O slideshow foi denunciado.
Utilizamos seu perfil e dados de atividades no LinkedIn para personalizar e exibir anúncios mais relevantes. Altere suas preferências de anúncios quando desejar.

The Next Gen Program Analysis Infographic

638 visualizações

Publicada em

At Booz Allen Hamilton, we saw many of our clients languishing with dispersed program artifacts, slow and inaccurate analysis, and complex project issues that required a new generation of program analysis software. We created Polaris™ to be fully equipped with advanced features to help solve the most complex project issues.

Publicada em: Dados e análise
  • Seja o primeiro a comentar

  • Seja a primeira pessoa a gostar disto

The Next Gen Program Analysis Infographic

  1. 1. INTERFACE Polaris™ has an easy to use, intuitive interface and is fully equipped with a variety of data visualization views, such as the standard Gantt Chart view, Cost Phasing panel, and the Joint Confidence Level scatterplot. Innovate Forward The Next Generation of Program Analysis Innovate Forward At Booz Allen Hamilton, we saw many of our clients languishing with dispersed program artifacts, slow and inaccurate analysis, and complex project issues that required a new generation of program analysis software.We created Polaris™ to be fully equipped with advanced features to help solve the most complex project issues. 1 100 1000 3000 Schedule Lines (Complexity) Logarithmic Scale Duration(Seconds) 6000 10 Booz Allen Polaris™ Deltek® Acumen Risk Oracle® Primavera Risk Analysis 100 1000 10000 14.5 How much faster is Polaris™ ? Polaris™ is exponentially faster than other toolsfor both small and large schedule sizes. 76x 113x 105x 23x 50x Oracle® Primavera Risk Analysis: Deltek® Acumen Risk: Schedule Lines: 226x 228x 124x 1 100 1000 3000 Schedule Lines (Complexity) Logarithmic Scale Duration(Seconds) 6000 10 Booz Allen Polaris™ Deltek® Acumen Risk Oracle® Primavera Risk Analysis 100 1000 10000 14.5 How much faster is Polaris™ ? Polaris™ is exponentially faster than other toolsfor both small and large schedule sizes. 76x 113x 105x 23x 50x Oracle® Primavera Risk Analysis: Deltek® Acumen Risk: Schedule Lines: 226x 228x 124x FULL PROGRAM INTEGRATION Program Integration, or Analytical Program Management (APM), is a methodology pioneered by Booz Allen to fully integrate cost, schedule, and risk. Program Integration ensures that a program has compatible artifacts and allows projects to immediately determine the impacts of cost and schedule growth and their effect on one another. SPEED Built on Booz Allen’s RealTime Analytics technology, Polaris™ is the industry leader in Monte Carlo simulation run times, capable of running small and large complex schedules in seconds. TRAINING & CONSULTING SERVICES Program Integration is more than just a software or an approach. That is why, in keeping with our rich heritage in the management consulting industry, we work directly with our clients to provide in-depth Polaris™ training and our consulting services to adapt our program management methodology for the most effective solutions. 05.088.14D

×