12513-A6

NORTH ELEVATION
BISTRO
PARKING
EAST ELEVATION
ENGINEERING
ARCHITECTURE &
PLANNING
320-324 W. VALLEY BOULEVARD
SAN GABRIEL, CA, 91776
NORTH ELEVATION
SCALE: 3
32" = 1'-0"
EAST ELEVATION
SCALE: 3
32" = 1'-0"
ELEVATION NOTES
A- Stone veneer
B- Aluminum Storefront
C- Aluminum Entrance Door
D- Canopy
E- Metal Roof
F- Trellis
G- Building Signage
H- Steel Tower
I- Roof Garden
J- Stair to Roof
K- Planter
L- Parapet Coping
M- Cornice
N- Parking Entrance
O- Clear Story Window
P- Wall Paint Finished
ABCD EF C DG G HH I JK KL N OP
6
GROUP0DwgDWG121251312513.dwg, 9/22/2015 3:33:37 PM, DWG To PDF.pc3
1 de 1

Recomendados

C.V-Ayman por
C.V-Ayman  C.V-Ayman
C.V-Ayman Ayman design
470 visualizações5 slides
Pile Detail por
Pile DetailPile Detail
Pile DetailSARMAND R MAMAND
972 visualizações1 slide
Wael Portofolio___Dec_2016 REDUCED por
Wael Portofolio___Dec_2016 REDUCEDWael Portofolio___Dec_2016 REDUCED
Wael Portofolio___Dec_2016 REDUCEDwael elbana
159 visualizações15 slides
C.V.UP DATE por
C.V.UP DATEC.V.UP DATE
C.V.UP DATEMoataza Motawe
264 visualizações5 slides
Byron CV 2016v5 por
Byron CV 2016v5Byron CV 2016v5
Byron CV 2016v5Byron Correia
85 visualizações3 slides
Zeeshan.M Portfolio por
Zeeshan.M PortfolioZeeshan.M Portfolio
Zeeshan.M PortfolioZeeshan Mohammed
115 visualizações23 slides

Mais conteúdo relacionado

Mais procurados

cv mohamed mostafa 6 por
cv mohamed mostafa 6cv mohamed mostafa 6
cv mohamed mostafa 6mohamed mostafa
183 visualizações3 slides
Konstantinos.S.Brellas.Resume TN por
Konstantinos.S.Brellas.Resume TNKonstantinos.S.Brellas.Resume TN
Konstantinos.S.Brellas.Resume TN?????? ????????
107 visualizações1 slide
Building-Performance case study: Toondah Harbour, Cleveland por
Building-Performance case study: Toondah Harbour, ClevelandBuilding-Performance case study: Toondah Harbour, Cleveland
Building-Performance case study: Toondah Harbour, Clevelandbuildingperformance
361 visualizações7 slides
CURRICULUM VITAE1 por
CURRICULUM VITAE1CURRICULUM VITAE1
CURRICULUM VITAE1Yas Eid
26 visualizações2 slides
Ck21 presentation team 5 por
Ck21 presentation team 5Ck21 presentation team 5
Ck21 presentation team 5Campus
1.3K visualizações46 slides
construction manager 2015 por
construction manager 2015construction manager 2015
construction manager 2015Hassan gariesh
165 visualizações4 slides

Mais procurados(7)

cv mohamed mostafa 6 por mohamed mostafa
cv mohamed mostafa 6cv mohamed mostafa 6
cv mohamed mostafa 6
mohamed mostafa183 visualizações
Konstantinos.S.Brellas.Resume TN por ?????? ????????
Konstantinos.S.Brellas.Resume TNKonstantinos.S.Brellas.Resume TN
Konstantinos.S.Brellas.Resume TN
?????? ????????107 visualizações
Building-Performance case study: Toondah Harbour, Cleveland por buildingperformance
Building-Performance case study: Toondah Harbour, ClevelandBuilding-Performance case study: Toondah Harbour, Cleveland
Building-Performance case study: Toondah Harbour, Cleveland
buildingperformance361 visualizações
CURRICULUM VITAE1 por Yas Eid
CURRICULUM VITAE1CURRICULUM VITAE1
CURRICULUM VITAE1
Yas Eid26 visualizações
Ck21 presentation team 5 por Campus
Ck21 presentation team 5Ck21 presentation team 5
Ck21 presentation team 5
Campus1.3K visualizações
construction manager 2015 por Hassan gariesh
construction manager 2015construction manager 2015
construction manager 2015
Hassan gariesh165 visualizações

12513-A6

  • 1. NORTH ELEVATION BISTRO PARKING EAST ELEVATION ENGINEERING ARCHITECTURE & PLANNING 320-324 W. VALLEY BOULEVARD SAN GABRIEL, CA, 91776 NORTH ELEVATION SCALE: 3 32" = 1'-0" EAST ELEVATION SCALE: 3 32" = 1'-0" ELEVATION NOTES A- Stone veneer B- Aluminum Storefront C- Aluminum Entrance Door D- Canopy E- Metal Roof F- Trellis G- Building Signage H- Steel Tower I- Roof Garden J- Stair to Roof K- Planter L- Parapet Coping M- Cornice N- Parking Entrance O- Clear Story Window P- Wall Paint Finished ABCD EF C DG G HH I JK KL N OP 6 GROUP0DwgDWG121251312513.dwg, 9/22/2015 3:33:37 PM, DWG To PDF.pc3