1. PROPOSED POSITION:
SNR. MECHANICAL ENGINEER/ QA/QC ENGINEER
Personal data
Last name Dolocanog
First name Diosdado
Year of birth 1967
Nationality Filipino
Email address diosdadodolocanog@yahoo.com
Mobile # 33517097/77990781
Education
1999 Southwestern University
B.S. in Mechanical Engineering
Key qualifications
Quality Management System, Planning, Calculation, Estimates, General Operation and Maintenance Management including Preventive
Maintenance.
Planning, Scheduling Management, Billing, Cost Estimates, Quality Control of Work Standards, Monitoring of Progress Reports and Findings.
Project Construction Management, Implementation of Standard Procedure and Specification.
Testing and Commissioning, Supervision, Piping Erection (Aboveground / Underground)
Reviewing Method Statement, JSA, and Procedures
Professional experience
Sept. 2012 to date Tebodin Middle East Ltd.
Senior Mechanical Supervisor/Superintendent – Qatargas Operating Company
Duties and responsibilities are review and co-ordinate the approval of Standards and safety instructions.
Assist in the planning of projects and shutdown assessing resources, materials and logistics requirements.
Provide expertise and support during shutdown and restart of the plant.
Preparing of scopes and packages for shutdowns Planning for shutdown activities, including material
expediting Shutdown execution, supervision progress monitoring Contract scope writing for shutdown
activities Contract supervision during shutdowns Post shutdown demobilization activities, including
material return, wrap up reports.
Carry out any other duties as directed by Company. This includes budgeting, managing contractors,
interfacing with plant departments, and performing basic and detail mechanical engineering for the
implementation of both small and large projects.
Responsible for allocating engineering resources to execute capital and plant projects.
Reviewing technical contract documents, engineering reviews, method statement and JSA.
Provide appropriate solutions for all parties and evaluate and analyze all client requirements and design
all piping specifications for clients and recommend appropriate alternatives.
June 2010 to Jul 2012 Hyundai Engineering & Construction Company ltd..) Khursaniyah, K.S.A
Senior Piping Engineer/Superintendent - Karan Gas Field Development Project), (S.A.C.no.
6600021904)
Reviewing technical contract documents & engineering reviews.
Verify the design integrity of work carried out by engineering contractors to ensure that propose solutions
are technically sound and meet operability & maintainability requirements.
Responsible in facilitating of plan drawing, isometric drawing and lay out making.
Responsible for all materials requisitions to be used in the field.
Prepare original rough layouts and sketches to present design proposal:
Coordinates design criteria with engineering, tooling, material, and planning group in accordance with
contractual specifications Inspect and monitor the site/project activities, ensuring technical integrity and
quality as per the contracts/project piping discipline requirements and best practices.
Working closely with various contractors to progress the work required to meet the project schedule and
goal.
Provide appropriate solutions for all parties and evaluate and analyze all client requirements and design
all piping specifications for clients and recommend appropriate alternatives.
Inspect and monitor the site/project activities, ensuring technical integrity and quality as per the
contracts/project piping discipline requirements and best practices.
Prepare inspection plan and checklist in accordance with project requirements.
2. Mar 2008 to Nov. 2009 Kellogg Brown & Root Int’l. Inc. - Ras Laffan, Qatar
Piping Engineer – Pearl Shell GTL Project
Coordinates design criteria with engineering, tooling, material, and planning group in accordance with
contractual specifications Inspect and monitor the site/project activities, ensuring technical integrity and
quality as per the contracts/project piping discipline requirements and best practices.
Manage interface issues between all parties involved to ensure that consistent fabrication and
construction procedures are employed across the project. Manage and execute pipeline and flow line
construction & installation scopes including technical procedures for fabrication, installation, pre-
commissioning, and regulatory compliance. Verify the design integrity of work carried out by engineering
contractors to ensure that propose solutions are technically sound and meet operability & maintainability
requirements.
To study design oriented field problems, propose remedial measures and provide technical reports
highlighting the historical events and recommendation. Responding site technical query raised by sub-
contractor as regard the inconsistency of the design and procedure. Inspect and monitor the site/project
activities, ensuring technical integrity and quality as per the contracts/project piping discipline
requirements and best practices.
Jan. 2006 to Jan. 2008 Sungchang & Al-shaikh Co. Ltd. Jubail K.S.A.
QA/QC Engineer / Supervisor - APPC PDH/PP Plant
To assure the filling-in of all the Quality Control Reports Certificates by all parties involved including the
signature for final acceptance. Review installation reports in conjunction with inspected spools for
completeness of documentation and traceability.
Prepare daily accomplishment report on the production of the fabrication. Witnessed qualification test and
determining the validity in accordance with specification and procedure for construction. Quality Control
Inspection covering; materials receiving.
Aug. 2003 to Dec. 2005 Technip Saudi Arabia Ltd. (S.A.C. no. 6400044663), Jubail, K.S.A
QA/QC Piping Engineer / Supervisor - Qatif Facilities @ Berry Gas Plant
Work under TECHNIP as a part of Project Management Team to perform and supervise the project
quality control inspection, testing, pre-commissioning and proper documentation on all the Subcontractor’s
activities of piping works. Specific QA/QC activities performed in this project are: Review, Monitor,
Surveillance and Prepare Inspection and Test Plan two weeks look ahead Inspection and Test Schedule.
To coordinates inspection activity with the client and sub-contractor. Witness the execution of the specified
inspection signing the relevant report for acceptance. To check that the Sub-contractor, according to his
obligations, has all the test equipment and tools (duly calibrated) required perform the test pointing out to
the Construction Superintendent any deficiencies to be corrected. Witnessed qualification test and
determining the validity in accordance with specification and procedure for construction.
Jan. 2000 to Jan. 2003 Formosa Petrochemical Corp., Mailiao, Yunlin County, Taiwan R.O.C.
Piping Engineer / Supervisor - Refinery Mech’l Maintenance Engineering & Const. Div.
Responsible for the day to day construction activities and to ensure that safe working of personnel,
equipment and good housekeeping are being done. Conduct a toolbox meeting with my workforce to
3. discuss the job and activity, risk involved and the precautions that will be taken to control the risk.
Supervision in the fabrication of pipe spools/fitting up and welding works.
Responsible in facilitating of plan drawing, isometric drawing and lay out making. Responsible for all
materials requisitions to be used in the field. Prepare original rough layouts and sketches to present
design proposal: Coordinates design criteria with engineering, tooling, material, and planning group in
accordance with contractual specifications.
Apr 1997 to Apr 1999 FAFCO Ltd.. Dammam Saudi Arabia
QA/QC Piping Engineer / Inspector – Waste Water Treatment Plant (ARAMCO PROJECT)
Responsible for the implementation of Project Quality Plan in this project that includes inspection, hydro
testing, pre-commissioning and start up. Responsible for fit-up inspection prior to welding and make sure
essential and non-essential variables are complying with approved Welding Procedure Specification
(WPS).
Check dimensional, location, proper orientation & elevation of aboveground and underground piping.
Conduct NDT Testing (RT, UT, MT, PT) as per reference Code Standard Such as AWS D11 , ASME VIII ,
ASME B31.3 , API 1104
Sept 1994 to Nov 1995 IEC Philippines, Inc., Philipines
Project Manager / Engineer – Monte de Piedad Center ( 32 Story Building)
Planning work to meet the required schedule with minimum use of overtime. Work planning includes
expediting the planned inputs from other workgroups to ensure the maintenance of the estimate schedule.
Coordinate with other departments to implement smooth handing over of projects without delay. Prepare
inspection plan and checklist in accordance with project requirements.
Supervision in the installation of Fire Protection Machinery’s such as; Fire Pump, Jockey Pump, Control
Panel and its Accessories. Doing updated progress-billing, catch up schedule for production efficiency.
Supervision in the erection and fabrication of piping works. Prepare original rough layouts and sketches to
present design proposal: Coordinates design criteria with engineering, tooling, material, and planning
group in accordance with contractual specifications.
Nov. 1993 to July 1994 Kalayaan Engineering Corporation, Philippines.
Site Engineer – Mechanical - Mactan Int’l. Airport,
Successfully translated subject matter into responsible for the contract administration, project planning
and management for the installation of Site External Mechanical Piping System, HVAC CHW Piping
System, Fire Protection Sprinkler Piping System.
Prepare inspection plan and checklist in accordance with project requirements.
Involve in the preparation and coordination of technical submittals, material selections/comparison, material
quality assurance and other material engineering works.
Responsible for material cost inquiry, deliveries and inventory and other procurement works.
Performed site supervision, reports preparation and documentation for construction work methodology
and execution (ie. Shop drawings, testing and measurements reports, etc) for quality construction works.
Nov. 1992 to Oct. 1993 PHIMA VENTURES CORPORATION, Philippines
Site Engineer - Mechanical - Mactan Shangrila Hotel
Successfully translated subject matter into responsible for the contract administration, project planning and
management for the installation of Site External Mechanical Piping System, HVAC CHW Piping System, Fire
Protection Sprinkler Piping System.
Prepare inspection plan and checklist in accordance with project requirements.
Involve in the preparation and coordination of technical submittals, material selections/comparison, material
quality assurance and other material engineering works.
Responsible for material cost inquiry, deliveries and inventory and other procurement works.
Performed site supervision, reports preparation and documentation for construction work methodology and
execution (ie. Shop drawings, testing and measurements reports, etc) for quality construction works.
Languages
Speaking Reading Writing
English 2 2 2
Philippines 1 1 1
Scale: 1. mother tongue | 2. good | 3. working knowledge
4. EDUCATIONAL AND PROFESSIONAL AFFILIATION
UNIVERSITY OF SOUTHWESTERN, CEBU CITY, PHILIPPINES
Bachelor of Science in Mechanical Engineering
• Class of 1992 Working Scholarship recipient
MASTER TECHNICAL TRAINING CENTER, CEBU CITY, PHILIPPINES
Refrigeration & Air-conditioning
• Class of 1996
CERTIFICATION
ASNT CERTIFIED NDT LEVEL II in following methods:
1.) Radiographic Test 3.) Ultrasonic Testing
2.) Magnetic Particle Testing 4.) Liquid Penetrant Testing
ARAMCO, K.S.A
QC Piping Inspector (Certified) with SAPMT # 1139, (2004)
• Passed the interview & Examination
VELOSI Certification LLC, Qatar
Internal QMS Auditor for ISO 9001:2000 (Certified) with Cert. # VQ-IAC/008/10/66, (IQSA) – IRCA)
• Class of 2008 Completed Training Course and passed the examination conducted by Velosi
ILM International, Qatar
The Leadership and Supervisor Training Program (Certified Silver) with Cert. # NB089018063103
• Class of 2008 Completed Training Course and passed the examination conducted by ILM International
ACHIEVEMENT AWARD RECEIVED WITH CERTIFICATE
12/2014 Certificate of Appreciation – In recognition of your commitment and dedication
12/2013 Certificate of Appreciation – In recognition of your commitment and dedication
04/2009 Most Outstanding Contributions and Support for Safety Observations (SOC)
03/2009 Most Outstanding Contributions and Support for Safety Observations (SOC)
07/2008 Award of Recognition for Achieving 10 million Man Hours Lost Time / Incident Free
02/2007 Award of Recognition for Achieving 6 million Man Hours without Lost Time Incident
SPECIAL TRAINING COURSE ATTAINED WITH CERTIFICATE
2014 H2S BA training Seminar Conducted by Qatargas
2014 10 Life Saving Rules Training Conducted by Qatargas
2014 Permit Receiver Training Seminar Conducted by Qatargas
2013 Defensive Driver Training Conducted by Qatargas
2013 Fire Awareness LEVEL II Conducted by Qatargas
2012 IIF Occupational Health & Safety Course Conducted by Qatar Gas
2012 Permit Receiver Training Seminar (Safety) Conducted by Qatar Gas
2008 ISO 9001: 2000 – Internal Quality System Auditor Conducted by VELOSI Certification Qatar
Training Program (IQSA) – IRCA
2008 Incident & Injury-Free Supervisor Skills Workshop Conducted by JMJ Associates, Qatar
2008 Intro to HSE and Leadership Training Course Conducted by Shell Pearl GTL, Qatar
2008 Supervision within LCAs Training Course Conducted by Shell Pearl GTL, Qatar
2008 Train the Trainer Course Conducted by Shell Pearl GTL, Qatar
2008 Practical Leadership Course Conducted by Shell Pearl GTL, Qatar
2008 Flawless Start up Initiative Training Course Conducted by Shell Pearl GTL, Qatar
2008 Cultural Awareness Training Course Conducted by Shell Pearl GTL, Qatar
2008 Quality Control Course Conducted by Shell Pearl GTL, Qatar
2008 Organizing and Planning (Leadership) Conducted by Shell Pearl GTL, Qatar
2006 Training for QA/QC Inspector (Evaluated Class B) Conducted by JS-KOBE Builders, Phil.
1997 Training for QA/QC Inspector Piping Conducted by FAFCO Head Office, Dammam,
w/c covered the following: K.S.A.
Closed Awareness Understanding of Aramco
standard (including SAES, SMAS, SAEP & SAIP) and Saudi Aramco
5. Deskstop Standard & Procedure, ISO 9000, Saudi Aramco Standard,
Shell DEP’s, Etc.
IT SKILLS
Windows & Office Tools
1.) Microsoft Excel – Expert 4.) Microsoft Word – Expert
2.) Nexus, Documentum – Expert 5.) PowerPoint – Intermediate
3.) PDF Acrobat professional - Expert 6.) Paint - Expert
Operating System, Networking & Hardware
• Nexus (Networking) – Expert
• Navis Works (3D Model) overview Design – Expert
• PDMS Design – Intermediate
• Auto Cad Design – Intermediate
REFERENCES: Available Upon Request
6. Deskstop Standard & Procedure, ISO 9000, Saudi Aramco Standard,
Shell DEP’s, Etc.
IT SKILLS
Windows & Office Tools
1.) Microsoft Excel – Expert 4.) Microsoft Word – Expert
2.) Nexus, Documentum – Expert 5.) PowerPoint – Intermediate
3.) PDF Acrobat professional - Expert 6.) Paint - Expert
Operating System, Networking & Hardware
• Nexus (Networking) – Expert
• Navis Works (3D Model) overview Design – Expert
• PDMS Design – Intermediate
• Auto Cad Design – Intermediate
REFERENCES: Available Upon Request