Design of transmission elements

shone john Há 5 anos

FEA Using Ansys

Radhakrishnan Ramkumar Há 10 anos

Nord-Lock Wedge-Locking Solutions

Nord-Lock Group Há 4 anos

Bp drill string failure

Hamidreza Shobeyri Há 5 anos

Slb drill string-failure

Hamidreza Shobeyri Há 5 anos

Wire rope design

gosavianiruddha Há 6 anos

Wire rope

ANA ISABEL R.R. Há 11 anos

residual stress measurement

Mangaldeep Mandal Há 8 anos

residual stress in welding

Jitendra Malav Há 11 anos

Drilling in mining

Eder Reyes Há 10 anos

Structures and Materials- Section 1 Statics

The Engineering Centre for Excellence in Teaching and Learning Há 13 anos

MECHANICS ENGINEERING - Equilibrium

Cik Aisyahfitrah Há 11 anos

Mechanical principles and applications pres

Dr Andrew Kimmance PhD, MSc, BSc, MAPM, CIOB, AHEA Há 7 anos

Trusses

Amr Hamed Há 14 anos