SlideShare a Scribd company logo
1 of 15
Portland Public Schools Capital
 Construction Bond Program

  Presentation to Portland AIA Chapter
                   by
          James E. Owens, PE
           Executive Director
     Office of School Modernization
                    &
           Elaine Baker, CPPO
            Program Director
       Purchasing & Contracting
             February 21, 2012
Strategic Framework
Bond Development Committee
• 22 community member committee
• Considered a number of criteria and dollar
  values for 17 bond proposals including:
  – High Schools       - Facility Condition Index
  – Large Site Size - Free & Reduced Lunch %
  – Poor Seismic Condition
  – Priority Access Needs - Partnerships
  – Only infrastructure major repairs
Public Input Session:
            May 2012
• Support for November 2012 as the right
  time to move forward with a bond measure
• Seismic issues identified as concern
• Concern over cost of a bond measure
• Support for initial focus on high schools
• Interest in bond supporting an educational
  vision as well as taking care of urgent
  needs
Preferred School Construction

           Bond Proposal
• Partnership
  – Faubion PK-8 with Concordia University
• Starting at High Schools:
  – a natural extension of the high school re-
    design process
  – Greater need for specialized educational
    spaces
  – Minimizes student disruption during K-12
  – More visible & accessible to entire community
Preferred School Construction

              Bond Proposal
• Provides balance between schools
  identified for full modernization and
  focused, urgent facility needs
  – Physical facility improvements provide a
    geographic balance across the district
  – Criteria includes;
     •   High seismic risk
     •   Priority roof replacements
     •   Accessibility to educational programs
     •   Partnerships
“Modernizations/Replacements”
• Master Plan entire site
• All building systems addressed at one time;
  complete interior & exterior rehabilitation
• Cost savings through coordinated work
• More costly overall than simply repairing but
  results in improved learning spaces
• Likely requires students to relocate during
  construction
“Targeted Improvements”
• Partial improvements to one or two building
  systems at a time (roofs, seismic strength &
  ADA)
• Educational facility improvements at grade 6-
  8 Science Classrooms
• Addresses biggest problems at many schools
• Less likely to substantively improve learning
  spaces
• Most work should not require student
  relocation
High School, Seismic & Access
  $1.10 per $1000 of assessed value
       Educational Facility Improvements
       Improve grades 6-8 science classrooms with sinks and electrical outlets
       at as many as 39 schools.
  $5M
       Seismic and other building improvements
       Seismic strengthening at as many as 26 schools. Replace and
       seismically brace roofs at as many as 14 schools. Replace roofs at as
       many as 8 schools. Improve accessibility to educational programs at as
$69.5M many as 33 schools.
       Full modernizations or replacement
       These schools are identified as potential modernizations or replacement:
       • High schools with high seismic risk.
$278M • High schools with major access upgrades needed.
       • Faubion = capital partnership with Concordia University.

         3 high schools –        Grant      Franklin     Roosevelt

                                 $95M       $85M         $70M
                       Faubion
         1 K-8 –
                       $28M
High School, Seismic & Access
  $1.10 per $1,000 of assessed value
       Debt repayment
       Rosa Parks K-8.
       Boiler conversions, prior roof replacements and other financed capital
 $45M projects.
       Program costs
       Required reserves, materials and labor cost escalation, bond issuance
       costs and improvements and transportation to buildings where students
$84.5M attend school while their school is renovated. Master planning for 6 high
       schools ($1.5M)
$482M Total Bond Program
       Estimated rate: $1.10/$1,000 of assessed value over 8 years, $0.30
       over an additional 12 years.

          Program duration – Eight Years
Voter Decision
         Measure M26-144
• Strong voter response - 66% voted in
  favor based on County analysis – Passed!
• Transparency & oversight
  – Use of bond accountability committee
  – Seven member committee
  – Report to Board
  – Design oversight group for full
    modernizations/replacements
  – Extensive community involvement
Blended team
Doing business with PPS
• PPS is a large public agency - “full & open competition”
  is an important objective
• Equity in public purchasing & contracting policy
   – Aspirational MWESB, workforce & students
• Architect, Engineers, Land Surveyors & Related services
   – PM/CM, Planners, architects, building envelope,
     engineers, special inspection, etc.
• Builders/Contractors – Public Improvements
   – Traditional design-bid-build & alternative (CM/GC)
• Goods & Services
   – Furniture, Fixtures & Equipment
Next Steps
• Monitor ORPIN/DJC for solicitations
• Get on PPS’s ‘list of interested
  consultants’
• Multiple opportunities at direct
  appointment & informal level
• Project sequence – Roosevelt, Franklin,
  Group 2 designs
• Communicate with purchasing &
  contracting and OSM staff
Questions?
• Thank you for your support Portland
• Buildings do matter and contribute to
  student success!

More Related Content

Similar to Portland public schools

School Plant Management Educ. 265
School Plant Management Educ. 265School Plant Management Educ. 265
School Plant Management Educ. 265Elma Gapusan
 
Think You Can't Afford Green? Think Again
Think You Can't Afford Green? Think AgainThink You Can't Afford Green? Think Again
Think You Can't Afford Green? Think AgainCHPSOnline
 
TDR_work_samples (11-05-14)
TDR_work_samples (11-05-14)TDR_work_samples (11-05-14)
TDR_work_samples (11-05-14)Timothy Ralston
 
Financing energy upgrades for k 12 schools - u.s. dept. of energy
Financing energy upgrades for k 12 schools - u.s. dept. of energyFinancing energy upgrades for k 12 schools - u.s. dept. of energy
Financing energy upgrades for k 12 schools - u.s. dept. of energyTNenergy
 
A Community Network: A Systems Approach to Implementation Success
A Community Network: A Systems Approach to Implementation SuccessA Community Network: A Systems Approach to Implementation Success
A Community Network: A Systems Approach to Implementation SuccessCalifornia STEM Learning Network
 
Critical Importance of Well-Maintained Facilities - Thurnau
Critical Importance of Well-Maintained Facilities - ThurnauCritical Importance of Well-Maintained Facilities - Thurnau
Critical Importance of Well-Maintained Facilities - ThurnauMeg Thompson
 
USD 497 Budget Savings Recommendations
USD 497 Budget Savings RecommendationsUSD 497 Budget Savings Recommendations
USD 497 Budget Savings RecommendationsLHSBudget
 
renovation presentation
renovation presentationrenovation presentation
renovation presentationDavid Peck
 
SUU Sorenson Child & Family Center
SUU Sorenson Child & Family CenterSUU Sorenson Child & Family Center
SUU Sorenson Child & Family CenterHigherEdUtah
 
Green needham sustainable communities
Green needham sustainable communitiesGreen needham sustainable communities
Green needham sustainable communitiesGreen Needham
 
Paulpirainomasccc2014
Paulpirainomasccc2014Paulpirainomasccc2014
Paulpirainomasccc2014Jen Boudrie
 
Designing and Implementing a Robust and Sustainable Campus Green Fund: Recom...
Designing and Implementing a Robust and Sustainable Campus Green Fund:  Recom...Designing and Implementing a Robust and Sustainable Campus Green Fund:  Recom...
Designing and Implementing a Robust and Sustainable Campus Green Fund: Recom...Mieko Ozeki
 
School district-referendum-presentation-3-30
School district-referendum-presentation-3-30School district-referendum-presentation-3-30
School district-referendum-presentation-3-30Rick McGrath
 
Triple Bottom Line: How Green Schools Save Money, Promote Health, and Improve...
Triple Bottom Line: How Green Schools Save Money, Promote Health, and Improve...Triple Bottom Line: How Green Schools Save Money, Promote Health, and Improve...
Triple Bottom Line: How Green Schools Save Money, Promote Health, and Improve...caiscalifornia
 
Solutions Overview: Charter School Energy
Solutions Overview: Charter School EnergySolutions Overview: Charter School Energy
Solutions Overview: Charter School EnergyCharter School Capital
 
A Year of Transition
A Year of TransitionA Year of Transition
A Year of Transitioncelinstitute
 
Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013SchoolDude
 
Guilford High School Proposed Improvement
Guilford High School Proposed ImprovementGuilford High School Proposed Improvement
Guilford High School Proposed ImprovementTai Soo Kim Partners
 

Similar to Portland public schools (20)

School Plant Management Educ. 265
School Plant Management Educ. 265School Plant Management Educ. 265
School Plant Management Educ. 265
 
Think You Can't Afford Green? Think Again
Think You Can't Afford Green? Think AgainThink You Can't Afford Green? Think Again
Think You Can't Afford Green? Think Again
 
TDR_work_samples (11-05-14)
TDR_work_samples (11-05-14)TDR_work_samples (11-05-14)
TDR_work_samples (11-05-14)
 
Financing energy upgrades for k 12 schools - u.s. dept. of energy
Financing energy upgrades for k 12 schools - u.s. dept. of energyFinancing energy upgrades for k 12 schools - u.s. dept. of energy
Financing energy upgrades for k 12 schools - u.s. dept. of energy
 
A Community Network: A Systems Approach to Implementation Success
A Community Network: A Systems Approach to Implementation SuccessA Community Network: A Systems Approach to Implementation Success
A Community Network: A Systems Approach to Implementation Success
 
Critical Importance of Well-Maintained Facilities - Thurnau
Critical Importance of Well-Maintained Facilities - ThurnauCritical Importance of Well-Maintained Facilities - Thurnau
Critical Importance of Well-Maintained Facilities - Thurnau
 
USD 497 Budget Savings Recommendations
USD 497 Budget Savings RecommendationsUSD 497 Budget Savings Recommendations
USD 497 Budget Savings Recommendations
 
renovation presentation
renovation presentationrenovation presentation
renovation presentation
 
SUU Sorenson Child & Family Center
SUU Sorenson Child & Family CenterSUU Sorenson Child & Family Center
SUU Sorenson Child & Family Center
 
Green needham sustainable communities
Green needham sustainable communitiesGreen needham sustainable communities
Green needham sustainable communities
 
Cefpi power point presentation revised
Cefpi power point presentation revisedCefpi power point presentation revised
Cefpi power point presentation revised
 
Paulpirainomasccc2014
Paulpirainomasccc2014Paulpirainomasccc2014
Paulpirainomasccc2014
 
Designing and Implementing a Robust and Sustainable Campus Green Fund: Recom...
Designing and Implementing a Robust and Sustainable Campus Green Fund:  Recom...Designing and Implementing a Robust and Sustainable Campus Green Fund:  Recom...
Designing and Implementing a Robust and Sustainable Campus Green Fund: Recom...
 
School district-referendum-presentation-3-30
School district-referendum-presentation-3-30School district-referendum-presentation-3-30
School district-referendum-presentation-3-30
 
Watkins School Modernization Community (November 17, 2015)
Watkins School Modernization Community (November 17, 2015)Watkins School Modernization Community (November 17, 2015)
Watkins School Modernization Community (November 17, 2015)
 
Triple Bottom Line: How Green Schools Save Money, Promote Health, and Improve...
Triple Bottom Line: How Green Schools Save Money, Promote Health, and Improve...Triple Bottom Line: How Green Schools Save Money, Promote Health, and Improve...
Triple Bottom Line: How Green Schools Save Money, Promote Health, and Improve...
 
Solutions Overview: Charter School Energy
Solutions Overview: Charter School EnergySolutions Overview: Charter School Energy
Solutions Overview: Charter School Energy
 
A Year of Transition
A Year of TransitionA Year of Transition
A Year of Transition
 
Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013
 
Guilford High School Proposed Improvement
Guilford High School Proposed ImprovementGuilford High School Proposed Improvement
Guilford High School Proposed Improvement
 

Recently uploaded

mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...Pooja Nehwal
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...anjaliyadav012327
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 

Recently uploaded (20)

mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 

Portland public schools

  • 1. Portland Public Schools Capital Construction Bond Program Presentation to Portland AIA Chapter by James E. Owens, PE Executive Director Office of School Modernization & Elaine Baker, CPPO Program Director Purchasing & Contracting February 21, 2012
  • 3. Bond Development Committee • 22 community member committee • Considered a number of criteria and dollar values for 17 bond proposals including: – High Schools - Facility Condition Index – Large Site Size - Free & Reduced Lunch % – Poor Seismic Condition – Priority Access Needs - Partnerships – Only infrastructure major repairs
  • 4. Public Input Session: May 2012 • Support for November 2012 as the right time to move forward with a bond measure • Seismic issues identified as concern • Concern over cost of a bond measure • Support for initial focus on high schools • Interest in bond supporting an educational vision as well as taking care of urgent needs
  • 5. Preferred School Construction Bond Proposal • Partnership – Faubion PK-8 with Concordia University • Starting at High Schools: – a natural extension of the high school re- design process – Greater need for specialized educational spaces – Minimizes student disruption during K-12 – More visible & accessible to entire community
  • 6. Preferred School Construction Bond Proposal • Provides balance between schools identified for full modernization and focused, urgent facility needs – Physical facility improvements provide a geographic balance across the district – Criteria includes; • High seismic risk • Priority roof replacements • Accessibility to educational programs • Partnerships
  • 7. “Modernizations/Replacements” • Master Plan entire site • All building systems addressed at one time; complete interior & exterior rehabilitation • Cost savings through coordinated work • More costly overall than simply repairing but results in improved learning spaces • Likely requires students to relocate during construction
  • 8. “Targeted Improvements” • Partial improvements to one or two building systems at a time (roofs, seismic strength & ADA) • Educational facility improvements at grade 6- 8 Science Classrooms • Addresses biggest problems at many schools • Less likely to substantively improve learning spaces • Most work should not require student relocation
  • 9. High School, Seismic & Access $1.10 per $1000 of assessed value Educational Facility Improvements Improve grades 6-8 science classrooms with sinks and electrical outlets at as many as 39 schools. $5M Seismic and other building improvements Seismic strengthening at as many as 26 schools. Replace and seismically brace roofs at as many as 14 schools. Replace roofs at as many as 8 schools. Improve accessibility to educational programs at as $69.5M many as 33 schools. Full modernizations or replacement These schools are identified as potential modernizations or replacement: • High schools with high seismic risk. $278M • High schools with major access upgrades needed. • Faubion = capital partnership with Concordia University. 3 high schools – Grant Franklin Roosevelt $95M $85M $70M Faubion 1 K-8 – $28M
  • 10. High School, Seismic & Access $1.10 per $1,000 of assessed value Debt repayment Rosa Parks K-8. Boiler conversions, prior roof replacements and other financed capital $45M projects. Program costs Required reserves, materials and labor cost escalation, bond issuance costs and improvements and transportation to buildings where students $84.5M attend school while their school is renovated. Master planning for 6 high schools ($1.5M) $482M Total Bond Program Estimated rate: $1.10/$1,000 of assessed value over 8 years, $0.30 over an additional 12 years. Program duration – Eight Years
  • 11. Voter Decision Measure M26-144 • Strong voter response - 66% voted in favor based on County analysis – Passed! • Transparency & oversight – Use of bond accountability committee – Seven member committee – Report to Board – Design oversight group for full modernizations/replacements – Extensive community involvement
  • 13. Doing business with PPS • PPS is a large public agency - “full & open competition” is an important objective • Equity in public purchasing & contracting policy – Aspirational MWESB, workforce & students • Architect, Engineers, Land Surveyors & Related services – PM/CM, Planners, architects, building envelope, engineers, special inspection, etc. • Builders/Contractors – Public Improvements – Traditional design-bid-build & alternative (CM/GC) • Goods & Services – Furniture, Fixtures & Equipment
  • 14. Next Steps • Monitor ORPIN/DJC for solicitations • Get on PPS’s ‘list of interested consultants’ • Multiple opportunities at direct appointment & informal level • Project sequence – Roosevelt, Franklin, Group 2 designs • Communicate with purchasing & contracting and OSM staff
  • 15. Questions? • Thank you for your support Portland • Buildings do matter and contribute to student success!