Challenging Design: Foundations for Tall Buildings Helen Chow & Frances Badelow
Presentation Outline ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Introduction ,[object Object],[object Object],[object Object],Data from Council on Tall Buildings and Urban Habitat
Design Team Project Principal Project Manager Design Engineer
Foundation Systems – Piled Raft ,[object Object],[object Object],[object Object]
Design Issues ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Design Process ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Foundation Design ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Limit State Design Criteria: Serviceability Limit State (SLS) (Unfactored Load) :  max  all  max       all   Displacement  Angular Distortion
Foundation Performance ,[object Object],[object Object],[object Object],[object Object]
Foundation Performance ,[object Object],[object Object],[object Object],[object Object]
Incheon 151 Tower, Korea ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Incheon 151 Tower ,[object Object],[object Object],[object Object]
Incheon 151 Tower ,[object Object],~ 30m ~ 20m
Incheon 151 Tower ,[object Object],[object Object],Ground Conditions
Incheon 151 Tower Foundation Design
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Incheon 151 Tower 88m 77.5m
Incheon 151 Tower ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
PLAXIS 3D - Vertical Loading 200m 200m 100m Incheon 151 Tower
Incheon 151 Tower PLAXIS 3D GARP – Overall Settlement = 0.067m Differential Settlement = 1/2600 Angular Distortion = 0.07°  Settlement of Foundation 600m Foundation
Incheon Tower ,[object Object],[object Object]
Nakheel Tall Tower, Dubai Nakheel Incheon Burj Dubai
Nakheel Tall Tower ,[object Object],[object Object],[object Object],Sand 20m <2.5m Gypsum >75m Cemented Carbonate Siltstone
Nakheel Tall Tower ,[object Object],[object Object],[object Object],[object Object]
Nakheel Tall Tower ,[object Object],[object Object],[object Object],[object Object],[object Object]
Nakheel Tall Tower ,[object Object],[object Object],[object Object],[object Object],[object Object],1000m
Conclusion ,[object Object],[object Object],[object Object]
Thank You

More Related Content

What's hot

Acoustical materials
Acoustical materialsAcoustical materials
Acoustical materials
shahzeb163
 
Fire safety-in-high-rise-apartment-buildings
Fire safety-in-high-rise-apartment-buildingsFire safety-in-high-rise-apartment-buildings
Fire safety-in-high-rise-apartment-buildings
Ferit Fazliu
 

What's hot (20)

Jin Mao Tower
Jin Mao TowerJin Mao Tower
Jin Mao Tower
 
Form Active system
Form Active systemForm Active system
Form Active system
 
Taipei 101 : Building in Taipei ,Taiwan
Taipei 101 : Building in Taipei ,TaiwanTaipei 101 : Building in Taipei ,Taiwan
Taipei 101 : Building in Taipei ,Taiwan
 
Shanghai tower facade_design_process_11_10_2011
Shanghai tower facade_design_process_11_10_2011Shanghai tower facade_design_process_11_10_2011
Shanghai tower facade_design_process_11_10_2011
 
Contemporary architecture eero saarinen.
Contemporary architecture   eero saarinen.Contemporary architecture   eero saarinen.
Contemporary architecture eero saarinen.
 
Acoustical materials
Acoustical materialsAcoustical materials
Acoustical materials
 
Architectural acoustics
Architectural acousticsArchitectural acoustics
Architectural acoustics
 
Empire state building
Empire state buildingEmpire state building
Empire state building
 
One world trade centre
One world trade centreOne world trade centre
One world trade centre
 
High Rise Building Research Document
High Rise Building Research DocumentHigh Rise Building Research Document
High Rise Building Research Document
 
Architectural acoustics
Architectural acousticsArchitectural acoustics
Architectural acoustics
 
14. Area of Refuge
14. Area of Refuge14. Area of Refuge
14. Area of Refuge
 
Curtain walls - Advanced structural systems
Curtain walls - Advanced structural systemsCurtain walls - Advanced structural systems
Curtain walls - Advanced structural systems
 
One world trade centre
One world trade centreOne world trade centre
One world trade centre
 
Beijing airport(1)
Beijing airport(1)Beijing airport(1)
Beijing airport(1)
 
Openings in walls
Openings in wallsOpenings in walls
Openings in walls
 
Hearst Tower
Hearst TowerHearst Tower
Hearst Tower
 
Post lintel structre
Post lintel structrePost lintel structre
Post lintel structre
 
Fire safety-in-high-rise-apartment-buildings
Fire safety-in-high-rise-apartment-buildingsFire safety-in-high-rise-apartment-buildings
Fire safety-in-high-rise-apartment-buildings
 
Aluminium window
Aluminium windowAluminium window
Aluminium window
 

Similar to ICWES15 - Challenging Design: Foundations for Tall Buildings. Presented by Ms Frances Badelow, AUST & Ms Helen Chow, AUST

Similar to ICWES15 - Challenging Design: Foundations for Tall Buildings. Presented by Ms Frances Badelow, AUST & Ms Helen Chow, AUST (20)

CCTV Building, A Structural Design Overview
CCTV Building, A Structural Design OverviewCCTV Building, A Structural Design Overview
CCTV Building, A Structural Design Overview
 
Lec.1 introduction
Lec.1   introductionLec.1   introduction
Lec.1 introduction
 
ACE special structures
ACE special structuresACE special structures
ACE special structures
 
Modeling procedure and Case study of ‘Gocheok Sky Dome’
Modeling procedure and Case study of  ‘Gocheok Sky Dome’Modeling procedure and Case study of  ‘Gocheok Sky Dome’
Modeling procedure and Case study of ‘Gocheok Sky Dome’
 
CCTVHeadquarters.pdf
CCTVHeadquarters.pdfCCTVHeadquarters.pdf
CCTVHeadquarters.pdf
 
IRJET- A Study on Seismic Analysis of RC Framed Structures on Varying Slo...
IRJET-  	  A Study on Seismic Analysis of RC Framed Structures on Varying Slo...IRJET-  	  A Study on Seismic Analysis of RC Framed Structures on Varying Slo...
IRJET- A Study on Seismic Analysis of RC Framed Structures on Varying Slo...
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
P.e.b. mini project report
P.e.b. mini project reportP.e.b. mini project report
P.e.b. mini project report
 
Keep it Flowing! Culvert Design 20: Design, Durability & Applications
Keep it Flowing! Culvert Design 20: Design, Durability & ApplicationsKeep it Flowing! Culvert Design 20: Design, Durability & Applications
Keep it Flowing! Culvert Design 20: Design, Durability & Applications
 
Geotechnical Investigation
Geotechnical InvestigationGeotechnical Investigation
Geotechnical Investigation
 
IRJET- Numerical Study on Behaviour of Non-Tower Building Attached with Tower
IRJET- Numerical Study on Behaviour of Non-Tower Building Attached with TowerIRJET- Numerical Study on Behaviour of Non-Tower Building Attached with Tower
IRJET- Numerical Study on Behaviour of Non-Tower Building Attached with Tower
 
Harlem Park Building Design Project
Harlem Park Building Design ProjectHarlem Park Building Design Project
Harlem Park Building Design Project
 
Dynamic Response of Offshore Articulated Tower-Under Airy and Stokes Theories
Dynamic Response of Offshore Articulated Tower-Under Airy and Stokes TheoriesDynamic Response of Offshore Articulated Tower-Under Airy and Stokes Theories
Dynamic Response of Offshore Articulated Tower-Under Airy and Stokes Theories
 
seminar.pptx
seminar.pptxseminar.pptx
seminar.pptx
 
Calculation note 29 11-2014
Calculation note 29 11-2014Calculation note 29 11-2014
Calculation note 29 11-2014
 
swati structure.ipt
swati structure.iptswati structure.ipt
swati structure.ipt
 
02_Practical_Design_Balanced_Cantilever_Bridges_Piyush_R1.pdf
02_Practical_Design_Balanced_Cantilever_Bridges_Piyush_R1.pdf02_Practical_Design_Balanced_Cantilever_Bridges_Piyush_R1.pdf
02_Practical_Design_Balanced_Cantilever_Bridges_Piyush_R1.pdf
 
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
 
IMPROVING THE STRUCTURAL EFFICIENCY OF STEEL TRUSSES BY COMPARATIVE STUDY
IMPROVING THE STRUCTURAL EFFICIENCY OF STEEL TRUSSES BY COMPARATIVE STUDYIMPROVING THE STRUCTURAL EFFICIENCY OF STEEL TRUSSES BY COMPARATIVE STUDY
IMPROVING THE STRUCTURAL EFFICIENCY OF STEEL TRUSSES BY COMPARATIVE STUDY
 
Group 2 , ce471
Group 2  ,  ce471Group 2  ,  ce471
Group 2 , ce471
 

More from Engineers Australia

Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...
Engineers Australia
 
Cyber supply chain risk management ASDE
Cyber supply chain risk management   ASDECyber supply chain risk management   ASDE
Cyber supply chain risk management ASDE
Engineers Australia
 
Timber Connections reduced by Geoff Boughton
Timber Connections reduced by Geoff BoughtonTimber Connections reduced by Geoff Boughton
Timber Connections reduced by Geoff Boughton
Engineers Australia
 
Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9
Engineers Australia
 
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Engineers Australia
 
Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1
Engineers Australia
 
Smart grid - Do they fit into real networks ver 1
Smart grid  - Do they fit into real networks ver 1Smart grid  - Do they fit into real networks ver 1
Smart grid - Do they fit into real networks ver 1
Engineers Australia
 
Arc flash August 2012 IE Aust JEEP
Arc flash  August 2012   IE Aust JEEPArc flash  August 2012   IE Aust JEEP
Arc flash August 2012 IE Aust JEEP
Engineers Australia
 
121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1
Engineers Australia
 
Pavement materials and design in western australia by geoffrey cocks
Pavement materials and design in western australia by geoffrey cocksPavement materials and design in western australia by geoffrey cocks
Pavement materials and design in western australia by geoffrey cocks
Engineers Australia
 
Bid write presentation engineers australia & spe 7 feb12-1
Bid write presentation   engineers australia & spe 7 feb12-1Bid write presentation   engineers australia & spe 7 feb12-1
Bid write presentation engineers australia & spe 7 feb12-1
Engineers Australia
 
EA / ATSE joint seminar Engineering for Extreme Natural Events
EA / ATSE joint seminar Engineering for Extreme Natural EventsEA / ATSE joint seminar Engineering for Extreme Natural Events
EA / ATSE joint seminar Engineering for Extreme Natural Events
Engineers Australia
 
Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011
Engineers Australia
 

More from Engineers Australia (20)

Where to From Here - Oil and Gas in WA
Where to From Here - Oil and Gas in WAWhere to From Here - Oil and Gas in WA
Where to From Here - Oil and Gas in WA
 
Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...
 
Cyber supply chain risk management ASDE
Cyber supply chain risk management   ASDECyber supply chain risk management   ASDE
Cyber supply chain risk management ASDE
 
Timber Connections reduced by Geoff Boughton
Timber Connections reduced by Geoff BoughtonTimber Connections reduced by Geoff Boughton
Timber Connections reduced by Geoff Boughton
 
Connecting to the future: how transport will shape the City of Fremantle
Connecting to the future: how transport will shape the City of FremantleConnecting to the future: how transport will shape the City of Fremantle
Connecting to the future: how transport will shape the City of Fremantle
 
Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9
 
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
 
Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1
 
Smart grid - Do they fit into real networks ver 1
Smart grid  - Do they fit into real networks ver 1Smart grid  - Do they fit into real networks ver 1
Smart grid - Do they fit into real networks ver 1
 
Arc flash August 2012 IE Aust JEEP
Arc flash  August 2012   IE Aust JEEPArc flash  August 2012   IE Aust JEEP
Arc flash August 2012 IE Aust JEEP
 
121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1
 
Pavement materials and design in western australia by geoffrey cocks
Pavement materials and design in western australia by geoffrey cocksPavement materials and design in western australia by geoffrey cocks
Pavement materials and design in western australia by geoffrey cocks
 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems
 
The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...
 
Bid write presentation engineers australia & spe 7 feb12-1
Bid write presentation   engineers australia & spe 7 feb12-1Bid write presentation   engineers australia & spe 7 feb12-1
Bid write presentation engineers australia & spe 7 feb12-1
 
111125 IChemE Palmer
111125 IChemE Palmer111125 IChemE Palmer
111125 IChemE Palmer
 
EA / ATSE joint seminar Engineering for Extreme Natural Events
EA / ATSE joint seminar Engineering for Extreme Natural EventsEA / ATSE joint seminar Engineering for Extreme Natural Events
EA / ATSE joint seminar Engineering for Extreme Natural Events
 
Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011
 
How to write a research paper. By Gareth Forbes, Curtin University and Engine...
How to write a research paper. By Gareth Forbes, Curtin University and Engine...How to write a research paper. By Gareth Forbes, Curtin University and Engine...
How to write a research paper. By Gareth Forbes, Curtin University and Engine...
 
How to write a research paper. By Mark Bush
How to write a research paper. By Mark BushHow to write a research paper. By Mark Bush
How to write a research paper. By Mark Bush
 

Recently uploaded

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Recently uploaded (20)

From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 

ICWES15 - Challenging Design: Foundations for Tall Buildings. Presented by Ms Frances Badelow, AUST & Ms Helen Chow, AUST

Editor's Notes

  1. First, we will have a brief introduction of foundation system for tall buildings, then we will talk about the key design issues and design processes. After that, we will look at 2 cases – Incheon Tower in South Korea and Nakheel tall tower in Dubai. For the Incheon Tower, Coffey was appointed as the geotechnical designer and for Nakheel tower, we were appointed as geotechnical peer reviewer.
  2. In the past 2 decades, the number of buildings with a height in excess of 200m is increasing. Predictions from council on tall buildings and urban habitat show that by next year, the total number of tall buildings will reach 680 and 83 of them are supertalls which are over 300m high. The design of these supertalls are challenging as the traditional design approach cannot be applied with confidence. It is necessary to come up with some innovative design approach for the design of a cost effective foundation to satisfy the long term performance requirements.
  3. Now, we look at the structure of our tall building design team, at the top, we have a project principal who is responsible for the supervision of the design team, review design process and provide technical advice to the team and clients. The next level is the project manager. The project manager will be responsible for the preparation of proposal and cost estimation of the design services, interact with clients and supervise the design process. Then the next level is the design engineers who will be responsible for the interpretation of test data, development of geotechnical models and undertaking foundation analyses.
  4. Piled rafts are a cost-effective form of foundation for tall buildings as the raft and piles can combine to transfer the applied load from the structure to the supporting soil. By placing the piles strategically, the overall and differential settlement can be controlled, therefore, the piles are often used as settlement reducers. In this case the load carried by the piles is considered as a secondary issue in the design.
  5. The design issues that need to be addressed in the design of tall building foundation. The ultimate capacity of the foundation subjected to vertical, horizontal and moment loading combinations. The influence of cyclic nature of wind and earthquake on foundation capacity and movements. The overall settlement and the differential settlement within the footprint of the building and the differential settlement between the high rise and low rise areas. Sharing of loads between the raft and piles and the distribution of load along the piles. If excavation is required for the construction of pile cap, it may impose external ground movement which could induce additional load and movement to the pile. Earthquake can cause serious damage to buildings, so it is necessary to assess the response of the structure foundation system to earthquake excitation and the possibility of liquefaction of the surrounding soil supporting the foundation. Lastly, is the dynamic response of the structure foundation to wind induced forces.
  6. Before carrying out the foundation design, we need to have a well planned design process. The design process has to include several phases: The first phase is subsurface exploration to carry out a desktop study of all available geotechnical data including previous site investigations and geotechnical engineering recommendations in the vicinity of the site. Then to perform site specific geotechnical investigation to explore the soil strata profile, groundwater conditions and perform in-situ and laboratory testing to get the soil properties. The second phase is foundation design. In this phase, first we have to develop geotechnical models based on the available geotechnical information from Phase 1. Then we can carry out preliminary foundation design using simplified geotechnical models and simple analysis method. Upon receiving the geotechnical information from the site specific geotechnical investigation and structural loads from structural engineers, we can then revise the geotechnical models and perform detailed design to assess the performance of the foundation under different loading conditions. If excavation is required during construction, we have to design the retention system to control groundwater inflow. Then we need to carry out and assessment on the impacts of construction on adjacent properties and other facilities within the site. Lastly, is to carry out an assessment of seismicity of the site including changes in soil and rock conditions during earthquakes and possible effects on the foundation system.
  7. Limit state design is used for the foundation design. The ultimate limit state in which the design strength has to be greater than or equal to the design action. The design strength is calculated by applying a reduction factor f to the ultimate strength. For the serviceability limit state (SLS), the settlement and augular distortion or rotation of the foundation under working load have to be less than the allowable values
  8. Incheon Tower is a super high rise twin tower proposed to be constructed in Songdo in South Korea. Each tower consists of 151 storeys with a height of 600m and basements of approximately 8.5m deep. The 2 towers is connected by three skybridges. The geotechnical designer is Coffey in associated with Jin-Young ENC in South Korea, the structural designer is Thornton Tomasetti and the architect is John Portman and associates. For this project Frances was the project manager and Helen was the design engineer.
  9. The tower is to be constructed on reclaimed land comprised of approximately 8m of loose sand and sandy silt underlain by approximately 20m of soft to firm marine silty clay, followed by 2m of medium dense to dense silty sand and then the residual soil and weathered rock. The rock material within about 50m from the surface have been affected by weathering and the strength has reduced to a very weak rock or a soil like material.
  10. This figure shows the inferred contours of the soft rock surface. Based on the borehole data, the top of the soft rock surface within the foundation footprint has a variation of up to 40m. To capture the variation of ground conditions, the footprint of the tower was divided into 8 zones with the appropriate geotechnical models and parameters.
  11. The performance of the foundation was assessed using the different computer programs. Program CLAP was used to assess the overall stability under ultimate load combinations. Program GARP was used to assess the foundation settlement under vertical and moment loadings. Finite Element Program PLAXIS 3D was used to carry out an independent check of the foundation settlement under vertical and horizontal loads.
  12. The foundation has a bow tie shape. It consists of a 5.5m thick raft supported by 172 piles with a diameter of 2.5m. The raft is embedded into the ground with the base located at about 14m below the ground surface. The length of piles varies between 36m to 66m with a minimum socket length of 2 times pile diameters into soft rock.
  13. GARP was used as the main design tool for the settlement assessment under vertical loading. In the GARP model, the piled raft is in contact with the underlying soil but not with the surrounding soil. The overall settlement under the unfactored dead and live loads was 67mm with a differential settlement of 34mm. In PLAXIS 3D, 2 cases were considered. Case 1 is similar to the GARP analysis in which the piled raft is in contact with the underlying soil only. For case 2, the piled raft is embedded in which the raft is in contact with the underlying soil and the soil surrounding the raft. The basement walls were modelled in the analysis.
  14. This is the mesh used for the PLAXIS analysis, the dark blue elements represent the basement walls supporting the sides of excavation. The soil layers are modelled as Mohr-Coulomb material to allow for non-linear behaviour. Point loads were applied at the column locations and uniform loads were applied at the corewall locations. This plot shows the load displacement curve for both cases. The solid line is the displacement for case 1 and the dotted line is the displacement for case 2. We can see that the displacement is reduced when the resistance of the surrounding soil is considered.
  15. The performance of the foundation under horizontal loading is a critical issue in the design. Program CLAP was used to assess the lateral stiffness of the pile group in which the raft is not in contact with the underlying soil. The lateral stiffness of the raft and basement wall were calculated separately. From CLAP analysis, the lateral deflection of the pile group was 22mm. Again, PLAXIS 3D was used as an independent check. Three cases were considered. Cases 1 and 2 were the same as for the vertical load, case 3 was the for a pile group only.
  16. The performance of the foundation under horizontal loading is a critical issue in the design as the building is subjected to very high wind load. This load will then transfer to the foundation. Program CLAP was used to assess the lateral stiffness of the pile group in which the raft is not in contact with the underlying soil. The lateral stiffness of the raft and basement wall were calculated separately. From CLAP analysis, the lateral deflection of the pile group was 22mm. Again, PLAXIS 3D was used as an independent check. Three cases were considered. Cases 1 and 2 were the same as for the vertical load, case 3 was the for a pile group only.
  17. For this project, Coffey was appointed as geotechnical peer reviewer. Frances was responsible for setting up the peer review process and review the geotechnical designers report and foundation design method provided by the foundation designer. I was responsible for undertaking independent analyses for the foundation system proposed by the foundation designers.
  18. Nakheel Tower is one of the multi-billion dollar projects in Dubai. The tower is proposed to have more than 200 storeys high with a height exceeding 1km. This tower will be one of the centre pieces of Nakheel Harbour. Now we look at the ground conditions. The geotechnical profile consists of 20m thick sand layer underlain by cemented carbonate siltstone with gypsum layers up to 2.5m thick occurring at depths greater than 75m below ground level.
  19. One of the main features observed from the material was the existence of bond yield strength that controls the compressibility of the material. If the imposed stress on the ground is less than the bond yield strength, the soil will behave as a very stiff material otherwise, the compressibility would increase which results in excessive settlement. Therefore, in the foundation design, the stress on the ground has to be limit to be below the bond yield strength.
  20. The foundation consists of a raft with a thickness varies up to a maximum of 8m supported by a total of 392 barrettes. The sizes of the barrettes are 2.8m x 1.2m and 2.8m x 1.5m and the length of the barrettes are 37m 42m and 72m.
  21. As the geotechnical peer reviewer, we are involved in reviewing the geotechnical designer’s report and the foundation design method provided by the geotechnical designer. Then we have to develop independent geotechnical models based on the available geotechnical data and undertaking independent analyses for the foundation under different loading conditions. In the independent analyses, Program CLAP and PIGS were used to assess the overall stability of foundation under ultimate limit state load combinations. Program GARP was used to assess the settlement under serviceability loads and PLAXIS 2D was used as a check for the GARP results. In PLAXIS 2D analysis, an asymmetric model was used and the barrettes were modelled as equivalent circular rings. From GARP analysis, the maximum settlement was 95mm which agreed well with the settlement from the designer.
  22. In conclusion, we have discuss about the key design issues that are required to be addressed and the design process that needs to be considered in the foundation design for super tall buildings. It is necessary to have a good understanding of the ground conditions in the development of geotechnical models and parameters. In the design, the performance of the foundation under lateral loads is a critical issue, therefore special consideration has to be given in adopting the parameters for assessing the lateral response. In the past few decades, female engineers have been involved in different aspect of engineering and they are often given the opportunity to undertake different roles in major projects.