Scaffolding
Safety
D E PA R T M E N T O R D E R N O . 1 2 8
S e r i e s o f 2 0 1 3
A M E N D I N G R U L E 1 4 1 4 O N
S C A F F O L D I N G S O F T H E 1 9 8 9
O C C U PAT I O N A L H E A LT H A N D
S A F E T Y S TA N D A R D S
What is a scaffolding?
INTRODUCTION
It refers to a temporary or
movable platform supported on
the ground or suspended, used
for access and/or working at
considerable heights above
ground.
Working platform
Platform and walking passage
FUNCTIONS
OF A SCAFFOLDING
Classification of Scaffolds
⚬Supported Scaffolds
⚬Suspended Scaffolds
⚬Mobile
⚬Ladder
⚬Tube and coupler
⚬Frame
⚬Timber
Supported Scaffolds
⚬Bamboo
⚬Trestle
⚬Form and Carpenter’s
Bracket
⚬Roof Bracket
⚬Window Jack
Supported Scaffolds
⚬ Two-point adjustable
suspension
⚬ Single-point adjustable
suspension
Suspended Scaffolds
⚬ Design instruction shall be prepared by the end user.
⚬ Design shall be in accordance with recognized engineering principles.
⚬ Shall be designed with regard to ease and safety of erection and dismantling.
⚬ Supported scaffolds shall be capable of supporting without failure at least four (4)
times the maximum intended load, while suspended scaffolds shall have six (6)
times factor of safety.
⚬ All scaffolds designed by a structural engineer shall be approved by appropriate
authority.
DESIGN AND STABILITY
DESIGN
•Shall have vertical members(posts) diagonally and horizontally braced.
•No splices between the points of support of load carrying horizontal members and
secured to prevent lateral movement.
•The footing, sills or anchorage – sound, rigid, and capable of carrying twice the
maximum intended load.
•Posts shall rest on a foundation of sufficient size and strength to spread the load
from the posts.
•Any damaged or weakened scaffold members shall be immediately repaired,
replaced or discarded.
STRENGTH & STABILITY
DESIGN AND STABILITY
•Not be overloaded for which they are intended.
•Anchored or secured to permanent or rigid structures.
•Components produced by different manufacturers shall not be intermixed unless
the components fit together without force and the scaffold’s structural integrity is
maintained by the user.
•Front-end loaders and similar types of equipment shall not be used to support
scaffold platforms unless they have been specifically designed by the manufacturer
or such use.
STRENGTH & STABILITY
DESIGN AND STABILITY
•Must be inspected either upon delivery or before it is erected/installed.
•Any defective material shall be repaired, replaced or discarded.
•Lumber with two (2) nail holes aligned crosswise or four (4) nail holes
along its length shall not be used as horizontal load bearing member of
scaffold
INSPECTION OF SCAFFOLDS
•Check ground conditions, overhead wires, obstructions, changes in surface
elevation, and structural support.
• Ensure the following in site preparation:
• Soil are level and firm.
• Mud and soft soil are replaced with compacted gravel or crushed stone.
• On sloping grounds, the area where mudsills rest shall be leveled by
excavating rather than backfilling
SITE INSPECTION & PREPARATION
•Direct supervision of a competent/qualified person as the case may be.
•Maintained plumb regardless of connection.
•Conform to the designer’s specification.
•Runners shall be perpendicular to the posts. Spacing shall conform to the
designed scaffold.
•Diagonal braces shall extend from one connection to another.
•Diagonal braces shall not exceed an angle of 60deg from horizontal.
•Diagonal braces shall be installed immediately.
SCAFFOLD ERECTION
•All posts shall be joined or connected by means of joint pin, spigot or any
appropriate means of connections.
•Always maintain the base width to height ratio of 1:4 during installation for stability.
•No scaffold activity shall be undertaken if the wind velocity exceeds 48 kph.
•No work shall be allowed to commence below the scaffold.
•Working platform shall be provided per level during erection.
SCAFFOLD ERECTION
•Scaffolds of more than 6 meters in height shall be designed by a structural
engineer and shall be erected, installed and dismantled by TESDA certified
erectors.
•Scaffold shall be erected, added, altered or dismantled only under the supervision
of the competent/qualified person in the construction.
SCAFFOLD ERECTION
⚬ Performed by a qualified and competent person.
⚬ All manufactured scaffolds shall follow the manufacturers’ recommendations.
• Direct connections shall be evaluated by a qualified or competent person who
shall confirm.
• Inspections should be carried out daily and every shift.
INSPECTION & TAGGING
•Identification tags – solid green, yellow, or red color with black lettering.
•Tags shall be hanged in every scaffold access points.
■ Green tags – scaffolds access that have been inspected and are safe for use.
■ Yellow tags – special requirements for safe use are required and shall be closely
supervised.
■ Red “DANGER – UNSAFE FOR USE” tags – used when all green or yellow tags
has been removed.
All the records of the inspections shall be available on site and made available to
proper authority upon request.
INSPECTION & TAGGING
•Properly maintained, fixed and secured in position to prevent displacement.
•Not to be used unless it is rendered stable, strong and safe for the purpose.
•Left standing for four (4) months shall not be used until damaged members are
replaced.
MAINTENANCE DURING USE
⚬ Must be done by trained personnel.
⚬ Proceed in reverse order to its erection.
⚬ Workers should wear a safety harness and lanyard tied off to a secured anchor
before attempting to loosen stuck or jammed parts.
⚬ Do not hammer or pry apart the scaffold components.
⚬ Do not throw scaffold components.
SCAFFOLD DISMANTLING
•All scaffolds shall be properly maintained, kept, clean, and free of
damage.
• Accessories requiring lubrication shall be oiled prior to storage in a
covered or closed container, or as per manufacturer’s recommendation.
MAINTENANCE & STORAGE
BASIC CONSIDERATION
⚬The weight of workers, tools, materials and equipment to be carried by
the scaffold system.
⚬Site conditions
⚬Height to which the scaffold may be erected.
⚬Type of work that will be done from the scaffold.
SCAFFOLD AND TYPE SELECTIONS
SCAFFOLD AND TYPE SELECTIONS
BASIC CONSIDERATION
⚬Duration of work
⚬Weather conditions, including wind
⚬Requirements for pedestrian traffic through and under the scaffold area
⚬Means of access to the scaffold
⚬Configuration of the building or structure being worked on.
⚬Wind speed limit is 48kph (DO 128) and 40kph (International Practice)
SCAFFOLD AND TYPE SELECTIONS
SCAFFOLD CAPACITY
⚬Scaffolds must be capable of supporting its own weight and at least 4x the
expected load. Expected load includes Live Load + Dead Load.
SCAFFOLD LOAD RATINGS
⚬ The allowable working load of scaffolding is 3,450kg per leg [TESDA]
⚬ The allowable working load of scaffolding is 150 kg per sq. m [DO 128]
OVERLOADING
⚬ Most frequent violations in scaffold practice.
HOUSEKEEPING
⚬ Scaffold decks are usually small, narrow and confined. Debris and waste
materials should not be allowed to collect on the platform.
SAFETY
SAFE SCAFFOLD USE
⚬Do not use damaged parts that affect the strength of the scaffold.
⚬Do not allow employees to work on scaffolds when they are feeling weak, sick,
or dizzy.
⚬Do not work from any part of the scaffold other than the platform.
⚬Do not alter the scaffold.
⚬Do not move a scaffold horizontally while workers are on it, unless it is a mobile
scaffold and the proper procedures are followed.
⚬Do not put more weight on a scaffold than it is designed to hold.
SAFETY
SAFE SCAFFOLD USE
⚬Do not allow employees to work on scaffolds covered slippery materials.
⚬Do not erect, use, alter, or move scaffolds within 10 feet of overhead power
lines.
⚬Do not use shore or lean-to scaffolds.
⚬Do not swing loads near or on scaffolds unless you use a tag line.
⚬Do not work on scaffolds in bad weather or high winds unless the competent
person decides that doing so is safe.
⚬Do not let extra material build up on the platforms.
⚬Do not use ladders, boxes, barrels, or other makeshift contraptions to raise your
work height.
SAFETY
TRAINING & COMPETENCY
Competent Person - responsible for determining the feasibility and safety of providing
fall protection for personnel erecting, installing or dismantling scaffolds.
■ Must undergo the standard scaffold training and assessment prescribed by
DOLE and TESDA.
■ Training Certificate from DOLE or its accredited safety training organization.
■ Holder of TESDA prescribed Scaffold Erection Certificate.
■ At least 2 years experience in scaffold erection.
TRAINING & COMPETENCY
Scaffold Erector
■ Must undergo the standard scaffold training and assessment prescribed by
DOLE and TESDA.
■ One Day Workers Safety Orientation from DOLE or its accredited safety
training organization.
■ Must be a holder of TESDA prescribed Scaffold Erection NC II
END OF PRESENTATION

More Related Content

What's hot

Crawler crane introduction
Crawler crane   introductionCrawler crane   introduction
Crawler crane introductionBhushan Goyal
 
Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.pptIrfanAwan25
 
049 Working at Heights.ppt
049 Working at Heights.ppt049 Working at Heights.ppt
049 Working at Heights.pptPremPratap5
 
Working at height regulations
Working at height regulationsWorking at height regulations
Working at height regulationsAlliver Revilla
 
Tower crane safety
Tower crane safetyTower crane safety
Tower crane safetyShiva Kaveri
 
Basic Scaffolding Awareness
Basic Scaffolding AwarenessBasic Scaffolding Awareness
Basic Scaffolding Awarenessedale07
 
Excavation safety
Excavation safetyExcavation safety
Excavation safetykaolapenang
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templatesDwarika Bhushan Sharma
 
Working at height Fall Protection Presentation.ppt
Working at height  Fall Protection Presentation.pptWorking at height  Fall Protection Presentation.ppt
Working at height Fall Protection Presentation.pptSINOPECHSEDEPARTMENT
 
Safety in Excavations
Safety in Excavations Safety in Excavations
Safety in Excavations Amol Pawar
 
SG4:10 presentation
SG4:10 presentationSG4:10 presentation
SG4:10 presentationAlan Bate
 
Scaffolding awareness presentation
Scaffolding awareness presentationScaffolding awareness presentation
Scaffolding awareness presentationbobrobbo
 

What's hot (20)

Crawler crane introduction
Crawler crane   introductionCrawler crane   introduction
Crawler crane introduction
 
Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.ppt
 
Excavation.ppt
Excavation.pptExcavation.ppt
Excavation.ppt
 
Do's and Don'ts of Scaffold Safety
Do's and Don'ts of Scaffold SafetyDo's and Don'ts of Scaffold Safety
Do's and Don'ts of Scaffold Safety
 
049 Working at Heights.ppt
049 Working at Heights.ppt049 Working at Heights.ppt
049 Working at Heights.ppt
 
Scaffold and Aerial Lift Safety by KTA
Scaffold and Aerial Lift Safety by KTAScaffold and Aerial Lift Safety by KTA
Scaffold and Aerial Lift Safety by KTA
 
Working at height regulations
Working at height regulationsWorking at height regulations
Working at height regulations
 
Tower crane safety
Tower crane safetyTower crane safety
Tower crane safety
 
Basic Scaffolding Awareness
Basic Scaffolding AwarenessBasic Scaffolding Awareness
Basic Scaffolding Awareness
 
Excavation safety
Excavation safetyExcavation safety
Excavation safety
 
8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates8 lifting operations with mobile crane risk assessment templates
8 lifting operations with mobile crane risk assessment templates
 
Scaffolding
ScaffoldingScaffolding
Scaffolding
 
Working at height Fall Protection Presentation.ppt
Working at height  Fall Protection Presentation.pptWorking at height  Fall Protection Presentation.ppt
Working at height Fall Protection Presentation.ppt
 
Safety in Excavations
Safety in Excavations Safety in Excavations
Safety in Excavations
 
Scaffold
ScaffoldScaffold
Scaffold
 
Excavation safety
Excavation safetyExcavation safety
Excavation safety
 
Fall Protection by Osha
Fall Protection by Osha Fall Protection by Osha
Fall Protection by Osha
 
Lifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptxLifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptx
 
SG4:10 presentation
SG4:10 presentationSG4:10 presentation
SG4:10 presentation
 
Scaffolding awareness presentation
Scaffolding awareness presentationScaffolding awareness presentation
Scaffolding awareness presentation
 

Similar to DO 128 - 13 SCAFFOLDING SAFETY.pptx

Scaffold And Aerial Lift Training by KTA
Scaffold And Aerial Lift Training by KTAScaffold And Aerial Lift Training by KTA
Scaffold And Aerial Lift Training by KTAAtlantic Training, LLC.
 
Safety Procedures while working in height
Safety Procedures while working in heightSafety Procedures while working in height
Safety Procedures while working in heightRoman Shrestha
 
Module 3.pptx
Module 3.pptxModule 3.pptx
Module 3.pptxShijo25
 
WORK AT HEIGHT.pptx
WORK AT HEIGHT.pptxWORK AT HEIGHT.pptx
WORK AT HEIGHT.pptxDavidNanda3
 
Scaffolding safety procedures and its types
Scaffolding safety procedures and its typesScaffolding safety procedures and its types
Scaffolding safety procedures and its typesabhisheksharma12001
 
DOC-20231115-WA0057..pdf
DOC-20231115-WA0057..pdfDOC-20231115-WA0057..pdf
DOC-20231115-WA0057..pdfrajaahmed49
 
Scaffolding by chakamba j
Scaffolding by chakamba jScaffolding by chakamba j
Scaffolding by chakamba jJohn Chakamba
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction siteNMRD Ltd
 
Safety while Working at Height
Safety while Working at HeightSafety while Working at Height
Safety while Working at HeightBimal Chandra Das
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction siteNMRD Ltd
 
WORKING AT HEIGHT pptx
WORKING AT HEIGHT pptxWORKING AT HEIGHT pptx
WORKING AT HEIGHT pptxDavidNanda3
 
Construction Fall Protection
Construction Fall Protection Construction Fall Protection
Construction Fall Protection John Newquist
 
Safe Material Handling
Safe Material Handling Safe Material Handling
Safe Material Handling Reliance
 
SCAFFOLD TRAINING.ppt
SCAFFOLD TRAINING.pptSCAFFOLD TRAINING.ppt
SCAFFOLD TRAINING.pptMianMKhurram
 

Similar to DO 128 - 13 SCAFFOLDING SAFETY.pptx (20)

Scaffold And Aerial Lift Training by KTA
Scaffold And Aerial Lift Training by KTAScaffold And Aerial Lift Training by KTA
Scaffold And Aerial Lift Training by KTA
 
Safety Procedures while working in height
Safety Procedures while working in heightSafety Procedures while working in height
Safety Procedures while working in height
 
Module 3.pptx
Module 3.pptxModule 3.pptx
Module 3.pptx
 
Scaffold Safety (2).ppt
Scaffold Safety (2).pptScaffold Safety (2).ppt
Scaffold Safety (2).ppt
 
Scaffolding by UTK
Scaffolding by UTKScaffolding by UTK
Scaffolding by UTK
 
WORK AT HEIGHT.pptx
WORK AT HEIGHT.pptxWORK AT HEIGHT.pptx
WORK AT HEIGHT.pptx
 
Scaffolding safety procedures and its types
Scaffolding safety procedures and its typesScaffolding safety procedures and its types
Scaffolding safety procedures and its types
 
DOC-20231115-WA0057..pdf
DOC-20231115-WA0057..pdfDOC-20231115-WA0057..pdf
DOC-20231115-WA0057..pdf
 
Scaffolding by chakamba j
Scaffolding by chakamba jScaffolding by chakamba j
Scaffolding by chakamba j
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction site
 
Safety while Working at Height
Safety while Working at HeightSafety while Working at Height
Safety while Working at Height
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction site
 
Supported Scaffold Safety
Supported Scaffold SafetySupported Scaffold Safety
Supported Scaffold Safety
 
WORKING AT HEIGHT pptx
WORKING AT HEIGHT pptxWORKING AT HEIGHT pptx
WORKING AT HEIGHT pptx
 
Overhead Crane Operators by
Overhead  Crane Operators byOverhead  Crane Operators by
Overhead Crane Operators by
 
Construction safety VI
Construction safety VIConstruction safety VI
Construction safety VI
 
Construction Fall Protection
Construction Fall Protection Construction Fall Protection
Construction Fall Protection
 
SCAFFOLDING
SCAFFOLDINGSCAFFOLDING
SCAFFOLDING
 
Safe Material Handling
Safe Material Handling Safe Material Handling
Safe Material Handling
 
SCAFFOLD TRAINING.ppt
SCAFFOLD TRAINING.pptSCAFFOLD TRAINING.ppt
SCAFFOLD TRAINING.ppt
 

Recently uploaded

Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashidFaiyazSheikh
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)ChandrakantDivate1
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Computer Graphics - Windowing and Clipping
Computer Graphics - Windowing and ClippingComputer Graphics - Windowing and Clipping
Computer Graphics - Windowing and ClippingChandrakantDivate1
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxMustafa Ahmed
 
Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...
Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...
Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...Christo Ananth
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...archanaece3
 
Independent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging StationIndependent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging Stationsiddharthteach18
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptjigup7320
 
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...AshwaniAnuragi1
 
Presentation on Slab, Beam, Column, and Foundation/Footing
Presentation on Slab,  Beam, Column, and Foundation/FootingPresentation on Slab,  Beam, Column, and Foundation/Footing
Presentation on Slab, Beam, Column, and Foundation/FootingEr. Suman Jyoti
 
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...ssuserdfc773
 
Fundamentals of Structure in C Programming
Fundamentals of Structure in C ProgrammingFundamentals of Structure in C Programming
Fundamentals of Structure in C ProgrammingChandrakantDivate1
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxKarpagam Institute of Teechnology
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Studentskannan348865
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptamrabdallah9
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfKira Dess
 

Recently uploaded (20)

Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Computer Graphics - Windowing and Clipping
Computer Graphics - Windowing and ClippingComputer Graphics - Windowing and Clipping
Computer Graphics - Windowing and Clipping
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...
Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...
Call for Papers - Journal of Electrical Systems (JES), E-ISSN: 1112-5209, ind...
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
Independent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging StationIndependent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging Station
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) ppt
 
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
 
Presentation on Slab, Beam, Column, and Foundation/Footing
Presentation on Slab,  Beam, Column, and Foundation/FootingPresentation on Slab,  Beam, Column, and Foundation/Footing
Presentation on Slab, Beam, Column, and Foundation/Footing
 
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
 
Fundamentals of Structure in C Programming
Fundamentals of Structure in C ProgrammingFundamentals of Structure in C Programming
Fundamentals of Structure in C Programming
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptx
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
 

DO 128 - 13 SCAFFOLDING SAFETY.pptx

  • 2. D E PA R T M E N T O R D E R N O . 1 2 8 S e r i e s o f 2 0 1 3 A M E N D I N G R U L E 1 4 1 4 O N S C A F F O L D I N G S O F T H E 1 9 8 9 O C C U PAT I O N A L H E A LT H A N D S A F E T Y S TA N D A R D S
  • 3. What is a scaffolding? INTRODUCTION It refers to a temporary or movable platform supported on the ground or suspended, used for access and/or working at considerable heights above ground.
  • 4. Working platform Platform and walking passage FUNCTIONS OF A SCAFFOLDING
  • 5. Classification of Scaffolds ⚬Supported Scaffolds ⚬Suspended Scaffolds
  • 7. ⚬Bamboo ⚬Trestle ⚬Form and Carpenter’s Bracket ⚬Roof Bracket ⚬Window Jack Supported Scaffolds
  • 8. ⚬ Two-point adjustable suspension ⚬ Single-point adjustable suspension Suspended Scaffolds
  • 9. ⚬ Design instruction shall be prepared by the end user. ⚬ Design shall be in accordance with recognized engineering principles. ⚬ Shall be designed with regard to ease and safety of erection and dismantling. ⚬ Supported scaffolds shall be capable of supporting without failure at least four (4) times the maximum intended load, while suspended scaffolds shall have six (6) times factor of safety. ⚬ All scaffolds designed by a structural engineer shall be approved by appropriate authority. DESIGN AND STABILITY DESIGN
  • 10. •Shall have vertical members(posts) diagonally and horizontally braced. •No splices between the points of support of load carrying horizontal members and secured to prevent lateral movement. •The footing, sills or anchorage – sound, rigid, and capable of carrying twice the maximum intended load. •Posts shall rest on a foundation of sufficient size and strength to spread the load from the posts. •Any damaged or weakened scaffold members shall be immediately repaired, replaced or discarded. STRENGTH & STABILITY DESIGN AND STABILITY
  • 11. •Not be overloaded for which they are intended. •Anchored or secured to permanent or rigid structures. •Components produced by different manufacturers shall not be intermixed unless the components fit together without force and the scaffold’s structural integrity is maintained by the user. •Front-end loaders and similar types of equipment shall not be used to support scaffold platforms unless they have been specifically designed by the manufacturer or such use. STRENGTH & STABILITY DESIGN AND STABILITY
  • 12. •Must be inspected either upon delivery or before it is erected/installed. •Any defective material shall be repaired, replaced or discarded. •Lumber with two (2) nail holes aligned crosswise or four (4) nail holes along its length shall not be used as horizontal load bearing member of scaffold INSPECTION OF SCAFFOLDS
  • 13. •Check ground conditions, overhead wires, obstructions, changes in surface elevation, and structural support. • Ensure the following in site preparation: • Soil are level and firm. • Mud and soft soil are replaced with compacted gravel or crushed stone. • On sloping grounds, the area where mudsills rest shall be leveled by excavating rather than backfilling SITE INSPECTION & PREPARATION
  • 14. •Direct supervision of a competent/qualified person as the case may be. •Maintained plumb regardless of connection. •Conform to the designer’s specification. •Runners shall be perpendicular to the posts. Spacing shall conform to the designed scaffold. •Diagonal braces shall extend from one connection to another. •Diagonal braces shall not exceed an angle of 60deg from horizontal. •Diagonal braces shall be installed immediately. SCAFFOLD ERECTION
  • 15. •All posts shall be joined or connected by means of joint pin, spigot or any appropriate means of connections. •Always maintain the base width to height ratio of 1:4 during installation for stability. •No scaffold activity shall be undertaken if the wind velocity exceeds 48 kph. •No work shall be allowed to commence below the scaffold. •Working platform shall be provided per level during erection. SCAFFOLD ERECTION
  • 16. •Scaffolds of more than 6 meters in height shall be designed by a structural engineer and shall be erected, installed and dismantled by TESDA certified erectors. •Scaffold shall be erected, added, altered or dismantled only under the supervision of the competent/qualified person in the construction. SCAFFOLD ERECTION
  • 17. ⚬ Performed by a qualified and competent person. ⚬ All manufactured scaffolds shall follow the manufacturers’ recommendations. • Direct connections shall be evaluated by a qualified or competent person who shall confirm. • Inspections should be carried out daily and every shift. INSPECTION & TAGGING
  • 18. •Identification tags – solid green, yellow, or red color with black lettering. •Tags shall be hanged in every scaffold access points. ■ Green tags – scaffolds access that have been inspected and are safe for use. ■ Yellow tags – special requirements for safe use are required and shall be closely supervised. ■ Red “DANGER – UNSAFE FOR USE” tags – used when all green or yellow tags has been removed. All the records of the inspections shall be available on site and made available to proper authority upon request. INSPECTION & TAGGING
  • 19. •Properly maintained, fixed and secured in position to prevent displacement. •Not to be used unless it is rendered stable, strong and safe for the purpose. •Left standing for four (4) months shall not be used until damaged members are replaced. MAINTENANCE DURING USE
  • 20. ⚬ Must be done by trained personnel. ⚬ Proceed in reverse order to its erection. ⚬ Workers should wear a safety harness and lanyard tied off to a secured anchor before attempting to loosen stuck or jammed parts. ⚬ Do not hammer or pry apart the scaffold components. ⚬ Do not throw scaffold components. SCAFFOLD DISMANTLING
  • 21. •All scaffolds shall be properly maintained, kept, clean, and free of damage. • Accessories requiring lubrication shall be oiled prior to storage in a covered or closed container, or as per manufacturer’s recommendation. MAINTENANCE & STORAGE
  • 22. BASIC CONSIDERATION ⚬The weight of workers, tools, materials and equipment to be carried by the scaffold system. ⚬Site conditions ⚬Height to which the scaffold may be erected. ⚬Type of work that will be done from the scaffold. SCAFFOLD AND TYPE SELECTIONS
  • 23. SCAFFOLD AND TYPE SELECTIONS BASIC CONSIDERATION ⚬Duration of work ⚬Weather conditions, including wind ⚬Requirements for pedestrian traffic through and under the scaffold area ⚬Means of access to the scaffold ⚬Configuration of the building or structure being worked on. ⚬Wind speed limit is 48kph (DO 128) and 40kph (International Practice)
  • 24. SCAFFOLD AND TYPE SELECTIONS SCAFFOLD CAPACITY ⚬Scaffolds must be capable of supporting its own weight and at least 4x the expected load. Expected load includes Live Load + Dead Load. SCAFFOLD LOAD RATINGS ⚬ The allowable working load of scaffolding is 3,450kg per leg [TESDA] ⚬ The allowable working load of scaffolding is 150 kg per sq. m [DO 128]
  • 25. OVERLOADING ⚬ Most frequent violations in scaffold practice. HOUSEKEEPING ⚬ Scaffold decks are usually small, narrow and confined. Debris and waste materials should not be allowed to collect on the platform. SAFETY
  • 26. SAFE SCAFFOLD USE ⚬Do not use damaged parts that affect the strength of the scaffold. ⚬Do not allow employees to work on scaffolds when they are feeling weak, sick, or dizzy. ⚬Do not work from any part of the scaffold other than the platform. ⚬Do not alter the scaffold. ⚬Do not move a scaffold horizontally while workers are on it, unless it is a mobile scaffold and the proper procedures are followed. ⚬Do not put more weight on a scaffold than it is designed to hold. SAFETY
  • 27. SAFE SCAFFOLD USE ⚬Do not allow employees to work on scaffolds covered slippery materials. ⚬Do not erect, use, alter, or move scaffolds within 10 feet of overhead power lines. ⚬Do not use shore or lean-to scaffolds. ⚬Do not swing loads near or on scaffolds unless you use a tag line. ⚬Do not work on scaffolds in bad weather or high winds unless the competent person decides that doing so is safe. ⚬Do not let extra material build up on the platforms. ⚬Do not use ladders, boxes, barrels, or other makeshift contraptions to raise your work height. SAFETY
  • 28. TRAINING & COMPETENCY Competent Person - responsible for determining the feasibility and safety of providing fall protection for personnel erecting, installing or dismantling scaffolds. ■ Must undergo the standard scaffold training and assessment prescribed by DOLE and TESDA. ■ Training Certificate from DOLE or its accredited safety training organization. ■ Holder of TESDA prescribed Scaffold Erection Certificate. ■ At least 2 years experience in scaffold erection.
  • 29. TRAINING & COMPETENCY Scaffold Erector ■ Must undergo the standard scaffold training and assessment prescribed by DOLE and TESDA. ■ One Day Workers Safety Orientation from DOLE or its accredited safety training organization. ■ Must be a holder of TESDA prescribed Scaffold Erection NC II

Editor's Notes

  1. 1.7.2013
  2. 1.7.2013
  3. 1.7.2013
  4. 1.7.2013
  5. 1.7.2013
  6. 1.7.2013
  7. 1.7.2013
  8. 1.7.2013
  9. 1.7.2013
  10. 1.7.2013
  11. 1.7.2013
  12. 1.7.2013
  13. 1.7.2013
  14. 1.7.2013
  15. 1.7.2013
  16. 1.7.2013
  17. 1.7.2013
  18. 1.7.2013
  19. 1.7.2013
  20. 1.7.2013
  21. 1.7.2013
  22. 1.7.2013
  23. 1.7.2013