PROFESIENAL EXPEREANCE
1. TECHNICAL PROJECT & INSPECTION DEPT. MANAGER (TPID) NATPET February 2014 - Now
• Managing A new Mega project in the plant.
• Accepting the challenge to manage and leading of the team to implement more than 55 Plant change in
T/A period of 30 days which succeeded.
• Leading my team to implement all small project within the budget available.
• Lead the inspection team to implement all the requirement of meridium and commission the program
with all history upload.
• Lead the inspection team to create the SAP system and involve all our required job through SAP and
uploading all the equipment data.
• Lead the team to complete all the tasks during T/A of 2015.
• Succeed to be the focal contact person to all the neighbor petrochemical affiliates in the area, royal
commission and vendors.
2. ETHYLENE II Manager October 2010- January 2014
• Building a new culture within the unit (operation & maintenance) based on the following :
We will maintain safe, healthy, environmental friendly and reliable operation
• Currently working on Ethylene unit Vision, mission and values.
• Generate 5 years training plan for U-210 operation staff.
• Introduce the idea of cross functional team. The idea is involve the operators in different teams with
different organization within the unit.
• Introduce the idea of work flow of all routine works in the unit. This is to ensure the quality and the
consistency of the unit work.
• Lead the operation unit to execute the shutdown, turnaround and start-up safely with zero incidents.
3. ETHYLENE II Senior Production Engineer January 2009 to October 2010
Projects:
• The Major Unit Turnaround and 2nd
De-bottle nicking Operation Engineer
 Leading the operation team activities
• Work list
• Blind list
• Tie-ins
• Shutdown procedure
• Environmental aspects
• Shutdown schedule
• Join the 2nd
expansion to the unit as operation/process engineer for the detail study and construction
stage in Netherland ( September 2009-October 2010)
 P&ID review
EXPERIENCE SUMMARY
ETHYLENE PROCESS ENGINEER
HOT SECTION ENGINEER (GAS CRAKER) * YEP PROJECT ENGINEER
PRE-COMMSSIONING & COMMISSONING ENGINEER
START-UP SHIFT ENGINEER
HOT & COLD SECTION ENGINEER (GAS/ LQUIED CRAKER)
ETHYLENE II Manager
TECHNICAL PROJECT & INSPECTION DEPT. MANAGER (TPID) NATPET
Ayman Shaikh Resume
 PFD review
 Final Design review
 Per-commissioning planning
 Standard Operating Procedure SOP review
 Operation team leader on Engineer/Operators Process Simulation Software
4. ETHYLENE II Production Engineer June-2005 to January 2009
1,050,000 Ton ETHYLENE PRODUCTION (GAS / LIQUID CRACKER)
Dealing with daily unit production, operation, problems and activities. Monitoring unit production, material
balance, chemical consumption and inventory.
Projects:
• Operation representative for Unit advance control project DMCplus for both Hot End and Cold End.
o Scope development
o Pre-testing
o Design review
o Commissioning
o Maintaining
5. ETHYLENE II Commissioning Engineer & Process Engineer January 2000 to June-2005
• Deal with the challenging task to Startup 760,000 Ton Ethylene unit on its initial startup with zero
incidents and injuries.
• Deal with the daily trouble shooting in the plant especially after the initial start up.
• Efficiency evaluation study of most of the equipments after the startup (i.e. major gas compressors, heat
exchangers, distillation towers…).
• Represent as project engineer at the 1st
expansion of the plant at 2005 to increase the plant capacity from
760,000 to 1,050,000 ton of ethylene annually production.
6. ETHYLENE II Site Engineer April 1999 to January 2000
Involved in all site activities:
• Drums & Towers internal inspection
• System punch out
• Team member on Loop, Logic and functional testing activities
• Heaters dry out
• Air blow
• Cold section dry out
• System pre-commissioning
• Handling coordination between ETHYLENE II and other units
• Mechanical acceptance team member
• Startup planning team member
7. INSPECTION ENGINEER Yanbu Refinery (ARAMCO) January 1998 to March
1999
The assignment was to monitor the on stream inspection program, review of the heat exchanger operation and
corrosion monitoring Program.
 OPERATION ENGINEER Yanbu Refinery (ARAMCO) February 1997
to December 1997
The assignment include close monitoring of process parameters, review of operating procedure and control of
operating parameters.
 CSD Engineer ARAMCO Dhahran August 1996 to January 1997
An engineer in Consulting Services Department at material and corrosion control division. the main contribution
was to study ARAMCO standards in corrosion and control corrosion by coating.
 Joined the team which was formalized to evaluate the main corrosion problems in ARAMCO Refineries.
Ayman Shaikh Resume
 ARAMCO August 1996 to March 1999
 Saudi Yanbu Petrochemical Company (YANPET) April 1999 to Now
TRAINING
 Managing affective turnaround and shutdown
 Advance Supervision
 Incident Investigation HAZOP
 PHA LEADER
 Basic Supervision
 Creative thinking
 Emotion intelligence
 First aid
 Fire fighting
 Plant engineering
 Protective coating
 Positive Thinking
 Operation of Steam turbine and Centrifugal Compressor
 RCA LEADERSHIP TRAINING
 Effective presentation Skills
 Strategic planning and goal setting
 Problem Solving and Decision Making
 Career in Management Gate 1
 Career in Management Gate 2
 Preventing Human Error
 Self, Time and Stress Management
 Business Simulation- Decision Based
 Finance for Non Finance Leaders
 The Seven Innovation Tools
 Internal Auditing
 The Looking Glass Experience
 Leading Successful Change
 Developing Leadership Skills
 Emergency Response Management
 Productive Business Conversations
COMPUTER SKILLS
 Microsoft Excel
 Microsoft Word
 Power Point
 Outlook
PERSONAL SKILLS
 Ability for working extra hours
 High energy, motivated and dependable
 Excellent communication skills and problem solving skills
 Fluent in English & Arabic language
 Ability to present and speech in popular.
EDUCATION
Bachelor of science in applied Chemical Engineering from King Fahad University of Petroleum and Minerals KFUPM
with major GPA 3.6 on scale of 4.0 June 1996.
Ayman Shaikh Resume
PERSINAL INFORMATION
Date of Birth: 22nd
June 1973
Office: +966-4-324-6258
Mobile: +966-505-314241
Email: ayman744@Gmail.com or ashaikh@natpet.com
Skype: aymanshaikh744

Mais conteúdo relacionado

Mais procurados

Praveen Kumar (Resume)
Praveen Kumar (Resume)Praveen Kumar (Resume)
Praveen Kumar (Resume)Praveen Kumar
 
engineer salama c.v
engineer salama c.vengineer salama c.v
engineer salama c.vsam .
 
PatrickHudginResume CV
PatrickHudginResume CVPatrickHudginResume CV
PatrickHudginResume CVPatrick Hudgin
 
Commissioning and Operations
Commissioning and OperationsCommissioning and Operations
Commissioning and OperationsAchal Gupta
 
Prasad_Naik__International 1
Prasad_Naik__International 1Prasad_Naik__International 1
Prasad_Naik__International 1Prasad naik
 
AZHAR ZAHOOR mech supervisor
AZHAR ZAHOOR mech supervisorAZHAR ZAHOOR mech supervisor
AZHAR ZAHOOR mech supervisorAzhar Zahoor
 
CURRICULUM VITAE - Victor Hugo Pelaez Hernandez - 15 Noviembre 2016
CURRICULUM VITAE - Victor Hugo Pelaez Hernandez - 15 Noviembre 2016CURRICULUM VITAE - Victor Hugo Pelaez Hernandez - 15 Noviembre 2016
CURRICULUM VITAE - Victor Hugo Pelaez Hernandez - 15 Noviembre 2016Victor Pelaez
 
Updated NEW SECCC1
Updated  NEW SECCC1Updated  NEW SECCC1
Updated NEW SECCC1Farhan Morai
 
Engr Nuhu Solomon Updated CV v1
Engr Nuhu Solomon Updated CV v1Engr Nuhu Solomon Updated CV v1
Engr Nuhu Solomon Updated CV v1Solomon Nuhu MNSE
 
David c brooks resume 06 2018
David c brooks resume 06 2018David c brooks resume 06 2018
David c brooks resume 06 2018David Brooks
 
Commissioning 12-11-13
Commissioning 12-11-13Commissioning 12-11-13
Commissioning 12-11-13jabralind
 
Engr Nuhu Solomon Updated CV v1
Engr Nuhu Solomon Updated CV v1Engr Nuhu Solomon Updated CV v1
Engr Nuhu Solomon Updated CV v1Solomon Nuhu MNSE
 

Mais procurados (20)

Praveen Kumar (Resume)
Praveen Kumar (Resume)Praveen Kumar (Resume)
Praveen Kumar (Resume)
 
Curriculum Vitae (2)
Curriculum Vitae (2)Curriculum Vitae (2)
Curriculum Vitae (2)
 
engineer salama c.v
engineer salama c.vengineer salama c.v
engineer salama c.v
 
Chandrasekaran
ChandrasekaranChandrasekaran
Chandrasekaran
 
PatrickHudginResume CV
PatrickHudginResume CVPatrickHudginResume CV
PatrickHudginResume CV
 
Commissioning and Operations
Commissioning and OperationsCommissioning and Operations
Commissioning and Operations
 
Resume of Srinivas
Resume of SrinivasResume of Srinivas
Resume of Srinivas
 
CV
CVCV
CV
 
Resume
ResumeResume
Resume
 
Prasad_Naik__International 1
Prasad_Naik__International 1Prasad_Naik__International 1
Prasad_Naik__International 1
 
AZHAR ZAHOOR mech supervisor
AZHAR ZAHOOR mech supervisorAZHAR ZAHOOR mech supervisor
AZHAR ZAHOOR mech supervisor
 
CURRICULUM VITAE - Victor Hugo Pelaez Hernandez - 15 Noviembre 2016
CURRICULUM VITAE - Victor Hugo Pelaez Hernandez - 15 Noviembre 2016CURRICULUM VITAE - Victor Hugo Pelaez Hernandez - 15 Noviembre 2016
CURRICULUM VITAE - Victor Hugo Pelaez Hernandez - 15 Noviembre 2016
 
Updated NEW SECCC1
Updated  NEW SECCC1Updated  NEW SECCC1
Updated NEW SECCC1
 
Engr Nuhu Solomon Updated CV v1
Engr Nuhu Solomon Updated CV v1Engr Nuhu Solomon Updated CV v1
Engr Nuhu Solomon Updated CV v1
 
David c brooks resume 06 2018
David c brooks resume 06 2018David c brooks resume 06 2018
David c brooks resume 06 2018
 
Commissioning 12-11-13
Commissioning 12-11-13Commissioning 12-11-13
Commissioning 12-11-13
 
Vincenzo Grassia CV
Vincenzo Grassia CVVincenzo Grassia CV
Vincenzo Grassia CV
 
Engr Nuhu Solomon Updated CV v1
Engr Nuhu Solomon Updated CV v1Engr Nuhu Solomon Updated CV v1
Engr Nuhu Solomon Updated CV v1
 
Vinod Singh_CV
Vinod Singh_CVVinod Singh_CV
Vinod Singh_CV
 
Steve Wonnacott Resume
Steve Wonnacott ResumeSteve Wonnacott Resume
Steve Wonnacott Resume
 

Destaque

Burner management systems
Burner management systemsBurner management systems
Burner management systemsemmasmith8866
 
On the large scale of studying dynamics with MEG: Lessons learned from the Hu...
On the large scale of studying dynamics with MEG: Lessons learned from the Hu...On the large scale of studying dynamics with MEG: Lessons learned from the Hu...
On the large scale of studying dynamics with MEG: Lessons learned from the Hu...Robert Oostenveld
 
Group analyses with FieldTrip
Group analyses with FieldTripGroup analyses with FieldTrip
Group analyses with FieldTripRobert Oostenveld
 
Btech_Fresher_2015_resume
Btech_Fresher_2015_resumeBtech_Fresher_2015_resume
Btech_Fresher_2015_resumeFarhath Baig
 
aliya company resume
aliya company resumealiya company resume
aliya company resumeNoor Banu
 
Ghousia Islam Resume updated
Ghousia Islam Resume updatedGhousia Islam Resume updated
Ghousia Islam Resume updatedGhousia Islam
 
Laila Naz Resume
 Laila Naz Resume Laila Naz Resume
Laila Naz ResumeLaila Naz
 
nusrat jahan cv with photo and sign
nusrat jahan cv with photo and signnusrat jahan cv with photo and sign
nusrat jahan cv with photo and signNusrat Jahan
 
HaseenaResume.doc
HaseenaResume.docHaseenaResume.doc
HaseenaResume.docsk haseena
 
Training process manual for wtp narmada
Training  process manual for wtp narmadaTraining  process manual for wtp narmada
Training process manual for wtp narmadaAKHILESH AHIRWAL
 
Laboratory role in petroleum industry
Laboratory role  in petroleum industryLaboratory role  in petroleum industry
Laboratory role in petroleum industryFouad Agamy
 
Scheduled Shutdown Maintenance
Scheduled Shutdown MaintenanceScheduled Shutdown Maintenance
Scheduled Shutdown Maintenancejdparfett
 

Destaque (19)

Burner management systems
Burner management systemsBurner management systems
Burner management systems
 
On the large scale of studying dynamics with MEG: Lessons learned from the Hu...
On the large scale of studying dynamics with MEG: Lessons learned from the Hu...On the large scale of studying dynamics with MEG: Lessons learned from the Hu...
On the large scale of studying dynamics with MEG: Lessons learned from the Hu...
 
Group analyses with FieldTrip
Group analyses with FieldTripGroup analyses with FieldTrip
Group analyses with FieldTrip
 
1 5
1 51 5
1 5
 
nazia
nazianazia
nazia
 
Shireen Awaud
Shireen AwaudShireen Awaud
Shireen Awaud
 
Btech_Fresher_2015_resume
Btech_Fresher_2015_resumeBtech_Fresher_2015_resume
Btech_Fresher_2015_resume
 
aliya company resume
aliya company resumealiya company resume
aliya company resume
 
Ghousia Islam Resume updated
Ghousia Islam Resume updatedGhousia Islam Resume updated
Ghousia Islam Resume updated
 
Laila Naz Resume
 Laila Naz Resume Laila Naz Resume
Laila Naz Resume
 
nusrat jahan cv with photo and sign
nusrat jahan cv with photo and signnusrat jahan cv with photo and sign
nusrat jahan cv with photo and sign
 
NAZIYA RESUME
NAZIYA RESUMENAZIYA RESUME
NAZIYA RESUME
 
HaseenaResume.doc
HaseenaResume.docHaseenaResume.doc
HaseenaResume.doc
 
Nazia(resume)
Nazia(resume)Nazia(resume)
Nazia(resume)
 
Training process manual for wtp narmada
Training  process manual for wtp narmadaTraining  process manual for wtp narmada
Training process manual for wtp narmada
 
Samreen resume 2016
Samreen resume 2016Samreen resume 2016
Samreen resume 2016
 
shaikh heena
shaikh heenashaikh heena
shaikh heena
 
Laboratory role in petroleum industry
Laboratory role  in petroleum industryLaboratory role  in petroleum industry
Laboratory role in petroleum industry
 
Scheduled Shutdown Maintenance
Scheduled Shutdown MaintenanceScheduled Shutdown Maintenance
Scheduled Shutdown Maintenance
 

Semelhante a Resume Ayman Shaikh

Semelhante a Resume Ayman Shaikh (20)

JEFF CV
JEFF CVJEFF CV
JEFF CV
 
Circulem viate
Circulem viateCirculem viate
Circulem viate
 
M.ZALNOUN
M.ZALNOUNM.ZALNOUN
M.ZALNOUN
 
vikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioningvikash kumar NOV 2014 - project - Commissioning
vikash kumar NOV 2014 - project - Commissioning
 
Maurice Ullman CV M
Maurice Ullman CV MMaurice Ullman CV M
Maurice Ullman CV M
 
ADEL's CV, 2016 -SHORT
ADEL's CV, 2016 -SHORT ADEL's CV, 2016 -SHORT
ADEL's CV, 2016 -SHORT
 
New Resume Francis Ellivera.. (1)
New Resume Francis Ellivera.. (1)New Resume Francis Ellivera.. (1)
New Resume Francis Ellivera.. (1)
 
RESUME - Abhay Paranjape
RESUME - Abhay ParanjapeRESUME - Abhay Paranjape
RESUME - Abhay Paranjape
 
CV
CVCV
CV
 
djm
djmdjm
djm
 
DSHCV 2016 March
DSHCV 2016 MarchDSHCV 2016 March
DSHCV 2016 March
 
Zhanyun Liu - CV standard
Zhanyun Liu - CV standardZhanyun Liu - CV standard
Zhanyun Liu - CV standard
 
Siswanto 30-05-2016
Siswanto 30-05-2016Siswanto 30-05-2016
Siswanto 30-05-2016
 
nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_nixon cv-Jan2016 _2_
nixon cv-Jan2016 _2_
 
CV_Ivan Shamonaev_Nov_2015
CV_Ivan Shamonaev_Nov_2015CV_Ivan Shamonaev_Nov_2015
CV_Ivan Shamonaev_Nov_2015
 
Paul Farnsworth Resume Updated Oct 15 doc
Paul Farnsworth Resume Updated Oct 15 docPaul Farnsworth Resume Updated Oct 15 doc
Paul Farnsworth Resume Updated Oct 15 doc
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
 
Curriculum Vitae BDP(rev)
Curriculum Vitae BDP(rev)Curriculum Vitae BDP(rev)
Curriculum Vitae BDP(rev)
 
Hussam Abdullah Alghamdi-Resume (Mechanical Engineer)
Hussam Abdullah Alghamdi-Resume (Mechanical Engineer)Hussam Abdullah Alghamdi-Resume (Mechanical Engineer)
Hussam Abdullah Alghamdi-Resume (Mechanical Engineer)
 
MY CV RESUME reviewed
MY CV RESUME reviewedMY CV RESUME reviewed
MY CV RESUME reviewed
 

Resume Ayman Shaikh

  • 1. Ayman Shaikh Resume Ayman Bandar Shaikh Yanbu Al-Saniyah, Natpet P.O.BOX 31469 Saudi Arabia PROFESIENAL EXPEREANCE 1. TECHNICAL PROJECT & INSPECTION DEPT. MANAGER (TPID) NATPET February 2014 - Now • Managing A new Mega project in the plant. • Accepting the challenge to manage and leading of the team to implement more than 55 Plant change in T/A period of 30 days which succeeded. • Leading my team to implement all small project within the budget available. • Lead the inspection team to implement all the requirement of meridium and commission the program with all history upload. • Lead the inspection team to create the SAP system and involve all our required job through SAP and uploading all the equipment data. • Lead the team to complete all the tasks during T/A of 2015. • Succeed to be the focal contact person to all the neighbor petrochemical affiliates in the area, royal commission and vendors. 2. ETHYLENE II Manager October 2010- January 2014 • Building a new culture within the unit (operation & maintenance) based on the following : We will maintain safe, healthy, environmental friendly and reliable operation • Currently working on Ethylene unit Vision, mission and values. • Generate 5 years training plan for U-210 operation staff. • Introduce the idea of cross functional team. The idea is involve the operators in different teams with different organization within the unit. • Introduce the idea of work flow of all routine works in the unit. This is to ensure the quality and the consistency of the unit work. • Lead the operation unit to execute the shutdown, turnaround and start-up safely with zero incidents. 3. ETHYLENE II Senior Production Engineer January 2009 to October 2010 Projects: • The Major Unit Turnaround and 2nd De-bottle nicking Operation Engineer  Leading the operation team activities • Work list • Blind list • Tie-ins • Shutdown procedure • Environmental aspects • Shutdown schedule • Join the 2nd expansion to the unit as operation/process engineer for the detail study and construction stage in Netherland ( September 2009-October 2010)  P&ID review EXPERIENCE SUMMARY ETHYLENE PROCESS ENGINEER HOT SECTION ENGINEER (GAS CRAKER) * YEP PROJECT ENGINEER PRE-COMMSSIONING & COMMISSONING ENGINEER START-UP SHIFT ENGINEER HOT & COLD SECTION ENGINEER (GAS/ LQUIED CRAKER) ETHYLENE II Manager TECHNICAL PROJECT & INSPECTION DEPT. MANAGER (TPID) NATPET
  • 2. Ayman Shaikh Resume  PFD review  Final Design review  Per-commissioning planning  Standard Operating Procedure SOP review  Operation team leader on Engineer/Operators Process Simulation Software 4. ETHYLENE II Production Engineer June-2005 to January 2009 1,050,000 Ton ETHYLENE PRODUCTION (GAS / LIQUID CRACKER) Dealing with daily unit production, operation, problems and activities. Monitoring unit production, material balance, chemical consumption and inventory. Projects: • Operation representative for Unit advance control project DMCplus for both Hot End and Cold End. o Scope development o Pre-testing o Design review o Commissioning o Maintaining 5. ETHYLENE II Commissioning Engineer & Process Engineer January 2000 to June-2005 • Deal with the challenging task to Startup 760,000 Ton Ethylene unit on its initial startup with zero incidents and injuries. • Deal with the daily trouble shooting in the plant especially after the initial start up. • Efficiency evaluation study of most of the equipments after the startup (i.e. major gas compressors, heat exchangers, distillation towers…). • Represent as project engineer at the 1st expansion of the plant at 2005 to increase the plant capacity from 760,000 to 1,050,000 ton of ethylene annually production. 6. ETHYLENE II Site Engineer April 1999 to January 2000 Involved in all site activities: • Drums & Towers internal inspection • System punch out • Team member on Loop, Logic and functional testing activities • Heaters dry out • Air blow • Cold section dry out • System pre-commissioning • Handling coordination between ETHYLENE II and other units • Mechanical acceptance team member • Startup planning team member 7. INSPECTION ENGINEER Yanbu Refinery (ARAMCO) January 1998 to March 1999 The assignment was to monitor the on stream inspection program, review of the heat exchanger operation and corrosion monitoring Program.  OPERATION ENGINEER Yanbu Refinery (ARAMCO) February 1997 to December 1997 The assignment include close monitoring of process parameters, review of operating procedure and control of operating parameters.  CSD Engineer ARAMCO Dhahran August 1996 to January 1997 An engineer in Consulting Services Department at material and corrosion control division. the main contribution was to study ARAMCO standards in corrosion and control corrosion by coating.  Joined the team which was formalized to evaluate the main corrosion problems in ARAMCO Refineries.
  • 3. Ayman Shaikh Resume  ARAMCO August 1996 to March 1999  Saudi Yanbu Petrochemical Company (YANPET) April 1999 to Now TRAINING  Managing affective turnaround and shutdown  Advance Supervision  Incident Investigation HAZOP  PHA LEADER  Basic Supervision  Creative thinking  Emotion intelligence  First aid  Fire fighting  Plant engineering  Protective coating  Positive Thinking  Operation of Steam turbine and Centrifugal Compressor  RCA LEADERSHIP TRAINING  Effective presentation Skills  Strategic planning and goal setting  Problem Solving and Decision Making  Career in Management Gate 1  Career in Management Gate 2  Preventing Human Error  Self, Time and Stress Management  Business Simulation- Decision Based  Finance for Non Finance Leaders  The Seven Innovation Tools  Internal Auditing  The Looking Glass Experience  Leading Successful Change  Developing Leadership Skills  Emergency Response Management  Productive Business Conversations COMPUTER SKILLS  Microsoft Excel  Microsoft Word  Power Point  Outlook PERSONAL SKILLS  Ability for working extra hours  High energy, motivated and dependable  Excellent communication skills and problem solving skills  Fluent in English & Arabic language  Ability to present and speech in popular. EDUCATION Bachelor of science in applied Chemical Engineering from King Fahad University of Petroleum and Minerals KFUPM with major GPA 3.6 on scale of 4.0 June 1996.