Abstract: Environmental Impact Assessment (EIA) is a tool used to identify the environmental, social and economic
impacts of a project prior to decision making. The process leads to the selection of the projects on the principle of
sustainable development, sothat the adverse effects ofthenewdevelopments are mitigatedthroughproactive andrational
decisionsmaking.Overthe years,EIA has not been practicedholistically in the developing countries and particularly in
South Asian Nations. However in the last few years Governments, environmentalists, researchers, media and
communities of these countries have formulated sufficient legislative and institutional frame work for the EIA. In this
paper, an overview of the EIA practices in developing countries and particularly South Asia, have been given, with
specialreference to the developments in Pakistan.The creationofawareness and formulating legislation has thus forced
the countries to abandon many developmental projects, which were detrimental to the environment Some of the basic
flaws in the EIA ofa mega project (Zero Point Interchange ProjectZPIP0have been highlighted..
Keywords:EnvironmentalImpact Assessment,economic impacts,South Asia.
1.0. INTRODUCTION Environmental Impact Assessment (EIA) is a systematic process to apply current scientific
knowledge to checkthe socialand environmentalconsequences ofprojects,policies and programs and device strategies
to mitigate their adverse impacts. EIA aims to predict the environmental impacts of the developmental activities at an
early stage in project planning&designingto find ways andmeans to reducetheiradverse impacts,shape projects to suit
the localenvironment and present optionsto decision-makers.
The international history of EIA dates back to the National Environmental Policy Act of the United States of America
(NEPA) in 1969. Following the US initiative,severalcountries implemented EIA systems,forexample Australia (1974),
Thailand (1975), France (1976), Philippines (1978), Israel (1981) and Pakistan (1983).
Three decades back,there seems very negligible policy and legislative framework for EIA in developingcountries,but
today,EIA is firmly establishedin the planningprocess in many ofthese countries.TheWorld Bank,AsianDevelopment
Bank and UNEP have developed guidelines forEIA in the developingcountries.The enforcement ofEIA guidelines in
these countriesis stilla big challenge andtheindividualefforts by various departments in these countries have notbrought
the desired results.The environmentalsustainability in the developing countries has notbeenassuredby theEIA.Hence
there is need to develop Strategic EnvironmentalAssessment(SEA).
Following discussed are the problems and issues relating to establishing EIA and SEA in the developingcountries with
specialreference toPakistan.Suggestionshavebeenmade toimprove thepolicy and institutionalframework.Some basic
flaws in the EIA ofa mega project namely Zero Point Interchange Project (ZPIP)have beenhighlightedat the end.
1.1.Constraints inimplementation of EIA procedure in Pakistan:
i. EIA implementation unit is often the subsidiary of the project management units in developing countries and
hence placed at verypriority.The relatively lowstatus oftheseagencies in the bureaucracymakes it difficult for
themto have sufficient influence to ensure effective implementationofthe EIA process.
ii. The EIA monitoring and Management units are lacking the qualified and trained human resource. There is a
shortage ofqualified environmentalengineers,ecologists andsocio-economists in many parts ofthedeveloping
countries.
iii. The project managersare oftenexpert in monitoring and executionofconstructionprojects,with very little orno
knowledge aboutthe Environmentalmonitoringandmanagement.Thereis a need to place the EIA as coresubject
in Civil Engineering and Project Management curriculum.
iv. A time limit is imposed on approvalofthe EIA to avoid project delays in public and private sectors.But due to
limited human resourcein the relevantdepartments and subsequent pressureon the agencies involved,the quality
of the reviewof EIA is not ofthe desired standards.
48 OIDA INTERNATIONAL JOURNAL OF SUSTAINABLE DEVELOPMENT VOL. 01:04
v. Public participation is an effective tool for the involvement of the basic stakeholders in the EIA process and
particularly the affected community. But unfortunately this process is often neglected. In some countries the
government is unwilling to have any form of public debate or scrutiny of its development policy. In other
countries,while there are no formal prohibitions,there are no mandatory requirements forpublic participation.
In most countries,affectedgroupsdo not have sufficientresources to participate in the process.
vi. The EnvironmentalImpact Statement(EIS)orEnvironmentalImpact Reportis notwellstandardized.The variety
of formats used by these countries makes the analysis and assessment of the developmental projects towards
environmentalimpact more difficult. The lack of baseline data and shortage ofrequisite information makes the
prediction ofthe potentialdevelopments on environment more difficult. Asian Development Banks (ADB)has
reported the following weaknessesin the EIA reports ofthe developing countries:
a assessment ofecologicalimpacts;
b analysis ofalternatives;
c economic analysisofenvironmentalimpacts; and
d Public participation.
vii.Finally, the environmentalmanagement plans proposed forimplementation ofthe recommendations ofthe EIA
report were usually inadequate both in terms oftheinstitutionalarrangements proposedand the fundingallocated.
2.0.EIA PROCESSIN PAKISTAN:
In Pakistan EIA startedwith the promulgationofPakistanEnvironmentalProtectionOrdinance(PEPO)of1983 (repealed
in 1997).The National Environmental Protection Act was enacted in 1997, which was followed by National
EnvironmentalPolicy in 2005. The ECNEC (Executive Committee of the NationalEconomic Council)decided in 2004,
that โ€œin case of development projects having environmental implication, an environmental impact assessment (EIA)
report should be submitted along with the project document at the time ofgetting approval.
The Pakistan EnvironmentalProtection Agencyis the main organization to evaluate andmonitorEIA.
The generic EIA processfollowed in Pakistan in shownin Fig.1.
Fig. 1: Current EIA process in Pakistan
2010 ENVIRONMENT IMPACT ASSESSMENT 49
2.1 Problems and issuesinEIA of developmental Projects inPakistan.
Like many othercountriesofthe SouthAsia,serious efforts have beenmade at policy and institutionallevels to develop
EIA studies for developmental projects in Pakistan, however the following issues as identified by Pak EPA (2000)
through consultation with the stakeholder,needs to be addressed:
i. Availability and reliability ofbaseline data:
The accuracyofthe anticipatedimpactsdepends ontheavailable base line dataandselectionofappropriate methods
and techniquesforprediction ofthe impacts owningto the proposeddevelopmentalactivities.The lackofbaselines
data about the existing environment is one of the major impediments to the quality of EIA studies. To solve this
problemmore research is required todevelopand enhance theexisting database andlinking ofthe available datafor
easy accessto researchers,throughNationalDatabase System.
ii. Lack ofstandardizationand disseminationofEIA procedures
The proceduresand methodsadopted forEIA are not standardized at Federaland provinciallevels and again these
are not well disseminated.There is a need touse allprint and electronic media besides internetandothersourcesfor
data sharing.
iii. Lack ofinstitutionalcapacity, trainedhumanresources and shortage ofnon-humanresources:
The exiting institutionalframework of the nation building departments is not sufficient to dealwith the volume of
EIA work and its review. The existing Environment Cells in the Planning and Development Departments at
provinciallevels are not having thedesired human andnon-human resources forthe implementation ofthe EMP.It
is required to clearly define the roles and responsibilities of these organs and one hand and provide them the
necessaryequipment and infrastructure on theotherhand.
iv. Poorimplementationand enforcement ofEIA
One can see some good EIA work at the planning stage,but its implementation has beenalways an uphilltaskdue
to potential pressure from the politicians and other influential groups. The lack of political will and poor
infrastructure at lowlevels makes the implementation of EIA, very difficult. The involvement ofcore stakeholders
at the lowest levelis essentialand it has been proposedthat theEIA may be involved throughthe TehsilMunicipal
Authority (TMA), monitored and controlled by Provincial EPA and evaluated by the Federal EPA for the
involvement ofstakeholders.
v. Weak public participationpractices:
The public Participation is considered as an important part of EIA process, for creating awareness and ownership
amongst the community andbasic stakeholders.
In Pakistan, the public participation process is most of the time a formality and the affected populations and
communities are not mobilized for their participation. The media persons, though appear in the process, but their
knowledge is often limited and they cannot guide the masses about the detrimental aspects of the projects. There
must be training and awarenessopportunities forthesebasic stakeholders and media people.
vi. Lack ofstandardsconsultancy servicesfor EnvironmentalAssessment.
The quality of services provided by the consultants for Environmental Assessment of developmental projects is
usually oflow quality and lacks the desired depth.Mostofthe consultancy firms in the EnvironmentalAssessment
at Pakistan are predominantly engineeringand design firms registered with Pakistan Engineering Council(PEC).
Their expertise and involvementin the Environmental Assessment (EA) of Projects has been very marginal. The
Environmental Assessment requires active collaboration of the multidisciplinary groups of experts to analyze a
variety of environmentalconsequences ofa project on naturalenvironment,built environment and socioeconomic
environment. The existing level of expertise with the consultants in Pakistan is superficial and cursory. Hence an
objective and realistic ES is rarely developed.The report is more focusedon gettingapprovalofthe project rather
50 OIDA INTERNATIONAL JOURNAL OF SUSTAINABLE DEVELOPMENT VOL. 01:04
than to highlight negative aspects ofthe projects and theirmitigation.The low capacity ofthe EPA (Pakistan)and
lack of awarenessofthe community,the EIA doesnโ€™t serve the purpose ofsoundplanning.
vii. Insufficient Judicial supportand lackoffinancialresources:
Despite ofthe facts that much legislation have been done in last two decades forEnvironmentalimprovement and
sustainability but the enforcement part is still lacking due to insufficient policy and institutional framework. The
lack of will on the part of political and public fabrics,require active perusalofthe judiciary towards cases relating
to environmentaldegradations.The recent judiciary role fordeveloping good governance in Pakistan is a hallmark
of the history of the country; however the Environment needs to be placed on top most agenda besides good
governance.
The Govt.must allocate sufficient fundsin the Public Sectordevelopment Program(PSDP),forthe capacitybuilding
ofthe human resources,acquisition oftoolsandequipmentandcollection ofdata primary data byresearchat various
levels.
Though there have been some serious efforts in developing countries during the last two decades to develop
compliance to environmentallegislation,yet the true benefits ofthese endeavors lie in the firm commitment on the
parts ofpoliticians,media and generalpublic to play theirdue roles in theseefforts.
In the following a case study of EIA of Zero Point-Interchange, a mega under construction project in Islamabad-
Pakistan has beendiscussedto highlight the weaknesses andshortcomings in the study.
3.0.ENVIRONMENTAL IMPACT ASSESSMENTOFZERO POINTINTERCHANGEISLAMABAD-PAKISTAN.
Islamabad is the capitalcity ofPakistan,which has beenplannedand designedontheprinciples ofmodern Town planning
and Urban Development.In last fewyears,the road networkofthe city has been improvedsubstantially and barrierfree
Avenues andunderpasses have been constructed.The Zero Point Interchange Project (ZPIP)is one ofthe mega projects
initiated by the CapitalDevelopment Authority (CDA)-Islamabad.The layoutofZIPPhas been given in Fig.2.
The salient featuresofthe ZIPare given as follows:
Client : Capital Development Authority,Islamabad-Pakistan.
Consultant : ECIL (Pvt.) Limited.
Contractor : MaqboolAssociates (Pvt.)Limited.
Locations : The Project is located at the intersection oftwo majorarterial roads in Islamabad i.e.
Islamabad Highway &Kashmir Highway.
Interchange Type: Cloverleaf Interchange
Project Cost: Pak Rs. 2.500 Billions (US$ 300 million)
Completion Period: 24 Months
Date of Commencement: September,2008
Date of Completion: September,2010
Defect Liability Period: 730 Days.
Fig 2. The layout ofZero Point Interchange
Project (ZPIP)-Islamabad-Pakistan.
[CDA,2010]
2010 ENVIRONMENT IMPACT ASSESSMENT 51
The following issues have been observed in the EIA studyofthe ZPIP:
i. The major objectionsraisedon the construction ofZero Point Interchange Islamabad,was that CapitalDevelopment
Authority(CDA)being proponent ofthe projectdidnot submit EnvironmentalImpact Assessment (EIA)report,a
mandatory requirement underSection 12of Pakistan EnvironmentalProtectionAct,1997 [12] in time and before
approvalofthe project.It was agreed thatthe EIA shallbe submitted byJan,2010 before major work is started,but it was
not complied with and major earthworkwas started wellbefore it.
ii. The Flora & Fauna,Light & Visual Pollution was not given due considerations.It was assumed that no trees will be cut
except papermulberry and eucalyptusandallothertrees,which fall in the constructionarea,will be replanted.But
unfortunately no such effortsare observedat site.
iii. It was also agreed thatroad safety andsignage measures forthe commuters will be ensured andnecessary mitigation
measures will be taken to construct the levelofdust pollution,but noefforts have been made forthat.
iv. It was ensured that the CapitalDevelopment Authority (CDA)pledged to plant 7,400 new trees at Zero Point Interchange
in place of 530 trees to be cut during construction activities,butno suchefforts have been initiated.
v. During Public hearing of the project,CDA had assured that.706 trees will be transplanted and 1000 indigenous trees
shallbe planted but the effortsare not seemingly
vi. Huge concrete workwas plannedandexecutedat various components ofZPIP,which has violated the principlesof
resource conservation. There could have beenbettersolutionin terms ofindigenous and environment friendly
designsand material.
vii. The ZPIP will severely affect the visualquality ofthe buildings in the adjoiningareas and many buildings have lost their
significance and uniquenessin the area.The access to many such buildings is again a major problem.
viii. On the economic side,the construction ofZPIPaftercompletion ofmany signalfree Avenues in Islamabad at a huge cost
of US$300 million is considered as a pre-mature project,where the diversion ofvehiculartraffic to othernewly
constructed arteriesin the city will make the ZPIP underutilized,aftercompletion.The opportunitycost ofthis investment
at the time, when the CDA and country is facing financialcrunch,is very high as many otherimportant housingand
building projects need finances.The housing problemofthe city has been worsening forthe last one decade,as noserious
efforts have beenmade to solve the problemon rational grounds.The money collected fromthe sales ofplots in housing
projects hasbeenspenton relatively insignificant projects,which shows the non-serious attitudes ofthe planners and
CDA executive management towardssolving thelong standinghousingproblem in the capitalcity of Pakistan.
ix. The quality ofEIA report later submitted to EPA,was regarded up to the desire by the concerned authorities,howeverthe
actualsuccess ofthe EIA would depend on thecompliance to various commitments exhibited in the report and EMPof
the EIA studies,which seems a remote possibility forZPIP.
Some of the damages inflectedto the environmentby ZPIPhas been shown in Fig.3.
a. Extensive deforestation b. severe damage to National Monument c. huge concrete works
52 OIDA INTERNATIONAL JOURNAL OF SUSTAINABLE DEVELOPMENT VOL. 01:04
d. Unnecessary use ofconcrete in pedestrian crossing.e.Visual quality of many building damaged f. huge earth &concrete
work.
Fig 3: The various environmental issues observed during execution of the ZPIP.
4.0.COMPARISON OF EIAs OF HYDROPOWER PROJECTS OF PAKISTAN:
CRITERIA RESULTS
With EIA studies Without EIA studies
Unsolved issues 1 0
Losses to humans and environment 2 0
Success of mitigation measures 2 0
Total 5 0
4.0.CONCLUSION
Sustainable built environmentrequiresequitable use ofnaturalresources to provide modern facilities to the people fortheirsocio-
economic development.The developing countriesrequire more physicaldevelopmentfortheireconomic uplift and alleviation of
poverty,butthe principlesofsustainable development needto be religiously followed.Despite ofvisible changes in the attitudesof
legislature,policy makers,media people and generalpublic towards environmentalimprovement,there is a need formore funding
and support forthe concernedorganization forthe improvement in the human resources andequipment forbettercompliance
towards the commitments in the EIA for developmentalprojects.
Zeropoint interchange Islamabad Pakistan

More Related Content

What's hot

STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA)
STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA)
STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) eAmbiente
ย 
Leadership Development Program Yields Results in Cรดte dโ€™Ivoire
Leadership Development Program Yields Results in Cรดte dโ€™IvoireLeadership Development Program Yields Results in Cรดte dโ€™Ivoire
Leadership Development Program Yields Results in Cรดte dโ€™IvoireMEASURE Evaluation
ย 
EIA: The state of art.
EIA: The state of art.EIA: The state of art.
EIA: The state of art.Tulsi Makwana
ย 
Growth Week 2011: Ideas for Growth Session 5 - Governance, Accountability and...
Growth Week 2011: Ideas for Growth Session 5 - Governance, Accountability and...Growth Week 2011: Ideas for Growth Session 5 - Governance, Accountability and...
Growth Week 2011: Ideas for Growth Session 5 - Governance, Accountability and...The International Growth Centre
ย 
Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...Ethical Sector
ย 
Health Impact Assessment
Health Impact AssessmentHealth Impact Assessment
Health Impact AssessmentBen Harris-Roxas
ย 
THS Joint Learning Network Case Study
THS Joint Learning Network Case StudyTHS Joint Learning Network Case Study
THS Joint Learning Network Case StudyThe Rockefeller Foundation
ย 
Environmental Impact Assessment and Meaningful Citizen Participation
Environmental Impact Assessment and Meaningful Citizen ParticipationEnvironmental Impact Assessment and Meaningful Citizen Participation
Environmental Impact Assessment and Meaningful Citizen ParticipationPublic Affairs Centre
ย 

What's hot (9)

Social Innovation Lab Guide
Social Innovation Lab GuideSocial Innovation Lab Guide
Social Innovation Lab Guide
ย 
STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA)
STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA)
STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA)
ย 
Leadership Development Program Yields Results in Cรดte dโ€™Ivoire
Leadership Development Program Yields Results in Cรดte dโ€™IvoireLeadership Development Program Yields Results in Cรดte dโ€™Ivoire
Leadership Development Program Yields Results in Cรดte dโ€™Ivoire
ย 
EIA: The state of art.
EIA: The state of art.EIA: The state of art.
EIA: The state of art.
ย 
Growth Week 2011: Ideas for Growth Session 5 - Governance, Accountability and...
Growth Week 2011: Ideas for Growth Session 5 - Governance, Accountability and...Growth Week 2011: Ideas for Growth Session 5 - Governance, Accountability and...
Growth Week 2011: Ideas for Growth Session 5 - Governance, Accountability and...
ย 
Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...
ย 
Health Impact Assessment
Health Impact AssessmentHealth Impact Assessment
Health Impact Assessment
ย 
THS Joint Learning Network Case Study
THS Joint Learning Network Case StudyTHS Joint Learning Network Case Study
THS Joint Learning Network Case Study
ย 
Environmental Impact Assessment and Meaningful Citizen Participation
Environmental Impact Assessment and Meaningful Citizen ParticipationEnvironmental Impact Assessment and Meaningful Citizen Participation
Environmental Impact Assessment and Meaningful Citizen Participation
ย 

Similar to Zeropoint interchange Islamabad Pakistan

Concepts in Participatory Monitoring and Evaluation
Concepts in Participatory Monitoring and Evaluation Concepts in Participatory Monitoring and Evaluation
Concepts in Participatory Monitoring and Evaluation Jo Balucanag - Bitonio
ย 
Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...
Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...
Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...Iwl Pcu
ย 
Environmental management
Environmental managementEnvironmental management
Environmental managementmunyemanaemmanuel
ย 
BDG_UNDEF_REVISED_FB 17.01 11
BDG_UNDEF_REVISED_FB 17.01 11BDG_UNDEF_REVISED_FB 17.01 11
BDG_UNDEF_REVISED_FB 17.01 11Nizam Al-Hussainy
ย 
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
 HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK... HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...Abraham Ncunge
ย 
Summary of findings - e-agriculture strategies in the ACP
Summary of findings - e-agriculture strategies in the ACPSummary of findings - e-agriculture strategies in the ACP
Summary of findings - e-agriculture strategies in the ACPNawsheen Hosenally
ย 
293_ILO_Preventing trafficking in girls and young women for labor_China
293_ILO_Preventing trafficking in girls and young women for labor_China293_ILO_Preventing trafficking in girls and young women for labor_China
293_ILO_Preventing trafficking in girls and young women for labor_ChinaMichael Midling
ย 
Evaluation of the SEA for the Dhaka Metropolitan Plan
Evaluation of the SEA for the Dhaka Metropolitan PlanEvaluation of the SEA for the Dhaka Metropolitan Plan
Evaluation of the SEA for the Dhaka Metropolitan PlanMatthew Cashmore
ย 
Alternative To Impact Evaluation Methods In Developing Countries A Case Stud...
Alternative To Impact Evaluation Methods In Developing Countries  A Case Stud...Alternative To Impact Evaluation Methods In Developing Countries  A Case Stud...
Alternative To Impact Evaluation Methods In Developing Countries A Case Stud...Emma Burke
ย 
Nbi draft 00 presentation oct 23 25, 2017
Nbi draft 00 presentation oct 23 25, 2017Nbi draft 00 presentation oct 23 25, 2017
Nbi draft 00 presentation oct 23 25, 2017Ogaro Lugard
ย 
Environment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentEnvironment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentArunAngadi5
ย 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessmentBimal Antony
ย 
Support to strengthen institutional capacity to monitor poverty - environment...
Support to strengthen institutional capacity to monitor poverty - environment...Support to strengthen institutional capacity to monitor poverty - environment...
Support to strengthen institutional capacity to monitor poverty - environment...HanaTiti
ย 
Environmental Alert presentation--strenpo annual review--fwd--4 dec2018
Environmental Alert presentation--strenpo annual review--fwd--4 dec2018Environmental Alert presentation--strenpo annual review--fwd--4 dec2018
Environmental Alert presentation--strenpo annual review--fwd--4 dec2018ENVIRONMENTALALERTEA1
ย 
Green gdp-accounting-pratice-in-china-draft-by-unep-tongji-team
Green gdp-accounting-pratice-in-china-draft-by-unep-tongji-teamGreen gdp-accounting-pratice-in-china-draft-by-unep-tongji-team
Green gdp-accounting-pratice-in-china-draft-by-unep-tongji-teamvhanamane
ย 

Similar to Zeropoint interchange Islamabad Pakistan (20)

Concepts in Participatory Monitoring and Evaluation
Concepts in Participatory Monitoring and Evaluation Concepts in Participatory Monitoring and Evaluation
Concepts in Participatory Monitoring and Evaluation
ย 
Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...
Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...
Role of Stakeholder Engagement in Integrated Water Management (A GEF Internat...
ย 
Environmental management
Environmental managementEnvironmental management
Environmental management
ย 
BDG_UNDEF_REVISED_FB 17.01 11
BDG_UNDEF_REVISED_FB 17.01 11BDG_UNDEF_REVISED_FB 17.01 11
BDG_UNDEF_REVISED_FB 17.01 11
ย 
World Bank IAG1_Aug1997
World Bank IAG1_Aug1997World Bank IAG1_Aug1997
World Bank IAG1_Aug1997
ย 
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
 HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK... HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
HOW PROJECT IMPACT ASSESSMENT OF THE ENVIRONMENT OF AN ORGANIZATION AND STAK...
ย 
Summary of findings - e-agriculture strategies in the ACP
Summary of findings - e-agriculture strategies in the ACPSummary of findings - e-agriculture strategies in the ACP
Summary of findings - e-agriculture strategies in the ACP
ย 
Summary of findings - e-agriculture strategies in the ACP
Summary of findings - e-agriculture strategies in the ACPSummary of findings - e-agriculture strategies in the ACP
Summary of findings - e-agriculture strategies in the ACP
ย 
293_ILO_Preventing trafficking in girls and young women for labor_China
293_ILO_Preventing trafficking in girls and young women for labor_China293_ILO_Preventing trafficking in girls and young women for labor_China
293_ILO_Preventing trafficking in girls and young women for labor_China
ย 
Evaluation of the SEA for the Dhaka Metropolitan Plan
Evaluation of the SEA for the Dhaka Metropolitan PlanEvaluation of the SEA for the Dhaka Metropolitan Plan
Evaluation of the SEA for the Dhaka Metropolitan Plan
ย 
Alternative To Impact Evaluation Methods In Developing Countries A Case Stud...
Alternative To Impact Evaluation Methods In Developing Countries  A Case Stud...Alternative To Impact Evaluation Methods In Developing Countries  A Case Stud...
Alternative To Impact Evaluation Methods In Developing Countries A Case Stud...
ย 
Nbi draft 00 presentation oct 23 25, 2017
Nbi draft 00 presentation oct 23 25, 2017Nbi draft 00 presentation oct 23 25, 2017
Nbi draft 00 presentation oct 23 25, 2017
ย 
Environment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentEnvironment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessment
ย 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
ย 
Water shed.ppt
Water shed.pptWater shed.ppt
Water shed.ppt
ย 
Support to strengthen institutional capacity to monitor poverty - environment...
Support to strengthen institutional capacity to monitor poverty - environment...Support to strengthen institutional capacity to monitor poverty - environment...
Support to strengthen institutional capacity to monitor poverty - environment...
ย 
Environmental Alert presentation--strenpo annual review--fwd--4 dec2018
Environmental Alert presentation--strenpo annual review--fwd--4 dec2018Environmental Alert presentation--strenpo annual review--fwd--4 dec2018
Environmental Alert presentation--strenpo annual review--fwd--4 dec2018
ย 
Green gdp-accounting-pratice-in-china-draft-by-unep-tongji-team
Green gdp-accounting-pratice-in-china-draft-by-unep-tongji-teamGreen gdp-accounting-pratice-in-china-draft-by-unep-tongji-team
Green gdp-accounting-pratice-in-china-draft-by-unep-tongji-team
ย 
APR Workshop 2010 Integrating M&E in project implementation-Pakistan-A.Karim
APR Workshop 2010 Integrating M&E in project implementation-Pakistan-A.KarimAPR Workshop 2010 Integrating M&E in project implementation-Pakistan-A.Karim
APR Workshop 2010 Integrating M&E in project implementation-Pakistan-A.Karim
ย 
APR Workshop 2010-M&E-Integratng monitoring and evaluation in project impleme...
APR Workshop 2010-M&E-Integratng monitoring and evaluation in project impleme...APR Workshop 2010-M&E-Integratng monitoring and evaluation in project impleme...
APR Workshop 2010-M&E-Integratng monitoring and evaluation in project impleme...
ย 

More from Ash Hassan

Procedure of hybridoma technology
Procedure of hybridoma technologyProcedure of hybridoma technology
Procedure of hybridoma technologyAsh Hassan
ย 
Impaired mitochondrial protein synthesis
Impaired mitochondrial protein synthesisImpaired mitochondrial protein synthesis
Impaired mitochondrial protein synthesisAsh Hassan
ย 
MONOCLONAL ANTIBODY PRODUCTION STRATEGY
MONOCLONAL ANTIBODY PRODUCTION STRATEGYMONOCLONAL ANTIBODY PRODUCTION STRATEGY
MONOCLONAL ANTIBODY PRODUCTION STRATEGYAsh Hassan
ย 
HUMAN DISEASES WITH IMPAIRED MITOCHONDRIAL PROTEIN SYNTHESIS
HUMAN DISEASES WITH IMPAIRED MITOCHONDRIAL PROTEIN SYNTHESISHUMAN DISEASES WITH IMPAIRED MITOCHONDRIAL PROTEIN SYNTHESIS
HUMAN DISEASES WITH IMPAIRED MITOCHONDRIAL PROTEIN SYNTHESISAsh Hassan
ย 
Fuel cells
Fuel cellsFuel cells
Fuel cellsAsh Hassan
ย 
ENDOPLASMIC RETICULUM DYSFUNCTION
ENDOPLASMIC RETICULUM DYSFUNCTIONENDOPLASMIC RETICULUM DYSFUNCTION
ENDOPLASMIC RETICULUM DYSFUNCTIONAsh Hassan
ย 
sustainable nitrogen management
sustainable nitrogen managementsustainable nitrogen management
sustainable nitrogen managementAsh Hassan
ย 
Pre processing of groundwater data
Pre processing of groundwater dataPre processing of groundwater data
Pre processing of groundwater dataAsh Hassan
ย 
Renewability of Nuclear Energy
Renewability of Nuclear EnergyRenewability of Nuclear Energy
Renewability of Nuclear EnergyAsh Hassan
ย 
Slaughter house policy
Slaughter house policySlaughter house policy
Slaughter house policyAsh Hassan
ย 
Agricultural biodiversity
Agricultural biodiversityAgricultural biodiversity
Agricultural biodiversityAsh Hassan
ย 
enviromental Policy
enviromental Policyenviromental Policy
enviromental PolicyAsh Hassan
ย 
Shampoo industry
Shampoo industryShampoo industry
Shampoo industryAsh Hassan
ย 
Metro cash and carry
Metro cash and carryMetro cash and carry
Metro cash and carryAsh Hassan
ย 
Integrating health and biodiversity
Integrating health and biodiversityIntegrating health and biodiversity
Integrating health and biodiversityAsh Hassan
ย 
Evaluation of shampoo
Evaluation of shampooEvaluation of shampoo
Evaluation of shampooAsh Hassan
ย 
Environmental policy
Environmental policyEnvironmental policy
Environmental policyAsh Hassan
ย 
Environmental managment
Environmental managmentEnvironmental managment
Environmental managmentAsh Hassan
ย 
Biofilms
BiofilmsBiofilms
BiofilmsAsh Hassan
ย 
Aldehydes
AldehydesAldehydes
AldehydesAsh Hassan
ย 

More from Ash Hassan (20)

Procedure of hybridoma technology
Procedure of hybridoma technologyProcedure of hybridoma technology
Procedure of hybridoma technology
ย 
Impaired mitochondrial protein synthesis
Impaired mitochondrial protein synthesisImpaired mitochondrial protein synthesis
Impaired mitochondrial protein synthesis
ย 
MONOCLONAL ANTIBODY PRODUCTION STRATEGY
MONOCLONAL ANTIBODY PRODUCTION STRATEGYMONOCLONAL ANTIBODY PRODUCTION STRATEGY
MONOCLONAL ANTIBODY PRODUCTION STRATEGY
ย 
HUMAN DISEASES WITH IMPAIRED MITOCHONDRIAL PROTEIN SYNTHESIS
HUMAN DISEASES WITH IMPAIRED MITOCHONDRIAL PROTEIN SYNTHESISHUMAN DISEASES WITH IMPAIRED MITOCHONDRIAL PROTEIN SYNTHESIS
HUMAN DISEASES WITH IMPAIRED MITOCHONDRIAL PROTEIN SYNTHESIS
ย 
Fuel cells
Fuel cellsFuel cells
Fuel cells
ย 
ENDOPLASMIC RETICULUM DYSFUNCTION
ENDOPLASMIC RETICULUM DYSFUNCTIONENDOPLASMIC RETICULUM DYSFUNCTION
ENDOPLASMIC RETICULUM DYSFUNCTION
ย 
sustainable nitrogen management
sustainable nitrogen managementsustainable nitrogen management
sustainable nitrogen management
ย 
Pre processing of groundwater data
Pre processing of groundwater dataPre processing of groundwater data
Pre processing of groundwater data
ย 
Renewability of Nuclear Energy
Renewability of Nuclear EnergyRenewability of Nuclear Energy
Renewability of Nuclear Energy
ย 
Slaughter house policy
Slaughter house policySlaughter house policy
Slaughter house policy
ย 
Agricultural biodiversity
Agricultural biodiversityAgricultural biodiversity
Agricultural biodiversity
ย 
enviromental Policy
enviromental Policyenviromental Policy
enviromental Policy
ย 
Shampoo industry
Shampoo industryShampoo industry
Shampoo industry
ย 
Metro cash and carry
Metro cash and carryMetro cash and carry
Metro cash and carry
ย 
Integrating health and biodiversity
Integrating health and biodiversityIntegrating health and biodiversity
Integrating health and biodiversity
ย 
Evaluation of shampoo
Evaluation of shampooEvaluation of shampoo
Evaluation of shampoo
ย 
Environmental policy
Environmental policyEnvironmental policy
Environmental policy
ย 
Environmental managment
Environmental managmentEnvironmental managment
Environmental managment
ย 
Biofilms
BiofilmsBiofilms
Biofilms
ย 
Aldehydes
AldehydesAldehydes
Aldehydes
ย 

Recently uploaded

NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...Amil baba
ย 
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdfTraining Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdfBasel Ahmed
ย 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...Call Girls in Nagpur High Profile
ย 
young Whatsapp Call Girls in Delhi Cantt๐Ÿ” 9953056974 ๐Ÿ” escort service
young Whatsapp Call Girls in Delhi Cantt๐Ÿ” 9953056974 ๐Ÿ” escort serviceyoung Whatsapp Call Girls in Delhi Cantt๐Ÿ” 9953056974 ๐Ÿ” escort service
young Whatsapp Call Girls in Delhi Cantt๐Ÿ” 9953056974 ๐Ÿ” escort service9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...SUHANI PANDEY
ย 
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Bookingtanu pandey
ย 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
Hot Call Girls |Delhi |Preet Vihar โ˜Ž 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar โ˜Ž 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar โ˜Ž 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar โ˜Ž 9711199171 Book Your One night Standkumarajju5765
ย 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...SUHANI PANDEY
ย 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
ย 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...SUHANI PANDEY
ย 
Horizon Net Zero Dawn โ€“ keynote slides by Ben Abraham
Horizon Net Zero Dawn โ€“ keynote slides by Ben AbrahamHorizon Net Zero Dawn โ€“ keynote slides by Ben Abraham
Horizon Net Zero Dawn โ€“ keynote slides by Ben Abrahamssuserbb03ff
ย 
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...Call Girls in Nagpur High Profile
ย 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7Call Girls in Nagpur High Profile Call Girls
ย 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...MOHANI PANDEY
ย 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...Call Girls in Nagpur High Profile
ย 
Types of Pollution Powerpoint presentation
Types of Pollution Powerpoint presentationTypes of Pollution Powerpoint presentation
Types of Pollution Powerpoint presentationmarygraceaque1
ย 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...tanu pandey
ย 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas๐Ÿ’ฅVictoria K. Colangelo
ย 

Recently uploaded (20)

NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
ย 
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdfTraining Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
ย 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
ย 
young Whatsapp Call Girls in Delhi Cantt๐Ÿ” 9953056974 ๐Ÿ” escort service
young Whatsapp Call Girls in Delhi Cantt๐Ÿ” 9953056974 ๐Ÿ” escort serviceyoung Whatsapp Call Girls in Delhi Cantt๐Ÿ” 9953056974 ๐Ÿ” escort service
young Whatsapp Call Girls in Delhi Cantt๐Ÿ” 9953056974 ๐Ÿ” escort service
ย 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
ย 
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Hot Call Girls |Delhi |Preet Vihar โ˜Ž 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar โ˜Ž 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar โ˜Ž 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar โ˜Ž 9711199171 Book Your One night Stand
ย 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
ย 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
ย 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
ย 
Horizon Net Zero Dawn โ€“ keynote slides by Ben Abraham
Horizon Net Zero Dawn โ€“ keynote slides by Ben AbrahamHorizon Net Zero Dawn โ€“ keynote slides by Ben Abraham
Horizon Net Zero Dawn โ€“ keynote slides by Ben Abraham
ย 
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
ย 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
ย 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
ย 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
ย 
Types of Pollution Powerpoint presentation
Types of Pollution Powerpoint presentationTypes of Pollution Powerpoint presentation
Types of Pollution Powerpoint presentation
ย 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
ย 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
ย 

Zeropoint interchange Islamabad Pakistan

  • 1. Abstract: Environmental Impact Assessment (EIA) is a tool used to identify the environmental, social and economic impacts of a project prior to decision making. The process leads to the selection of the projects on the principle of sustainable development, sothat the adverse effects ofthenewdevelopments are mitigatedthroughproactive andrational decisionsmaking.Overthe years,EIA has not been practicedholistically in the developing countries and particularly in South Asian Nations. However in the last few years Governments, environmentalists, researchers, media and communities of these countries have formulated sufficient legislative and institutional frame work for the EIA. In this paper, an overview of the EIA practices in developing countries and particularly South Asia, have been given, with specialreference to the developments in Pakistan.The creationofawareness and formulating legislation has thus forced the countries to abandon many developmental projects, which were detrimental to the environment Some of the basic flaws in the EIA ofa mega project (Zero Point Interchange ProjectZPIP0have been highlighted.. Keywords:EnvironmentalImpact Assessment,economic impacts,South Asia. 1.0. INTRODUCTION Environmental Impact Assessment (EIA) is a systematic process to apply current scientific knowledge to checkthe socialand environmentalconsequences ofprojects,policies and programs and device strategies to mitigate their adverse impacts. EIA aims to predict the environmental impacts of the developmental activities at an early stage in project planning&designingto find ways andmeans to reducetheiradverse impacts,shape projects to suit the localenvironment and present optionsto decision-makers. The international history of EIA dates back to the National Environmental Policy Act of the United States of America (NEPA) in 1969. Following the US initiative,severalcountries implemented EIA systems,forexample Australia (1974), Thailand (1975), France (1976), Philippines (1978), Israel (1981) and Pakistan (1983). Three decades back,there seems very negligible policy and legislative framework for EIA in developingcountries,but today,EIA is firmly establishedin the planningprocess in many ofthese countries.TheWorld Bank,AsianDevelopment Bank and UNEP have developed guidelines forEIA in the developingcountries.The enforcement ofEIA guidelines in these countriesis stilla big challenge andtheindividualefforts by various departments in these countries have notbrought the desired results.The environmentalsustainability in the developing countries has notbeenassuredby theEIA.Hence there is need to develop Strategic EnvironmentalAssessment(SEA). Following discussed are the problems and issues relating to establishing EIA and SEA in the developingcountries with specialreference toPakistan.Suggestionshavebeenmade toimprove thepolicy and institutionalframework.Some basic flaws in the EIA ofa mega project namely Zero Point Interchange Project (ZPIP)have beenhighlightedat the end. 1.1.Constraints inimplementation of EIA procedure in Pakistan: i. EIA implementation unit is often the subsidiary of the project management units in developing countries and hence placed at verypriority.The relatively lowstatus oftheseagencies in the bureaucracymakes it difficult for themto have sufficient influence to ensure effective implementationofthe EIA process. ii. The EIA monitoring and Management units are lacking the qualified and trained human resource. There is a shortage ofqualified environmentalengineers,ecologists andsocio-economists in many parts ofthedeveloping countries. iii. The project managersare oftenexpert in monitoring and executionofconstructionprojects,with very little orno knowledge aboutthe Environmentalmonitoringandmanagement.Thereis a need to place the EIA as coresubject in Civil Engineering and Project Management curriculum. iv. A time limit is imposed on approvalofthe EIA to avoid project delays in public and private sectors.But due to limited human resourcein the relevantdepartments and subsequent pressureon the agencies involved,the quality of the reviewof EIA is not ofthe desired standards.
  • 2. 48 OIDA INTERNATIONAL JOURNAL OF SUSTAINABLE DEVELOPMENT VOL. 01:04 v. Public participation is an effective tool for the involvement of the basic stakeholders in the EIA process and particularly the affected community. But unfortunately this process is often neglected. In some countries the government is unwilling to have any form of public debate or scrutiny of its development policy. In other countries,while there are no formal prohibitions,there are no mandatory requirements forpublic participation. In most countries,affectedgroupsdo not have sufficientresources to participate in the process. vi. The EnvironmentalImpact Statement(EIS)orEnvironmentalImpact Reportis notwellstandardized.The variety of formats used by these countries makes the analysis and assessment of the developmental projects towards environmentalimpact more difficult. The lack of baseline data and shortage ofrequisite information makes the prediction ofthe potentialdevelopments on environment more difficult. Asian Development Banks (ADB)has reported the following weaknessesin the EIA reports ofthe developing countries: a assessment ofecologicalimpacts; b analysis ofalternatives; c economic analysisofenvironmentalimpacts; and d Public participation. vii.Finally, the environmentalmanagement plans proposed forimplementation ofthe recommendations ofthe EIA report were usually inadequate both in terms oftheinstitutionalarrangements proposedand the fundingallocated. 2.0.EIA PROCESSIN PAKISTAN: In Pakistan EIA startedwith the promulgationofPakistanEnvironmentalProtectionOrdinance(PEPO)of1983 (repealed in 1997).The National Environmental Protection Act was enacted in 1997, which was followed by National EnvironmentalPolicy in 2005. The ECNEC (Executive Committee of the NationalEconomic Council)decided in 2004, that โ€œin case of development projects having environmental implication, an environmental impact assessment (EIA) report should be submitted along with the project document at the time ofgetting approval. The Pakistan EnvironmentalProtection Agencyis the main organization to evaluate andmonitorEIA. The generic EIA processfollowed in Pakistan in shownin Fig.1. Fig. 1: Current EIA process in Pakistan
  • 3. 2010 ENVIRONMENT IMPACT ASSESSMENT 49 2.1 Problems and issuesinEIA of developmental Projects inPakistan. Like many othercountriesofthe SouthAsia,serious efforts have beenmade at policy and institutionallevels to develop EIA studies for developmental projects in Pakistan, however the following issues as identified by Pak EPA (2000) through consultation with the stakeholder,needs to be addressed: i. Availability and reliability ofbaseline data: The accuracyofthe anticipatedimpactsdepends ontheavailable base line dataandselectionofappropriate methods and techniquesforprediction ofthe impacts owningto the proposeddevelopmentalactivities.The lackofbaselines data about the existing environment is one of the major impediments to the quality of EIA studies. To solve this problemmore research is required todevelopand enhance theexisting database andlinking ofthe available datafor easy accessto researchers,throughNationalDatabase System. ii. Lack ofstandardizationand disseminationofEIA procedures The proceduresand methodsadopted forEIA are not standardized at Federaland provinciallevels and again these are not well disseminated.There is a need touse allprint and electronic media besides internetandothersourcesfor data sharing. iii. Lack ofinstitutionalcapacity, trainedhumanresources and shortage ofnon-humanresources: The exiting institutionalframework of the nation building departments is not sufficient to dealwith the volume of EIA work and its review. The existing Environment Cells in the Planning and Development Departments at provinciallevels are not having thedesired human andnon-human resources forthe implementation ofthe EMP.It is required to clearly define the roles and responsibilities of these organs and one hand and provide them the necessaryequipment and infrastructure on theotherhand. iv. Poorimplementationand enforcement ofEIA One can see some good EIA work at the planning stage,but its implementation has beenalways an uphilltaskdue to potential pressure from the politicians and other influential groups. The lack of political will and poor infrastructure at lowlevels makes the implementation of EIA, very difficult. The involvement ofcore stakeholders at the lowest levelis essentialand it has been proposedthat theEIA may be involved throughthe TehsilMunicipal Authority (TMA), monitored and controlled by Provincial EPA and evaluated by the Federal EPA for the involvement ofstakeholders. v. Weak public participationpractices: The public Participation is considered as an important part of EIA process, for creating awareness and ownership amongst the community andbasic stakeholders. In Pakistan, the public participation process is most of the time a formality and the affected populations and communities are not mobilized for their participation. The media persons, though appear in the process, but their knowledge is often limited and they cannot guide the masses about the detrimental aspects of the projects. There must be training and awarenessopportunities forthesebasic stakeholders and media people. vi. Lack ofstandardsconsultancy servicesfor EnvironmentalAssessment. The quality of services provided by the consultants for Environmental Assessment of developmental projects is usually oflow quality and lacks the desired depth.Mostofthe consultancy firms in the EnvironmentalAssessment at Pakistan are predominantly engineeringand design firms registered with Pakistan Engineering Council(PEC). Their expertise and involvementin the Environmental Assessment (EA) of Projects has been very marginal. The Environmental Assessment requires active collaboration of the multidisciplinary groups of experts to analyze a variety of environmentalconsequences ofa project on naturalenvironment,built environment and socioeconomic environment. The existing level of expertise with the consultants in Pakistan is superficial and cursory. Hence an objective and realistic ES is rarely developed.The report is more focusedon gettingapprovalofthe project rather
  • 4. 50 OIDA INTERNATIONAL JOURNAL OF SUSTAINABLE DEVELOPMENT VOL. 01:04 than to highlight negative aspects ofthe projects and theirmitigation.The low capacity ofthe EPA (Pakistan)and lack of awarenessofthe community,the EIA doesnโ€™t serve the purpose ofsoundplanning. vii. Insufficient Judicial supportand lackoffinancialresources: Despite ofthe facts that much legislation have been done in last two decades forEnvironmentalimprovement and sustainability but the enforcement part is still lacking due to insufficient policy and institutional framework. The lack of will on the part of political and public fabrics,require active perusalofthe judiciary towards cases relating to environmentaldegradations.The recent judiciary role fordeveloping good governance in Pakistan is a hallmark of the history of the country; however the Environment needs to be placed on top most agenda besides good governance. The Govt.must allocate sufficient fundsin the Public Sectordevelopment Program(PSDP),forthe capacitybuilding ofthe human resources,acquisition oftoolsandequipmentandcollection ofdata primary data byresearchat various levels. Though there have been some serious efforts in developing countries during the last two decades to develop compliance to environmentallegislation,yet the true benefits ofthese endeavors lie in the firm commitment on the parts ofpoliticians,media and generalpublic to play theirdue roles in theseefforts. In the following a case study of EIA of Zero Point-Interchange, a mega under construction project in Islamabad- Pakistan has beendiscussedto highlight the weaknesses andshortcomings in the study. 3.0.ENVIRONMENTAL IMPACT ASSESSMENTOFZERO POINTINTERCHANGEISLAMABAD-PAKISTAN. Islamabad is the capitalcity ofPakistan,which has beenplannedand designedontheprinciples ofmodern Town planning and Urban Development.In last fewyears,the road networkofthe city has been improvedsubstantially and barrierfree Avenues andunderpasses have been constructed.The Zero Point Interchange Project (ZPIP)is one ofthe mega projects initiated by the CapitalDevelopment Authority (CDA)-Islamabad.The layoutofZIPPhas been given in Fig.2. The salient featuresofthe ZIPare given as follows: Client : Capital Development Authority,Islamabad-Pakistan. Consultant : ECIL (Pvt.) Limited. Contractor : MaqboolAssociates (Pvt.)Limited. Locations : The Project is located at the intersection oftwo majorarterial roads in Islamabad i.e. Islamabad Highway &Kashmir Highway. Interchange Type: Cloverleaf Interchange Project Cost: Pak Rs. 2.500 Billions (US$ 300 million) Completion Period: 24 Months Date of Commencement: September,2008 Date of Completion: September,2010 Defect Liability Period: 730 Days. Fig 2. The layout ofZero Point Interchange Project (ZPIP)-Islamabad-Pakistan. [CDA,2010]
  • 5. 2010 ENVIRONMENT IMPACT ASSESSMENT 51 The following issues have been observed in the EIA studyofthe ZPIP: i. The major objectionsraisedon the construction ofZero Point Interchange Islamabad,was that CapitalDevelopment Authority(CDA)being proponent ofthe projectdidnot submit EnvironmentalImpact Assessment (EIA)report,a mandatory requirement underSection 12of Pakistan EnvironmentalProtectionAct,1997 [12] in time and before approvalofthe project.It was agreed thatthe EIA shallbe submitted byJan,2010 before major work is started,but it was not complied with and major earthworkwas started wellbefore it. ii. The Flora & Fauna,Light & Visual Pollution was not given due considerations.It was assumed that no trees will be cut except papermulberry and eucalyptusandallothertrees,which fall in the constructionarea,will be replanted.But unfortunately no such effortsare observedat site. iii. It was also agreed thatroad safety andsignage measures forthe commuters will be ensured andnecessary mitigation measures will be taken to construct the levelofdust pollution,but noefforts have been made forthat. iv. It was ensured that the CapitalDevelopment Authority (CDA)pledged to plant 7,400 new trees at Zero Point Interchange in place of 530 trees to be cut during construction activities,butno suchefforts have been initiated. v. During Public hearing of the project,CDA had assured that.706 trees will be transplanted and 1000 indigenous trees shallbe planted but the effortsare not seemingly vi. Huge concrete workwas plannedandexecutedat various components ofZPIP,which has violated the principlesof resource conservation. There could have beenbettersolutionin terms ofindigenous and environment friendly designsand material. vii. The ZPIP will severely affect the visualquality ofthe buildings in the adjoiningareas and many buildings have lost their significance and uniquenessin the area.The access to many such buildings is again a major problem. viii. On the economic side,the construction ofZPIPaftercompletion ofmany signalfree Avenues in Islamabad at a huge cost of US$300 million is considered as a pre-mature project,where the diversion ofvehiculartraffic to othernewly constructed arteriesin the city will make the ZPIP underutilized,aftercompletion.The opportunitycost ofthis investment at the time, when the CDA and country is facing financialcrunch,is very high as many otherimportant housingand building projects need finances.The housing problemofthe city has been worsening forthe last one decade,as noserious efforts have beenmade to solve the problemon rational grounds.The money collected fromthe sales ofplots in housing projects hasbeenspenton relatively insignificant projects,which shows the non-serious attitudes ofthe planners and CDA executive management towardssolving thelong standinghousingproblem in the capitalcity of Pakistan. ix. The quality ofEIA report later submitted to EPA,was regarded up to the desire by the concerned authorities,howeverthe actualsuccess ofthe EIA would depend on thecompliance to various commitments exhibited in the report and EMPof the EIA studies,which seems a remote possibility forZPIP. Some of the damages inflectedto the environmentby ZPIPhas been shown in Fig.3. a. Extensive deforestation b. severe damage to National Monument c. huge concrete works
  • 6. 52 OIDA INTERNATIONAL JOURNAL OF SUSTAINABLE DEVELOPMENT VOL. 01:04 d. Unnecessary use ofconcrete in pedestrian crossing.e.Visual quality of many building damaged f. huge earth &concrete work. Fig 3: The various environmental issues observed during execution of the ZPIP. 4.0.COMPARISON OF EIAs OF HYDROPOWER PROJECTS OF PAKISTAN: CRITERIA RESULTS With EIA studies Without EIA studies Unsolved issues 1 0 Losses to humans and environment 2 0 Success of mitigation measures 2 0 Total 5 0 4.0.CONCLUSION Sustainable built environmentrequiresequitable use ofnaturalresources to provide modern facilities to the people fortheirsocio- economic development.The developing countriesrequire more physicaldevelopmentfortheireconomic uplift and alleviation of poverty,butthe principlesofsustainable development needto be religiously followed.Despite ofvisible changes in the attitudesof legislature,policy makers,media people and generalpublic towards environmentalimprovement,there is a need formore funding and support forthe concernedorganization forthe improvement in the human resources andequipment forbettercompliance towards the commitments in the EIA for developmentalprojects.