For More Details Visit Us : http://fleckcontracting.com/ With the redesign and obliteration of structures and structures, particularly more established structures, comes the need to manage risky materials. Through a building study, the customer will know the sorts, degree, and state of risky materials present. The safe reduction of all normal and disguised risky materials will need to adjust to different Federal regulations. We are guaranteed to handle or uproot perilous materials, for example, asbestos, polychlorinated biphenyl (PCB), lead, mercury, substantial metal, poisons, and combustible or hazardous material.