Construction Coordinator Duties

Construction Coordinator Duties
 NJUNS Tickets Weekly: print new jobs from “Monday Pole Report”, Daily: print status updates/maps
(from Carol Hellon). Make CWOs for issue to Contractor and/or issue directly to Construction Team.
Close out all NJUNS tickets through the website.
 Maintenance Print and acknowledge receipt of jobs from System (Sweep) or other TechOps Dept., build
CWOs in a timely manner- do not allow substantial build-up. Notate all CLI jobs and any other rush jobs
as “priority” in the Construction Work Order notes. Coordinate with originators of jobs to ensure
accurate work notes/drawings are placed in the workbook. Use ‘Reports’ tab on CWO website to track
jobs, contact Contractor if necessary to expedite completion.
 Forced Relocate Print and acknowledge receipt of jobs (Power Companies, Municipalities, MDOT, etc).
Pull system maps and mark Scope of Work to coincide with provided maps. Onsite inspections must be
complete in a timely manner: coordinate with design/field personnel if necessary for clarification.
Weekly: be sure to keep tabs on work progress- route drawings, CCI design, CPR status and field work.
Give updates on progress as needed, notify when work is complete. Relocate requests from individuals
or private businesses should be treated as voluntary: do a site inspection, build and print a mock
workbook to determine cost and submit to requestor as an invoice. Once the invoice is paid, build a full
CWO.
 Joint Trench Print and acknowledge jobs from builders or Power Company, get any available maps or
designs. Onsite inspections are not always necessary, but are very helpful. Build CWO, send out for CCI
design (if New Build) and get invoice information as soon as possible, as well as email CWO to supervisor
for CPR request. Be sure to include all JT fees, permit costs and any aid to Construction (subscriber
invoice fees) in the workbook. Coordinate with Trenching Contractor for dates and manpower. Send
parts order for activation when CPR is approved. Weekly: keep tabs on progress/updates
 Permits Apply for any Municipal, County, MDOT or Pole Permits needed for any job as soon as time and
information allows; include any fees in the workbook. Permitting can take anywhere from a few hours to
120 days: be sure to have information for specific jobs noted and be ready to discuss reasons for any
delays.
 0625 Report Daily: check and print, send any completed, CWO-in-progress or improperly listed jobs to DL
West MI Bay City Escalation Team. Coordinate with System and TechOps Dept. supervisors as needed to
ensure jobs on the report are surveyed/completed quickly: there is a 10-day window before they are
escalated to management.
 Map Updates All types of completed jobs that have changed the System Map layout must be given out
for updates. Submit all ‘completes’ needing map updates to DL MI CAD: contact Mike Simerson for the
proper format of the submissions.
 BMC Remedy All ticket requests should be treated as urgent and entered on a same-day basis. Always
provide the CRQ ticket number to the requestor when ticket is submitted. Accurate data entry is
absolutely necessary to ensure ticket approval.
 General Organization and accurate notes are the key to maintaining workflow: write ‘received’ and
‘complete’ dates on everything, file CWOs and in-progress work every day. Keep Outlook folders as clear
as possible, do not allow to ‘overflow’: save important emails and files on desktop or other Enterprise
areas granted for your use. Be sure to take part in all daily meetings, as well as Tuesday & Thursday
contractor calls. Follow Company Vehicle maintenance schedules and comply with all safety standards
set forth by the Safety Dept., the Safety Committee and the Construction Supervisor. Whenever
necessary, ask questions or for help from the Construction Dept. or any related Departments. Track
conversations, jobs, emails and any information as often as possible. Work on jobs from an “A to B”
perspective, not “A to Z”.
1 de 3

Recomendados

Construction management assignment 1 por
Construction management assignment 1Construction management assignment 1
Construction management assignment 1Nicole Valerio
468 visualizações6 slides
Quantim - Best Project Management Software por
Quantim - Best Project Management SoftwareQuantim - Best Project Management Software
Quantim - Best Project Management SoftwareJay Bhavsar 👨🏻‍💻
19 visualizações9 slides
CPTC Site Plan Review module 8.23.2015 por
CPTC Site Plan Review module 8.23.2015CPTC Site Plan Review module 8.23.2015
CPTC Site Plan Review module 8.23.2015Wayne Feiden
1.1K visualizações32 slides
Alice's Admin Resume por
Alice's Admin ResumeAlice's Admin Resume
Alice's Admin ResumeAlice Perez
1.1K visualizações18 slides
Govind_Bio por
Govind_BioGovind_Bio
Govind_Biogovindaraj rajgopal
307 visualizações10 slides
Cdc Business Systems Overview por
Cdc Business Systems OverviewCdc Business Systems Overview
Cdc Business Systems Overviewcdcsys
326 visualizações19 slides

Mais conteúdo relacionado

Similar a Construction Coordinator Duties

ICC Broadband Presintation por
ICC Broadband PresintationICC Broadband Presintation
ICC Broadband PresintationICCBroadband
209 visualizações46 slides
SUMMARY por
SUMMARYSUMMARY
SUMMARYAlexandria Rex
65 visualizações2 slides
SPIROS TSOUMANIS-CV por
SPIROS TSOUMANIS-CVSPIROS TSOUMANIS-CV
SPIROS TSOUMANIS-CVspiros tsoumanis
441 visualizações7 slides
Resume 2015 por
Resume 2015Resume 2015
Resume 2015Henry Schmitz
285 visualizações7 slides
Quoted Works and Contracts Co-Ordinator - Info por
Quoted Works and Contracts Co-Ordinator - InfoQuoted Works and Contracts Co-Ordinator - Info
Quoted Works and Contracts Co-Ordinator - InfoMabel Reyneke-Fourie
117 visualizações2 slides
Mechanical Completions por
Mechanical CompletionsMechanical Completions
Mechanical CompletionsAndy Lang
22K visualizações17 slides

Similar a Construction Coordinator Duties(20)

ICC Broadband Presintation por ICCBroadband
ICC Broadband PresintationICC Broadband Presintation
ICC Broadband Presintation
ICCBroadband209 visualizações
SUMMARY por Alexandria Rex
SUMMARYSUMMARY
SUMMARY
Alexandria Rex65 visualizações
SPIROS TSOUMANIS-CV por spiros tsoumanis
SPIROS TSOUMANIS-CVSPIROS TSOUMANIS-CV
SPIROS TSOUMANIS-CV
spiros tsoumanis441 visualizações
Resume 2015 por Henry Schmitz
Resume 2015Resume 2015
Resume 2015
Henry Schmitz285 visualizações
Quoted Works and Contracts Co-Ordinator - Info por Mabel Reyneke-Fourie
Quoted Works and Contracts Co-Ordinator - InfoQuoted Works and Contracts Co-Ordinator - Info
Quoted Works and Contracts Co-Ordinator - Info
Mabel Reyneke-Fourie117 visualizações
Mechanical Completions por Andy Lang
Mechanical CompletionsMechanical Completions
Mechanical Completions
Andy Lang22K visualizações
Tiffany Matthews Resume 2016 por Tiffany Matthews
Tiffany Matthews Resume 2016Tiffany Matthews Resume 2016
Tiffany Matthews Resume 2016
Tiffany Matthews237 visualizações
CV_Rizwan Mujawar - Secretary - Doc. Controller por Rizwan Mujawar
CV_Rizwan Mujawar - Secretary - Doc. ControllerCV_Rizwan Mujawar - Secretary - Doc. Controller
CV_Rizwan Mujawar - Secretary - Doc. Controller
Rizwan Mujawar305 visualizações
ahmed nady-c por Ahmed Nady
ahmed nady-cahmed nady-c
ahmed nady-c
Ahmed Nady264 visualizações
Lean section 2 por C Kaye Woodard
Lean section 2Lean section 2
Lean section 2
C Kaye Woodard4.3K visualizações
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1 por Antonio Coladarce
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Advanced Training for Construction Management: CONTRACTS MANAGEMENT part1
Antonio Coladarce10K visualizações
CV-SPIROS TSOUMANIS por spiros tsoumanis
CV-SPIROS TSOUMANISCV-SPIROS TSOUMANIS
CV-SPIROS TSOUMANIS
spiros tsoumanis240 visualizações
William Thomas Beckley resume por Tommy Beckley
William Thomas Beckley resumeWilliam Thomas Beckley resume
William Thomas Beckley resume
Tommy Beckley265 visualizações
Lou Fanglin's Document Control Procedure and DOC Experience Summary por Lou Fanglin
Lou Fanglin's Document Control Procedure and DOC Experience SummaryLou Fanglin's Document Control Procedure and DOC Experience Summary
Lou Fanglin's Document Control Procedure and DOC Experience Summary
Lou Fanglin673 visualizações
loinbj por bellabella09
loinbj loinbj
loinbj
bellabella0978 visualizações
Christy_McKinzie_Resume_2015 por Christy McKinzie
Christy_McKinzie_Resume_2015Christy_McKinzie_Resume_2015
Christy_McKinzie_Resume_2015
Christy McKinzie201 visualizações
Summer Internship Presentation por Kishore Kumar
Summer Internship PresentationSummer Internship Presentation
Summer Internship Presentation
Kishore Kumar502 visualizações
Mohammad Romzan Ali Updated(Format-2) por Mohammad Romzan Ali
Mohammad Romzan Ali Updated(Format-2)Mohammad Romzan Ali Updated(Format-2)
Mohammad Romzan Ali Updated(Format-2)
Mohammad Romzan Ali475 visualizações
Muhammad Shamim up date CV 30-11-2015 por mohammad shamim
Muhammad Shamim up date CV 30-11-2015Muhammad Shamim up date CV 30-11-2015
Muhammad Shamim up date CV 30-11-2015
mohammad shamim190 visualizações
Syeda Taha Mateen (1) por Taha Mateen
Syeda Taha Mateen (1)Syeda Taha Mateen (1)
Syeda Taha Mateen (1)
Taha Mateen566 visualizações

Construction Coordinator Duties

  • 1. Construction Coordinator Duties  NJUNS Tickets Weekly: print new jobs from “Monday Pole Report”, Daily: print status updates/maps (from Carol Hellon). Make CWOs for issue to Contractor and/or issue directly to Construction Team. Close out all NJUNS tickets through the website.  Maintenance Print and acknowledge receipt of jobs from System (Sweep) or other TechOps Dept., build CWOs in a timely manner- do not allow substantial build-up. Notate all CLI jobs and any other rush jobs as “priority” in the Construction Work Order notes. Coordinate with originators of jobs to ensure accurate work notes/drawings are placed in the workbook. Use ‘Reports’ tab on CWO website to track jobs, contact Contractor if necessary to expedite completion.  Forced Relocate Print and acknowledge receipt of jobs (Power Companies, Municipalities, MDOT, etc). Pull system maps and mark Scope of Work to coincide with provided maps. Onsite inspections must be complete in a timely manner: coordinate with design/field personnel if necessary for clarification. Weekly: be sure to keep tabs on work progress- route drawings, CCI design, CPR status and field work. Give updates on progress as needed, notify when work is complete. Relocate requests from individuals or private businesses should be treated as voluntary: do a site inspection, build and print a mock workbook to determine cost and submit to requestor as an invoice. Once the invoice is paid, build a full CWO.  Joint Trench Print and acknowledge jobs from builders or Power Company, get any available maps or designs. Onsite inspections are not always necessary, but are very helpful. Build CWO, send out for CCI
  • 2. design (if New Build) and get invoice information as soon as possible, as well as email CWO to supervisor for CPR request. Be sure to include all JT fees, permit costs and any aid to Construction (subscriber invoice fees) in the workbook. Coordinate with Trenching Contractor for dates and manpower. Send parts order for activation when CPR is approved. Weekly: keep tabs on progress/updates  Permits Apply for any Municipal, County, MDOT or Pole Permits needed for any job as soon as time and information allows; include any fees in the workbook. Permitting can take anywhere from a few hours to 120 days: be sure to have information for specific jobs noted and be ready to discuss reasons for any delays.  0625 Report Daily: check and print, send any completed, CWO-in-progress or improperly listed jobs to DL West MI Bay City Escalation Team. Coordinate with System and TechOps Dept. supervisors as needed to ensure jobs on the report are surveyed/completed quickly: there is a 10-day window before they are escalated to management.  Map Updates All types of completed jobs that have changed the System Map layout must be given out for updates. Submit all ‘completes’ needing map updates to DL MI CAD: contact Mike Simerson for the proper format of the submissions.  BMC Remedy All ticket requests should be treated as urgent and entered on a same-day basis. Always provide the CRQ ticket number to the requestor when ticket is submitted. Accurate data entry is absolutely necessary to ensure ticket approval.
  • 3.  General Organization and accurate notes are the key to maintaining workflow: write ‘received’ and ‘complete’ dates on everything, file CWOs and in-progress work every day. Keep Outlook folders as clear as possible, do not allow to ‘overflow’: save important emails and files on desktop or other Enterprise areas granted for your use. Be sure to take part in all daily meetings, as well as Tuesday & Thursday contractor calls. Follow Company Vehicle maintenance schedules and comply with all safety standards set forth by the Safety Dept., the Safety Committee and the Construction Supervisor. Whenever necessary, ask questions or for help from the Construction Dept. or any related Departments. Track conversations, jobs, emails and any information as often as possible. Work on jobs from an “A to B” perspective, not “A to Z”.