FROM PRODUCTIVITY BRIEFCASES HELP DESK
LABOUR
PRODUCTIVITY
LABOUR PRODUCTIVITY
 A large proportion of the high cost
in construction work is as a result of
excessive labour costs.
 These costs can be reduced if
productivity on site is increased by
improving labour efficiency.
LABOUR PRODUCTIVITY
 Labour productivity is determined by a
complexity of factors.
 One of these factors is the type and size
of the project.
 It includes the layout and complexity of the
project.
 A large construction site requiring a large
number of workers will be relatively harder
to manage than a smaller size.
LABOUR PRODUCTIVITY
 The difficulties in managing manpower on a
large scale may result in productivity loss
(Thomas and Jansma, 1985).
 There are four main factors that affect labour
productivity;
1. The duration of worker’s effort.
2. The intensity of worker’s effort.
3. The effectiveness of worker’s effort combined
with the technology used.
4. The efficiency of worker’s effort, which can be
described as a measure of how much the
worker is utilising his ability.
LABOUR PRODUCTIVITY
 Work on a complex project (e.g. such as the
construction of a major shopping centre)
becomes more difficult as the project advances.
 Off-site pre-fabrication units will reduce the
number of labour hours required.
Other factors such as:
 the level of skill amongst the workers;
 the length of the workday;
 Innovative work practices can increase
productivity.
LABOUR PRODUCTIVITY
 In view of Olomolaiye et al (1998):
 The personal attribution of workers contribute to
the factors that directly affect productivity.
These attributes as:
 worker’s skills
 experience
 training
 qualifications
 Innate (inborn) physical and mental ability.
 The intensity of the application of both skills and
innate ability to the production process.
LABOUR PRODUCTIVITY
Thomas et al (1992) investigated the level of labour
productivity for masonry activities from seven countries.
Case study showed that:
 little difference in productivity amongst the seven
countries.
 The aim of investigation was to show that productivity in
 Australia
 Canada
 England
 Finland,
 Scotland
 Sweden and the United State-was similar.
LABOUR PRODUCTIVITY
 The site with the highest level of
disruption will have the worse level of
productivity.
 Other investigations show that labour
disruption accounts for more than
50% of the variability in daily crew
productivity.
LABOUR PRODUCTIVITY
 An excessive number of staff can be disruptive.
 It also has the effect of reducing the level of
productivity.
The results of a model based survey of contractors
(planning engineers) in France, Germany and UK
Showed that :
 the working schedule of UK and German
contractors may be excessive;
 can have an impact on construction productivity
level.
LABOUR PRODUCTIVITY
 The survey also identified that in the UK the
labour force employed on site are:
 26% directly employed
 74% sub-contracted
 In France 93% of the labour force on site are
directly employed.
 In France 7% are sub-contractors.
 This trend goes back to year 2000 to 2003
and recently there has been some changes
to above figures.
LABOUR PRODUCTIVITY
 Employment practice has an impact on
the cohesiveness amongst the workforce.
Some of the Important contributors towards
Labour productivity are:
 a culture of cohesiveness
 common goal
 strong sense of a team working
 towards a common goal
LABOUR PRODUCTIVITY
 A culture of team working involving all
workers is to achieve a common goal.
 A common goal on construction site is to
achieve KPIs.
 Labour productivity can also be improved
if operatives on site avoid conflict.
 Conflict on site can hamper the progress
of work.
 Team working reduces conflict and will
greatly facilitate increased productivity.
LABOUR PRODUCTIVITY
 The importance of a directly or indirectly
employed workforce.
 and the effect on the dynamics of
productivity is reiterated in several
research work.
 The growth in the construction sector is
relatively stagnant.
 The job security can be very bad during
any recession for construction workforce.
LABOUR PRODUCTIVITY
 This is based on a number of observations.
 One such observation is the limited use of
mass production.
 The reasons for high productivity amongst
major contractors are:
 Scheduled overtime is avoided
 The labour force is directly employed
 They are a mainly skilled work force
LABOUR PRODUCTIVITY
 Maximum 40 hour per week is the norm
rather than the exception.
 There are also other factors such as:
 high salary
 job security
which are also important reasons for high
productivity amongst major construction
firms.
LABOUR PRODUCTIVITY
Impact of Changes on Labour
Productivity
 Any changes made to the original
scope of work are costly.
 They will have an effect on labour
productivity.
 Although some changes are inevitable,
the impact on site productivity is
nonetheless significant.
LABOUR PRODUCTIVITY
 The impact of changes in quantitative
terms has been measured by researchers.
 Changes impacts on the labour force’s
efficiency.
 The relationship between change and
various types of disruption would result in
productivity decline.
LABOUR PRODUCTIVITY
 The increase in the percentage of work
hours spent on changes will lead to a 10-
20% loss in productivity.
 Changes are considered an indirect factor
influencing productivity.
 It has also been realised that changes in
themselves do not decrease productivity
or efficiency.
 It is the manpower involved in the process.
LABOUR PRODUCTIVITY
 If a change occurs in the final stage of a
construction project:
 the crew must stop working until the
changes are carried out first.
 Also the work method may require
changes as well as more co-ordination
being required.
LABOUR PRODUCTIVITY
 If changes occur:
 routine work will change,
 processes will slow down
 the total work hours will be several times
greater.
 On average, there is a 30% loss of
efficiency when changes are being
performed, although it is possible to carry
out many changes without a loss of
efficiency.
LABOUR PRODUCTIVITY
 The variables affecting efficiency are
believed to be the time of the change.
 Productivity can decline if there are:
 repeat works
 disruption
 the presence of change
LABOUR PRODUCTIVITY
 The impact of change on the construction site
will often result in disputes.
 Changes should be kept to a minimum.
Improving Productivity by Training Methods
 Training is considered to be an influential factor
in high productivity on construction sites.
 The growth in labour only sub-contracting in UK
construction sector.
 The level and quality of training within the
industry.
LABOUR PRODUCTIVITY
 Productivity within the UK construction
industry compared with West Germany
and France is partly the result of low levels
of training labour force receive in UK
amongst small firms.
 Large UK firms have a good training
policy.
LABOUR PRODUCTIVITY
 Improving the knowledge and skill of
workers on construction sites.
 Motivated work force.
 Including the quality of management all
can improve the productivity.
 Site worker’s training is considered to be
an important factor in improving site
productivity.
LABOUR PRODUCTIVITY
 Therefore, organisational performance (P)
can be considered to be dependent on:
 the aggregate sums of performance of
each worker (F)
 and each manager (M)
 and the external factor (e)
 and the organisational performance is
shown as; P = f (F, M, e).
LABOUR PRODUCTIVITY
 The individual performance is dependent
on individual knowledge (K)
 skill (S)
 and the attitude to the work (a) of each
worker and manager
 P= f (K,S, a), M =f (K, S, a). Performance
of workers is linked to both quality
(qualitative) and output (quantitative) rate.
LABOUR PRODUCTIVITY
 Productivity and the quality of work can be
improved by:
 giving appropriate training to upgrade the:
 knowledge
 skills
 and attitude of workers and managers.
056 Labour Productivity
056 Labour Productivity

Mais conteúdo relacionado

Mais procurados

Overview -productivity management
Overview -productivity managementOverview -productivity management
Overview -productivity managementBharat Parmar
 
Importance of Performance Management And Measurement of Productivity
Importance of Performance Management  And Measurement of ProductivityImportance of Performance Management  And Measurement of Productivity
Importance of Performance Management And Measurement of ProductivityNational Productivity Secretariat
 
RESOURCE LEVELLING (MS PROJECT)
RESOURCE LEVELLING (MS PROJECT)RESOURCE LEVELLING (MS PROJECT)
RESOURCE LEVELLING (MS PROJECT)Mayur Rahangdale
 
Man power management or labour management.
Man power management or labour management.Man power management or labour management.
Man power management or labour management.Sumpi Tana
 
Construction Productivity
Construction ProductivityConstruction Productivity
Construction ProductivitySunil Manjeri
 
Techniques for measurement of productivity
Techniques for measurement of productivityTechniques for measurement of productivity
Techniques for measurement of productivityANSHUL AHUJA
 
021 Construction Productivity (PART 1)
021 Construction Productivity (PART 1)021 Construction Productivity (PART 1)
021 Construction Productivity (PART 1)Dr Fereidoun Dejahang
 
Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management A Makwana
 
Controling productivity in construction projects
Controling productivity in construction projectsControling productivity in construction projects
Controling productivity in construction projectsEssam Lotffy, PMP®, CCP®
 
Productivity management
Productivity management   Productivity management
Productivity management Nikhil Nimbarte
 
Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)FahadHasan36
 
Work measurement and productivity
Work measurement and productivityWork measurement and productivity
Work measurement and productivityMd Nazir Ansari
 
Labour Productivity for construction projects
Labour Productivity for construction projectsLabour Productivity for construction projects
Labour Productivity for construction projectsKapugantikapuganti Gupta
 
Factors affecting productivity
Factors affecting productivity Factors affecting productivity
Factors affecting productivity Waleed Attalla
 

Mais procurados (20)

Overview -productivity management
Overview -productivity managementOverview -productivity management
Overview -productivity management
 
Importance of Performance Management And Measurement of Productivity
Importance of Performance Management  And Measurement of ProductivityImportance of Performance Management  And Measurement of Productivity
Importance of Performance Management And Measurement of Productivity
 
what is Productivity
what is  Productivitywhat is  Productivity
what is Productivity
 
RESOURCE LEVELLING (MS PROJECT)
RESOURCE LEVELLING (MS PROJECT)RESOURCE LEVELLING (MS PROJECT)
RESOURCE LEVELLING (MS PROJECT)
 
Man power management or labour management.
Man power management or labour management.Man power management or labour management.
Man power management or labour management.
 
Construction Productivity
Construction ProductivityConstruction Productivity
Construction Productivity
 
Techniques for measurement of productivity
Techniques for measurement of productivityTechniques for measurement of productivity
Techniques for measurement of productivity
 
021 Construction Productivity (PART 1)
021 Construction Productivity (PART 1)021 Construction Productivity (PART 1)
021 Construction Productivity (PART 1)
 
Labor management at construction site
Labor management at construction siteLabor management at construction site
Labor management at construction site
 
Productivity
ProductivityProductivity
Productivity
 
Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management
 
Controling productivity in construction projects
Controling productivity in construction projectsControling productivity in construction projects
Controling productivity in construction projects
 
Productivity management
Productivity management   Productivity management
Productivity management
 
Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)Presentation on Cost Overrun ( Project Management)
Presentation on Cost Overrun ( Project Management)
 
Work measurement and productivity
Work measurement and productivityWork measurement and productivity
Work measurement and productivity
 
An introduction to project accounting
An introduction to project accountingAn introduction to project accounting
An introduction to project accounting
 
Scheduling
SchedulingScheduling
Scheduling
 
Labour market in india
Labour market in indiaLabour market in india
Labour market in india
 
Labour Productivity for construction projects
Labour Productivity for construction projectsLabour Productivity for construction projects
Labour Productivity for construction projects
 
Factors affecting productivity
Factors affecting productivity Factors affecting productivity
Factors affecting productivity
 

Destaque

#MP2013 Presentation by the Minister of Labour and Productivity
#MP2013 Presentation by the Minister of Labour and Productivity#MP2013 Presentation by the Minister of Labour and Productivity
#MP2013 Presentation by the Minister of Labour and ProductivityFMINigeria
 
Labor productivity improvement in construction projects using wbs obs integra...
Labor productivity improvement in construction projects using wbs obs integra...Labor productivity improvement in construction projects using wbs obs integra...
Labor productivity improvement in construction projects using wbs obs integra...Essam Lotffy, PMP®, CCP®
 
Human capital: Education and health in economic development egp
Human capital: Education and health in economic development egpHuman capital: Education and health in economic development egp
Human capital: Education and health in economic development egpShivani Baghel
 
Five ways to improve productivity at the construction site
Five ways to improve productivity at the construction siteFive ways to improve productivity at the construction site
Five ways to improve productivity at the construction siteVikaslal2006
 
02 cernic urban-rural%20-life%20setting%20as%20the%20explanatory%20factor%20of..
02 cernic urban-rural%20-life%20setting%20as%20the%20explanatory%20factor%20of..02 cernic urban-rural%20-life%20setting%20as%20the%20explanatory%20factor%20of..
02 cernic urban-rural%20-life%20setting%20as%20the%20explanatory%20factor%20of..tuyagerel
 
Status of Hepatitis in Pakistam
Status of Hepatitis in PakistamStatus of Hepatitis in Pakistam
Status of Hepatitis in PakistamHareem_syed
 
Gender and migration
Gender and migration Gender and migration
Gender and migration ysu1314
 
Economic determinants and female labour force participation an empirical anal...
Economic determinants and female labour force participation an empirical anal...Economic determinants and female labour force participation an empirical anal...
Economic determinants and female labour force participation an empirical anal...Alexander Decker
 
MERIDIANOS ESTOMAGO-BAÇO PANCREAS MTC.PPT
MERIDIANOS ESTOMAGO-BAÇO PANCREAS MTC.PPTMERIDIANOS ESTOMAGO-BAÇO PANCREAS MTC.PPT
MERIDIANOS ESTOMAGO-BAÇO PANCREAS MTC.PPTfabricio escudine
 
Gender Dimension of Migration
Gender Dimension of MigrationGender Dimension of Migration
Gender Dimension of Migrationguest7ebcc3
 
DETERMINANTS OF FEMALE LABOUR FORCE PARTICIPATION IN FAM AND NON FARM LIVELIH...
DETERMINANTS OF FEMALE LABOUR FORCE PARTICIPATION IN FAM AND NON FARM LIVELIH...DETERMINANTS OF FEMALE LABOUR FORCE PARTICIPATION IN FAM AND NON FARM LIVELIH...
DETERMINANTS OF FEMALE LABOUR FORCE PARTICIPATION IN FAM AND NON FARM LIVELIH...Hudu Zakaria
 
Women in the labour force 23 9-2004
Women in the labour force 23 9-2004Women in the labour force 23 9-2004
Women in the labour force 23 9-2004VIBHUTI PATEL
 
Indian textile industry
Indian textile industryIndian textile industry
Indian textile industryAdane Nega
 
HEALTH & ECONOMIC DEVELOPMENT
HEALTH & ECONOMIC DEVELOPMENTHEALTH & ECONOMIC DEVELOPMENT
HEALTH & ECONOMIC DEVELOPMENTBobba Leeladhar
 
Presentation1 brain drain
Presentation1 brain drainPresentation1 brain drain
Presentation1 brain drainSujay Pal
 
Women Participation in Labour Market
Women Participation in Labour MarketWomen Participation in Labour Market
Women Participation in Labour MarketKeshab Giri
 
Time measurement
Time measurementTime measurement
Time measurementAhmed Gamal
 

Destaque (20)

#MP2013 Presentation by the Minister of Labour and Productivity
#MP2013 Presentation by the Minister of Labour and Productivity#MP2013 Presentation by the Minister of Labour and Productivity
#MP2013 Presentation by the Minister of Labour and Productivity
 
Labor productivity improvement in construction projects using wbs obs integra...
Labor productivity improvement in construction projects using wbs obs integra...Labor productivity improvement in construction projects using wbs obs integra...
Labor productivity improvement in construction projects using wbs obs integra...
 
Human capital: Education and health in economic development egp
Human capital: Education and health in economic development egpHuman capital: Education and health in economic development egp
Human capital: Education and health in economic development egp
 
Five ways to improve productivity at the construction site
Five ways to improve productivity at the construction siteFive ways to improve productivity at the construction site
Five ways to improve productivity at the construction site
 
Associação MTM Portugal
Associação MTM PortugalAssociação MTM Portugal
Associação MTM Portugal
 
10. Nepal standard formulation process
10. Nepal standard formulation process10. Nepal standard formulation process
10. Nepal standard formulation process
 
02 cernic urban-rural%20-life%20setting%20as%20the%20explanatory%20factor%20of..
02 cernic urban-rural%20-life%20setting%20as%20the%20explanatory%20factor%20of..02 cernic urban-rural%20-life%20setting%20as%20the%20explanatory%20factor%20of..
02 cernic urban-rural%20-life%20setting%20as%20the%20explanatory%20factor%20of..
 
2 3
2 32 3
2 3
 
Status of Hepatitis in Pakistam
Status of Hepatitis in PakistamStatus of Hepatitis in Pakistam
Status of Hepatitis in Pakistam
 
Gender and migration
Gender and migration Gender and migration
Gender and migration
 
Economic determinants and female labour force participation an empirical anal...
Economic determinants and female labour force participation an empirical anal...Economic determinants and female labour force participation an empirical anal...
Economic determinants and female labour force participation an empirical anal...
 
MERIDIANOS ESTOMAGO-BAÇO PANCREAS MTC.PPT
MERIDIANOS ESTOMAGO-BAÇO PANCREAS MTC.PPTMERIDIANOS ESTOMAGO-BAÇO PANCREAS MTC.PPT
MERIDIANOS ESTOMAGO-BAÇO PANCREAS MTC.PPT
 
Gender Dimension of Migration
Gender Dimension of MigrationGender Dimension of Migration
Gender Dimension of Migration
 
DETERMINANTS OF FEMALE LABOUR FORCE PARTICIPATION IN FAM AND NON FARM LIVELIH...
DETERMINANTS OF FEMALE LABOUR FORCE PARTICIPATION IN FAM AND NON FARM LIVELIH...DETERMINANTS OF FEMALE LABOUR FORCE PARTICIPATION IN FAM AND NON FARM LIVELIH...
DETERMINANTS OF FEMALE LABOUR FORCE PARTICIPATION IN FAM AND NON FARM LIVELIH...
 
Women in the labour force 23 9-2004
Women in the labour force 23 9-2004Women in the labour force 23 9-2004
Women in the labour force 23 9-2004
 
Indian textile industry
Indian textile industryIndian textile industry
Indian textile industry
 
HEALTH & ECONOMIC DEVELOPMENT
HEALTH & ECONOMIC DEVELOPMENTHEALTH & ECONOMIC DEVELOPMENT
HEALTH & ECONOMIC DEVELOPMENT
 
Presentation1 brain drain
Presentation1 brain drainPresentation1 brain drain
Presentation1 brain drain
 
Women Participation in Labour Market
Women Participation in Labour MarketWomen Participation in Labour Market
Women Participation in Labour Market
 
Time measurement
Time measurementTime measurement
Time measurement
 

Semelhante a 056 Labour Productivity

Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...IRJET Journal
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regioneSAT Publishing House
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regioneSAT Journals
 
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...IRJET Journal
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
Productivity planning and management
Productivity planning and managementProductivity planning and management
Productivity planning and managementpriyam141
 
Operations-Management-and-TQM_ESC-1LESSON-1 (1).pptx
Operations-Management-and-TQM_ESC-1LESSON-1 (1).pptxOperations-Management-and-TQM_ESC-1LESSON-1 (1).pptx
Operations-Management-and-TQM_ESC-1LESSON-1 (1).pptxGebethBaadera
 
Limits+of+the+learning+curve
Limits+of+the+learning+curveLimits+of+the+learning+curve
Limits+of+the+learning+curvereagan22
 
040 Integrating Financial Incentives
040 Integrating Financial Incentives040 Integrating Financial Incentives
040 Integrating Financial IncentivesDr Fereidoun Dejahang
 
040 integrating financial incentives
040 integrating financial incentives040 integrating financial incentives
040 integrating financial incentivesdrdej19
 
8. chapter 7 work study (time and motion study)
8. chapter 7   work study (time and motion study)8. chapter 7   work study (time and motion study)
8. chapter 7 work study (time and motion study)sundar sivam
 
Factors Affecting Laborers’ Productivity in the Construction Companies
Factors Affecting Laborers’ Productivity in the Construction CompaniesFactors Affecting Laborers’ Productivity in the Construction Companies
Factors Affecting Laborers’ Productivity in the Construction CompaniesIJAEMSJORNAL
 
cost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeriacost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeriaNewman Jonathan
 
downsizing & business reorganisation
downsizing & business reorganisationdownsizing & business reorganisation
downsizing & business reorganisationRAHAYU TASNIM
 
Downsizing & Business Reorganisation
Downsizing & Business ReorganisationDownsizing & Business Reorganisation
Downsizing & Business ReorganisationRAHAYU TASNIM
 
Overall Equipment Effectiveness in Construction Equipments
Overall Equipment Effectiveness in Construction EquipmentsOverall Equipment Effectiveness in Construction Equipments
Overall Equipment Effectiveness in Construction EquipmentsIRJET Journal
 
IRJET-A Review of Impact on Labour Management in Construction Industry
IRJET-A Review of Impact on Labour Management in Construction IndustryIRJET-A Review of Impact on Labour Management in Construction Industry
IRJET-A Review of Impact on Labour Management in Construction IndustryIRJET Journal
 
Manufacturing differently
Manufacturing differentlyManufacturing differently
Manufacturing differentlyHendrik Lourens
 
034 innovation & productivity
034 innovation & productivity034 innovation & productivity
034 innovation & productivitydrdej19
 

Semelhante a 056 Labour Productivity (20)

092 Productivity Improvement
092 Productivity Improvement092 Productivity Improvement
092 Productivity Improvement
 
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal region
 
Improvement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal regionImprovement of construction labor productivity in chambal region
Improvement of construction labor productivity in chambal region
 
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
A Review On Quantified Impacts Of Construction Labour Productivity Towards Pr...
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
 
Productivity planning and management
Productivity planning and managementProductivity planning and management
Productivity planning and management
 
Operations-Management-and-TQM_ESC-1LESSON-1 (1).pptx
Operations-Management-and-TQM_ESC-1LESSON-1 (1).pptxOperations-Management-and-TQM_ESC-1LESSON-1 (1).pptx
Operations-Management-and-TQM_ESC-1LESSON-1 (1).pptx
 
Limits+of+the+learning+curve
Limits+of+the+learning+curveLimits+of+the+learning+curve
Limits+of+the+learning+curve
 
040 Integrating Financial Incentives
040 Integrating Financial Incentives040 Integrating Financial Incentives
040 Integrating Financial Incentives
 
040 integrating financial incentives
040 integrating financial incentives040 integrating financial incentives
040 integrating financial incentives
 
8. chapter 7 work study (time and motion study)
8. chapter 7   work study (time and motion study)8. chapter 7   work study (time and motion study)
8. chapter 7 work study (time and motion study)
 
Factors Affecting Laborers’ Productivity in the Construction Companies
Factors Affecting Laborers’ Productivity in the Construction CompaniesFactors Affecting Laborers’ Productivity in the Construction Companies
Factors Affecting Laborers’ Productivity in the Construction Companies
 
cost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeriacost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeria
 
downsizing & business reorganisation
downsizing & business reorganisationdownsizing & business reorganisation
downsizing & business reorganisation
 
Downsizing & Business Reorganisation
Downsizing & Business ReorganisationDownsizing & Business Reorganisation
Downsizing & Business Reorganisation
 
Overall Equipment Effectiveness in Construction Equipments
Overall Equipment Effectiveness in Construction EquipmentsOverall Equipment Effectiveness in Construction Equipments
Overall Equipment Effectiveness in Construction Equipments
 
IRJET-A Review of Impact on Labour Management in Construction Industry
IRJET-A Review of Impact on Labour Management in Construction IndustryIRJET-A Review of Impact on Labour Management in Construction Industry
IRJET-A Review of Impact on Labour Management in Construction Industry
 
Manufacturing differently
Manufacturing differentlyManufacturing differently
Manufacturing differently
 
034 innovation & productivity
034 innovation & productivity034 innovation & productivity
034 innovation & productivity
 

Mais de Dr Fereidoun Dejahang

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020Dr Fereidoun Dejahang
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrunDr Fereidoun Dejahang
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvementDr Fereidoun Dejahang
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-writeDr Fereidoun Dejahang
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sectorDr Fereidoun Dejahang
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurementDr Fereidoun Dejahang
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projectsDr Fereidoun Dejahang
 

Mais de Dr Fereidoun Dejahang (20)

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020
 
28 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-201928 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-2019
 
16 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-201916 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-2019
 
029 fast-tracking projects
029 fast-tracking projects029 fast-tracking projects
029 fast-tracking projects
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun
 
027 fast-tracked projects-materials
027 fast-tracked projects-materials027 fast-tracked projects-materials
027 fast-tracked projects-materials
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvement
 
025 enterprise resources management
025 enterprise resources management025 enterprise resources management
025 enterprise resources management
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-write
 
022 a construction productivity (2)
022 a construction productivity (2)022 a construction productivity (2)
022 a construction productivity (2)
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)
 
019 competencies-managers
019 competencies-managers019 competencies-managers
019 competencies-managers
 
018 company productivity
018 company productivity018 company productivity
018 company productivity
 
017 communication
017 communication017 communication
017 communication
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sector
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projects
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 
011 business performance management
011 business performance management011 business performance management
011 business performance management
 

Último

Nodal seismic construction requirements.pptx
Nodal seismic construction requirements.pptxNodal seismic construction requirements.pptx
Nodal seismic construction requirements.pptxwendy cai
 
Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...
Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...
Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...Amil baba
 
Technology Features of Apollo HDD Machine, Its Technical Specification with C...
Technology Features of Apollo HDD Machine, Its Technical Specification with C...Technology Features of Apollo HDD Machine, Its Technical Specification with C...
Technology Features of Apollo HDD Machine, Its Technical Specification with C...Apollo Techno Industries Pvt Ltd
 
solar wireless electric vechicle charging system
solar wireless electric vechicle charging systemsolar wireless electric vechicle charging system
solar wireless electric vechicle charging systemgokuldongala
 
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...amrabdallah9
 
EPE3163_Hydro power stations_Unit2_Lect2.pptx
EPE3163_Hydro power stations_Unit2_Lect2.pptxEPE3163_Hydro power stations_Unit2_Lect2.pptx
EPE3163_Hydro power stations_Unit2_Lect2.pptxJoseeMusabyimana
 
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS Bahzad5
 
Graphics Primitives and CG Display Devices
Graphics Primitives and CG Display DevicesGraphics Primitives and CG Display Devices
Graphics Primitives and CG Display DevicesDIPIKA83
 
Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)Bahzad5
 
UNIT4_ESD_wfffffggggggggggggith_ARM.pptx
UNIT4_ESD_wfffffggggggggggggith_ARM.pptxUNIT4_ESD_wfffffggggggggggggith_ARM.pptx
UNIT4_ESD_wfffffggggggggggggith_ARM.pptxrealme6igamerr
 
Power System electrical and electronics .pptx
Power System electrical and electronics .pptxPower System electrical and electronics .pptx
Power System electrical and electronics .pptxMUKULKUMAR210
 
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docx
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docxSUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docx
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docxNaveenVerma126
 
Clutches and brkesSelect any 3 position random motion out of real world and d...
Clutches and brkesSelect any 3 position random motion out of real world and d...Clutches and brkesSelect any 3 position random motion out of real world and d...
Clutches and brkesSelect any 3 position random motion out of real world and d...sahb78428
 
Mohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptxMohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptxKISHAN KUMAR
 
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratoryدليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide LaboratoryBahzad5
 

Último (20)

Nodal seismic construction requirements.pptx
Nodal seismic construction requirements.pptxNodal seismic construction requirements.pptx
Nodal seismic construction requirements.pptx
 
Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...
Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...
Best-NO1 Best Rohani Amil In Lahore Kala Ilam In Lahore Kala Jadu Amil In Lah...
 
Technology Features of Apollo HDD Machine, Its Technical Specification with C...
Technology Features of Apollo HDD Machine, Its Technical Specification with C...Technology Features of Apollo HDD Machine, Its Technical Specification with C...
Technology Features of Apollo HDD Machine, Its Technical Specification with C...
 
solar wireless electric vechicle charging system
solar wireless electric vechicle charging systemsolar wireless electric vechicle charging system
solar wireless electric vechicle charging system
 
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...
 
計劃趕得上變化
計劃趕得上變化計劃趕得上變化
計劃趕得上變化
 
Litature Review: Research Paper work for Engineering
Litature Review: Research Paper work for EngineeringLitature Review: Research Paper work for Engineering
Litature Review: Research Paper work for Engineering
 
EPE3163_Hydro power stations_Unit2_Lect2.pptx
EPE3163_Hydro power stations_Unit2_Lect2.pptxEPE3163_Hydro power stations_Unit2_Lect2.pptx
EPE3163_Hydro power stations_Unit2_Lect2.pptx
 
Présentation IIRB 2024 Marine Cordonnier.pdf
Présentation IIRB 2024 Marine Cordonnier.pdfPrésentation IIRB 2024 Marine Cordonnier.pdf
Présentation IIRB 2024 Marine Cordonnier.pdf
 
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
 
Graphics Primitives and CG Display Devices
Graphics Primitives and CG Display DevicesGraphics Primitives and CG Display Devices
Graphics Primitives and CG Display Devices
 
Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)
 
UNIT4_ESD_wfffffggggggggggggith_ARM.pptx
UNIT4_ESD_wfffffggggggggggggith_ARM.pptxUNIT4_ESD_wfffffggggggggggggith_ARM.pptx
UNIT4_ESD_wfffffggggggggggggith_ARM.pptx
 
Power System electrical and electronics .pptx
Power System electrical and electronics .pptxPower System electrical and electronics .pptx
Power System electrical and electronics .pptx
 
Lecture 2 .pdf
Lecture 2                           .pdfLecture 2                           .pdf
Lecture 2 .pdf
 
Lecture 2 .pptx
Lecture 2                            .pptxLecture 2                            .pptx
Lecture 2 .pptx
 
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docx
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docxSUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docx
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docx
 
Clutches and brkesSelect any 3 position random motion out of real world and d...
Clutches and brkesSelect any 3 position random motion out of real world and d...Clutches and brkesSelect any 3 position random motion out of real world and d...
Clutches and brkesSelect any 3 position random motion out of real world and d...
 
Mohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptxMohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptx
 
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratoryدليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
 

056 Labour Productivity

  • 1. FROM PRODUCTIVITY BRIEFCASES HELP DESK LABOUR PRODUCTIVITY
  • 2. LABOUR PRODUCTIVITY  A large proportion of the high cost in construction work is as a result of excessive labour costs.  These costs can be reduced if productivity on site is increased by improving labour efficiency.
  • 3. LABOUR PRODUCTIVITY  Labour productivity is determined by a complexity of factors.  One of these factors is the type and size of the project.  It includes the layout and complexity of the project.  A large construction site requiring a large number of workers will be relatively harder to manage than a smaller size.
  • 4. LABOUR PRODUCTIVITY  The difficulties in managing manpower on a large scale may result in productivity loss (Thomas and Jansma, 1985).  There are four main factors that affect labour productivity; 1. The duration of worker’s effort. 2. The intensity of worker’s effort. 3. The effectiveness of worker’s effort combined with the technology used. 4. The efficiency of worker’s effort, which can be described as a measure of how much the worker is utilising his ability.
  • 5. LABOUR PRODUCTIVITY  Work on a complex project (e.g. such as the construction of a major shopping centre) becomes more difficult as the project advances.  Off-site pre-fabrication units will reduce the number of labour hours required. Other factors such as:  the level of skill amongst the workers;  the length of the workday;  Innovative work practices can increase productivity.
  • 6. LABOUR PRODUCTIVITY  In view of Olomolaiye et al (1998):  The personal attribution of workers contribute to the factors that directly affect productivity. These attributes as:  worker’s skills  experience  training  qualifications  Innate (inborn) physical and mental ability.  The intensity of the application of both skills and innate ability to the production process.
  • 7. LABOUR PRODUCTIVITY Thomas et al (1992) investigated the level of labour productivity for masonry activities from seven countries. Case study showed that:  little difference in productivity amongst the seven countries.  The aim of investigation was to show that productivity in  Australia  Canada  England  Finland,  Scotland  Sweden and the United State-was similar.
  • 8. LABOUR PRODUCTIVITY  The site with the highest level of disruption will have the worse level of productivity.  Other investigations show that labour disruption accounts for more than 50% of the variability in daily crew productivity.
  • 9. LABOUR PRODUCTIVITY  An excessive number of staff can be disruptive.  It also has the effect of reducing the level of productivity. The results of a model based survey of contractors (planning engineers) in France, Germany and UK Showed that :  the working schedule of UK and German contractors may be excessive;  can have an impact on construction productivity level.
  • 10. LABOUR PRODUCTIVITY  The survey also identified that in the UK the labour force employed on site are:  26% directly employed  74% sub-contracted  In France 93% of the labour force on site are directly employed.  In France 7% are sub-contractors.  This trend goes back to year 2000 to 2003 and recently there has been some changes to above figures.
  • 11. LABOUR PRODUCTIVITY  Employment practice has an impact on the cohesiveness amongst the workforce. Some of the Important contributors towards Labour productivity are:  a culture of cohesiveness  common goal  strong sense of a team working  towards a common goal
  • 12. LABOUR PRODUCTIVITY  A culture of team working involving all workers is to achieve a common goal.  A common goal on construction site is to achieve KPIs.  Labour productivity can also be improved if operatives on site avoid conflict.  Conflict on site can hamper the progress of work.  Team working reduces conflict and will greatly facilitate increased productivity.
  • 13. LABOUR PRODUCTIVITY  The importance of a directly or indirectly employed workforce.  and the effect on the dynamics of productivity is reiterated in several research work.  The growth in the construction sector is relatively stagnant.  The job security can be very bad during any recession for construction workforce.
  • 14. LABOUR PRODUCTIVITY  This is based on a number of observations.  One such observation is the limited use of mass production.  The reasons for high productivity amongst major contractors are:  Scheduled overtime is avoided  The labour force is directly employed  They are a mainly skilled work force
  • 15. LABOUR PRODUCTIVITY  Maximum 40 hour per week is the norm rather than the exception.  There are also other factors such as:  high salary  job security which are also important reasons for high productivity amongst major construction firms.
  • 16. LABOUR PRODUCTIVITY Impact of Changes on Labour Productivity  Any changes made to the original scope of work are costly.  They will have an effect on labour productivity.  Although some changes are inevitable, the impact on site productivity is nonetheless significant.
  • 17. LABOUR PRODUCTIVITY  The impact of changes in quantitative terms has been measured by researchers.  Changes impacts on the labour force’s efficiency.  The relationship between change and various types of disruption would result in productivity decline.
  • 18. LABOUR PRODUCTIVITY  The increase in the percentage of work hours spent on changes will lead to a 10- 20% loss in productivity.  Changes are considered an indirect factor influencing productivity.  It has also been realised that changes in themselves do not decrease productivity or efficiency.  It is the manpower involved in the process.
  • 19. LABOUR PRODUCTIVITY  If a change occurs in the final stage of a construction project:  the crew must stop working until the changes are carried out first.  Also the work method may require changes as well as more co-ordination being required.
  • 20. LABOUR PRODUCTIVITY  If changes occur:  routine work will change,  processes will slow down  the total work hours will be several times greater.  On average, there is a 30% loss of efficiency when changes are being performed, although it is possible to carry out many changes without a loss of efficiency.
  • 21. LABOUR PRODUCTIVITY  The variables affecting efficiency are believed to be the time of the change.  Productivity can decline if there are:  repeat works  disruption  the presence of change
  • 22. LABOUR PRODUCTIVITY  The impact of change on the construction site will often result in disputes.  Changes should be kept to a minimum. Improving Productivity by Training Methods  Training is considered to be an influential factor in high productivity on construction sites.  The growth in labour only sub-contracting in UK construction sector.  The level and quality of training within the industry.
  • 23. LABOUR PRODUCTIVITY  Productivity within the UK construction industry compared with West Germany and France is partly the result of low levels of training labour force receive in UK amongst small firms.  Large UK firms have a good training policy.
  • 24. LABOUR PRODUCTIVITY  Improving the knowledge and skill of workers on construction sites.  Motivated work force.  Including the quality of management all can improve the productivity.  Site worker’s training is considered to be an important factor in improving site productivity.
  • 25. LABOUR PRODUCTIVITY  Therefore, organisational performance (P) can be considered to be dependent on:  the aggregate sums of performance of each worker (F)  and each manager (M)  and the external factor (e)  and the organisational performance is shown as; P = f (F, M, e).
  • 26. LABOUR PRODUCTIVITY  The individual performance is dependent on individual knowledge (K)  skill (S)  and the attitude to the work (a) of each worker and manager  P= f (K,S, a), M =f (K, S, a). Performance of workers is linked to both quality (qualitative) and output (quantitative) rate.
  • 27. LABOUR PRODUCTIVITY  Productivity and the quality of work can be improved by:  giving appropriate training to upgrade the:  knowledge  skills  and attitude of workers and managers.