Lean
                              Management
                                 Teachers




       Our Improvement
         Story Board
Ideas building on Mike Rothers work using
    recent experience with beginning
               practitioners.
       March 2012 Emiel van Est
Our Improvement Story




 We practice the Improvement Kata & Coaching Kata as
  outlined in Mike Rothers Book Toyota Kata and the
  companion Handbook




                © Lean Management Teachers              2
We used the Process Analysis Mini Kata to
                      Understand our Current Condition.


   2                                                    4                                                                                               3                                           1
We were                                          Now we are here,                                                                                   We want                                      Challenge
 here                                    using PDCA to overcome obstacles                                                                          to be here                                    & Vision

                                                                                                                                      -- Example 2 --
                                                                                                                    All-in-one summary for a manual line
Customer Demand and Line Pace                                                         Customer Demand / Line Pace                                         CURRENT CONDITION
• Customer takt
• Planned cycle time                                                                    • Takt Time = 30 seconds                                        Process
• Number of shifts currently running                                                    • PC/T = 22 seconds
                                                                                        • Gap = 27%                                                     Date
Overview of the Process                                                                 • Running 2 Shifts + overtime
• Define the start & end points of the process                                          • 10 changeovers per day
• Get to know the process by sketching a block diagram of it                                                                     40                                                   Range of observed cycle times
      - Where does WIP accumulate?                                                    Overview
• How much does process output fluctuate? (Cycle-to-cycle and shift-to-shift)
• Note other details about the current operating pattern                                 • Output cycles vary +/- 109%           35                                                         Lowest repeatable

                                                                                         • Operator work steps vary
                                                                                                                                                                                            observed cycle time

                                                                                         • 4 operators                      TT
Machine Capacity                                                                       • WIP (as shown)
• Can the automatic equipment support the planned cycle time?
• How close are we to our current machine capacity limit?                 No Yes         • Line does not meet Pc/t               25
• What is the fastest Pc/t the equipment can currently support?                            and must run overtime          Pc/t
• Shift options?                                                                                                                 20
                                                                                      Machine Capacity                    90%
                                                                                                                       of Pc/t
Process Fluctuation
                                                                                       • Op 90 cannot meet Pc/t                15
• Time 20-40 full cycles of each operatorʼs work                          No Yes           (see chart)
• Are each operatorʼs work steps the same from cycle to cycle?
                                                                                                                                 10
                                                                                      Process Stability
Necessary Number of Operators (if process were stable)
                                                                                        • Operator cycles fluctuate                           I          I          I          I
• Calculate number of operators                                                           up to -30% / + 90% (see chart)
                                                                                                                                  5
                                                                                                                                              5          2         12         22
                                                                                        • Operator 4 cannot consistently                     pcs        pcs        pcs        pcs
                                                                                          meet Pc/t
                                                                                                                                        10         40         70         90         110
                                                                                      Necessary Number of Operators
                                                                                                                                                    Machines                                         Operators
                                                                                        • 3.2 operators / 4 actual
                                                                                        • Operators 1, 2 & 3
                                                                                          are underutilized (see chart)


                                                                                      © Improvement Kata Handbook                                                                                      Current Condition   50

                                                                                © Lean Management Teachers                                                                                                                 3
We filled in our Target Condition Form


            2                    4                                                                                                                3                              1
         We were          Now we are here,                                                                                                    We want                         Challenge
WHAT INFORMATION IS IN APDCA to overcome obstacles
          here    using TARGET CONDITION?                                                                                                    to be here                       & Vision
     A target condition describes how you want a process to operate
         • A target condition for a manufacturing process should include
           the following four categories of information.
           • No verbs in a target condition. Thatʼs for how to get there.
           • You must include a target date for achieving the target condition.
                                                                                              Process:                        Challenge:                                             TC date:
                      Achieve-By Date: (required)
                                                                                                                              Theme of this TC:
                        (1) DESCRIBE PROCESS STEPS, SEQUENCE & TIMES                            Step 1:                                                                          Step 2: Fill in what
                                                                                                                                                                                       you will keep
                                                                                                Fill in current               Current                                 Target
                            A pattern you can draw or chart (see example)                       condition data
                                                                                                                             Condition                               Condition
                                                                                                                                                                                            the same
                                                                                                                                                                                 Step 3: Fill in what
                                                                                                                                                                                 you want to change
                        (2) OTHER PROCESS CHARACTERISTICS
                            Examples:   • Number of operators                                  Takt time:                                         Takt time:
Used for                                • Number of shifts
 proving                                • Where 1x1 flow is planned, and where standard WIP    Pc/t:                                              Pc/t:
                                           (incl. quantity) is to be located                   # of Shifts:                                       # of Shifts:
                                        • Leveling sequence                                    Overtime (how much):                               Overtime:

                        (3) PROCESS METRIC(S) (Measurement in the moment)                      Output / Shift (run chart):                        Output / Shift:

                            For checking process condition in real time                        # of Operators:                                    # of Operators:

                            Examples:   • Time for each step, piece, pitch, etc.               Where 1x1, where WIP:                              Where 1x1, where WIP:
                                        • Degree of time fluctuation from cycle to cycle       Describe the process                               Describe the process
                                                                                               steps, sequence, times:                            steps, sequence, times:
                                                                                               Exit cycle fluctuation %:                          Exit cycle fluctuation %:
                        (4) OUTCOME METRIC(S)                                                  Other observations about the current pattern:
Used to                     To check outcome of improvement efforts
  check                     Examples:   • Number of pieces per hour or shift
                                        • Leveling sequence attainment
tcomes                                  • Productivity                                                                                             Process Metric:
                                                                                                                                                   Outcome Metric:


Improvement Kata Handbook                                                                  Target Condition Kata Handbook
                                                                                                   © Improvement
                                                                                                                    11
                                                                                                                                                                                 Target Condition       23



                                                                           © Lean Management Teachers                                                                                                   4
Now we are here mixing things up during
              coaching sessions.


   2                     4                             3          1
We were           Now we are here,                 We want     Challenge
 here     using PDCA to overcome obstacles        to be here   & Vision




                     © Lean Management Teachers                            5
Quite often, Q2 is answered by the Current
                  Condition we came from,..


   2                       4                                                          3                              1
We were             Now we are here,                                              We want                         Challenge
 here       using PDCA to overcome obstacles                                     to be here                       & Vision




                                   Process:                       Challenge:                                             TC date:
                                                                  Theme of this TC:

                                    Step 1:                                                                          Step 2: Fill in what
                                    Fill in current                                                                        you will keep
                                                                  Current                                 Target                the same
                                    condition data                                                       Condition
                                                                 Condition
                                                                                                                     Step 3: Fill in what
                                                                                                                     you want to change

                                   Takt time:                                         Takt time:
                                   Pc/t:                                              Pc/t:
                                   # of Shifts:                                       # of Shifts:
                                   Overtime (how much):                               Overtime:
                                   Output / Shift (run chart):                        Output / Shift:
                                   # of Operators:                                    # of Operators:
                                   Where 1x1, where WIP:                              Where 1x1, where WIP:
                                   Describe the process                               Describe the process
                                   steps, sequence, times:                            steps, sequence, times:
                                   Exit cycle fluctuation %:                          Exit cycle fluctuation %:
                                   Other observations about the current pattern:




                                                                                       Process Metric:
                                                                                       Outcome Metric:

                                       © Improvement Kata Handbook                                                   Target Condition       23



                       © Lean Management Teachers                                                                                           6
... instead of referring to Today's Current
                     Condition …


   2                     4                                 3          1
We were           Now we are here,                     We want     Challenge
 here     using PDCA to overcome obstacles            to be here   & Vision




                                                  Our Gemba
                                                   Go & See


                     © Lean Management Teachers                                7
… or this section is updated every PDCA
                       cycle


   2                     4                                                          3                              1
We were           Now we are here,                                              We want                         Challenge
 here     using PDCA to overcome obstacles                                     to be here                       & Vision




                                 Process:                       Challenge:                                             TC date:
                                                                Theme of this TC:

                                  Step 1:                                                                          Step 2: Fill in what
                                  Fill in current                                                                        you will keep
                                                                Current                                 Target                the same
                                  condition data                                                       Condition
                                                               Condition
                                                                                                                   Step 3: Fill in what
                                                                                                                   you want to change

                                 Takt time:                                         Takt time:
                                 Pc/t:                                              Pc/t:
                                 # of Shifts:                                       # of Shifts:
                                 Overtime (how much):                               Overtime:
                                 Output / Shift (run chart):                        Output / Shift:
                                 # of Operators:                                    # of Operators:
                                 Where 1x1, where WIP:                              Where 1x1, where WIP:
                                 Describe the process                               Describe the process
                                 steps, sequence, times:                            steps, sequence, times:
                                 Exit cycle fluctuation %:                          Exit cycle fluctuation %:
                                 Other observations about the current pattern:




                                                                                     Process Metric:
                                                                                     Outcome Metric:

                                     © Improvement Kata Handbook                                                   Target Condition       23



                     © Lean Management Teachers                                                                                           8
Lean
                                    Management
                                       Teachers




Maybe we can make things
  easier to understand




       © Lean Management Teachers                 9
Lets cut the Target Condition Form in two
              and add a date for the starting Current Condition
             to clearly distinct starting point and targeted point.

      2                                             4                                                                                   3                             1
   We were                                   Now we are here,                                                                       We want                        Challenge
    here                             using PDCA to overcome obstacles                                                              to be here                      & Vision




Process:                       Challenge:                                             TC date:
                                                                                      Process:                       Challenge:                                             TC date:
                               Theme of this TC:                                                                     Theme of this TC:

 Step 1:                                                                          Step 2: Fill in what
                                                                                       Step 1:                                                                          Step 2: Fill in what
 Fill in current                                                                        you will keep
                                                                                       Fill in current                                                                        you will keep
                               Current                                 Target                 the same               Current                                 Target                the same
 condition data                                                       Condition        condition data                                                       Condition
                              Condition                                                                             Condition
                                                                                  Step 3: Fill in what                                                                  Step 3: Fill in what
                                                                                  you want to change                                                                    you want to change

Takt time:
Pc/t:
                          Date                     Takt time:
                                                   Pc/t:
                                                                                      Takt time:
                                                                                      Pc/t:
                                                                                                                                         Takt time:
                                                                                                                                         Pc/t:
# of Shifts:                                       # of Shifts:                       # of Shifts:                                       # of Shifts:
Overtime (how much):                               Overtime:                          Overtime (how much):                               Overtime:
Output / Shift (run chart):                        Output / Shift:                    Output / Shift (run chart):                        Output / Shift:
# of Operators:                                    # of Operators:                    # of Operators:                                    # of Operators:
Where 1x1, where WIP:                              Where 1x1, where WIP:              Where 1x1, where WIP:                              Where 1x1, where WIP:
Describe the process                               Describe the process               Describe the process                               Describe the process
steps, sequence, times:                            steps, sequence, times:            steps, sequence, times:                            steps, sequence, times:
Exit cycle fluctuation %:                          Exit cycle fluctuation %:          Exit cycle fluctuation %:                          Exit cycle fluctuation %:
Other observations about the current pattern:                                         Other observations about the current pattern:




                                                    Process Metric:                                                                       Process Metric:
                                                    Outcome Metric:                                                                       Outcome Metric:

    © Improvement Kata Handbook                                                   Target Condition
                                                                                           © Improvement Kata Handbook
                                                                                                         23                                                             Target Condition       23



                                                            © Lean Management Teachers                                                                                                     10
In between we can list all relevant information
                       about our discovery process.


      2                                             4                                                                                     3                             1
   We were                                   Now we are here,                                                                         We want                        Challenge
    here                             using PDCA to overcome obstacles                                                                to be here                      & Vision




Process:                       Challenge:                                               TC date:
                                                                                        Process:                       Challenge:                                             TC date:
                               Theme of this TC:                                                                       Theme of this TC:

 Step 1:                                                                            Step 2: Fill in what
                                                                                         Step 1:                                                                          Step 2: Fill in what
 Fill in current                                                                          you will keep
                                                                                         Fill in current                                                                        you will keep
                               Current                                 Target                   the same               Current                                 Target                the same
 condition data                                                       Condition          condition data                                                       Condition
                              Condition                                                                               Condition
                                                                                    Step 3: Fill in what                                                                  Step 3: Fill in what
                              Date                                                  you want to change                                                                    you want to change

Takt time:                                         Takt time:                           Takt time:                                         Takt time:
Pc/t:                                              Pc/t:                                Pc/t:                                              Pc/t:
# of Shifts:                                       # of Shifts:                         # of Shifts:                                       # of Shifts:
Overtime (how much):                               Overtime:                            Overtime (how much):                               Overtime:
Output / Shift (run chart):                        Output / Shift:                      Output / Shift (run chart):                        Output / Shift:
# of Operators:                                    # of Operators:                      # of Operators:                                    # of Operators:
Where 1x1, where WIP:                              Where 1x1, where WIP:                Where 1x1, where WIP:                              Where 1x1, where WIP:
Describe the process                               Describe the process                 Describe the process                               Describe the process
steps, sequence, times:                            steps, sequence, times:              steps, sequence, times:                            steps, sequence, times:
Exit cycle fluctuation %:                          Exit cycle fluctuation %:            Exit cycle fluctuation %:                          Exit cycle fluctuation %:
Other observations about the current pattern:                                     Our Gemba about the current pattern:
                                                                                    Other observations

                                                                                   Go & See
                                                    Process Metric:                                                                         Process Metric:
                                                    Outcome Metric:                                                                         Outcome Metric:

    © Improvement Kata Handbook                                                     Target Condition
                                                                                             © Improvement Kata Handbook
                                                                                                           23                                                             Target Condition       23



                                                            © Lean Management Teachers                                                                                                       11
Lean
                                    Management
                                       Teachers




 Lets test our redesigned
Improvement Story Board




       © Lean Management Teachers                 12
Our Improvement Story
                                                                                                                                                             Q1 Our Target Condition


                                                           2                                                                                         4                                                                                   3                                                       1
                                                        We were                                                                               Now we are here,                                                                       We want                                                  Challenge
                                                         here                                                                         using PDCA to overcome obstacles                                                              to be here                                                & Vision


                                       Process:                                      Challenge:                                                                          TC date:                                Process:                       Challenge:                                                     TC date:
                                                                                     Theme of this TC:                                                                                                                                          Theme of this TC:

                                            Step 1:                                                                                                                  Step 2: Fill in what                         Step 1:                                                                                  Step 2: Fill in what
                                            Fill in current                                                                                                                you will keep                          Fill in current                                                                                you will keep
                                                                                     Current                                                              Target                the same                                                        Current                                        Target                 the same
                                            condition data                                                                                               Condition                                                condition data                                                              Condition
                                                                                    Condition                                                                                                                                                  Condition
                                                                                                                                                                     Step 3: Fill in what                                                                                                                  Step 3: Fill in what
                                                                                    Date                                                                             you want to change                                                                                                                    you want to change

                                       Takt time:                                                                                     Takt time:                                                                 Takt time:                                              Takt time:
                                       Pc/t:                                                                                          Pc/t:                                                                      Pc/t:                                                   Pc/t:
                                       # of Shifts:                                                                                   # of Shifts:                                                               # of Shifts:                                            # of Shifts:
                                       Overtime (how much):                                                                           Overtime:                                                                  Overtime (how much):                                    Overtime:
                                       Output / Shift (run chart):                                                                    Output / Shift:                                                            Output / Shift (run chart):                             Output / Shift:
                                       # of Operators:                                                                                # of Operators:                                                            # of Operators:                                         # of Operators:
                                       Where 1x1, where WIP:                                                                          Where 1x1, where WIP:                                                      Where 1x1, where WIP:                                   Where 1x1, where WIP:
                                       Describe the process                                                                           Describe the process                                                       Describe the process                                    Describe the process
                                       steps, sequence, times:                                                                        steps, sequence, times:                                                    steps, sequence, times:                                 steps, sequence, times:
                                       Exit cycle fluctuation %:                                                                      Exit cycle fluctuation %:                                                  Exit cycle fluctuation %:                               Exit cycle fluctuation %:
                                       Other observations about the current pattern:                                                                                                                             Other observations about the current pattern:
                                                -- Example 2 --
                              All-in-one summary for a manual line
Customer Demand / Line Pace                                          CURRENT CONDITION                                                 Process Metric:                                                                                                                    Process Metric:
  • Takt Time = 30 seconds                                         Process
  • PC/T = 22 seconds                                                                                                                  Outcome Metric:                                                                                                                    Outcome Metric:
  • Gap = 27%                                                      Date
  • Running 2 Shifts + overtime
  • 10 changeovers per day                       © Improvement Kata Handbook                                                                                         Target Condition       23                       © Improvement Kata Handbook                                                           Target Condition       23
                                           40                                                    Range of observed cycle times
Overview
   • Output cycles vary +/- 109%           35                                                          Lowest repeatable

   • Operator work steps vary
                                                                                                       observed cycle time

   • 4 operators                      TT                                                                                                                                                                                                                                                       90                110
   • WIP (as shown)
   • Line does not meet Pc/t               25
     and must run overtime          Pc/t
Machine Capacity                    90%
                                           20
                                                                                                                                                                                                                                                                                      4       4      5     6     3            4
                                 of Pc/t
   • Op 90 cannot meet Pc/t
     (see chart)
                                           15
                                                                                                                                                                                                                                                                    70       3
                                           10
Process Stability
  • Operator cycles fluctuate
                                                                                                                                                                                                                                                                                 2        1   3      2 1               2 1
                                                                                                                                                                                                 Our Gemba
                                            5            I          I          I          I
    up to -30% / + 90% (see chart)                       5          2         12         22
  • Operator 4 cannot consistently                      pcs        pcs        pcs        pcs
    meet Pc/t
                                                   10         40         70         90         110                                                                                                                                                                                            40                       10
Necessary Number of Operators
  • 3.2 operators / 4 actual
  • Operators 1, 2 & 3
    are underutilized (see chart)
                                                               Machines                                         Operators
                                                                                                                                                                                                  Go & See
© Improvement Kata Handbook                                                                                       Current Condition       50




                                                                                                                                                                                    © Lean Management Teachers                                                                                                                     13
Our Improvement Story
                                                                                                                                                          Q2 Our Current Condition


                                                           2                                                                                         4                                                                                   3                                                       1
                                                        We were                                                                               Now we are here,                                                                       We want                                                  Challenge
                                                         here                                                                         using PDCA to overcome obstacles                                                              to be here                                                & Vision


                                       Process:                                      Challenge:                                                                          TC date:                                Process:                       Challenge:                                                     TC date:
                                                                                     Theme of this TC:                                                                                                                                          Theme of this TC:

                                            Step 1:                                                                                                                  Step 2: Fill in what                         Step 1:                                                                                  Step 2: Fill in what
                                            Fill in current                                                                                                                you will keep                          Fill in current                                                                                you will keep
                                                                                     Current                                                              Target                the same                                                        Current                                        Target                 the same
                                            condition data                                                                                               Condition                                                condition data                                                              Condition
                                                                                    Condition                                                                                                                                                  Condition
                                                                                                                                                                     Step 3: Fill in what                                                                                                                  Step 3: Fill in what
                                                                                    Date                                                                             you want to change                                                                                                                    you want to change

                                       Takt time:                                                                                     Takt time:                                                                 Takt time:                                              Takt time:
                                       Pc/t:                                                                                          Pc/t:                                                                      Pc/t:                                                   Pc/t:
                                       # of Shifts:                                                                                   # of Shifts:                                                               # of Shifts:                                            # of Shifts:
                                       Overtime (how much):                                                                           Overtime:                                                                  Overtime (how much):                                    Overtime:
                                       Output / Shift (run chart):                                                                    Output / Shift:                                                            Output / Shift (run chart):                             Output / Shift:
                                       # of Operators:                                                                                # of Operators:                                                            # of Operators:                                         # of Operators:
                                       Where 1x1, where WIP:                                                                          Where 1x1, where WIP:                                                      Where 1x1, where WIP:                                   Where 1x1, where WIP:
                                       Describe the process                                                                           Describe the process                                                       Describe the process                                    Describe the process
                                       steps, sequence, times:                                                                        steps, sequence, times:                                                    steps, sequence, times:                                 steps, sequence, times:
                                       Exit cycle fluctuation %:                                                                      Exit cycle fluctuation %:                                                  Exit cycle fluctuation %:                               Exit cycle fluctuation %:
                                       Other observations about the current pattern:                                                                                                                             Other observations about the current pattern:
                                                -- Example 2 --
                              All-in-one summary for a manual line
Customer Demand / Line Pace                                          CURRENT CONDITION                                                 Process Metric:                                                                                                                    Process Metric:
  • Takt Time = 30 seconds                                         Process
  • PC/T = 22 seconds                                                                                                                  Outcome Metric:                                                                                                                    Outcome Metric:
  • Gap = 27%                                                      Date
  • Running 2 Shifts + overtime
  • 10 changeovers per day                       © Improvement Kata Handbook                                                                                         Target Condition       23                       © Improvement Kata Handbook                                                           Target Condition       23
                                           40                                                    Range of observed cycle times
Overview
   • Output cycles vary +/- 109%           35                                                          Lowest repeatable

   • Operator work steps vary
                                                                                                       observed cycle time

   • 4 operators                      TT                                                                                                                                                                                                                                                       90                110
   • WIP (as shown)
   • Line does not meet Pc/t               25
     and must run overtime          Pc/t
Machine Capacity                    90%
                                           20
                                                                                                                                                                                                                                                                                      4       4      5     6     3            4
                                 of Pc/t
   • Op 90 cannot meet Pc/t
     (see chart)
                                           15
                                                                                                                                                                                                                                                                    70       3
                                           10
Process Stability
  • Operator cycles fluctuate
                                                                                                                                                                                                                                                                                 2        1   3      2 1               2 1
                                                                                                                                                                                                 Our Gemba
                                            5            I          I          I          I
    up to -30% / + 90% (see chart)                       5          2         12         22
  • Operator 4 cannot consistently                      pcs        pcs        pcs        pcs
    meet Pc/t
                                                   10         40         70         90         110                                                                                                                                                                                            40                       10
Necessary Number of Operators
  • 3.2 operators / 4 actual
  • Operators 1, 2 & 3
    are underutilized (see chart)
                                                               Machines                                         Operators
                                                                                                                                                                                                  Go & See
© Improvement Kata Handbook                                                                                       Current Condition       50




                                                                                                                                                                                    © Lean Management Teachers                                                                                                                     14
Our Improvement Story
                                                                                                                                                                    Q3 Our obstacles


                                                           2                                                                                         4                                                                                   3                                                       1
                                                        We were                                                                               Now we are here,                                                                       We want                                                  Challenge
                                                         here                                                                         using PDCA to overcome obstacles                                                              to be here                                                & Vision


                                       Process:                                      Challenge:                                                                          TC date:                                Process:                       Challenge:                                                     TC date:
                                                                                     Theme of this TC:                                                                                                                                          Theme of this TC:

                                            Step 1:                                                                                                                  Step 2: Fill in what                         Step 1:                                                                                  Step 2: Fill in what
                                            Fill in current                                                                                                                you will keep                          Fill in current                                                                                you will keep
                                                                                     Current                                                              Target                the same                                                        Current                                        Target                 the same
                                            condition data                                                                                               Condition                                                condition data                                                              Condition
                                                                                    Condition                                                                                                                                                  Condition
                                                                                                                                                                     Step 3: Fill in what                                                                                                                  Step 3: Fill in what
                                                                                    Date                                                                             you want to change                                                                                                                    you want to change

                                       Takt time:                                                                                     Takt time:                                                                 Takt time:                                              Takt time:
                                       Pc/t:                                                                                          Pc/t:                                                                      Pc/t:                                                   Pc/t:
                                       # of Shifts:                                                                                   # of Shifts:                                                               # of Shifts:                                            # of Shifts:
                                       Overtime (how much):                                                                           Overtime:                                                                  Overtime (how much):                                    Overtime:
                                       Output / Shift (run chart):                                                                    Output / Shift:                                                            Output / Shift (run chart):                             Output / Shift:
                                       # of Operators:                                                                                # of Operators:                                                            # of Operators:                                         # of Operators:
                                       Where 1x1, where WIP:                                                                          Where 1x1, where WIP:                                                      Where 1x1, where WIP:                                   Where 1x1, where WIP:
                                       Describe the process                                                                           Describe the process                                                       Describe the process                                    Describe the process
                                       steps, sequence, times:                                                                        steps, sequence, times:                                                    steps, sequence, times:                                 steps, sequence, times:
                                       Exit cycle fluctuation %:                                                                      Exit cycle fluctuation %:                                                  Exit cycle fluctuation %:                               Exit cycle fluctuation %:
                                       Other observations about the current pattern:                                                                                                                             Other observations about the current pattern:
                                                -- Example 2 --
                              All-in-one summary for a manual line
Customer Demand / Line Pace                                          CURRENT CONDITION                                                 Process Metric:                                                                                                                    Process Metric:
  • Takt Time = 30 seconds                                         Process
  • PC/T = 22 seconds                                                                                                                  Outcome Metric:                                                                                                                    Outcome Metric:
  • Gap = 27%                                                      Date
  • Running 2 Shifts + overtime
  • 10 changeovers per day                       © Improvement Kata Handbook                                                                                         Target Condition       23                       © Improvement Kata Handbook                                                           Target Condition       23
                                           40                                                    Range of observed cycle times
Overview
   • Output cycles vary +/- 109%           35                                                          Lowest repeatable

   • Operator work steps vary
                                                                                                       observed cycle time

   • 4 operators                      TT                                                                                                                                                                                                                                                       90                110
   • WIP (as shown)
   • Line does not meet Pc/t               25
     and must run overtime          Pc/t
Machine Capacity                    90%
                                           20
                                                                                                                                                                                                                                                                                      4       4      5     6     3            4
                                 of Pc/t
   • Op 90 cannot meet Pc/t
     (see chart)
                                           15
                                                                                                                                                                                                                                                                    70       3
                                           10
Process Stability
  • Operator cycles fluctuate
                                                                                                                                                                                                                                                                                 2        1   3      2 1               2 1
                                                                                                                                                                                                 Our Gemba
                                            5            I          I          I          I
    up to -30% / + 90% (see chart)                       5          2         12         22
  • Operator 4 cannot consistently                      pcs        pcs        pcs        pcs
    meet Pc/t
                                                   10         40         70         90         110                                                                                                                                                                                            40                       10
Necessary Number of Operators
  • 3.2 operators / 4 actual
  • Operators 1, 2 & 3
    are underutilized (see chart)
                                                               Machines                                         Operators
                                                                                                                                                                                                  Go & See
© Improvement Kata Handbook                                                                                       Current Condition       50




                                                                                                                                                                                    © Lean Management Teachers                                                                                                                     15
Our Improvement Story
                                                                                                                                                              Our reflection


                                                           2                                                                                          4                                                                              3                                                       1
                                                        We were                                                                                Now we are here,                                                                  We want                                                  Challenge
                                                         here                                                                          using PDCA to overcome obstacles                                                         to be here                                                & Vision


                                      Process:                                       Challenge:                                                                  TC date:                                    Process:                       Challenge:                                                     TC date:
                                                                                     Theme of this TC:                                                                                                                                      Theme of this TC:

                                           Step 1:                                                                                                           Step 2: Fill in what                             Step 1:                                                                                  Step 2: Fill in what
                                           Fill in current                                                                                                         you will keep                              Fill in current                                                                                you will keep
                                           condition data
                                                                                     Current
                                                                                    Condition                                                        Reflect Step 3: Fill in what
                                                                                                                                                       Target
                                                                                                                                                      Condition on the Last Step Taken
                                                                                                                                                                        the same                              condition data
                                                                                                                                                                                                                                            Current
                                                                                                                                                                                                                                           Condition
                                                                                                                                                                                                                                                                                           Target
                                                                                                                                                                                                                                                                                          Condition
                                                                                                                                                                                                                                                                                                                  the same
                                                                                                                                                                                                                                                                                                       Step 3: Fill in what
                                                                                    Date                                                                                    donʼt
                                                                                                                                                     Because youchange actually know
                                                                                                                                                                you want to                                                                                                                            you want to change

                                      Takt time:                                                                                      Takt time:                                                             Takt time:                                              Takt time:
                                      Pc/t:                                                                                           Pc/t:
                                                                                                                                                     what the result of a step will be!                      Pc/t:                                                   Pc/t:
                                      # of Shifts:                                                                                    # of Shifts:                                                           # of Shifts:                                            # of Shifts:
                                      Overtime (how much):                                                                            Overtime:                                                              Overtime (how much):                                    Overtime:
                                      Output / Shift (run chart):                                                                     Output / Shift:
                                                                                                                                                           1) What was your last step?                       Output / Shift (run chart):                             Output / Shift:
                                      # of Operators:                                                                                 # of Operators:      2) What actually happened?                        # of Operators:                                         # of Operators:
                                      Where 1x1, where WIP:                                                                           Where 1x1, where WIP:                                                  Where 1x1, where WIP:                                   Where 1x1, where WIP:
                                      Describe the process
                                      steps, sequence, times:
                                                                                                                                      Describe the process
                                                                                                                                      steps, sequence, times:
                                                                                                                                                                3) What did you learn?                       Describe the process
                                                                                                                                                                                                             steps, sequence, times:
                                                                                                                                                                                                                                                                     Describe the process
                                                                                                                                                                                                                                                                     steps, sequence, times:
                                      Exit cycle fluctuation %:                                                                                          ----------------------------> Return
                                                                                                                                      Exit cycle fluctuation %:                                              Exit cycle fluctuation %:                               Exit cycle fluctuation %:
                                      Other observations about the current pattern:                                                                                                                          Other observations about the current pattern:
                                                -- Example 2 --
                              All-in-one summary for a manual line
Customer Demand / Line Pace                                          CURRENT CONDITION                                                 Process Metric:                                                                                                                Process Metric:
  • Takt Time = 30 seconds                                         Process
  • PC/T = 22 seconds                                                                                                                  Outcome Metric:                                                                                                                Outcome Metric:
  • Gap = 27%                                                      Date
  • Running 2 Shifts + overtime
  • 10 changeovers per day                      © Improvement Kata Handbook                                                                                  Target Condition       23                           © Improvement Kata Handbook                                                           Target Condition       23
                                           40                                                    Range of observed cycle times
Overview
   • Output cycles vary +/- 109%           35                                                          Lowest repeatable

   • Operator work steps vary
                                                                                                       observed cycle time

   • 4 operators                      TT                                                                                                                                                                                                                                                   90                110
   • WIP (as shown)
   • Line does not meet Pc/t               25
     and must run overtime          Pc/t
Machine Capacity                    90%
                                           20
                                                                                                                                                                                                                                                                                  4       4      5     6     3            4
                                 of Pc/t
   • Op 90 cannot meet Pc/t
     (see chart)
                                           15
                                                                                                                                                                                                                                                                70       3
                                           10
Process Stability
  • Operator cycles fluctuate
                                                                                                                                                                                                                                                                             2        1   3      2 1               2 1
                                                                                                                                                                                         Our Gemba
                                            5            I          I          I          I
    up to -30% / + 90% (see chart)                       5          2         12         22
  • Operator 4 cannot consistently                      pcs        pcs        pcs        pcs
    meet Pc/t
                                                   10         40         70         90         110                                                                                                                                                                                        40                       10
Necessary Number of Operators
  • 3.2 operators / 4 actual
  • Operators 1, 2 & 3
    are underutilized (see chart)
                                                               Machines                                         Operators
                                                                                                                                                                                          Go & See
© Improvement Kata Handbook                                                                                       Current Condition           50




                                                                                                                                                                                © Lean Management Teachers                                                                                                                     16
Our Improvement Story
                                                                                                                                                                    Q4 Our next step


                                                           2                                                                                         4                                                                                   3                                                       1
                                                        We were                                                                               Now we are here,                                                                       We want                                                  Challenge
                                                         here                                                                         using PDCA to overcome obstacles                                                              to be here                                                & Vision


                                       Process:                                      Challenge:                                                                          TC date:                                Process:                       Challenge:                                                     TC date:
                                                                                     Theme of this TC:                                                                                                                                          Theme of this TC:

                                            Step 1:                                                                                                                  Step 2: Fill in what                         Step 1:                                                                                  Step 2: Fill in what
                                            Fill in current                                                                                                                you will keep                          Fill in current                                                                                you will keep
                                                                                     Current                                                              Target                the same                                                        Current                                        Target                 the same
                                            condition data                                                                                               Condition                                                condition data                                                              Condition
                                                                                    Condition                                                                                                                                                  Condition
                                                                                                                                                                     Step 3: Fill in what                                                                                                                  Step 3: Fill in what
                                                                                    Date                                                                             you want to change                                                                                                                    you want to change

                                       Takt time:                                                                                     Takt time:                                                                 Takt time:                                              Takt time:
                                       Pc/t:                                                                                          Pc/t:                                                                      Pc/t:                                                   Pc/t:
                                       # of Shifts:                                                                                   # of Shifts:                                                               # of Shifts:                                            # of Shifts:
                                       Overtime (how much):                                                                           Overtime:                                                                  Overtime (how much):                                    Overtime:
                                       Output / Shift (run chart):                                                                    Output / Shift:                                                            Output / Shift (run chart):                             Output / Shift:
                                       # of Operators:                                                                                # of Operators:                                                            # of Operators:                                         # of Operators:
                                       Where 1x1, where WIP:                                                                          Where 1x1, where WIP:                                                      Where 1x1, where WIP:                                   Where 1x1, where WIP:
                                       Describe the process                                                                           Describe the process                                                       Describe the process                                    Describe the process
                                       steps, sequence, times:                                                                        steps, sequence, times:                                                    steps, sequence, times:                                 steps, sequence, times:
                                       Exit cycle fluctuation %:                                                                      Exit cycle fluctuation %:                                                  Exit cycle fluctuation %:                               Exit cycle fluctuation %:
                                       Other observations about the current pattern:                                                                                                                             Other observations about the current pattern:
                                                -- Example 2 --
                              All-in-one summary for a manual line
Customer Demand / Line Pace                                          CURRENT CONDITION                                                 Process Metric:                                                                                                                    Process Metric:
  • Takt Time = 30 seconds                                         Process
  • PC/T = 22 seconds                                                                                                                  Outcome Metric:                                                                                                                    Outcome Metric:
  • Gap = 27%                                                      Date
  • Running 2 Shifts + overtime
  • 10 changeovers per day                       © Improvement Kata Handbook                                                                                         Target Condition       23                       © Improvement Kata Handbook                                                           Target Condition       23
                                           40                                                    Range of observed cycle times
Overview
   • Output cycles vary +/- 109%           35                                                          Lowest repeatable

   • Operator work steps vary
                                                                                                       observed cycle time

   • 4 operators                      TT                                                                                                                                                                                                                                                       90                110
   • WIP (as shown)
   • Line does not meet Pc/t               25
     and must run overtime          Pc/t
Machine Capacity                    90%
                                           20
                                                                                                                                                                                                                                                                                      4       4      5     6     3            4
                                 of Pc/t
   • Op 90 cannot meet Pc/t
     (see chart)
                                           15
                                                                                                                                                                                                                                                                    70       3
                                           10
Process Stability
  • Operator cycles fluctuate
                                                                                                                                                                                                                                                                                 2        1   3      2 1               2 1
                                                                                                                                                                                                 Our Gemba
                                            5            I          I          I          I
    up to -30% / + 90% (see chart)                       5          2         12         22
  • Operator 4 cannot consistently                      pcs        pcs        pcs        pcs
    meet Pc/t
                                                   10         40         70         90         110                                                                                                                                                                                            40                       10
Necessary Number of Operators
  • 3.2 operators / 4 actual
  • Operators 1, 2 & 3
    are underutilized (see chart)
                                                               Machines                                         Operators
                                                                                                                                                                                                  Go & See
© Improvement Kata Handbook                                                                                       Current Condition       50




                                                                                                                                                                                    © Lean Management Teachers                                                                                                                     17
Our Improvement Story Board
Our Improvement Story Board

Mais conteúdo relacionado

Destaque

How do we get started with Toyota Kata?
How do we get started with Toyota Kata?How do we get started with Toyota Kata?
How do we get started with Toyota Kata?EmielVanEst
 
Performance management
Performance managementPerformance management
Performance managementtaratoot
 
Organizational excellence
Organizational excellenceOrganizational excellence
Organizational excellenceHass Chapman
 
NonViolent Communication - Gamestorming Barcelona session
NonViolent Communication - Gamestorming Barcelona sessionNonViolent Communication - Gamestorming Barcelona session
NonViolent Communication - Gamestorming Barcelona sessionJaume Jornet Rivas
 
Organizational excellence
Organizational excellenceOrganizational excellence
Organizational excellenceMugdha Pednekar
 
Wie Sie mit Wertstromdesign Ihre Produktion systematisch optimieren
Wie Sie mit Wertstromdesign Ihre Produktion systematisch optimierenWie Sie mit Wertstromdesign Ihre Produktion systematisch optimieren
Wie Sie mit Wertstromdesign Ihre Produktion systematisch optimierenLearning Factory
 
Toyota Kata Unified Field Theory & Strategy Deployment (Hoshin Kanri)
Toyota Kata Unified Field Theory & Strategy Deployment (Hoshin Kanri)Toyota Kata Unified Field Theory & Strategy Deployment (Hoshin Kanri)
Toyota Kata Unified Field Theory & Strategy Deployment (Hoshin Kanri)EmielVanEst
 
Organizational Excellence
Organizational ExcellenceOrganizational Excellence
Organizational ExcellenceYucika Kalvari
 
Improvement Kata Roles & Structure
Improvement Kata Roles & StructureImprovement Kata Roles & Structure
Improvement Kata Roles & StructureTyson Ortiz
 
259000828 toyota-kata-presentation-from-keith-deibert
259000828 toyota-kata-presentation-from-keith-deibert259000828 toyota-kata-presentation-from-keith-deibert
259000828 toyota-kata-presentation-from-keith-deibertMario Charlin
 

Destaque (17)

25 Principles For Quality Leader
25 Principles For Quality Leader25 Principles For Quality Leader
25 Principles For Quality Leader
 
Key ingredients for organizational excellence
Key ingredients for organizational excellenceKey ingredients for organizational excellence
Key ingredients for organizational excellence
 
Kata bingo
Kata bingoKata bingo
Kata bingo
 
How do we get started with Toyota Kata?
How do we get started with Toyota Kata?How do we get started with Toyota Kata?
How do we get started with Toyota Kata?
 
Tiens spirulina
Tiens spirulinaTiens spirulina
Tiens spirulina
 
Performance management
Performance managementPerformance management
Performance management
 
Organizational excellence
Organizational excellenceOrganizational excellence
Organizational excellence
 
NonViolent Communication - Gamestorming Barcelona session
NonViolent Communication - Gamestorming Barcelona sessionNonViolent Communication - Gamestorming Barcelona session
NonViolent Communication - Gamestorming Barcelona session
 
toyota pdca
toyota pdcatoyota pdca
toyota pdca
 
Organizational excellence
Organizational excellenceOrganizational excellence
Organizational excellence
 
Wie Sie mit Wertstromdesign Ihre Produktion systematisch optimieren
Wie Sie mit Wertstromdesign Ihre Produktion systematisch optimierenWie Sie mit Wertstromdesign Ihre Produktion systematisch optimieren
Wie Sie mit Wertstromdesign Ihre Produktion systematisch optimieren
 
Toyota Kata Unified Field Theory & Strategy Deployment (Hoshin Kanri)
Toyota Kata Unified Field Theory & Strategy Deployment (Hoshin Kanri)Toyota Kata Unified Field Theory & Strategy Deployment (Hoshin Kanri)
Toyota Kata Unified Field Theory & Strategy Deployment (Hoshin Kanri)
 
Organizational Excellence
Organizational ExcellenceOrganizational Excellence
Organizational Excellence
 
Improvement Kata Roles & Structure
Improvement Kata Roles & StructureImprovement Kata Roles & Structure
Improvement Kata Roles & Structure
 
The Wrong Kata
The Wrong KataThe Wrong Kata
The Wrong Kata
 
259000828 toyota-kata-presentation-from-keith-deibert
259000828 toyota-kata-presentation-from-keith-deibert259000828 toyota-kata-presentation-from-keith-deibert
259000828 toyota-kata-presentation-from-keith-deibert
 
VSM Lean Value Stream intro
VSM Lean Value Stream introVSM Lean Value Stream intro
VSM Lean Value Stream intro
 

Semelhante a Our Improvement Story Board

Characteristics of the Current Process
Characteristics of the Current Process Characteristics of the Current Process
Characteristics of the Current Process Emma Dickens
 
Information in a Current Condition
Information in a Current Condition Information in a Current Condition
Information in a Current Condition Emma Dickens
 
Equipment Capacity
Equipment CapacityEquipment Capacity
Equipment CapacityEmma Dickens
 
Webinar - Disaster in Japan: A Lesson in BCM
Webinar - Disaster in Japan: A Lesson in BCMWebinar - Disaster in Japan: A Lesson in BCM
Webinar - Disaster in Japan: A Lesson in BCMeasy2comply
 
Simulating Operability of Wheel Loaders
Simulating Operability of Wheel LoadersSimulating Operability of Wheel Loaders
Simulating Operability of Wheel LoadersReno Filla
 
Tackling the Management Challenges of Server Consolidation on Multi-core Systems
Tackling the Management Challenges of Server Consolidation on Multi-core SystemsTackling the Management Challenges of Server Consolidation on Multi-core Systems
Tackling the Management Challenges of Server Consolidation on Multi-core SystemsThe Linux Foundation
 
Towards Achieving Execution Time Predictability in Web Services Middleware
Towards Achieving Execution Time Predictability in Web Services MiddlewareTowards Achieving Execution Time Predictability in Web Services Middleware
Towards Achieving Execution Time Predictability in Web Services MiddlewareVidura Gamini Abhaya
 
Conquer CI Server! - Re-establishment of Order and Nurture of the Solid Organ...
Conquer CI Server! - Re-establishment of Order and Nurture of the Solid Organ...Conquer CI Server! - Re-establishment of Order and Nurture of the Solid Organ...
Conquer CI Server! - Re-establishment of Order and Nurture of the Solid Organ...Rakuten Group, Inc.
 
Case study electronics industry
Case study   electronics industryCase study   electronics industry
Case study electronics industryGanesh TN
 
Measuring Product Management/Ownership Effectiveness in a Lean/Agile world
Measuring Product Management/Ownership Effectiveness in a Lean/Agile worldMeasuring Product Management/Ownership Effectiveness in a Lean/Agile world
Measuring Product Management/Ownership Effectiveness in a Lean/Agile worldYuval Yeret
 
PID Tuner: A practical guide
PID Tuner: A practical guidePID Tuner: A practical guide
PID Tuner: A practical guideRudolfKalman
 
M10 - Theory of Constraints_11_2020 (1).pptx
M10 - Theory of Constraints_11_2020 (1).pptxM10 - Theory of Constraints_11_2020 (1).pptx
M10 - Theory of Constraints_11_2020 (1).pptxgina458018
 
Balancing exercise for garment industry
Balancing exercise for garment industryBalancing exercise for garment industry
Balancing exercise for garment industryAdithy_Kottangal
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)MohammedLahssaini1
 
Supply chain logistic review by lisa ferguson
Supply chain logistic review by lisa fergusonSupply chain logistic review by lisa ferguson
Supply chain logistic review by lisa fergusonUtkan Uluçay, MSc., CDDP
 

Semelhante a Our Improvement Story Board (20)

Lecture 2a
Lecture 2aLecture 2a
Lecture 2a
 
Characteristics of the Current Process
Characteristics of the Current Process Characteristics of the Current Process
Characteristics of the Current Process
 
Information in a Current Condition
Information in a Current Condition Information in a Current Condition
Information in a Current Condition
 
Equipment Capacity
Equipment CapacityEquipment Capacity
Equipment Capacity
 
Making Run Charts
Making Run ChartsMaking Run Charts
Making Run Charts
 
Customer TAKT
Customer TAKTCustomer TAKT
Customer TAKT
 
Webinar - Disaster in Japan: A Lesson in BCM
Webinar - Disaster in Japan: A Lesson in BCMWebinar - Disaster in Japan: A Lesson in BCM
Webinar - Disaster in Japan: A Lesson in BCM
 
Simulating Operability of Wheel Loaders
Simulating Operability of Wheel LoadersSimulating Operability of Wheel Loaders
Simulating Operability of Wheel Loaders
 
Tackling the Management Challenges of Server Consolidation on Multi-core Systems
Tackling the Management Challenges of Server Consolidation on Multi-core SystemsTackling the Management Challenges of Server Consolidation on Multi-core Systems
Tackling the Management Challenges of Server Consolidation on Multi-core Systems
 
Towards Achieving Execution Time Predictability in Web Services Middleware
Towards Achieving Execution Time Predictability in Web Services MiddlewareTowards Achieving Execution Time Predictability in Web Services Middleware
Towards Achieving Execution Time Predictability in Web Services Middleware
 
Itil in one_hour
Itil in one_hourItil in one_hour
Itil in one_hour
 
Conquer CI Server! - Re-establishment of Order and Nurture of the Solid Organ...
Conquer CI Server! - Re-establishment of Order and Nurture of the Solid Organ...Conquer CI Server! - Re-establishment of Order and Nurture of the Solid Organ...
Conquer CI Server! - Re-establishment of Order and Nurture of the Solid Organ...
 
Case study electronics industry
Case study   electronics industryCase study   electronics industry
Case study electronics industry
 
Measuring Product Management/Ownership Effectiveness in a Lean/Agile world
Measuring Product Management/Ownership Effectiveness in a Lean/Agile worldMeasuring Product Management/Ownership Effectiveness in a Lean/Agile world
Measuring Product Management/Ownership Effectiveness in a Lean/Agile world
 
PID Tuner: A practical guide
PID Tuner: A practical guidePID Tuner: A practical guide
PID Tuner: A practical guide
 
5 Steps to implementing Lean
5  Steps to implementing Lean5  Steps to implementing Lean
5 Steps to implementing Lean
 
M10 - Theory of Constraints_11_2020 (1).pptx
M10 - Theory of Constraints_11_2020 (1).pptxM10 - Theory of Constraints_11_2020 (1).pptx
M10 - Theory of Constraints_11_2020 (1).pptx
 
Balancing exercise for garment industry
Balancing exercise for garment industryBalancing exercise for garment industry
Balancing exercise for garment industry
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)
 
Supply chain logistic review by lisa ferguson
Supply chain logistic review by lisa fergusonSupply chain logistic review by lisa ferguson
Supply chain logistic review by lisa ferguson
 

Mais de EmielVanEst

Culture and mindset for continuous improvement
Culture and mindset for continuous improvementCulture and mindset for continuous improvement
Culture and mindset for continuous improvementEmielVanEst
 
Scientific thinking is not enough
Scientific thinking is not enoughScientific thinking is not enough
Scientific thinking is not enoughEmielVanEst
 
Is there a Path to Purpose?
Is there a Path to Purpose?Is there a Path to Purpose?
Is there a Path to Purpose?EmielVanEst
 
Did Toyota fool the lean community for decades?
Did Toyota fool the lean community for decades?Did Toyota fool the lean community for decades?
Did Toyota fool the lean community for decades?EmielVanEst
 
Where should you focus your improvement kata efforts?
Where should you focus your improvement kata efforts?Where should you focus your improvement kata efforts?
Where should you focus your improvement kata efforts?EmielVanEst
 
Obstacles as Targeted Learning Questions
Obstacles as Targeted Learning QuestionsObstacles as Targeted Learning Questions
Obstacles as Targeted Learning QuestionsEmielVanEst
 
How to measure coaching and pdca cycles
How to measure coaching and pdca cyclesHow to measure coaching and pdca cycles
How to measure coaching and pdca cyclesEmielVanEst
 
Little's Law Toegepast
Little's Law ToegepastLittle's Law Toegepast
Little's Law ToegepastEmielVanEst
 

Mais de EmielVanEst (8)

Culture and mindset for continuous improvement
Culture and mindset for continuous improvementCulture and mindset for continuous improvement
Culture and mindset for continuous improvement
 
Scientific thinking is not enough
Scientific thinking is not enoughScientific thinking is not enough
Scientific thinking is not enough
 
Is there a Path to Purpose?
Is there a Path to Purpose?Is there a Path to Purpose?
Is there a Path to Purpose?
 
Did Toyota fool the lean community for decades?
Did Toyota fool the lean community for decades?Did Toyota fool the lean community for decades?
Did Toyota fool the lean community for decades?
 
Where should you focus your improvement kata efforts?
Where should you focus your improvement kata efforts?Where should you focus your improvement kata efforts?
Where should you focus your improvement kata efforts?
 
Obstacles as Targeted Learning Questions
Obstacles as Targeted Learning QuestionsObstacles as Targeted Learning Questions
Obstacles as Targeted Learning Questions
 
How to measure coaching and pdca cycles
How to measure coaching and pdca cyclesHow to measure coaching and pdca cycles
How to measure coaching and pdca cycles
 
Little's Law Toegepast
Little's Law ToegepastLittle's Law Toegepast
Little's Law Toegepast
 

Último

Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 

Último (20)

Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 

Our Improvement Story Board

  • 1. Lean Management Teachers Our Improvement Story Board Ideas building on Mike Rothers work using recent experience with beginning practitioners. March 2012 Emiel van Est
  • 2. Our Improvement Story  We practice the Improvement Kata & Coaching Kata as outlined in Mike Rothers Book Toyota Kata and the companion Handbook © Lean Management Teachers 2
  • 3. We used the Process Analysis Mini Kata to Understand our Current Condition. 2 4 3 1 We were Now we are here, We want Challenge here using PDCA to overcome obstacles to be here & Vision -- Example 2 -- All-in-one summary for a manual line Customer Demand and Line Pace Customer Demand / Line Pace CURRENT CONDITION • Customer takt • Planned cycle time • Takt Time = 30 seconds Process • Number of shifts currently running • PC/T = 22 seconds • Gap = 27% Date Overview of the Process • Running 2 Shifts + overtime • Define the start & end points of the process • 10 changeovers per day • Get to know the process by sketching a block diagram of it 40 Range of observed cycle times - Where does WIP accumulate? Overview • How much does process output fluctuate? (Cycle-to-cycle and shift-to-shift) • Note other details about the current operating pattern • Output cycles vary +/- 109% 35 Lowest repeatable • Operator work steps vary observed cycle time • 4 operators TT Machine Capacity   • WIP (as shown) • Can the automatic equipment support the planned cycle time? • How close are we to our current machine capacity limit? No Yes • Line does not meet Pc/t 25 • What is the fastest Pc/t the equipment can currently support? and must run overtime Pc/t • Shift options? 20 Machine Capacity 90% of Pc/t Process Fluctuation   • Op 90 cannot meet Pc/t 15 • Time 20-40 full cycles of each operatorʼs work No Yes (see chart) • Are each operatorʼs work steps the same from cycle to cycle? 10 Process Stability Necessary Number of Operators (if process were stable) • Operator cycles fluctuate I I I I • Calculate number of operators up to -30% / + 90% (see chart) 5 5 2 12 22 • Operator 4 cannot consistently pcs pcs pcs pcs meet Pc/t 10 40 70 90 110 Necessary Number of Operators Machines Operators • 3.2 operators / 4 actual • Operators 1, 2 & 3 are underutilized (see chart) © Improvement Kata Handbook Current Condition 50 © Lean Management Teachers 3
  • 4. We filled in our Target Condition Form 2 4 3 1 We were Now we are here, We want Challenge WHAT INFORMATION IS IN APDCA to overcome obstacles here using TARGET CONDITION? to be here & Vision A target condition describes how you want a process to operate • A target condition for a manufacturing process should include the following four categories of information. • No verbs in a target condition. Thatʼs for how to get there. • You must include a target date for achieving the target condition. Process: Challenge: TC date: Achieve-By Date: (required) Theme of this TC: (1) DESCRIBE PROCESS STEPS, SEQUENCE & TIMES Step 1: Step 2: Fill in what you will keep Fill in current Current Target A pattern you can draw or chart (see example) condition data Condition Condition the same Step 3: Fill in what you want to change (2) OTHER PROCESS CHARACTERISTICS Examples: • Number of operators Takt time: Takt time: Used for • Number of shifts proving • Where 1x1 flow is planned, and where standard WIP Pc/t: Pc/t: (incl. quantity) is to be located # of Shifts: # of Shifts: • Leveling sequence Overtime (how much): Overtime: (3) PROCESS METRIC(S) (Measurement in the moment) Output / Shift (run chart): Output / Shift: For checking process condition in real time # of Operators: # of Operators: Examples: • Time for each step, piece, pitch, etc. Where 1x1, where WIP: Where 1x1, where WIP: • Degree of time fluctuation from cycle to cycle Describe the process Describe the process steps, sequence, times: steps, sequence, times: Exit cycle fluctuation %: Exit cycle fluctuation %: (4) OUTCOME METRIC(S) Other observations about the current pattern: Used to To check outcome of improvement efforts check Examples: • Number of pieces per hour or shift • Leveling sequence attainment tcomes • Productivity Process Metric: Outcome Metric: Improvement Kata Handbook Target Condition Kata Handbook © Improvement 11 Target Condition 23 © Lean Management Teachers 4
  • 5. Now we are here mixing things up during coaching sessions. 2 4 3 1 We were Now we are here, We want Challenge here using PDCA to overcome obstacles to be here & Vision © Lean Management Teachers 5
  • 6. Quite often, Q2 is answered by the Current Condition we came from,.. 2 4 3 1 We were Now we are here, We want Challenge here using PDCA to overcome obstacles to be here & Vision Process: Challenge: TC date: Theme of this TC: Step 1: Step 2: Fill in what Fill in current you will keep Current Target the same condition data Condition Condition Step 3: Fill in what you want to change Takt time: Takt time: Pc/t: Pc/t: # of Shifts: # of Shifts: Overtime (how much): Overtime: Output / Shift (run chart): Output / Shift: # of Operators: # of Operators: Where 1x1, where WIP: Where 1x1, where WIP: Describe the process Describe the process steps, sequence, times: steps, sequence, times: Exit cycle fluctuation %: Exit cycle fluctuation %: Other observations about the current pattern: Process Metric: Outcome Metric: © Improvement Kata Handbook Target Condition 23 © Lean Management Teachers 6
  • 7. ... instead of referring to Today's Current Condition … 2 4 3 1 We were Now we are here, We want Challenge here using PDCA to overcome obstacles to be here & Vision Our Gemba Go & See © Lean Management Teachers 7
  • 8. … or this section is updated every PDCA cycle 2 4 3 1 We were Now we are here, We want Challenge here using PDCA to overcome obstacles to be here & Vision Process: Challenge: TC date: Theme of this TC: Step 1: Step 2: Fill in what Fill in current you will keep Current Target the same condition data Condition Condition Step 3: Fill in what you want to change Takt time: Takt time: Pc/t: Pc/t: # of Shifts: # of Shifts: Overtime (how much): Overtime: Output / Shift (run chart): Output / Shift: # of Operators: # of Operators: Where 1x1, where WIP: Where 1x1, where WIP: Describe the process Describe the process steps, sequence, times: steps, sequence, times: Exit cycle fluctuation %: Exit cycle fluctuation %: Other observations about the current pattern: Process Metric: Outcome Metric: © Improvement Kata Handbook Target Condition 23 © Lean Management Teachers 8
  • 9. Lean Management Teachers Maybe we can make things easier to understand © Lean Management Teachers 9
  • 10. Lets cut the Target Condition Form in two and add a date for the starting Current Condition to clearly distinct starting point and targeted point. 2 4 3 1 We were Now we are here, We want Challenge here using PDCA to overcome obstacles to be here & Vision Process: Challenge: TC date: Process: Challenge: TC date: Theme of this TC: Theme of this TC: Step 1: Step 2: Fill in what Step 1: Step 2: Fill in what Fill in current you will keep Fill in current you will keep Current Target the same Current Target the same condition data Condition condition data Condition Condition Condition Step 3: Fill in what Step 3: Fill in what you want to change you want to change Takt time: Pc/t: Date Takt time: Pc/t: Takt time: Pc/t: Takt time: Pc/t: # of Shifts: # of Shifts: # of Shifts: # of Shifts: Overtime (how much): Overtime: Overtime (how much): Overtime: Output / Shift (run chart): Output / Shift: Output / Shift (run chart): Output / Shift: # of Operators: # of Operators: # of Operators: # of Operators: Where 1x1, where WIP: Where 1x1, where WIP: Where 1x1, where WIP: Where 1x1, where WIP: Describe the process Describe the process Describe the process Describe the process steps, sequence, times: steps, sequence, times: steps, sequence, times: steps, sequence, times: Exit cycle fluctuation %: Exit cycle fluctuation %: Exit cycle fluctuation %: Exit cycle fluctuation %: Other observations about the current pattern: Other observations about the current pattern: Process Metric: Process Metric: Outcome Metric: Outcome Metric: © Improvement Kata Handbook Target Condition © Improvement Kata Handbook 23 Target Condition 23 © Lean Management Teachers 10
  • 11. In between we can list all relevant information about our discovery process. 2 4 3 1 We were Now we are here, We want Challenge here using PDCA to overcome obstacles to be here & Vision Process: Challenge: TC date: Process: Challenge: TC date: Theme of this TC: Theme of this TC: Step 1: Step 2: Fill in what Step 1: Step 2: Fill in what Fill in current you will keep Fill in current you will keep Current Target the same Current Target the same condition data Condition condition data Condition Condition Condition Step 3: Fill in what Step 3: Fill in what Date you want to change you want to change Takt time: Takt time: Takt time: Takt time: Pc/t: Pc/t: Pc/t: Pc/t: # of Shifts: # of Shifts: # of Shifts: # of Shifts: Overtime (how much): Overtime: Overtime (how much): Overtime: Output / Shift (run chart): Output / Shift: Output / Shift (run chart): Output / Shift: # of Operators: # of Operators: # of Operators: # of Operators: Where 1x1, where WIP: Where 1x1, where WIP: Where 1x1, where WIP: Where 1x1, where WIP: Describe the process Describe the process Describe the process Describe the process steps, sequence, times: steps, sequence, times: steps, sequence, times: steps, sequence, times: Exit cycle fluctuation %: Exit cycle fluctuation %: Exit cycle fluctuation %: Exit cycle fluctuation %: Other observations about the current pattern: Our Gemba about the current pattern: Other observations Go & See Process Metric: Process Metric: Outcome Metric: Outcome Metric: © Improvement Kata Handbook Target Condition © Improvement Kata Handbook 23 Target Condition 23 © Lean Management Teachers 11
  • 12. Lean Management Teachers Lets test our redesigned Improvement Story Board © Lean Management Teachers 12
  • 13. Our Improvement Story Q1 Our Target Condition 2 4 3 1 We were Now we are here, We want Challenge here using PDCA to overcome obstacles to be here & Vision Process: Challenge: TC date: Process: Challenge: TC date: Theme of this TC: Theme of this TC: Step 1: Step 2: Fill in what Step 1: Step 2: Fill in what Fill in current you will keep Fill in current you will keep Current Target the same Current Target the same condition data Condition condition data Condition Condition Condition Step 3: Fill in what Step 3: Fill in what Date you want to change you want to change Takt time: Takt time: Takt time: Takt time: Pc/t: Pc/t: Pc/t: Pc/t: # of Shifts: # of Shifts: # of Shifts: # of Shifts: Overtime (how much): Overtime: Overtime (how much): Overtime: Output / Shift (run chart): Output / Shift: Output / Shift (run chart): Output / Shift: # of Operators: # of Operators: # of Operators: # of Operators: Where 1x1, where WIP: Where 1x1, where WIP: Where 1x1, where WIP: Where 1x1, where WIP: Describe the process Describe the process Describe the process Describe the process steps, sequence, times: steps, sequence, times: steps, sequence, times: steps, sequence, times: Exit cycle fluctuation %: Exit cycle fluctuation %: Exit cycle fluctuation %: Exit cycle fluctuation %: Other observations about the current pattern: Other observations about the current pattern: -- Example 2 -- All-in-one summary for a manual line Customer Demand / Line Pace CURRENT CONDITION Process Metric: Process Metric: • Takt Time = 30 seconds Process • PC/T = 22 seconds Outcome Metric: Outcome Metric: • Gap = 27% Date • Running 2 Shifts + overtime • 10 changeovers per day © Improvement Kata Handbook Target Condition 23 © Improvement Kata Handbook Target Condition 23 40 Range of observed cycle times Overview • Output cycles vary +/- 109% 35 Lowest repeatable • Operator work steps vary observed cycle time • 4 operators TT 90 110 • WIP (as shown) • Line does not meet Pc/t 25 and must run overtime Pc/t Machine Capacity 90% 20 4 4 5 6 3 4 of Pc/t • Op 90 cannot meet Pc/t (see chart) 15 70 3 10 Process Stability • Operator cycles fluctuate 2 1 3 2 1 2 1 Our Gemba 5 I I I I up to -30% / + 90% (see chart) 5 2 12 22 • Operator 4 cannot consistently pcs pcs pcs pcs meet Pc/t 10 40 70 90 110 40 10 Necessary Number of Operators • 3.2 operators / 4 actual • Operators 1, 2 & 3 are underutilized (see chart) Machines Operators Go & See © Improvement Kata Handbook Current Condition 50 © Lean Management Teachers 13
  • 14. Our Improvement Story Q2 Our Current Condition 2 4 3 1 We were Now we are here, We want Challenge here using PDCA to overcome obstacles to be here & Vision Process: Challenge: TC date: Process: Challenge: TC date: Theme of this TC: Theme of this TC: Step 1: Step 2: Fill in what Step 1: Step 2: Fill in what Fill in current you will keep Fill in current you will keep Current Target the same Current Target the same condition data Condition condition data Condition Condition Condition Step 3: Fill in what Step 3: Fill in what Date you want to change you want to change Takt time: Takt time: Takt time: Takt time: Pc/t: Pc/t: Pc/t: Pc/t: # of Shifts: # of Shifts: # of Shifts: # of Shifts: Overtime (how much): Overtime: Overtime (how much): Overtime: Output / Shift (run chart): Output / Shift: Output / Shift (run chart): Output / Shift: # of Operators: # of Operators: # of Operators: # of Operators: Where 1x1, where WIP: Where 1x1, where WIP: Where 1x1, where WIP: Where 1x1, where WIP: Describe the process Describe the process Describe the process Describe the process steps, sequence, times: steps, sequence, times: steps, sequence, times: steps, sequence, times: Exit cycle fluctuation %: Exit cycle fluctuation %: Exit cycle fluctuation %: Exit cycle fluctuation %: Other observations about the current pattern: Other observations about the current pattern: -- Example 2 -- All-in-one summary for a manual line Customer Demand / Line Pace CURRENT CONDITION Process Metric: Process Metric: • Takt Time = 30 seconds Process • PC/T = 22 seconds Outcome Metric: Outcome Metric: • Gap = 27% Date • Running 2 Shifts + overtime • 10 changeovers per day © Improvement Kata Handbook Target Condition 23 © Improvement Kata Handbook Target Condition 23 40 Range of observed cycle times Overview • Output cycles vary +/- 109% 35 Lowest repeatable • Operator work steps vary observed cycle time • 4 operators TT 90 110 • WIP (as shown) • Line does not meet Pc/t 25 and must run overtime Pc/t Machine Capacity 90% 20 4 4 5 6 3 4 of Pc/t • Op 90 cannot meet Pc/t (see chart) 15 70 3 10 Process Stability • Operator cycles fluctuate 2 1 3 2 1 2 1 Our Gemba 5 I I I I up to -30% / + 90% (see chart) 5 2 12 22 • Operator 4 cannot consistently pcs pcs pcs pcs meet Pc/t 10 40 70 90 110 40 10 Necessary Number of Operators • 3.2 operators / 4 actual • Operators 1, 2 & 3 are underutilized (see chart) Machines Operators Go & See © Improvement Kata Handbook Current Condition 50 © Lean Management Teachers 14
  • 15. Our Improvement Story Q3 Our obstacles 2 4 3 1 We were Now we are here, We want Challenge here using PDCA to overcome obstacles to be here & Vision Process: Challenge: TC date: Process: Challenge: TC date: Theme of this TC: Theme of this TC: Step 1: Step 2: Fill in what Step 1: Step 2: Fill in what Fill in current you will keep Fill in current you will keep Current Target the same Current Target the same condition data Condition condition data Condition Condition Condition Step 3: Fill in what Step 3: Fill in what Date you want to change you want to change Takt time: Takt time: Takt time: Takt time: Pc/t: Pc/t: Pc/t: Pc/t: # of Shifts: # of Shifts: # of Shifts: # of Shifts: Overtime (how much): Overtime: Overtime (how much): Overtime: Output / Shift (run chart): Output / Shift: Output / Shift (run chart): Output / Shift: # of Operators: # of Operators: # of Operators: # of Operators: Where 1x1, where WIP: Where 1x1, where WIP: Where 1x1, where WIP: Where 1x1, where WIP: Describe the process Describe the process Describe the process Describe the process steps, sequence, times: steps, sequence, times: steps, sequence, times: steps, sequence, times: Exit cycle fluctuation %: Exit cycle fluctuation %: Exit cycle fluctuation %: Exit cycle fluctuation %: Other observations about the current pattern: Other observations about the current pattern: -- Example 2 -- All-in-one summary for a manual line Customer Demand / Line Pace CURRENT CONDITION Process Metric: Process Metric: • Takt Time = 30 seconds Process • PC/T = 22 seconds Outcome Metric: Outcome Metric: • Gap = 27% Date • Running 2 Shifts + overtime • 10 changeovers per day © Improvement Kata Handbook Target Condition 23 © Improvement Kata Handbook Target Condition 23 40 Range of observed cycle times Overview • Output cycles vary +/- 109% 35 Lowest repeatable • Operator work steps vary observed cycle time • 4 operators TT 90 110 • WIP (as shown) • Line does not meet Pc/t 25 and must run overtime Pc/t Machine Capacity 90% 20 4 4 5 6 3 4 of Pc/t • Op 90 cannot meet Pc/t (see chart) 15 70 3 10 Process Stability • Operator cycles fluctuate 2 1 3 2 1 2 1 Our Gemba 5 I I I I up to -30% / + 90% (see chart) 5 2 12 22 • Operator 4 cannot consistently pcs pcs pcs pcs meet Pc/t 10 40 70 90 110 40 10 Necessary Number of Operators • 3.2 operators / 4 actual • Operators 1, 2 & 3 are underutilized (see chart) Machines Operators Go & See © Improvement Kata Handbook Current Condition 50 © Lean Management Teachers 15
  • 16. Our Improvement Story Our reflection 2 4 3 1 We were Now we are here, We want Challenge here using PDCA to overcome obstacles to be here & Vision Process: Challenge: TC date: Process: Challenge: TC date: Theme of this TC: Theme of this TC: Step 1: Step 2: Fill in what Step 1: Step 2: Fill in what Fill in current you will keep Fill in current you will keep condition data Current Condition Reflect Step 3: Fill in what Target Condition on the Last Step Taken the same condition data Current Condition Target Condition the same Step 3: Fill in what Date donʼt Because youchange actually know you want to you want to change Takt time: Takt time: Takt time: Takt time: Pc/t: Pc/t: what the result of a step will be! Pc/t: Pc/t: # of Shifts: # of Shifts: # of Shifts: # of Shifts: Overtime (how much): Overtime: Overtime (how much): Overtime: Output / Shift (run chart): Output / Shift: 1) What was your last step? Output / Shift (run chart): Output / Shift: # of Operators: # of Operators: 2) What actually happened? # of Operators: # of Operators: Where 1x1, where WIP: Where 1x1, where WIP: Where 1x1, where WIP: Where 1x1, where WIP: Describe the process steps, sequence, times: Describe the process steps, sequence, times: 3) What did you learn? Describe the process steps, sequence, times: Describe the process steps, sequence, times: Exit cycle fluctuation %: ----------------------------> Return Exit cycle fluctuation %: Exit cycle fluctuation %: Exit cycle fluctuation %: Other observations about the current pattern: Other observations about the current pattern: -- Example 2 -- All-in-one summary for a manual line Customer Demand / Line Pace CURRENT CONDITION Process Metric: Process Metric: • Takt Time = 30 seconds Process • PC/T = 22 seconds Outcome Metric: Outcome Metric: • Gap = 27% Date • Running 2 Shifts + overtime • 10 changeovers per day © Improvement Kata Handbook Target Condition 23 © Improvement Kata Handbook Target Condition 23 40 Range of observed cycle times Overview • Output cycles vary +/- 109% 35 Lowest repeatable • Operator work steps vary observed cycle time • 4 operators TT 90 110 • WIP (as shown) • Line does not meet Pc/t 25 and must run overtime Pc/t Machine Capacity 90% 20 4 4 5 6 3 4 of Pc/t • Op 90 cannot meet Pc/t (see chart) 15 70 3 10 Process Stability • Operator cycles fluctuate 2 1 3 2 1 2 1 Our Gemba 5 I I I I up to -30% / + 90% (see chart) 5 2 12 22 • Operator 4 cannot consistently pcs pcs pcs pcs meet Pc/t 10 40 70 90 110 40 10 Necessary Number of Operators • 3.2 operators / 4 actual • Operators 1, 2 & 3 are underutilized (see chart) Machines Operators Go & See © Improvement Kata Handbook Current Condition 50 © Lean Management Teachers 16
  • 17. Our Improvement Story Q4 Our next step 2 4 3 1 We were Now we are here, We want Challenge here using PDCA to overcome obstacles to be here & Vision Process: Challenge: TC date: Process: Challenge: TC date: Theme of this TC: Theme of this TC: Step 1: Step 2: Fill in what Step 1: Step 2: Fill in what Fill in current you will keep Fill in current you will keep Current Target the same Current Target the same condition data Condition condition data Condition Condition Condition Step 3: Fill in what Step 3: Fill in what Date you want to change you want to change Takt time: Takt time: Takt time: Takt time: Pc/t: Pc/t: Pc/t: Pc/t: # of Shifts: # of Shifts: # of Shifts: # of Shifts: Overtime (how much): Overtime: Overtime (how much): Overtime: Output / Shift (run chart): Output / Shift: Output / Shift (run chart): Output / Shift: # of Operators: # of Operators: # of Operators: # of Operators: Where 1x1, where WIP: Where 1x1, where WIP: Where 1x1, where WIP: Where 1x1, where WIP: Describe the process Describe the process Describe the process Describe the process steps, sequence, times: steps, sequence, times: steps, sequence, times: steps, sequence, times: Exit cycle fluctuation %: Exit cycle fluctuation %: Exit cycle fluctuation %: Exit cycle fluctuation %: Other observations about the current pattern: Other observations about the current pattern: -- Example 2 -- All-in-one summary for a manual line Customer Demand / Line Pace CURRENT CONDITION Process Metric: Process Metric: • Takt Time = 30 seconds Process • PC/T = 22 seconds Outcome Metric: Outcome Metric: • Gap = 27% Date • Running 2 Shifts + overtime • 10 changeovers per day © Improvement Kata Handbook Target Condition 23 © Improvement Kata Handbook Target Condition 23 40 Range of observed cycle times Overview • Output cycles vary +/- 109% 35 Lowest repeatable • Operator work steps vary observed cycle time • 4 operators TT 90 110 • WIP (as shown) • Line does not meet Pc/t 25 and must run overtime Pc/t Machine Capacity 90% 20 4 4 5 6 3 4 of Pc/t • Op 90 cannot meet Pc/t (see chart) 15 70 3 10 Process Stability • Operator cycles fluctuate 2 1 3 2 1 2 1 Our Gemba 5 I I I I up to -30% / + 90% (see chart) 5 2 12 22 • Operator 4 cannot consistently pcs pcs pcs pcs meet Pc/t 10 40 70 90 110 40 10 Necessary Number of Operators • 3.2 operators / 4 actual • Operators 1, 2 & 3 are underutilized (see chart) Machines Operators Go & See © Improvement Kata Handbook Current Condition 50 © Lean Management Teachers 17