma məhlulu motoru Possum belly Ötürücü çən Pump Nasos Ram preventer Plaşkalı preventor Reamer Genişləndirici Roller cone bit/rock bit Şaroşkalı balta Rotary hose Qazıma şlanqı Rotary table Rotor stolu Rotational system Fırladıcı sitem Sand trap Qum tələsi Semi-submersible rig Yarımdalma üzən qazıma qurğusu Shale shaker Titrəyən ələk (rusca: vibrasita) Shear rams Kəsici plaşkalar Shock sub Amortizasiya keçiricisi Slip Pazlı tutucu (Klin) Spinning wrench Avtomat qazıma açarı Stabiliser (Stab) Stabilizator Stand of drill pipe Şamdan (rusca: Podsveçnik) Stand pipe Dik boru Sub Keçirici Substructure Özül Suction Sorma Swivel Fırlanğıc Tongs Universal maşın açar ı (rusca: УМК – UMK) Tool pusher Baş qazıma ustası Travelling block Tal bloku (tərpənəndir) Turbine Turbin Under-reamer Açılan genişləndirici V-door Boruları qaldırmaq üçün körpü Waste pool Tullantı hovuzu Well control Quyuya nəzarət Well site geologist Sahə geoloqu
  • 63. team Tarana Nasibli Azerbaijan National Academy of Science Research Engineer 63 Farida Ismayılova BP Drilling Geohazards Specialist Our goals: • Increasing materials in Azerbaijani • Helping overcome English language barrier Follow “Engineers Change” accounts on Facebook, Slideshare, Youtube or LinkedIn.