This document contains information about Eng. El Sayed Amer, a petroleum engineer who has worked for Weatherford Drilling International and as a process and production engineer for SUCO and RWE DEA. It discusses production packers, which are subsurface tools used to provide a seal between the tubing and casing. Production packers can protect the casing from corrosion, provide better well control, isolate pay zones, and prevent fluid movement between zones. They are classified as either permanent or retrievable based on whether they can be removed from the well without destruction. The document focuses on the characteristics and advantages and disadvantages of permanent and retrievable production packers.
Difference Between Search & Browse Methods in Odoo 17
Completion equipment packer part #1
1. Eng. El Sayed Amer
Well Completion
W e l l c o m p l e t i o n a n d i n t e r v e n t i o n
Subsurface Equipment
2. Eng. El Sayed Amer
Email: Eng20072007@gmail.com
https://www.facebook.com/elsayedameer
Phone : 01065860658
Petroleum and Natural gas Courses
Senior Process & Production Engineer
Excellent petroleum Eng. At SUCO & RWE DEA
BSC Of petroleum & NG engineering
Eng. Elsayed Amer
Petroleum Engineer
Worked for weatherford drilling international
4. Eng. El Sayed Amer
Page 40
06 Production packer
• Subsurface tool used to provide
seal between tubing and casing
Casing
Tubing
No-Go
Nipple.
Perfs
5. Eng. El Sayed Amer
Page 41
Protect the Casing
Formation
Packer
Corrosion
Inhibited
Packer Fluid
Locator Seal
Assembly
Tailpipewith
W/LNipple
Tubing
Tubing
Hanger
Xmas Tree
Perforations
Producing
Fluids
6. Eng. El Sayed Amer
Page 42
06 Production packer
Protect casing from corrosion
Provide better well control
Prevent fluid movement between pay zones
Isolate zones of bad cement
Protect casing from bursting
Perforation
Tail pipe
Packer
Annulus
With
packer fluid
Casing
7. Eng. El Sayed Amer
Page 43
06 Production packer
• Slips
❑Tooth-like parts of the packer
❑Forced outward by sitting action
❑Top slips to prevent up-motion and
bottom for down-motion
• Packing elements
❑ Normally nitrile-rubber for moderate
temperature and normal pressure
❑ Elastomers for HTHP
❑Provide seal between Csg and TBG
01
02
Cone
Slips
Flow mandrel
Packing element
9. Eng. El Sayed Amer
Page 45
06 Production packer
• Cone
❑ Part of the packer forced the slips to
move outward
03
Cone
Slips
Flow mandrel
Packing element
10. Classification
Based on customer and service companies point of view
46
Service packer
Used temporary and then retrieved or milled
out after well testing, cement squeezing,
acidizing, and fracturing
11. Eng. El Sayed Amer
Page 47
06 Production packer
Cannot be retrieved other
than by milling
Permanent
01
Retrieved using a special
retrieving tool
Retrievable Permanent
02
Released by manipulation of
tubing – generally over pull
or rotation
Retrievable
03
01 02 03
12. Eng. El Sayed Amer
Page 48
06 Production packer
Permanent
▪ Run or set on wireline or tubing
▪ Selection depends on rig cost, service company
and wellbore conditions
▪ Set hydraulically by
– Pressure for tubing or drill pipe set
– Firing an explosion for E-Line set
▪ Retrieved by milling
13. Eng. El Sayed Amer
Page 49
06 Production packer
Permanent Characteristics
▪ Permanently set
▪ Less costly; very low components
▪ Highest pressure rating, up to 15,000 psi
▪ High temperature rating, up to 500 F
▪ Most frequently used world wide
14. Eng. El Sayed Amer
Page 50
06 Production packer
Permanent Disadvantages
▪ Milling destroyed the packer
for retrieving
15. Eng. El Sayed Amer
Page 51
06 Production packer
Retrievable
• RIH on wireline or tubing
• Has bi-directional slips prevent debris from setting on bottom
• Main advantage is retrieving without destroying
• If stuck, should be milled.
• Generally milling take longer time because of harder
components