SlideShare uma empresa Scribd logo
1 de 18
Information is Tyco Electronics Confidential & Proprietary
Do Not Reproduce or Distribute
Kaizen Event :SVDO CONTI PRODUCTIVITY
IMPROVEMENT
Team Leader:Deepak(ME).
Team members: Rajesh(ME), Vinayak (Tooling), Chandrasekhar,Shivkumar,Arvind
(Production).
Date : 18th
March 2010
page
Information is Tyco Electronics Confidential & Proprietary
Do Not Reproduce or Distribute
Project Scope
Improving productivity
Reducing down time.
Reducing set up rejection.
Reduction of rework.
Define
page
Information is Tyco Electronics Confidential & Proprietary
Do Not Reproduce or Distribute
Concerns
• Increase in customer requirement :- 90k/month.
• Cycle time :- 70sec.
• Available hours :- 600 hrs.
• Maximum output:- 61K/Month
page
Information is Tyco Electronics Confidential & Proprietary
Do Not Reproduce or Distribute
Base Line
Metric Baseline Target Entitlement Improvement
Output per
day
2400nos 3100nos 3500nos 46%
Efficiency 120% 150% 170% 40%
Absolute
utilization of
the machine
72% 85% 18%
page
Information is Tyco Electronics Confidential & Proprietary
Do Not Reproduce or Distribute
Measure
•Average Cycle time running was 70 sec.
Cycle time
81.8
67.5
81.0
62.6 61.7
65.4
70.4 71.5
62.6
66.6
76.9
-
500
1,000
1,500
2,000
2,500
3,000
14-Mar 15-Mar 16-Mar 17-Mar 18-Mar 19-Mar 20-Mar 21-Mar 22-Mar 23-Mar 24-Mar
Day
Qty
0.0
10.0
20.0
30.0
40.0
50.0
60.0
70.0
80.0
90.0
Cycletime
page
Information is Tyco Electronics Confidential & Proprietary
Do Not Reproduce or Distribute
Pareto analysis
Dec-Feb
27.0
38.6
48.8
58.2
66.9
75.2
81.7
84.1
86.5 88.5 90.6 92.6 94.4 95.9 97.1 98.1 98.8 99.4 99.8 100.0
0
20
40
60
80
100
120
0.0
20.0
40.0
60.0
80.0
100.0
120.0
page
Information is Tyco Electronics Confidential & Proprietary
Do Not Reproduce or Distribute
Pareto analysis
Down time Time (hrs) Percentage
Waiting for operator 104.25 27
Mold problem 44.75 12
Machine down 39.5 10
Waiting for mold 36.25 9
Machine cleaning 33.5 9
No load 32 8
Power failure 25.25 7
Mold loading 9.25 2
Cooling connection 9 2
Planned mach stoppage 8 2
Auxiliary Down 8 2
Mold unloading 7.75 2
Planned preventive maintenance 6.75 2
Warming up 6 2
Waiting for tech 4.5 1
Optimization 3.75 1
Mold cleaning 3 1
Delay is start up due to power failure 2 1
Waiting for tool maker 1.75 0
Waiting for clarification QA 0.75 0
page
Information is Tyco Electronics Confidential & Proprietary
Do Not Reproduce or Distribute
Time analysis
1,Remove
the part
2,Place it on he
table and put runner
in the bin
3,Picking connector and
bobbin for insertion
4,Placing the
connector and bobbin
5,Inserting the
connectors
6,Inserting
bobbin
7,Tapping
the bobbin
8,Blowing
the air
9,Closing the
side core
10,Pressing the
start button
Operator 1
1,Removal of
pin header
2,Removal of
bobbin insert
3,Insertion of insert
for next cycle
Operator 2
1,Visual
inspection
2,Placing
the bobbin
as per
cavity
marking
Operator3
42.81 sec
28.10sec
4.81sec
page
Information is Tyco Electronics Confidential & Proprietary
Do Not Reproduce or Distribute
Analysis
Time study
4.81
25.5
42.81
12.66
28.1
24 24 24 24 24
0
5
10
15
20
25
30
35
40
45
Independent
function
Operator 1 Operator2 Operator3 Parellel function
Sec
Takt time
page
Information is Tyco Electronics Confidential & Proprietary
Do Not Reproduce or Distribute
Actions to be taken.
• Increasing the number of trained operator for avoiding the maximum
interruption.
• Improving the cooling connection for leakages to avoid mold down
interruption.
• Increasing the number of inserts.
• Improving the layout for better ergonomics.
• Minimizing the points of rework and bring it near the machine.
• Feasibility for UPS connection so that machine run uninterrupted.
page
Information is Tyco Electronics Confidential & Proprietary
Do Not Reproduce or Distribute
Improvements
2,Remove the
part Place it on
he table and
put runner in
the bin
1,Picking connector and
bobbin for insertion
3,Inserting the
connectors
4,Inserting
bobbin
5,Tapping
the bobbin
6,Blowing the air and
closing the side core
7,Pressing the start
button
Operator 1
1,Removal
of pin
header
2,Removal
of bobbin
insert
3,Insertion
of insert
for next
cycle
Operator
2
1,Visual
inspection
2,Placing the bobbin as per cavity
marking
Operator 3
26 sec
23.68sec 4.81sec
page
Information is Tyco Electronics Confidential & Proprietary
Do Not Reproduce or Distribute
Time after improvement.
Time study
23.68
12.66
26 25.5
4.81
24 24 24 24 24
0
5
10
15
20
25
30
Independent
function
Operator 1 Operator2 Operator3 Parellel function
Sec
Takt time
page
Information is Tyco Electronics Confidential & Proprietary
Do Not Reproduce or Distribute
Actions initiated
Reason Causes Actions
Waiting for operator
1,Only 2 trained operator per shift.
1, Trained operators so that at
least 4 operators are there
during breaks in a shift for
relieving.
2, Recruiting new operators
Mold problem
1, Cooling leakages.
2,Frequent insert breakages
1, New quick couplers planned.
2, Insert design changed to
avoid frequent breakages
Power failure
1, At least 4 time power break down
causing too much stoppages with
set up rejection.
1, UPS installed for back up in
case of power failure.
page
Information is Tyco Electronics Confidential & Proprietary
Do Not Reproduce or Distribute
Before and After lay out change
Before After
180
Operator movement for insertion of inserts and removal of the
molded part was difficult and tiresome.
The insertion station brought near operator making the movement
minimum.
page
Information is Tyco Electronics Confidential & Proprietary
Do Not Reproduce or Distribute
Before and after layout change
Before After
Congested work station making visual inspection difficult Increased the size of the work platform for accommodating all the
operators.
page
Information is Tyco Electronics Confidential & Proprietary
Do Not Reproduce or Distribute
Production after Kaizen activity
Average productivity presently 75K.
Last month output was 80K.
SVDO PRODUCTIVITY
80835
69956
46785
30623
108.5
75.1
48.7
56.2
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
Feb March April May
Month
Qty
0.0
20.0
40.0
60.0
80.0
100.0
120.0
Cycletime
Cycle time
page
Information is Tyco Electronics Confidential & Proprietary
Do Not Reproduce or Distribute
Benefits
•Ability to deliver the committed quantity as per customer needs.
•Machine interruption reduced by improving mold down time, installing ups and
training more operators for this project.
Savings April May
$ 3594 2970
page
Information is Tyco Electronics Confidential & Proprietary
Do Not Reproduce or Distribute
Pending work
• Changing the cooling connectors to good quality couplers:-30days.
• Fitting the new tables with acrylic sheets and lights:-1week.
• Reducing the rework points on the part.

Mais conteúdo relacionado

Destaque

Course outline Introduction to Quality
Course outline Introduction to QualityCourse outline Introduction to Quality
Course outline Introduction to QualityMarie Graves
 
REGLAMENTO INTERNO DE TRABAJO
REGLAMENTO INTERNO DE TRABAJO REGLAMENTO INTERNO DE TRABAJO
REGLAMENTO INTERNO DE TRABAJO macorovi
 
Confissão de fé de Westminster - PRST
Confissão de fé de Westminster - PRSTConfissão de fé de Westminster - PRST
Confissão de fé de Westminster - PRSTPresbitério de Santos
 
COMPUMABE LTDA
COMPUMABE LTDA COMPUMABE LTDA
COMPUMABE LTDA macorovi
 
Rf christmas
Rf christmasRf christmas
Rf christmasncantafio
 
Ecologia și ideologiile verzilor
Ecologia și ideologiile verzilorEcologia și ideologiile verzilor
Ecologia și ideologiile verzilorMarian Chiriac
 
Facility Programming_Sunda
Facility Programming_SundaFacility Programming_Sunda
Facility Programming_SundaVidel Oemry
 
mercy's_resume-new 2015-1 (1)
mercy's_resume-new 2015-1 (1)mercy's_resume-new 2015-1 (1)
mercy's_resume-new 2015-1 (1)Mercy Gonzalez
 
PHRMA V. WALSH 538 US 644 (2003)
PHRMA V. WALSH 538 US 644 (2003)PHRMA V. WALSH 538 US 644 (2003)
PHRMA V. WALSH 538 US 644 (2003)Andrew S. Hagler
 
Fases de la tecnología
Fases de la tecnología Fases de la tecnología
Fases de la tecnología Darley Ortiz
 
Propuestas para el medio ambiente
Propuestas para el medio ambiente Propuestas para el medio ambiente
Propuestas para el medio ambiente RenanPuente
 

Destaque (20)

Prepositions of place
Prepositions of placePrepositions of place
Prepositions of place
 
Course outline Introduction to Quality
Course outline Introduction to QualityCourse outline Introduction to Quality
Course outline Introduction to Quality
 
River Rafting Rishikesh
River Rafting RishikeshRiver Rafting Rishikesh
River Rafting Rishikesh
 
REGLAMENTO INTERNO DE TRABAJO
REGLAMENTO INTERNO DE TRABAJO REGLAMENTO INTERNO DE TRABAJO
REGLAMENTO INTERNO DE TRABAJO
 
Confissão de fé de Westminster - PRST
Confissão de fé de Westminster - PRSTConfissão de fé de Westminster - PRST
Confissão de fé de Westminster - PRST
 
Paulo Afonso - Business Model Canvas
Paulo Afonso - Business Model CanvasPaulo Afonso - Business Model Canvas
Paulo Afonso - Business Model Canvas
 
American-Sueno-StudyGuide
American-Sueno-StudyGuideAmerican-Sueno-StudyGuide
American-Sueno-StudyGuide
 
COMPUMABE LTDA
COMPUMABE LTDA COMPUMABE LTDA
COMPUMABE LTDA
 
Rf christmas
Rf christmasRf christmas
Rf christmas
 
Resume- 3.0
Resume- 3.0Resume- 3.0
Resume- 3.0
 
Ecologia și ideologiile verzilor
Ecologia și ideologiile verzilorEcologia și ideologiile verzilor
Ecologia și ideologiile verzilor
 
Facility Programming_Sunda
Facility Programming_SundaFacility Programming_Sunda
Facility Programming_Sunda
 
mercy's_resume-new 2015-1 (1)
mercy's_resume-new 2015-1 (1)mercy's_resume-new 2015-1 (1)
mercy's_resume-new 2015-1 (1)
 
Propiedadesdelarandano
PropiedadesdelarandanoPropiedadesdelarandano
Propiedadesdelarandano
 
La demanda
La demandaLa demanda
La demanda
 
PHRMA V. WALSH 538 US 644 (2003)
PHRMA V. WALSH 538 US 644 (2003)PHRMA V. WALSH 538 US 644 (2003)
PHRMA V. WALSH 538 US 644 (2003)
 
Fases de la tecnología
Fases de la tecnología Fases de la tecnología
Fases de la tecnología
 
Propuestas para el medio ambiente
Propuestas para el medio ambiente Propuestas para el medio ambiente
Propuestas para el medio ambiente
 
SMP_MC_prathima_Chenna
SMP_MC_prathima_ChennaSMP_MC_prathima_Chenna
SMP_MC_prathima_Chenna
 
CT - Dago Pojok
CT - Dago PojokCT - Dago Pojok
CT - Dago Pojok
 

Semelhante a Kaizen

IRJET- Development of a Smart Flipping System
IRJET-  	  Development of a Smart Flipping SystemIRJET-  	  Development of a Smart Flipping System
IRJET- Development of a Smart Flipping SystemIRJET Journal
 
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...IRJET Journal
 
Presentation_RFID Tag Production_Compay X
Presentation_RFID Tag Production_Compay XPresentation_RFID Tag Production_Compay X
Presentation_RFID Tag Production_Compay XMichael Trubilla
 
Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...
Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...
Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...Dien Ha The
 
Cataloge ge 3.control and_automation-4_speed_drive_units_vat200_manual_english
Cataloge ge 3.control and_automation-4_speed_drive_units_vat200_manual_englishCataloge ge 3.control and_automation-4_speed_drive_units_vat200_manual_english
Cataloge ge 3.control and_automation-4_speed_drive_units_vat200_manual_englishThuan Kieu
 
Cataloge ge 3.control and_automation-4_speed_drive_units_avat200_manual_english
Cataloge ge 3.control and_automation-4_speed_drive_units_avat200_manual_englishCataloge ge 3.control and_automation-4_speed_drive_units_avat200_manual_english
Cataloge ge 3.control and_automation-4_speed_drive_units_avat200_manual_englishDien Ha The
 
Baumann, Erik Resume 1
Baumann, Erik Resume 1Baumann, Erik Resume 1
Baumann, Erik Resume 1Erik Baumann
 
Baumann, Erik Resume 1
Baumann, Erik Resume 1Baumann, Erik Resume 1
Baumann, Erik Resume 1Erik Baumann
 
Kes Us Intel Presentation 2008 Smaller Version
Kes Us Intel Presentation 2008 Smaller VersionKes Us Intel Presentation 2008 Smaller Version
Kes Us Intel Presentation 2008 Smaller Versioncmleong
 
User Manual - Final Project 2015
User Manual - Final Project 2015User Manual - Final Project 2015
User Manual - Final Project 2015Chafic Bouchakra
 
Eia 364-38 c final
Eia 364-38 c finalEia 364-38 c final
Eia 364-38 c finalgaryftp
 
Datablad ua741 operasjonsforsterer OP-AMP OPAMP Forsterker operational amplif...
Datablad ua741 operasjonsforsterer OP-AMP OPAMP Forsterker operational amplif...Datablad ua741 operasjonsforsterer OP-AMP OPAMP Forsterker operational amplif...
Datablad ua741 operasjonsforsterer OP-AMP OPAMP Forsterker operational amplif...Sven Åge Eriksen
 
Omron Blackbird webinar-with voice recording_19112019
Omron Blackbird webinar-with voice recording_19112019Omron Blackbird webinar-with voice recording_19112019
Omron Blackbird webinar-with voice recording_19112019BlackbirdApS
 
Applied motion products txm24 c brochure
Applied motion products txm24 c brochureApplied motion products txm24 c brochure
Applied motion products txm24 c brochureElectromate
 

Semelhante a Kaizen (20)

Project Presentation
Project PresentationProject Presentation
Project Presentation
 
Tcl32c5
Tcl32c5Tcl32c5
Tcl32c5
 
IRJET- Development of a Smart Flipping System
IRJET-  	  Development of a Smart Flipping SystemIRJET-  	  Development of a Smart Flipping System
IRJET- Development of a Smart Flipping System
 
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
 
ZIPP torque controller operational manual
ZIPP torque controller operational manualZIPP torque controller operational manual
ZIPP torque controller operational manual
 
Presentation_RFID Tag Production_Compay X
Presentation_RFID Tag Production_Compay XPresentation_RFID Tag Production_Compay X
Presentation_RFID Tag Production_Compay X
 
Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...
Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...
Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...
 
Cataloge ge 3.control and_automation-4_speed_drive_units_vat200_manual_english
Cataloge ge 3.control and_automation-4_speed_drive_units_vat200_manual_englishCataloge ge 3.control and_automation-4_speed_drive_units_vat200_manual_english
Cataloge ge 3.control and_automation-4_speed_drive_units_vat200_manual_english
 
Cataloge ge 3.control and_automation-4_speed_drive_units_avat200_manual_english
Cataloge ge 3.control and_automation-4_speed_drive_units_avat200_manual_englishCataloge ge 3.control and_automation-4_speed_drive_units_avat200_manual_english
Cataloge ge 3.control and_automation-4_speed_drive_units_avat200_manual_english
 
Baumann, Erik Resume 1
Baumann, Erik Resume 1Baumann, Erik Resume 1
Baumann, Erik Resume 1
 
Baumann, Erik Resume 1
Baumann, Erik Resume 1Baumann, Erik Resume 1
Baumann, Erik Resume 1
 
Kes Us Intel Presentation 2008 Smaller Version
Kes Us Intel Presentation 2008 Smaller VersionKes Us Intel Presentation 2008 Smaller Version
Kes Us Intel Presentation 2008 Smaller Version
 
User Manual - Final Project 2015
User Manual - Final Project 2015User Manual - Final Project 2015
User Manual - Final Project 2015
 
Eia 364-38 c final
Eia 364-38 c finalEia 364-38 c final
Eia 364-38 c final
 
Datablad ua741 operasjonsforsterer OP-AMP OPAMP Forsterker operational amplif...
Datablad ua741 operasjonsforsterer OP-AMP OPAMP Forsterker operational amplif...Datablad ua741 operasjonsforsterer OP-AMP OPAMP Forsterker operational amplif...
Datablad ua741 operasjonsforsterer OP-AMP OPAMP Forsterker operational amplif...
 
Placa msi 7135
Placa msi 7135Placa msi 7135
Placa msi 7135
 
Omron Blackbird webinar-with voice recording_19112019
Omron Blackbird webinar-with voice recording_19112019Omron Blackbird webinar-with voice recording_19112019
Omron Blackbird webinar-with voice recording_19112019
 
Applied motion products txm24 c brochure
Applied motion products txm24 c brochureApplied motion products txm24 c brochure
Applied motion products txm24 c brochure
 
eTracer Network MPPT Solar Charge Controller ET2415N,ET3415N,ET4415N,ET6415N
eTracer Network MPPT Solar Charge Controller ET2415N,ET3415N,ET4415N,ET6415NeTracer Network MPPT Solar Charge Controller ET2415N,ET3415N,ET4415N,ET6415N
eTracer Network MPPT Solar Charge Controller ET2415N,ET3415N,ET4415N,ET6415N
 
Haeger Profit Center
Haeger Profit CenterHaeger Profit Center
Haeger Profit Center
 

Kaizen

  • 1. Information is Tyco Electronics Confidential & Proprietary Do Not Reproduce or Distribute Kaizen Event :SVDO CONTI PRODUCTIVITY IMPROVEMENT Team Leader:Deepak(ME). Team members: Rajesh(ME), Vinayak (Tooling), Chandrasekhar,Shivkumar,Arvind (Production). Date : 18th March 2010
  • 2. page Information is Tyco Electronics Confidential & Proprietary Do Not Reproduce or Distribute Project Scope Improving productivity Reducing down time. Reducing set up rejection. Reduction of rework. Define
  • 3. page Information is Tyco Electronics Confidential & Proprietary Do Not Reproduce or Distribute Concerns • Increase in customer requirement :- 90k/month. • Cycle time :- 70sec. • Available hours :- 600 hrs. • Maximum output:- 61K/Month
  • 4. page Information is Tyco Electronics Confidential & Proprietary Do Not Reproduce or Distribute Base Line Metric Baseline Target Entitlement Improvement Output per day 2400nos 3100nos 3500nos 46% Efficiency 120% 150% 170% 40% Absolute utilization of the machine 72% 85% 18%
  • 5. page Information is Tyco Electronics Confidential & Proprietary Do Not Reproduce or Distribute Measure •Average Cycle time running was 70 sec. Cycle time 81.8 67.5 81.0 62.6 61.7 65.4 70.4 71.5 62.6 66.6 76.9 - 500 1,000 1,500 2,000 2,500 3,000 14-Mar 15-Mar 16-Mar 17-Mar 18-Mar 19-Mar 20-Mar 21-Mar 22-Mar 23-Mar 24-Mar Day Qty 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 Cycletime
  • 6. page Information is Tyco Electronics Confidential & Proprietary Do Not Reproduce or Distribute Pareto analysis Dec-Feb 27.0 38.6 48.8 58.2 66.9 75.2 81.7 84.1 86.5 88.5 90.6 92.6 94.4 95.9 97.1 98.1 98.8 99.4 99.8 100.0 0 20 40 60 80 100 120 0.0 20.0 40.0 60.0 80.0 100.0 120.0
  • 7. page Information is Tyco Electronics Confidential & Proprietary Do Not Reproduce or Distribute Pareto analysis Down time Time (hrs) Percentage Waiting for operator 104.25 27 Mold problem 44.75 12 Machine down 39.5 10 Waiting for mold 36.25 9 Machine cleaning 33.5 9 No load 32 8 Power failure 25.25 7 Mold loading 9.25 2 Cooling connection 9 2 Planned mach stoppage 8 2 Auxiliary Down 8 2 Mold unloading 7.75 2 Planned preventive maintenance 6.75 2 Warming up 6 2 Waiting for tech 4.5 1 Optimization 3.75 1 Mold cleaning 3 1 Delay is start up due to power failure 2 1 Waiting for tool maker 1.75 0 Waiting for clarification QA 0.75 0
  • 8. page Information is Tyco Electronics Confidential & Proprietary Do Not Reproduce or Distribute Time analysis 1,Remove the part 2,Place it on he table and put runner in the bin 3,Picking connector and bobbin for insertion 4,Placing the connector and bobbin 5,Inserting the connectors 6,Inserting bobbin 7,Tapping the bobbin 8,Blowing the air 9,Closing the side core 10,Pressing the start button Operator 1 1,Removal of pin header 2,Removal of bobbin insert 3,Insertion of insert for next cycle Operator 2 1,Visual inspection 2,Placing the bobbin as per cavity marking Operator3 42.81 sec 28.10sec 4.81sec
  • 9. page Information is Tyco Electronics Confidential & Proprietary Do Not Reproduce or Distribute Analysis Time study 4.81 25.5 42.81 12.66 28.1 24 24 24 24 24 0 5 10 15 20 25 30 35 40 45 Independent function Operator 1 Operator2 Operator3 Parellel function Sec Takt time
  • 10. page Information is Tyco Electronics Confidential & Proprietary Do Not Reproduce or Distribute Actions to be taken. • Increasing the number of trained operator for avoiding the maximum interruption. • Improving the cooling connection for leakages to avoid mold down interruption. • Increasing the number of inserts. • Improving the layout for better ergonomics. • Minimizing the points of rework and bring it near the machine. • Feasibility for UPS connection so that machine run uninterrupted.
  • 11. page Information is Tyco Electronics Confidential & Proprietary Do Not Reproduce or Distribute Improvements 2,Remove the part Place it on he table and put runner in the bin 1,Picking connector and bobbin for insertion 3,Inserting the connectors 4,Inserting bobbin 5,Tapping the bobbin 6,Blowing the air and closing the side core 7,Pressing the start button Operator 1 1,Removal of pin header 2,Removal of bobbin insert 3,Insertion of insert for next cycle Operator 2 1,Visual inspection 2,Placing the bobbin as per cavity marking Operator 3 26 sec 23.68sec 4.81sec
  • 12. page Information is Tyco Electronics Confidential & Proprietary Do Not Reproduce or Distribute Time after improvement. Time study 23.68 12.66 26 25.5 4.81 24 24 24 24 24 0 5 10 15 20 25 30 Independent function Operator 1 Operator2 Operator3 Parellel function Sec Takt time
  • 13. page Information is Tyco Electronics Confidential & Proprietary Do Not Reproduce or Distribute Actions initiated Reason Causes Actions Waiting for operator 1,Only 2 trained operator per shift. 1, Trained operators so that at least 4 operators are there during breaks in a shift for relieving. 2, Recruiting new operators Mold problem 1, Cooling leakages. 2,Frequent insert breakages 1, New quick couplers planned. 2, Insert design changed to avoid frequent breakages Power failure 1, At least 4 time power break down causing too much stoppages with set up rejection. 1, UPS installed for back up in case of power failure.
  • 14. page Information is Tyco Electronics Confidential & Proprietary Do Not Reproduce or Distribute Before and After lay out change Before After 180 Operator movement for insertion of inserts and removal of the molded part was difficult and tiresome. The insertion station brought near operator making the movement minimum.
  • 15. page Information is Tyco Electronics Confidential & Proprietary Do Not Reproduce or Distribute Before and after layout change Before After Congested work station making visual inspection difficult Increased the size of the work platform for accommodating all the operators.
  • 16. page Information is Tyco Electronics Confidential & Proprietary Do Not Reproduce or Distribute Production after Kaizen activity Average productivity presently 75K. Last month output was 80K. SVDO PRODUCTIVITY 80835 69956 46785 30623 108.5 75.1 48.7 56.2 0 10000 20000 30000 40000 50000 60000 70000 80000 90000 Feb March April May Month Qty 0.0 20.0 40.0 60.0 80.0 100.0 120.0 Cycletime Cycle time
  • 17. page Information is Tyco Electronics Confidential & Proprietary Do Not Reproduce or Distribute Benefits •Ability to deliver the committed quantity as per customer needs. •Machine interruption reduced by improving mold down time, installing ups and training more operators for this project. Savings April May $ 3594 2970
  • 18. page Information is Tyco Electronics Confidential & Proprietary Do Not Reproduce or Distribute Pending work • Changing the cooling connectors to good quality couplers:-30days. • Fitting the new tables with acrylic sheets and lights:-1week. • Reducing the rework points on the part.

Notas do Editor

  1. <number>