To pursue a professionalcareer in a dynamic and creative environment in a well-reputed organization and excel in the field of Electrical Engineering by utilizing and expanding my technical, communication, managerial skills and analytical capabilities
1. uzairaamirkhan UZAIR AAMIR
Mobile: 0300-9099998 * E-Mail: uzairaamirkhan@yahoo.com
OBJECTIVE
To pursue a professionalcareer in a dynamic and creative environment in a well-reputed
organization and excel in the field of Electrical Engineering by utilizing and expanding my
technical, communication, managerial skills and analytical capabilities
Location Prefered:
SUMMARY
Technically Sophistiicated Professional with over one year of experience in the area of
Electrical Engineeringin the field of Construction and Transmission & Distribution .
Cureently associated with WAPDA, TSK Internatinal Pvt, PDA, and PESCO.
Proficient in Site Supervision, Wiring, Design Calculation (Estimation), Testing & Analysis,
Planning & Project Cordination according to the drawings.
Led Site work upgrade project for loading T/F and Generators, Load Banks, Main Distribution
Boards, Primary underground distribution (Conduits and cabling), Branch Distribution Boards,
Grounding (for electrical room and MDB, BDB or BCB and Load Bank).
Installations of Poles for 11 KVA Three Phase/440 voltage Three Phase Transmission Lines.
Installations Transformers.
Installations of Electric Meters & Three Phase Induction Motors
Ability to analyze, troubleshoot and determine technical problems.
Maintained Excellent academic record.
Rapid learner with the strong grasping approach.
Excellent communication, analy.tical & presentation skills.
Better analytical and problem resolving ability to go to the core of the problem for enhancing
operations.
PROFESSIONAL EXPERIENCE
hitech networks limited (hnl) on Telenor project: march 2016 till dated.
Network operating center (NOC ) trainee engineer
Operate the Innexiv remote monitoring system (rms).
2. Operate ZTE remote monitoring system .
On /off the generator by remote monitoring system .
On/off 3g by network elocation center(NEC) software.
Check the voltages and take action.
Escalation for down sites and lsv;s (low voltages) sites.
Check and send the updatesabout the sites.
Development Management Consultants ( DMC ): august , 2015 to february , 2016.
Electrical Engineer
Major project.
Construction and supervision at rural health center district bannu
Feasibility study
Design apply
Frontier Foundry Steel ( FF Steel ): may 8 , 2015 to july 6 , 2015.
Internee engineer
Major Projects
AC/DC Motors.
Installations of 20, 15, 10,25, 30, 150, 100, 7.5, 5, 2 , 1000 HP motors.
Installations of Star and delta connection.
Interlocking for star and delta connection.
Interlocking for forward and reserve direction.
Uses of contactors.
CKT Breaker 1500 Amps.
SF6 CKT Breaker.
Fly Wheel.
Earthing and grounding for Motors and transformers.
DC Pannel.
AC Speeder.
Installations of timer.
Over Load Relay.
Maintenance.
Armature Winding.
Steel Cutter.
Gear.
Cranp.
Thyrister.
3. 132 KV Hydro Power Generation Station , Warsak Dam, Peshawar, KPK,Pakistan
december, 2014 to april, 2015.
Internee Engineer
MAJOR PROJECTS
132 KV Hydro Power Generation Station , Warsak Dam, Peshawar,
KPK, Pakistan
At TSK EngineeringInternational PvtPeshawar, KPK, March 2014 to november2014
Electrical Engineer
MAJOR PROJECTS
Tarru Wapda Housing Society Peshawar, KPK, Pakistan.
Errection of HT and LT poles, Installtions of HT & LT conductors, 25 KVA, 50KVA,
100 KVA & 200 KVA transformers and Single & Three Phase Electric Meters and Street
Lights.
Reggi Lalma Housing Society Peshawar, KPK, Pakistan.
Errection of HT and LT poles, Installtions of HT & LT conductors, 25 KVA, 50KVA,
100 KVA & 200 KVA transformers and Single & Three Phase Electric Meters and Street
Lights.
Bagh-e-naran Road Hayatabad Peshawar, KPK, Pakistan.
Installation of Street Lights with Solar Pannel.
AzaKhail Matanai Housing society Peshawar, KPK, Pakistan.
Errection of HT and LT poles, Installtions of HT & LT conductors, 50 & 100 KVA
transformers and Single & Three Phase Electric Meters.
Phase V Hayatabad Peshawar, KPK, Pakistan.
maintenance and installations, Wiring, Lt Panel, Cable Trays, lights, fans and switches in
Officers Houses PDA Peshawar .
D-4, Phase VI Hayatabad Peshawar, KPK, Pakistan
Errection of HT and LT poles, Installtions of HT & LT conductors, 100 & 200 KVA
transformers and Single & Three Phase Electric Meters.
Installations of 25 KVA Tranformers for U.fone, Telenor,Zong & Mobilink Towers in
Peshawar, KPK, Pakistan.
Installations of 400 KVA & 500 KVA Transformers for USAWA pharmaceutical and
Papular Group of Juice, Resalpor Nawshehra, KPK, Pakistan
Installation of 630KVA Transformer for ARY Steel Manufacturing Industry, Industrial
Zone, Hayatabad Peshawar, KPK, Pakistan
4. At TSK Engineering International Pvt Peshawar, KPK, Pakistan August 2013 to till January 2014
Assistant Electrical Engineer
MAJOR PROJECTS
Hamza town Peshawar, KPK, Pakistan.
Installation of Street Lights and Elecrical meters for consumers Supply
Khyber Bazar, KPK, Pakistan.
Installation HT & LT Poles, Conductors, transformers and consumers connections.
Ring Road, Peshawar, KPK, Pakistan.
Installation of Street Lights, Transformers, conductors, Ht & LT Poles and consumers
supply.
JOB RESPONSIBILITIES
Construction:
Installed various electrical engineering and communication systemcomponents.
Prepared a project baseline and ensured that projects were carried in accordance to the same.
Scheduled the electrical work in coordination with the electrical engineers, contractors and
clients.
Installed under ground Conduits (PVC & X-PLE).
Wiring according to the drawings/ Site Supervision.
Ensured that all electrical tools were in accordance to the specifications.
Checked the installed electrical systems on a regular basis and ensured its smooth functioning.
Ensured that all safety regulations were followed in the facility and protective equipment’s
were given to workers.
Performed regular inspections on the electrical work carried in the facility.
Documented all client and vendor tests on the installed electrical equipment and conducted
tests.
Organized the inspection on site materials and ensured that they meet the required standards.
Assisted Reading of Drawings.
Weekly and monthly making Reports and send to Higher Authorities.
Daily making Reports and send to Higher Authorities.
Interfacing of different media devices.
Wiring and panel boards operations.
Transmission & Distribution:
Installations of HT poles (PC & Structure of 36, 45 ft Height) with 11 KVA Three Phase
Transmission lines (ACSR OSPREY, ACSR DOG & ACSR RABBIT Transmission power conductors)
5. Installations of LT Poles (PC & Structure of 30 ft Height) with 440 voltage Three Phase
Transmission Lines (AAC WASP & AAC ANT Transmission power conductors).
Installations of PIN insulators for HT transmission lines.
Installations of STRAIN Insulators for LT transmission lines.
Installations of DEAD END CLAMP for OSPERY, DOG & RABBIT Transmission power conductors.
Installations of SHACKLE Insulators for LT transmission lines.
Installations of D-SHACKLE ASSEMBALY for LT transmission lines.
Installations of ANCHOR Shackles.
Installations of PLATE FORM for Transformer (Single & Double Structure Pole/ H pole).
Installations of 12 Transformers (10 KVA, 15 KVA, 25 KVA, 50 KVA, 100 KVA & 200 KVA).
Installations of EARTH UNITES with THIMBLE.
Installations of STAY ROD with ELBOW & THIMBLE.
Installations of GALVANISED STEEL WIRE 10 mm.
Installations of GALVANISED STEEL & WIRE 6mm.
Installtions of DROP OUT CUT OUT for 11 KVA Transmission lines & Transformers.
Installations of SINGLE & THREE PHASE ELECTRIC METERS.
Installation of PVC 37/0.83 4/CORE & PVC 19/0.83 4/CORE connection between Transformer
and E-Meter.
Installations of Street lights.
Installations of THREE PHASE, 40 HP, 380-420 V, 58 A, 0.8 P.F, 1470 RPM MOTER for Tube Well.
Installations of Switch Gears for Three PHASE INDUCTION MOTOR.
Installations of 50 KVA Transformers for Tube Wells.
Maintinanace & Generation:
Worked on maintanace of Generation Generators (Generated voltage 11KV).
Worked on Step Up T/F (Step up from 11 KV to 132 KV )
Using Step Up T/F rating 40 MVA, SF 6 circuit bracker.
TECHNICAL SKILL
Site Engineer (Construction) : Installations of Generatr, Undewr Ground
Distribution,
Building Wiring according to Drawings.
Transmission & Distribution : Installation of Electrical HT & LT Cnductors,
T/F, E-Meters
AutoCAD Drafting, Designing & Techniques : Electrical Design Calculation
ECDAIL : Single Line Diagram
PLC/ MATLAB / C++ : programmable subjects
MS Office : Windows / (Word, Excel, Power Point.
Miantinanace & Generation : 132 KV Generation
6. ACADEMIC CREDENTIALS
2011 Bachelors in Electrical Engineering from Sarhad University of Science & Information
Technology, Peshawar, KPK, Pakistan.
ACHIEVEMENTS
Mini project
Toggling of LED’s screen on a bread board using Microprocessor8051.
Final Year Project & thesis.
Design of Electronic Circuit Breaker.
PERSONAL DOSSIER
Date of Birth: July 06, 1989
Residential Address Pakistan: House: 583, Street:30, Sector: D-4, Phase: 1. Hayatabad,
Peshawar.
REFERENCE
Will be furnishe on Demand