This document is intended to provide additional guidance to electrical contractors who require Electricity North West electrical connection to a property to be temporarily de-energised in order to facilitate safe working on a consumer’s electrical installation.

Guidance for Electrical Contractors for the Temporary
De-Energisation of Electrical Supplies
Introduction
This document is intended to provide additional guidance to electrical contractors
who require Electricity North West electrical connection to a property to be
temporarily de-energised in order to facilitate safe working on a consumer’s electrical
installation.
The following definitions shall apply in this document:
Disconnection – Removal of all distribution assets from site
De-energisation – Removal of distributor service fuse only
Contact should initially be made with the company that supplies power (i.e. the
company whom bills are paid).
Procedure for the Permanent Disconnection of Electrical Supplies
Requests for the permanent disconnection of electrical supplies from Electricity North
West distribution network should be referred to Electricity North West Customer
Service Desk.
Tel. 0800 195 4141
Procedure for the Temporary De-Energisation of Electrical Supplies
Electricity North West would advise all enquiries for temporary de-energisation to de
directed to their supplier, however as these details are frequently subject to change a
single point contact has been established to provide this information:
“Electricity North West Electricity Meter Point Administration Service” (MPAS).
Tel. 0870 751 0093
MPAS will provide relevant information regarding the supplier to persons responsible
for the account.
The supplier will then arrange for an authorised person to attend site to remove /
replace and seal the service termination cut out fuse.
Charges may be applied for this service.
Installation of Double Pole Isolators
In accordance with Engineering Recommendation P25/1 (1996) in some connection
arrangements it may be possible to install double pole isolators between the
electricity meter and the consumer unit for ease of isolation by the customer.
It is not the policy of Electricity North West to install double pole isolators for this
purpose.
Where a customer wishes to install a double pole isolator the ownership of the
equipment shall be clearly marked and the installation of the equipment shall be in
accordance with BS7671 (2001): - IEE Wiring Regulations 16th
Edition.
New Connections and Service Alterations
Refer to Electricity North West Company Website: www.enwl.co.uk
Technical Information
Requests for information regarding the supply characteristics of an existing
installation should be directed to Electricity North West Customer Service Desk.
Tel. 0800 195 4141
Upon request Electricity North West shall provide:
• The maximum prospective short circuit current at the supply terminals
• The maximum earth loop impedance of the earth fault path outside the
installation (for low voltage connections)
• The type and rating of the distributor’s protective device nearest the supply
terminals
• The type of earthing system applicable to the connection
• Details of number of phases, frequency and voltage at which the electricity is
supplies and permitted variations.
Electricity North West will not advise on the Earthing and Bonding requirements of
the premises as responsibility for this lies with the installer.
Electricity No Supplies (24hr) Tel: 0800 195 4141

Mais conteúdo relacionado

Mais procurados(20)

AVR for Tigo Case StudyAVR for Tigo Case Study
AVR for Tigo Case Study
Sollatek 371 visualizações
Power Grid Control SystemPower Grid Control System
Power Grid Control System
Jigyasa Singh4.8K visualizações
presentation on power grid systempresentation on power grid system
presentation on power grid system
rahul123gupta2.4K visualizações
Internship Training Project Report "PowerGrid"Internship Training Project Report "PowerGrid"
Internship Training Project Report "PowerGrid"
Raushan11610 visualizações
InPhase Power - IPC 150 Active Harmonic FilterInPhase Power - IPC 150 Active Harmonic Filter
InPhase Power - IPC 150 Active Harmonic Filter
Inphase Power technologies private limited19.1K visualizações
Power factor solution,presentationPower factor solution,presentation
Power factor solution,presentation
Amol Chande869 visualizações
Brushless DC Motor ControllerBrushless DC Motor Controller
Brushless DC Motor Controller
Lilaney621 visualizações
Gss herapura reportGss herapura report
Gss herapura report
swami keshvanand institute of technology,jaipur17.4K visualizações
2009-dec02_OnDuty2009-dec02_OnDuty
2009-dec02_OnDuty
Agora Group292 visualizações
CURRICULUM VITAE UPDATED 07.01.17 CURRICULUM VITAE UPDATED 07.01.17
CURRICULUM VITAE UPDATED 07.01.17
Ahmed Jaffar553 visualizações
Ultra fast acting electronic circuit breakerUltra fast acting electronic circuit breaker
Ultra fast acting electronic circuit breaker
Edgefxkits & Solutions1.5K visualizações
Electronic Circuit BreakerElectronic Circuit Breaker
Electronic Circuit Breaker
IRJET Journal17 visualizações
Lv switchgear & lv cable sizingLv switchgear & lv cable sizing
Lv switchgear & lv cable sizing
Asif Eqbal13.6K visualizações
power grid synchronization failure detectionpower grid synchronization failure detection
power grid synchronization failure detection
Jay Hind2.6K visualizações

Similar a Guide for Electrical Contractors(20)

windfarmgridissues.pdfwindfarmgridissues.pdf
windfarmgridissues.pdf
sundeepsiddula3 visualizações
Wind farm grid issuesWind farm grid issues
Wind farm grid issues
Rohil Kumar497 visualizações
Electricty wiring code 2016Electricty wiring code 2016
Electricty wiring code 2016
Manikandan Mani549 visualizações
pptpdf-131117235616-phpapp02.pdfpptpdf-131117235616-phpapp02.pdf
pptpdf-131117235616-phpapp02.pdf
Thien Phan Bản3 visualizações
Electric vehicle and charging infra by link vue systemElectric vehicle and charging infra by link vue system
Electric vehicle and charging infra by link vue system
Mahesh Chandra Manav59 visualizações
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSSWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
Partha Parida48.2K visualizações
Power quality pptPower quality ppt
Power quality ppt
Kaustubh Nande118.1K visualizações
powerqualityppt-130820010049-phpapp02.pdfpowerqualityppt-130820010049-phpapp02.pdf
powerqualityppt-130820010049-phpapp02.pdf
giahuy6465637 visualizações
electrical energy supply legrand.pdfelectrical energy supply legrand.pdf
electrical energy supply legrand.pdf
EMERSON EDUARDO RODRIGUES10 visualizações
Power qualityPower quality
Power quality
Biswajit Pratihari24.8K visualizações
Detecting power grid synchronisation failureDetecting power grid synchronisation failure
Detecting power grid synchronisation failure
Vivek Bhakta20 visualizações
Instruction manualInstruction manual
Instruction manual
rohit singh948 visualizações

Mais de Electricity North West Limited(9)

Electricity North West Limited - £1.9bn local power investmentElectricity North West Limited - £1.9bn local power investment
Electricity North West Limited - £1.9bn local power investment
Electricity North West Limited249 visualizações
Safety Overhead Electricity - LeisureSafety Overhead Electricity - Leisure
Safety Overhead Electricity - Leisure
Electricity North West Limited207 visualizações
Householder Electricitry Safety GuideHouseholder Electricitry Safety Guide
Householder Electricitry Safety Guide
Electricity North West Limited169 visualizações
Farming Safety Guide - Overhead Electricity LinesFarming Safety Guide - Overhead Electricity Lines
Farming Safety Guide - Overhead Electricity Lines
Electricity North West Limited268 visualizações
Electrical Safety Guide - Underground CablesElectrical Safety Guide - Underground Cables
Electrical Safety Guide - Underground Cables
Electricity North West Limited140 visualizações
Electrical Safety Guide - Overhead LinesElectrical Safety Guide - Overhead Lines
Electrical Safety Guide - Overhead Lines
Electricity North West Limited529 visualizações
Camping and Caravaning Safety Guide - Overhead LinesCamping and Caravaning Safety Guide - Overhead Lines
Camping and Caravaning Safety Guide - Overhead Lines
Electricity North West Limited241 visualizações
Angling Safety LeafletAngling Safety Leaflet
Angling Safety Leaflet
Electricity North West Limited410 visualizações
Fishery Owners and Managers Safety LeafletFishery Owners and Managers Safety Leaflet
Fishery Owners and Managers Safety Leaflet
Electricity North West Limited118 visualizações

Último(20)

Corporate DeckCorporate Deck
Corporate Deck
Equinox Gold Corp.186 visualizações
The Business Tycoons(March-2023) - Womens Day MagazineThe Business Tycoons(March-2023) - Womens Day Magazine
The Business Tycoons(March-2023) - Womens Day Magazine
Global India Business Forum14 visualizações
Skilled Landscape ContractorSkilled Landscape Contractor
Skilled Landscape Contractor
EmmanuelRyker10 visualizações
Moore_Merven_BUS119-0_PB1_2023-10.pptxMoore_Merven_BUS119-0_PB1_2023-10.pptx
Moore_Merven_BUS119-0_PB1_2023-10.pptx
mervenmoore16 visualizações
Greece opens countless opportunities for techiesGreece opens countless opportunities for techies
Greece opens countless opportunities for techies
Abhinav Immigration Services Pvt. Ltd.15 visualizações
TahminaTahseen Presentation.pdfTahminaTahseen Presentation.pdf
TahminaTahseen Presentation.pdf
thosna202223 visualizações
Personal Brand Exploration - Gray LeePersonal Brand Exploration - Gray Lee
Personal Brand Exploration - Gray Lee
grayl338 visualizações
Problem Solving & Visualization ToolsProblem Solving & Visualization Tools
Problem Solving & Visualization Tools
Operational Excellence Consulting (Singapore)27 visualizações
Effective Supervisory SkillEffective Supervisory Skill
Effective Supervisory Skill
Seta Wicaksana9 visualizações
Branam_Ragan_DMBS_PB1_2023-OCT.pdfBranam_Ragan_DMBS_PB1_2023-OCT.pdf
Branam_Ragan_DMBS_PB1_2023-OCT.pdf
ragan002320 visualizações
Voice Broadcasting - A Web Based Voice PromotionVoice Broadcasting - A Web Based Voice Promotion
Voice Broadcasting - A Web Based Voice Promotion
Nirmal Sharma14 visualizações
ENT PPP.pptx.Undergraduate htttc.pptxENT PPP.pptx.Undergraduate htttc.pptx
ENT PPP.pptx.Undergraduate htttc.pptx
National Higher polytechnic institute, university of Bamenda 13 visualizações
Mythic Forge - catálogo online.pdfMythic Forge - catálogo online.pdf
Mythic Forge - catálogo online.pdf
mythicstlforge26 visualizações

Guide for Electrical Contractors

  • 1. Guidance for Electrical Contractors for the Temporary De-Energisation of Electrical Supplies Introduction This document is intended to provide additional guidance to electrical contractors who require Electricity North West electrical connection to a property to be temporarily de-energised in order to facilitate safe working on a consumer’s electrical installation. The following definitions shall apply in this document: Disconnection – Removal of all distribution assets from site De-energisation – Removal of distributor service fuse only Contact should initially be made with the company that supplies power (i.e. the company whom bills are paid). Procedure for the Permanent Disconnection of Electrical Supplies Requests for the permanent disconnection of electrical supplies from Electricity North West distribution network should be referred to Electricity North West Customer Service Desk. Tel. 0800 195 4141 Procedure for the Temporary De-Energisation of Electrical Supplies Electricity North West would advise all enquiries for temporary de-energisation to de directed to their supplier, however as these details are frequently subject to change a single point contact has been established to provide this information: “Electricity North West Electricity Meter Point Administration Service” (MPAS). Tel. 0870 751 0093 MPAS will provide relevant information regarding the supplier to persons responsible for the account. The supplier will then arrange for an authorised person to attend site to remove / replace and seal the service termination cut out fuse. Charges may be applied for this service.
  • 2. Installation of Double Pole Isolators In accordance with Engineering Recommendation P25/1 (1996) in some connection arrangements it may be possible to install double pole isolators between the electricity meter and the consumer unit for ease of isolation by the customer. It is not the policy of Electricity North West to install double pole isolators for this purpose. Where a customer wishes to install a double pole isolator the ownership of the equipment shall be clearly marked and the installation of the equipment shall be in accordance with BS7671 (2001): - IEE Wiring Regulations 16th Edition. New Connections and Service Alterations Refer to Electricity North West Company Website: www.enwl.co.uk Technical Information Requests for information regarding the supply characteristics of an existing installation should be directed to Electricity North West Customer Service Desk. Tel. 0800 195 4141 Upon request Electricity North West shall provide: • The maximum prospective short circuit current at the supply terminals • The maximum earth loop impedance of the earth fault path outside the installation (for low voltage connections) • The type and rating of the distributor’s protective device nearest the supply terminals • The type of earthing system applicable to the connection • Details of number of phases, frequency and voltage at which the electricity is supplies and permitted variations. Electricity North West will not advise on the Earthing and Bonding requirements of the premises as responsibility for this lies with the installer. Electricity No Supplies (24hr) Tel: 0800 195 4141