SlideShare a Scribd company logo
1 of 1
SUMMARY EXPERIENCE
Joined Saipem S.p.A. since December 2005
Position: Subsea Umbilical Riser Flowline (SURF) Engineering Manager.
Skills:
 Engineering management in EPCI contracts and interface with Client.
 Riser design, subsea mechanical design, field development conceptual definition and subsea field
layout optimisation.
 Suppliers interface and management.
 Experienced user of specific analysis tools and software for global dynamic analysis of risers
systems (i.e. Flexcom, Orcaflex) and FEM computer programs for structural analysis (SACS,
Abaqus).
Involved in the following Projects/Bids:
 Lula EPCI project – PETROBRAS; Engineering Manager, from 05/2014 till now (Rio de Janeiro,
Brasil)
 Pre-Salt Sapinhoá EPCI project – PETROBRAS; Project Specialist Lead, from 11/2012 to 07/2014
(Fano, Italy)
 Gendalo-Gehem Bid – Chevron; Project Specialist Lead, from 09/2012 to 11/2012 (Fano, Italy)
 Martin Linge (HILD) Bid – TOTAL; Project Specialist Lead, from 04/2012 to 09/2012 (Fano, Italy)
 Pre-Salt Riser System Bid – PETROBRAS; Project Specialist Lead, from 09/2011 to 02/2012 (Fano,
Italy)
 Offshore IBLEO FEED – ENI; Project Specialist Lead; from 05/2011 to 10/2011 (Fano, Italy)
 Angola Block 15 Gas Gathering feasibility study – ENI; Project Specialist Lead, from 02/2011 to
06/2011 (Fano, Italy)
 MOHO Nord (Congo) feasibility study – Sofresid / TOTAL; Project Specialist Lead, from 12/2010 to
01/2011 (Fano, Italy)
 EGINA field development project (Nigeria) Bid – TOTAL Upstream Nigeria; Project Specialist, from
07/2010 to 12/2010 (Fano, Italy)
 Aquila Phase 2 (Italy) – ENI; Project Specialist, from 03/2010 to 06/2010 (Fano, Italy)
 OLT FSRU Livorno Project. Detail Engineering for EPICIC Contract (Italy) – OLT Livorno; Project
Specialist, from 04/2008 to 04/2010 (Fano, Italy)
 Olowi field development. Preliminary studies for flexible risers and umbilical design (Gabon) – CNRI;
Project Specialist, from 11/2007 to 06/2008 (Fano, Italy)
 West Delta Deep Marine Concession – Phase IV: Detail Engineering for EPCI Contract (Egypt) –
Burullus gas Company; Project Specialist, from 08/2006 to 11/2007 (Fano, Italy – Alexandria, Egypt)
 Sakhalin II Phase 2 Project (EPCI) (Russia) - SEIC; Project Specialist, from 02/2006 to 08/2006
(Fano, Italy)

More Related Content

Viewers also liked (11)

kiran Planning sche engineer CV
kiran Planning sche engineer CVkiran Planning sche engineer CV
kiran Planning sche engineer CV
 
Tanveer Sr Planning Engineer
Tanveer Sr Planning EngineerTanveer Sr Planning Engineer
Tanveer Sr Planning Engineer
 
Ahmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineerAhmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineer
 
JVB_Resume_2016-7-6
JVB_Resume_2016-7-6JVB_Resume_2016-7-6
JVB_Resume_2016-7-6
 
CV- Faraz Yasin, Planning Engineer 28-Nov-2016
CV- Faraz Yasin,  Planning Engineer 28-Nov-2016CV- Faraz Yasin,  Planning Engineer 28-Nov-2016
CV- Faraz Yasin, Planning Engineer 28-Nov-2016
 
Senior Planning Engineer.
Senior Planning Engineer.Senior Planning Engineer.
Senior Planning Engineer.
 
cv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineer
cv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineercv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineer
cv_attach_LAD_HANISH_B.E(MECH)_20yrsExp_maintenance_&_planning_Engineer
 
nizamuddinG Planning Engineer
nizamuddinG Planning EngineernizamuddinG Planning Engineer
nizamuddinG Planning Engineer
 
Planning Engineer CV
Planning Engineer CVPlanning Engineer CV
Planning Engineer CV
 
Sailesh CV-Planning Engineer
Sailesh CV-Planning EngineerSailesh CV-Planning Engineer
Sailesh CV-Planning Engineer
 
Planning engineer cv (mehtab)
Planning engineer cv (mehtab)Planning engineer cv (mehtab)
Planning engineer cv (mehtab)
 

Similar to SUMMARY EXPERIENCE 2016 (20)

CV of Re Bello - (BWE Denmark)
CV of Re Bello - (BWE Denmark)CV of Re Bello - (BWE Denmark)
CV of Re Bello - (BWE Denmark)
 
WebCruiter
WebCruiterWebCruiter
WebCruiter
 
WebCruiter
WebCruiterWebCruiter
WebCruiter
 
Cv inglese it
Cv inglese itCv inglese it
Cv inglese it
 
Cv paoloaguzzinov16
Cv paoloaguzzinov16Cv paoloaguzzinov16
Cv paoloaguzzinov16
 
cvPaoloAguzziNov16
cvPaoloAguzziNov16cvPaoloAguzziNov16
cvPaoloAguzziNov16
 
SR. SITE ENGINEER
SR. SITE ENGINEERSR. SITE ENGINEER
SR. SITE ENGINEER
 
SBCV2016
SBCV2016SBCV2016
SBCV2016
 
Update - CV[2 e] - --AIS
Update - CV[2 e] - --AISUpdate - CV[2 e] - --AIS
Update - CV[2 e] - --AIS
 
Curriculum Vitae v 7.0- Itamar Gelber
Curriculum Vitae v 7.0- Itamar GelberCurriculum Vitae v 7.0- Itamar Gelber
Curriculum Vitae v 7.0- Itamar Gelber
 
CV
CVCV
CV
 
Eagle LNG Terminal and Pipeline - Efficient solutions for the Balkans
Eagle LNG Terminal and Pipeline - Efficient solutions for the BalkansEagle LNG Terminal and Pipeline - Efficient solutions for the Balkans
Eagle LNG Terminal and Pipeline - Efficient solutions for the Balkans
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
Siemens_CV1
Siemens_CV1Siemens_CV1
Siemens_CV1
 
Giuseppe Esposito - AGUST 2016
Giuseppe Esposito - AGUST 2016Giuseppe Esposito - AGUST 2016
Giuseppe Esposito - AGUST 2016
 
Resume Nov/2011
Resume Nov/2011Resume Nov/2011
Resume Nov/2011
 
sharndencv
sharndencvsharndencv
sharndencv
 
MBEcurrEnglishRev7
MBEcurrEnglishRev7MBEcurrEnglishRev7
MBEcurrEnglishRev7
 
Akin Akinsipe CV.doc
Akin Akinsipe CV.docAkin Akinsipe CV.doc
Akin Akinsipe CV.doc
 
GW Amec Foster Wheeler
GW Amec Foster WheelerGW Amec Foster Wheeler
GW Amec Foster Wheeler
 

SUMMARY EXPERIENCE 2016

  • 1. SUMMARY EXPERIENCE Joined Saipem S.p.A. since December 2005 Position: Subsea Umbilical Riser Flowline (SURF) Engineering Manager. Skills:  Engineering management in EPCI contracts and interface with Client.  Riser design, subsea mechanical design, field development conceptual definition and subsea field layout optimisation.  Suppliers interface and management.  Experienced user of specific analysis tools and software for global dynamic analysis of risers systems (i.e. Flexcom, Orcaflex) and FEM computer programs for structural analysis (SACS, Abaqus). Involved in the following Projects/Bids:  Lula EPCI project – PETROBRAS; Engineering Manager, from 05/2014 till now (Rio de Janeiro, Brasil)  Pre-Salt Sapinhoá EPCI project – PETROBRAS; Project Specialist Lead, from 11/2012 to 07/2014 (Fano, Italy)  Gendalo-Gehem Bid – Chevron; Project Specialist Lead, from 09/2012 to 11/2012 (Fano, Italy)  Martin Linge (HILD) Bid – TOTAL; Project Specialist Lead, from 04/2012 to 09/2012 (Fano, Italy)  Pre-Salt Riser System Bid – PETROBRAS; Project Specialist Lead, from 09/2011 to 02/2012 (Fano, Italy)  Offshore IBLEO FEED – ENI; Project Specialist Lead; from 05/2011 to 10/2011 (Fano, Italy)  Angola Block 15 Gas Gathering feasibility study – ENI; Project Specialist Lead, from 02/2011 to 06/2011 (Fano, Italy)  MOHO Nord (Congo) feasibility study – Sofresid / TOTAL; Project Specialist Lead, from 12/2010 to 01/2011 (Fano, Italy)  EGINA field development project (Nigeria) Bid – TOTAL Upstream Nigeria; Project Specialist, from 07/2010 to 12/2010 (Fano, Italy)  Aquila Phase 2 (Italy) – ENI; Project Specialist, from 03/2010 to 06/2010 (Fano, Italy)  OLT FSRU Livorno Project. Detail Engineering for EPICIC Contract (Italy) – OLT Livorno; Project Specialist, from 04/2008 to 04/2010 (Fano, Italy)  Olowi field development. Preliminary studies for flexible risers and umbilical design (Gabon) – CNRI; Project Specialist, from 11/2007 to 06/2008 (Fano, Italy)  West Delta Deep Marine Concession – Phase IV: Detail Engineering for EPCI Contract (Egypt) – Burullus gas Company; Project Specialist, from 08/2006 to 11/2007 (Fano, Italy – Alexandria, Egypt)  Sakhalin II Phase 2 Project (EPCI) (Russia) - SEIC; Project Specialist, from 02/2006 to 08/2006 (Fano, Italy)